Capital Projects Dashboard - Citywide Budget and Schedule

All major capital infrastructure projects with a committed budget. Financial information and agency schedule details for each project are joined via FMS ID. Only projects in the design phase or later have project schedules displayed. This dataset is part of the Capital Projects Dashboard.

Note: Each row is uniquely identified by its Financial Management Service (FMS) ID. FMS ID is the unique ID that OMB uses for the FMS (Financial Information System). This ID can be universally joined with any OMB dataset that has the same field. The Capital Projects Dashboard is the result of joining OMB’s fiscal data with the agency’s schedule data. FMS IDs and agency projects don't always have a one-to-one relationship (i.e., one project schedule may correlate to multiple FMS IDs, and one FMS may correct to multiple projects with different schedules).

City Government Mayor's Office of Operations (OPS) Dataset fb86-vt7u 27 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4200
Fms Id
HWS2020XM
Total Budget
4848035.82
Spend To Date
3983550.92
Spend To Date 1
0.8216
Fms Project Name
Prior Notice Sidewalks- Manhattan & Bronx
Agency Project Name
Prior Notice Sidewalks- Manhattan & Bronx
Agency Project Description
PRIOR NOTICE SIDEWALKS - THE BRONX & MANHATTAN
Current Phase
(Completed)
Actual Design Start
2019-08-01T00:00:00.000
Actual Design End
2019-12-20T00:00:00.000
Actual Construction
2019-12-20T00:00:00.000
Actual Construction 1
2021-09-07T00:00:00.000
Actual Construction Start
2021-09-07T00:00:00.000
Actual Construction End
2023-02-24T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
HW-0200, P-1018
Ten Year Plan Category
SIDEWALK RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4201
Fms Id
HWS2021K
Total Budget
9415104.00
Spend To Date
148676.09
Spend To Date 1
0.0157
Fms Project Name
PRIOR NOTICE SIDEWALK - BROOKLYN
Agency Project Name
FY21 Prior Notice Sidewalks -Brooklyn
Agency Project Description
Prior Notice Sidewalks -Brooklyn
Current Phase
Construction
Current Phase Start
2023-08-07T00:00:00.000
Forecast Current Phase End
2025-02-01T00:00:00.000
Forecast Completion
2025-02-01T00:00:00.000
Actual Design Start
2021-12-08T00:00:00.000
Actual Design End
2022-05-20T00:00:00.000
Actual Construction
2022-05-20T00:00:00.000
Actual Construction 1
2023-08-07T00:00:00.000
Actual Construction Start
2023-08-07T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0200, HW-0200, P-1331
Ten Year Plan Category
SIDEWALK RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4202
Fms Id
HWS2020K1
Total Budget
11654913.59
Spend To Date
3297432.43
Spend To Date 1
0.2829
Fms Project Name
Prior Notice Sidewalks- Brooklyn
Agency Project Name
Prior Notice Sidewalks- Brooklyn
Agency Project Description
Prior Notice Sidewalks, Brooklyn
Current Phase
Construction
Current Phase Start
2022-08-08T00:00:00.000
Forecast Current Phase End
2024-02-03T00:00:00.000
Forecast Completion
2024-02-03T00:00:00.000
Actual Design Start
2019-07-30T00:00:00.000
Actual Design End
2022-02-04T00:00:00.000
Actual Construction
2022-02-04T00:00:00.000
Actual Construction 1
2022-08-08T00:00:00.000
Actual Construction Start
2022-08-08T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0200, HW-0200, P-1018
Ten Year Plan Category
SIDEWALK RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DSNY
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DSNY
Pid
4203
Fms Id
S216-415A
Total Budget
101266097.79
Spend To Date
95698175.06
Spend To Date 1
0.945
Fms Project Name
WEST 59th STREET MTS
Agency Project Name
West 59th St. MTS - Project 2
Agency Project Description
Project 2 Scope: Refurbishment of the existing pier building including: repair of existing pier structure including pile caps and fendering; construction of new emergency generator, electrical, mechanical, fire pump and fire valve rooms; new exit passageway construction and existing exit passageway refurbishment; re-arrangement and refurbishment of the Operations Building interiors; replacement of fire suppression system throughout the entire pier structure; mechanical, electrical and plumbing system upgrades; refurbishment and painting the existing pier interior steel framing and wall/roof surfaces; recoating the structure's exterior cladding systems including metal wall and roof panel system and translucent panel wall cladding system.
Current Phase
Construction
Current Phase Start
2015-05-20T00:00:00.000
Forecast Current Phase End
2023-09-30T00:00:00.000
Forecast Completion
2023-09-30T00:00:00.000
Actual Design Start
2012-01-17T00:00:00.000
Actual Design End
2014-06-30T00:00:00.000
Actual Construction
2014-06-30T00:00:00.000
Actual Construction 1
2015-05-20T00:00:00.000
Actual Construction Start
2015-05-20T00:00:00.000
Borough
Manhattan
Community Board
Manhattan, Manhattan 04, Manhattan 07
Budget Line
S-0216
Ten Year Plan Category
SOLID WASTE MANAGEMENT
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DHS
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DHS
Pid
4204
Fms Id
HH112BEES
Total Budget
27334709.49
Spend To Date
17293901.98
Spend To Date 1
0.6326
Fms Project Name
BELLEVUE - ELECT SVC UPGRADE
Agency Project Name
Bellevue Electrical Upgrade & New Generator
Agency Project Description
Project ID for bidding HH112BEES and HH112BEGE combined.
Current Phase
Construction
Current Phase Start
2019-05-10T00:00:00.000
Forecast Current Phase End
2024-07-12T00:00:00.000
Forecast Completion
2024-07-12T00:00:00.000
Actual Design Start
2016-07-22T00:00:00.000
Actual Design End
2018-01-11T00:00:00.000
Actual Construction
2018-01-11T00:00:00.000
Actual Construction 1
2019-05-10T00:00:00.000
Actual Construction Start
2019-05-10T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HH-0112
Ten Year Plan Category
SHELTERS FOR HOMELESS INDIVIDUALS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DCLA
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DCLA
Pid
4205
Fms Id
PV669-NPC
Total Budget
25519476.11
Spend To Date
2888333.61
Spend To Date 1
0.1131
Fms Project Name
NPC - Nuyorican Poets Cafe Renovation
Agency Project Name
Nuyorican Poets Cafe Renovation
Agency Project Description
Project is to rehabilitate the Nuyorican Poet’s Café facility for expanded spaces and ADA accessibility. The base scope of work includes renovation with new finishes, power, and lighting to accommodate three flexible classroom/rehearsal spaces. Additional staff office space and an additional publicly-accessible performance space will be created as part of this renovation.
Current Phase
Construction Procurement
Current Phase Start
2023-03-02T00:00:00.000
Forecast Current Phase End
2024-03-18T00:00:00.000
Forecast Completion
2026-03-18T00:00:00.000
Actual Design Start
2015-12-14T00:00:00.000
Actual Design End
2023-03-02T00:00:00.000
Actual Construction
2023-03-02T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 03
Budget Line
PV-0467, PV-0N669, PV-D467, PV-DN669, PV-I001, PV-MN669
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4206
Fms Id
REG-HP06
Total Budget
62513886.38
Spend To Date
21549171.97
Spend To Date 1
0.3447
Fms Project Name
RECONSTRUCTION OF REGULATOR HP-06
Agency Project Name
Reconstruction of Regulator HP06
Agency Project Description
Project REG-HP06 is for the reconstruction of Regulator HP06 . The work shall include, but is not limited to, the following items:1. Reconstruction of the existing Diversion Chamber (see attachment labeled 'REG-HP06 As-builts').2. Reconstruction of the existing Regulator Chamber (see attachment labeled 'REG-HP06 As-builts').3. Rehabilitation of the existing Interceptor (scope previously included in PS-312MX)4. Replacement of existing instrumentation and monitoring systems, as needed (i.e., sensors, probes, conduits, cables, etc.).5. Restoration of construction areas as needed (i.e., roadways, sidewalks, etc.)6. Implementation of an approved plan to maintain regulator and interceptor operations during construction.7. Shop drawings, as-built drawings, and equipment information.
Current Phase
Construction
Current Phase Start
2022-02-14T00:00:00.000
Forecast Current Phase End
2025-06-12T00:00:00.000
Forecast Completion
2025-06-12T00:00:00.000
Actual Design Start
2020-10-27T00:00:00.000
Actual Design End
2021-11-04T00:00:00.000
Actual Construction
2021-11-04T00:00:00.000
Actual Construction 1
2022-02-14T00:00:00.000
Actual Construction Start
2022-02-14T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
SE-0002X, WP-0169
Ten Year Plan Category
WATER QUALITY MANDATES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DHS
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DHS
Pid
4207
Fms Id
HH112CGIU
Total Budget
929227.88
Spend To Date
265246.60
Spend To Date 1
0.2854
Fms Project Name
Keener Assessment Shelter - Fire Alarm Upgrade
Agency Project Name
Keener Assessment Shelter: Fire Alarm Upgrade
Agency Project Description
Provide a new code compliant fire alarm system meet to meet FDNY and State OTDA standards.
Current Phase
Design
Current Phase Start
2018-01-03T00:00:00.000
Forecast Current Phase End
2024-07-05T00:00:00.000
Forecast Completion
2026-04-03T00:00:00.000
Actual Design Start
2018-01-03T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HH-0112
Ten Year Plan Category
SHELTERS FOR HOMELESS INDIVIDUALS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DCAS
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DCAS
Pid
4208
Fms Id
PW29310R
Total Budget
11444365.00
Spend To Date
560305.92
Spend To Date 1
0.0489
Fms Project Name
10 RICHMOND TERRACE - FIRE ALARM
Agency Project Name
10 RICHMOND TERRACE - FIRE ALARM
Agency Project Description
Provide new Fire Detection & Alarm system in in full compliance with the latest (2008/2014 or later) codes and install a sprinkler system throughout the Landmark building, including pumps.
Current Phase
Design
Current Phase Start
2022-07-08T00:00:00.000
Forecast Current Phase End
2024-04-23T00:00:00.000
Forecast Completion
2027-10-07T00:00:00.000
Actual Design Start
2022-07-08T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 01
Budget Line
PW-0293
Ten Year Plan Category
LEGAL MANDATES AND CORRECTION OF UNSAFE CONDITIONS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DCLA
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DCLA
Pid
4209
Fms Id
PV501BOIL
Total Budget
4130523.92
Spend To Date
3342513.84
Spend To Date 1
0.8092
Fms Project Name
PS1 - PS1 Boiler Replacement
Agency Project Name
MOMA PS1-BOILER REPLACEMENT
Agency Project Description
PS-1 MOMA Boiler Replacement and Lighting upgrade
Current Phase
Construction
Current Phase Start
2020-10-20T00:00:00.000
Forecast Current Phase End
2023-12-06T00:00:00.000
Forecast Completion
2023-12-06T00:00:00.000
Actual Design Start
2017-09-13T00:00:00.000
Actual Design End
2019-07-19T00:00:00.000
Actual Construction
2019-07-19T00:00:00.000
Actual Construction 1
2020-10-20T00:00:00.000
Actual Construction Start
2020-10-20T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
PV-0501
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-01-04T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DCAS
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DCAS
Pid
4210
Fms Id
CO299FIRE
Total Budget
23827348.53
Spend To Date
1260845.63
Spend To Date 1
0.0529
Fms Project Name
89-17 SUTPHIN BLVD - FIRE ALARM DESIGN & REPLACEMENT
Agency Project Name
Civil Courthouse:89-17 Sutphin BLVD,NY.FireAlarmUp
Agency Project Description
Queens Civil Courthouse at 89-17 Sutphin Blvd. - Fire alarm replacement. The goal of the project is to improve the building's life safety system and provide infrastructure for future office space renovations over the next 20 years.
Current Phase
Construction Procurement
Current Phase Start
2023-04-20T00:00:00.000
Forecast Current Phase End
2024-05-01T00:00:00.000
Forecast Completion
2027-04-28T00:00:00.000
Actual Design Start
2019-06-26T00:00:00.000
Actual Design End
2023-04-20T00:00:00.000
Actual Construction
2023-04-20T00:00:00.000
Borough
Queens
Community Board
Queens 01
Budget Line
CO-0299
Ten Year Plan Category
RECONSTRUCTION/RENOVATION OF COURT FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DCAS
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DCAS
Pid
4211
Fms Id
CO296RF
Total Budget
20905701.02
Spend To Date
956665.52
Spend To Date 1
0.0457
Fms Project Name
125-01 QUEENS BLVD.- ROOF
Agency Project Name
125-01 QUEENS BLVD.- ROOF
Agency Project Description
Queens County Criminal Court, Facade and Roof, 125-01 Queens Boulevard - Restore the façades and replace the roofs of the Main, Annex and DA Buildings to ensure weather-tightness and structural integrity.
Current Phase
Design
Current Phase Start
2018-09-18T00:00:00.000
Forecast Current Phase End
2024-05-31T00:00:00.000
Forecast Completion
2027-03-03T00:00:00.000
Actual Design Start
2018-09-18T00:00:00.000
Borough
Queens
Community Board
Queens 09
Budget Line
CO-0296
Ten Year Plan Category
RECONSTRUCTION/RENOVATION OF COURT FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DCLA
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DCLA
Pid
4212
Fms Id
PV291-QM2
Total Budget
38362841.67
Spend To Date
1031583.97
Spend To Date 1
0.0268
Fms Project Name
QMA - Queen's Museum of Art Expansion Phase II
Agency Project Name
Queens Museum of Art- Phase 2 Expansion
Agency Project Description
Queens Museum of Art - Phase 2
Current Phase
Design
Current Phase Start
2022-03-23T00:00:00.000
Forecast Current Phase End
2024-04-30T00:00:00.000
Forecast Completion
2027-04-20T00:00:00.000
Actual Design Start
2022-03-23T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
PV-0291, PV-D291, PV-D467, PV-Q291
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: QPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
QPL
Pid
4213
Fms Id
LQQBHHVAC
Total Budget
3046017.55
Spend To Date
550343.80
Spend To Date 1
0.1806
Fms Project Name
QUEENSBORO HILL - HVAC
Agency Project Name
Queensboro Hill HVAC Upgrade
Agency Project Description
Queensboro Hill Library HVAC system upgrade and related work.
Current Phase
Construction
Current Phase Start
2023-04-11T00:00:00.000
Forecast Current Phase End
2024-09-18T00:00:00.000
Forecast Completion
2024-09-18T00:00:00.000
Actual Design Start
2017-01-17T00:00:00.000
Actual Design End
2022-04-21T00:00:00.000
Actual Construction
2022-04-21T00:00:00.000
Actual Construction 1
2023-04-11T00:00:00.000
Actual Construction Start
2023-04-11T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
LQ-0122, LQ-0122, LQ-D122
Ten Year Plan Category
REPLACEMENT BRANCHES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4214
Fms Id
HWQ724B
Total Budget
64106435.73
Spend To Date
8151336.12
Spend To Date 1
0.1271
Fms Project Name
Recon of Streets in Brookville-Edgewood Triangle (SEQ200519)
Agency Project Name
Brookville Blvd and Edgewood Triangle (SEQ200519)
Agency Project Description
Reconstruct roadway and extend storm and sanitary sewers in portions of Brookville Boulevard, Edgewood Street, 147th Avenue, and adjacent streets west of 241st Street.
Current Phase
Design
Current Phase Start
2012-08-17T00:00:00.000
Forecast Current Phase End
2024-12-31T00:00:00.000
Forecast Completion
2030-10-13T00:00:00.000
Actual Design Start
2012-08-17T00:00:00.000
Borough
Queens
Community Board
Queens 13
Budget Line
HW-0001Q, HW-0061, HW-0200, HW-0200, HW-0724, TF-0002, TF-0502
Ten Year Plan Category
SIDEWALK RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4214
Fms Id
SEQ200519
Total Budget
61326225.94
Spend To Date
1469663.25
Spend To Date 1
0.0239
Fms Project Name
SEQ - Brookville-Edgewood Triangle West - Phase II (HWQ724B)
Agency Project Name
Brookville Blvd and Edgewood Triangle (SEQ200519)
Agency Project Description
Reconstruct roadway and extend storm and sanitary sewers in portions of Brookville Boulevard, Edgewood Street, 147th Avenue, and adjacent streets west of 241st Street.
Current Phase
Design
Current Phase Start
2012-08-17T00:00:00.000
Forecast Current Phase End
2024-12-31T00:00:00.000
Forecast Completion
2030-10-13T00:00:00.000
Actual Design Start
2012-08-17T00:00:00.000
Borough
Queens
Community Board
Queens 13
Budget Line
SE-0002Q, SE-0005, SE-0200Q, WM-0001
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4215
Fms Id
BED-794
Total Budget
55222361.57
Spend To Date
34332419.08
Spend To Date 1
0.6217
Fms Project Name
DUMBO/Vinegar Hill Area Reconstruction & Plaza. HWKKP005
Agency Project Name
DUMBO / VINEGAR HILL AREA-Phase II / BED-794
Agency Project Description
Reconstruction DUMBO/Vinegar Hill Area including Trunk and Distribution water main replacement; Installation of HLSS and Combined Sewer replacement; Restoration of Belgian block in Water Street; Street lighting and Traffic Signal work.
Current Phase
Construction
Current Phase Start
2019-01-07T00:00:00.000
Forecast Current Phase End
2024-06-04T00:00:00.000
Forecast Completion
2024-06-04T00:00:00.000
Actual Design Start
2012-06-07T00:00:00.000
Actual Design End
2017-12-29T00:00:00.000
Actual Construction
2017-12-29T00:00:00.000
Actual Construction 1
2019-01-07T00:00:00.000
Actual Construction Start
2019-01-07T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 02, Brooklyn 06
Budget Line
WM-0001, WM-0006
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4215
Fms Id
HWKKP005
Total Budget
75952294.77
Spend To Date
41055157.03
Spend To Date 1
0.5405
Fms Project Name
DUMBO D.M.A. - VINEGAR HILL AREA, BED-794,SANDHWK05
Agency Project Name
DUMBO / VINEGAR HILL AREA-Phase II / BED-794
Agency Project Description
Reconstruction DUMBO/Vinegar Hill Area including Trunk and Distribution water main replacement; Installation of HLSS and Combined Sewer replacement; Restoration of Belgian block in Water Street; Street lighting and Traffic Signal work.
Current Phase
Construction
Current Phase Start
2019-01-07T00:00:00.000
Forecast Current Phase End
2024-06-04T00:00:00.000
Forecast Completion
2024-06-04T00:00:00.000
Actual Design Start
2012-06-07T00:00:00.000
Actual Design End
2017-12-29T00:00:00.000
Actual Construction
2017-12-29T00:00:00.000
Actual Construction 1
2019-01-07T00:00:00.000
Actual Construction Start
2019-01-07T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 02
Budget Line
HW-0001K, HW-0944, TF-0002
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4215
Fms Id
SANDHWK05
Total Budget
2499357.54
Spend To Date
367754.34
Spend To Date 1
0.1471
Agency Project Name
DUMBO / VINEGAR HILL AREA-Phase II / BED-794
Agency Project Description
Reconstruction DUMBO/Vinegar Hill Area including Trunk and Distribution water main replacement; Installation of HLSS and Combined Sewer replacement; Restoration of Belgian block in Water Street; Street lighting and Traffic Signal work.
Current Phase
Construction
Current Phase Start
2019-01-07T00:00:00.000
Forecast Current Phase End
2024-06-04T00:00:00.000
Forecast Completion
2024-06-04T00:00:00.000
Actual Design Start
2012-06-07T00:00:00.000
Actual Design End
2017-12-29T00:00:00.000
Actual Construction
2017-12-29T00:00:00.000
Actual Construction 1
2019-01-07T00:00:00.000
Actual Construction Start
2019-01-07T00:00:00.000
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4216
Fms Id
HWR1140A
Total Budget
25069651.37
Spend To Date
3978267.75
Spend To Date 1
0.1586
Fms Project Name
ARTHUR KILL ROAD (PHASE I) - CLARKE AVE, RICHMOD AV, RED-366
Agency Project Name
Reconstruction of Arthur Kill Road, Phase I
Agency Project Description
Reconstruction of Arthur Kill Rd from Clark Avenue to Richmond Avenue including widening of roadway
Current Phase
Design
Current Phase Start
2016-12-16T00:00:00.000
Forecast Current Phase End
2023-11-30T00:00:00.000
Forecast Completion
2028-06-30T00:00:00.000
Actual Design Start
2016-12-16T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 03
Budget Line
HW-0061, HW-0200, HW-0200, HW-1140, HW-D104, TF-0002, TF-0502
Ten Year Plan Category
SIDEWALK RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4216
Fms Id
RED-366
Total Budget
24395366.00
Spend To Date
17583.42
Spend To Date 1
0.0007
Fms Project Name
WM WORK ARTHUR KILL RD BTW RICHMOND & ABINGTON AVE HWR1140A
Agency Project Name
Reconstruction of Arthur Kill Road, Phase I
Agency Project Description
Reconstruction of Arthur Kill Rd from Clark Avenue to Richmond Avenue including widening of roadway
Current Phase
Design
Current Phase Start
2016-12-16T00:00:00.000
Forecast Current Phase End
2023-11-30T00:00:00.000
Forecast Completion
2028-06-30T00:00:00.000
Actual Design Start
2016-12-16T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 03
Budget Line
SE-0002R, SE-0200R, SE-0432, WM-0001
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4217
Fms Id
SANDRDHK
Total Budget
120578000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Red Hook HMGP
Agency Project Name
RED HOOK INTEGRATED FLOOD PROTECTION SYSTEM
Agency Project Description
Reconstruction of Beard Street in the Red Hook neighborhood of Brooklyn, including raising the streets, reconstruction of roadway, curbs and sidewalk, and installing a new bulkhead and floodwall along the waterfront. The reconstruction/raising for Beard Street will cover two blocks (Van Brunt St. to Dwight St).
Current Phase
Design
Current Phase Start
2019-08-19T00:00:00.000
Forecast Current Phase End
2024-07-31T00:00:00.000
Forecast Completion
2027-04-30T00:00:00.000
Actual Design Start
2019-08-19T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
PU-0100
Ten Year Plan Category
MISCELLANEOUS ENERGY EFFICIENCY AND SUSTAINABILITY
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4217
Fms Id
SEK002390
Total Budget
1304000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Guniting of Outfall Sewers on Wolcott St BKLYN, SANDRDHK
Agency Project Name
RED HOOK INTEGRATED FLOOD PROTECTION SYSTEM
Agency Project Description
Reconstruction of Beard Street in the Red Hook neighborhood of Brooklyn, including raising the streets, reconstruction of roadway, curbs and sidewalk, and installing a new bulkhead and floodwall along the waterfront. The reconstruction/raising for Beard Street will cover two blocks (Van Brunt St. to Dwight St).
Current Phase
Design
Current Phase Start
2019-08-19T00:00:00.000
Forecast Current Phase End
2024-07-31T00:00:00.000
Forecast Completion
2027-04-30T00:00:00.000
Actual Design Start
2019-08-19T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 06
Budget Line
SE-0002K
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4218
Fms Id
BED-784
Total Budget
38469081.27
Spend To Date
30408395.52
Spend To Date 1
0.7904
Fms Project Name
RECON OF WM I& STORM SWR IN BERGEN AVE AREA
Agency Project Name
RECONSTRUCTION OF BERGEN AVE AREA, BKLYN/BED-784
Agency Project Description
Reconstruction of Bergen Avenue Area, including Storm Sewers, Water Mains, Street Lighting, Traffic Signal Work, and reconstruction of new outfall at East Mill Basin.
Current Phase
(Completed)
Actual Design Start
2012-12-03T00:00:00.000
Actual Design End
2017-09-21T00:00:00.000
Actual Construction
2017-09-21T00:00:00.000
Actual Construction 1
2019-02-25T00:00:00.000
Actual Construction Start
2019-02-25T00:00:00.000
Actual Construction End
2023-06-24T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 18
Budget Line
SE-0200K, WM-0001
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4218
Fms Id
HWK614D
Total Budget
37172881.00
Spend To Date
29070013.07
Spend To Date 1
0.782
Fms Project Name
RECONSTRUCTION OF BERGEN AVENUE AREA, BKLYN /BED-784
Agency Project Name
RECONSTRUCTION OF BERGEN AVE AREA, BKLYN/BED-784
Agency Project Description
Reconstruction of Bergen Avenue Area, including Storm Sewers, Water Mains, Street Lighting, Traffic Signal Work, and reconstruction of new outfall at East Mill Basin.
Current Phase
(Completed)
Actual Design Start
2012-12-03T00:00:00.000
Actual Design End
2017-09-21T00:00:00.000
Actual Construction
2017-09-21T00:00:00.000
Actual Construction 1
2019-02-25T00:00:00.000
Actual Construction Start
2019-02-25T00:00:00.000
Actual Construction End
2023-06-24T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 18
Budget Line
HW-0001K, HW-0200, HW-0614
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4219
Fms Id
HWXS711
Total Budget
10049362.84
Spend To Date
1050285.05
Spend To Date 1
0.1045
Fms Project Name
RECONSTRUCTION OF STEP STREET AT DAVIDSON AVE (SEX002272)
Agency Project Name
RECONSTRUCTION OF STEP ST AT DAVIDSON AVE
Agency Project Description
RECONSTRUCTION OF DAVIDSON AVE STEP STREET, BRONX. THE PROJECT WILL PERFORM A REPLACEMENT-IN-KIND OF THE DAVIDSON AVE STEP ST. LOCATED AT DAVIDSON AVE BETWEEN FEATHERBED LANE AND WEST 174TH ST. THE GRANITE STEPS ARE HIGHLY UNEVEN DUE TO EROSION AND ARE AT RISK OF DESTABILIZING THE STRUCTURE. THE JOINTS ARE IN POOR CONDITION WITH CRACKING, SPALLING AND SURROUNDING VOIDS. PORTIONS OF THE EXISTING RAILINGS ARE MISSING OR HAVE DISCONNECTED FROM THE BASE. THE PURPOSE OF THIS RECONSTRUCTION PROJECT IS TO PERFORM A REPLACEMENT-IN-KIND OF THE STEP STREET.
Current Phase
Design
Current Phase Start
2019-01-29T00:00:00.000
Forecast Current Phase End
2024-06-30T00:00:00.000
Forecast Completion
2027-03-24T00:00:00.000
Actual Design Start
2019-01-29T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
HW-0211, HW-0211
Ten Year Plan Category
RECONSTRUCTION OF STEP STREETS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4219
Fms Id
SEX002272
Total Budget
267000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Combined SE Replacement in Davidson Avenue. Bronx (HWXS711)
Agency Project Name
RECONSTRUCTION OF STEP ST AT DAVIDSON AVE
Agency Project Description
RECONSTRUCTION OF DAVIDSON AVE STEP STREET, BRONX. THE PROJECT WILL PERFORM A REPLACEMENT-IN-KIND OF THE DAVIDSON AVE STEP ST. LOCATED AT DAVIDSON AVE BETWEEN FEATHERBED LANE AND WEST 174TH ST. THE GRANITE STEPS ARE HIGHLY UNEVEN DUE TO EROSION AND ARE AT RISK OF DESTABILIZING THE STRUCTURE. THE JOINTS ARE IN POOR CONDITION WITH CRACKING, SPALLING AND SURROUNDING VOIDS. PORTIONS OF THE EXISTING RAILINGS ARE MISSING OR HAVE DISCONNECTED FROM THE BASE. THE PURPOSE OF THIS RECONSTRUCTION PROJECT IS TO PERFORM A REPLACEMENT-IN-KIND OF THE STEP STREET.
Current Phase
Design
Current Phase Start
2019-01-29T00:00:00.000
Forecast Current Phase End
2024-06-30T00:00:00.000
Forecast Completion
2027-03-24T00:00:00.000
Actual Design Start
2019-01-29T00:00:00.000
Borough
Bronx
Community Board
Bronx 05
Budget Line
SE-0002X
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4220
Fms Id
P-102DELV
Total Budget
25728979.14
Spend To Date
4929467.52
Spend To Date 1
0.1915
Fms Project Name
Del Valle Square X009-111M
Agency Project Name
Reconstruction of Del Valle Square, Bronx
Agency Project Description
RECONSTRUCTION OF DEL VALLE SQUARE - UPGRADE & EXPAND EXISTING PLAZA AND ENHANCE PEDESTRIAN SAFETY AND IMPROVE A COMMUNITY PUBLIC SPACE
Current Phase
Construction
Current Phase Start
2022-11-14T00:00:00.000
Forecast Current Phase End
2025-11-12T00:00:00.000
Forecast Completion
2025-11-12T00:00:00.000
Actual Design Start
2016-10-19T00:00:00.000
Actual Design End
2021-12-22T00:00:00.000
Actual Construction
2021-12-22T00:00:00.000
Actual Construction 1
2022-11-14T00:00:00.000
Actual Construction Start
2022-11-14T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
HW-0001X, HW-0200, HW-0944, HW-1684, TF-0002
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4221
Fms Id
SEBLQX01
Total Budget
11138364.27
Spend To Date
1638364.27
Spend To Date 1
0.147
Fms Project Name
Reconstruction of existing sewers from back log QN & BX
Agency Project Name
RECONSTRUCTION OF EXISTING SEWERS, BRONX
Agency Project Description
Reconstruction of Existing Sewers from Backlog. Queens and Bronx
Current Phase
Design
Current Phase Start
2018-12-12T00:00:00.000
Forecast Current Phase End
2023-12-15T00:00:00.000
Forecast Completion
2025-06-27T00:00:00.000
Actual Design Start
2018-12-12T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
SE-0002Q, SE-0002X
Ten Year Plan Category
REPLACEMENT OF CHRONICALLY FAILING COMPONENTS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4222
Fms Id
EC-SEKN24
Total Budget
9511000.00
Spend To Date
7421.40
Spend To Date 1
0.0007
Fms Project Name
Reconstruction of Existing Sewers, North Brooklyn
Agency Project Name
Reconstruction of Existing Sewers
Agency Project Description
Reconstruction of Existing Sewers, Emergency Contract - North Brooklyn.
Current Phase
Construction Procurement
Current Phase Start
2023-08-03T00:00:00.000
Forecast Current Phase End
2024-06-26T00:00:00.000
Forecast Completion
2025-06-25T00:00:00.000
Actual Design Start
2023-01-19T00:00:00.000
Actual Design End
2023-08-03T00:00:00.000
Actual Construction
2023-08-03T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
EP-0007, SE-0002K
Ten Year Plan Category
UTILITY RELOCATION FOR SE AND WM PROJECTS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4223
Fms Id
EC-SEQN24
Total Budget
12056000.00
Spend To Date
56000.00
Spend To Date 1
0.0046
Fms Project Name
Reconstruction of Existing Sewers, North Queens.
Agency Project Name
Reconstruction of Existing Sewers
Agency Project Description
Reconstruction of Existing Sewers, North Queens
Current Phase
Construction Procurement
Current Phase Start
2023-07-20T00:00:00.000
Forecast Current Phase End
2024-07-23T00:00:00.000
Forecast Completion
2025-07-22T00:00:00.000
Actual Design Start
2023-03-15T00:00:00.000
Actual Design End
2023-07-20T00:00:00.000
Actual Construction
2023-07-20T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
EP-0007, SE-0002Q
Ten Year Plan Category
UTILITY RELOCATION FOR SE AND WM PROJECTS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4224
Fms Id
EC-SEKS24
Total Budget
10544000.00
Spend To Date
32475.60
Spend To Date 1
0.003
Fms Project Name
Reconstruction of Existing Sewers, South Brooklyn
Agency Project Name
Reconstruction of Existing Sewers
Agency Project Description
Reconstruction of Existing Sewers, South Brooklyn
Current Phase
Construction Procurement
Current Phase Start
2023-06-30T00:00:00.000
Forecast Current Phase End
2024-01-10T00:00:00.000
Forecast Completion
2025-01-08T00:00:00.000
Actual Design Start
2023-01-13T00:00:00.000
Actual Design End
2023-06-30T00:00:00.000
Actual Construction
2023-06-30T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
EP-0007, SE-0002K
Ten Year Plan Category
UTILITY RELOCATION FOR SE AND WM PROJECTS
Agency Data Date
2024-01-04T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4225
Fms Id
EC-SEQS24
Total Budget
13500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Reconstruction of Existing Sewers, South Queens
Agency Project Name
Reconstruction of Existing Sewers
Agency Project Description
Reconstruction of Existing Sewers, South Queens
Current Phase
Construction Procurement
Current Phase Start
2023-07-17T00:00:00.000
Forecast Current Phase End
2024-03-18T00:00:00.000
Forecast Completion
2025-03-17T00:00:00.000
Actual Design Start
2023-01-30T00:00:00.000
Actual Design End
2023-07-17T00:00:00.000
Actual Construction
2023-07-17T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
EP-0007, SE-0002Q
Ten Year Plan Category
UTILITY RELOCATION FOR SE AND WM PROJECTS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4226
Fms Id
EC-SEX24
Total Budget
7025000.00
Spend To Date
25000.00
Spend To Date 1
0.0035
Fms Project Name
Reconstruction of Existing Sewers, The Bronx
Agency Project Name
Reconstruction of Existing Sewers
Agency Project Description
Reconstruction of Existing Sewers, the Bronx
Current Phase
Construction Procurement
Current Phase Start
2023-07-07T00:00:00.000
Forecast Current Phase End
2024-04-29T00:00:00.000
Forecast Completion
2025-04-28T00:00:00.000
Actual Design Start
2023-02-13T00:00:00.000
Actual Design End
2023-07-07T00:00:00.000
Actual Construction
2023-07-07T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
EP-0007, SE-0002X
Ten Year Plan Category
UTILITY RELOCATION FOR SE AND WM PROJECTS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4227
Fms Id
SANDHW08
Total Budget
34324518.74
Spend To Date
14055276.23
Spend To Date 1
0.4094
Fms Project Name
Reconstruction of Front Street-Hurricane Sandy
Agency Project Name
RECONSTRUCTION OF FRONT STREET, MANHATTAN
Agency Project Description
Reconstruction of Front Street, Manhattan
Current Phase
Construction
Current Phase Start
2019-10-21T00:00:00.000
Forecast Current Phase End
2024-06-30T00:00:00.000
Forecast Completion
2024-06-30T00:00:00.000
Actual Design Start
2015-07-31T00:00:00.000
Actual Design End
2018-05-02T00:00:00.000
Actual Construction
2018-05-02T00:00:00.000
Actual Construction 1
2019-10-21T00:00:00.000
Actual Construction Start
2019-10-21T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HW-0001M, HW-0944, SE-0002M
Ten Year Plan Category
REPLACEMENT OF CHRONICALLY FAILING COMPONENTS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: HPD
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
HPD
Pid
4228
Fms Id
BED-805
Total Budget
15875568.95
Spend To Date
12392948.20
Spend To Date 1
0.7806
Fms Project Name
New Storm & San Swrs & WM-Gateway Estates, Phase E (HD-161E)
Agency Project Name
GATEWAY ESTATE - PHASE E/BED-805
Agency Project Description
Reconstruction of Gateway Estates Area (Nehemiah Creek) including sewer, watermain, street lighting and traffic signal work. Phase E
Current Phase
Construction
Current Phase Start
2016-09-22T00:00:00.000
Forecast Current Phase End
2024-06-30T00:00:00.000
Forecast Completion
2024-06-30T00:00:00.000
Actual Design Start
2013-11-17T00:00:00.000
Actual Design End
2015-02-11T00:00:00.000
Actual Construction
2015-02-11T00:00:00.000
Actual Construction 1
2016-09-22T00:00:00.000
Actual Construction Start
2016-09-22T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 05
Budget Line
SE-0002K, SE-0200K, WM-0001
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: HPD
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
HPD
Pid
4228
Fms Id
HD-161E
Total Budget
55776404.40
Spend To Date
19138289.82
Spend To Date 1
0.3431
Fms Project Name
GATEWAY ESTATE - PHASE E (BED-805)
Agency Project Name
GATEWAY ESTATE - PHASE E/BED-805
Agency Project Description
Reconstruction of Gateway Estates Area (Nehemiah Creek) including sewer, watermain, street lighting and traffic signal work. Phase E
Current Phase
Construction
Current Phase Start
2016-09-22T00:00:00.000
Forecast Current Phase End
2024-06-30T00:00:00.000
Forecast Completion
2024-06-30T00:00:00.000
Actual Design Start
2013-11-17T00:00:00.000
Actual Design End
2015-02-11T00:00:00.000
Actual Construction
2015-02-11T00:00:00.000
Actual Construction 1
2016-09-22T00:00:00.000
Actual Construction Start
2016-09-22T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 05
Budget Line
ED-0075, HD-0161, HD-0161, HW-0200, TF-0002, TF-0502
Ten Year Plan Category
PEDESTRIAN RAMP CONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4229
Fms Id
HWMWTCB2
Total Budget
36452068.34
Spend To Date
8268069.37
Spend To Date 1
0.2268
Fms Project Name
Reconstruction of Greenwich
Agency Project Name
GREENWICH STREET RECONSTRUCTION
Agency Project Description
RECONSTRUCTION OF GREENWICH STREET FROM BARCLAY STREET TO CHAMBERS STREET, MANHATTAN
Current Phase
Construction
Current Phase Start
2021-11-08T00:00:00.000
Forecast Current Phase End
2024-11-06T00:00:00.000
Forecast Completion
2024-11-06T00:00:00.000
Actual Design Start
2018-04-25T00:00:00.000
Actual Design End
2019-12-02T00:00:00.000
Actual Construction
2019-12-02T00:00:00.000
Actual Construction 1
2021-11-08T00:00:00.000
Actual Construction Start
2021-11-08T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HW-0001M, HW-0944
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4230
Fms Id
HWMWTCB1
Total Budget
16336407.71
Spend To Date
1392181.18
Spend To Date 1
0.0852
Fms Project Name
Reconstruction of Nassau St
Agency Project Name
NASSAU STRET RECONSTRUCTION
Agency Project Description
Reconstruction of Nassau Street from Pine Street to Maiden Lane, Manhattan
Current Phase
Construction
Current Phase Start
2023-01-30T00:00:00.000
Forecast Current Phase End
2025-06-27T00:00:00.000
Forecast Completion
2025-06-27T00:00:00.000
Actual Design Start
2018-06-21T00:00:00.000
Actual Design End
2021-12-13T00:00:00.000
Actual Construction
2021-12-13T00:00:00.000
Actual Construction 1
2023-01-30T00:00:00.000
Actual Construction Start
2023-01-30T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HW-0001M, HW-0200, HW-0944, TF-0002, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4231
Fms Id
HWPLZ015M
Total Budget
15994995.62
Spend To Date
5362124.88
Spend To Date 1
0.3352
Fms Project Name
Pershing Square East Plaza/Streetscape Reconstruction
Agency Project Name
PERSHING SQUARE EAST PLAZA / STREETSCAPE
Agency Project Description
RECONSTRUCTION OF PERSHING SQUARE EAST - EASTERN SEGMENT OF PARK AVENUE BETWEEN 41ST AND 42ND STREETS
Current Phase
Construction
Current Phase Start
2021-10-12T00:00:00.000
Forecast Current Phase End
2024-04-01T00:00:00.000
Forecast Completion
2024-04-01T00:00:00.000
Actual Design Start
2018-11-09T00:00:00.000
Actual Design End
2020-12-02T00:00:00.000
Actual Construction
2020-12-02T00:00:00.000
Actual Construction 1
2021-10-12T00:00:00.000
Actual Construction Start
2021-10-12T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HW-0001M, SE-0002M
Ten Year Plan Category
REPLACEMENT OF CHRONICALLY FAILING COMPONENTS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4232
Fms Id
HWR00512
Total Budget
12774768.56
Spend To Date
1791210.37
Spend To Date 1
0.1402
Fms Project Name
Richmond Valley Road
Agency Project Name
RICHMOND VALLEY ROAD, SI
Agency Project Description
Re-construction of Richmond Valley Road Between Arthur Kill Road and Page Avenue
Current Phase
Design
Current Phase Start
2018-04-04T00:00:00.000
Forecast Current Phase End
2024-08-31T00:00:00.000
Forecast Completion
2026-09-29T00:00:00.000
Actual Design Start
2018-04-04T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
HW-0001R, HW-0061, HW-D104, HW-R005, HW-R988
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DPR
Pid
4233
Fms Id
P-3RANDAL
Total Budget
40207618.00
Spend To Date
1584812.71
Spend To Date 1
0.0394
Fms Project Name
Randall's Island Infrastructure, Roadways, Drainage, & CS
Agency Project Name
RECONSTRUCTION OF ROADWAYS AT RANDALL'S ISLAND
Agency Project Description
Reconstruction of Roadways at Randall's Island
Current Phase
Design
Current Phase Start
2016-11-10T00:00:00.000
Forecast Current Phase End
2024-10-30T00:00:00.000
Forecast Completion
2027-01-22T00:00:00.000
Actual Design Start
2016-11-10T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 11
Budget Line
P-0944, P-1018
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4234
Fms Id
BED-803
Total Budget
2942434.77
Spend To Date
7110.81
Spend To Date 1
0.0024
Fms Project Name
WM Repl in Schenck Av b/t Flatlands & Jamaica Av Bk, HWK797W
Agency Project Name
Reconstruction of Schenck Avenue
Agency Project Description
Reconstruction of Schenck Avenue
Current Phase
Construction
Current Phase Start
2023-01-09T00:00:00.000
Forecast Current Phase End
2025-06-06T00:00:00.000
Forecast Completion
2025-06-06T00:00:00.000
Actual Design Start
2014-12-01T00:00:00.000
Actual Design End
2022-01-06T00:00:00.000
Actual Construction
2022-01-06T00:00:00.000
Actual Construction 1
2023-01-09T00:00:00.000
Actual Construction Start
2023-01-09T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 05
Budget Line
SE-0002K, WM-0001
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4234
Fms Id
HWK797W
Total Budget
18294589.06
Spend To Date
1506186.22
Spend To Date 1
0.0823
Fms Project Name
Schenck Avenue, BED-803
Agency Project Name
Reconstruction of Schenck Avenue
Agency Project Description
Reconstruction of Schenck Avenue
Current Phase
Construction
Current Phase Start
2023-01-09T00:00:00.000
Forecast Current Phase End
2025-06-06T00:00:00.000
Forecast Completion
2025-06-06T00:00:00.000
Actual Design Start
2014-12-01T00:00:00.000
Actual Design End
2022-01-06T00:00:00.000
Actual Construction
2022-01-06T00:00:00.000
Actual Construction 1
2023-01-09T00:00:00.000
Actual Construction Start
2023-01-09T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 05
Budget Line
HW-0200, HW-0200, HW-0796, TF-0002, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4235
Fms Id
CONISPH3A
Total Budget
63353025.43
Spend To Date
39674672.29
Spend To Date 1
0.6262
Fms Project Name
Storm and Sanitary Sewer, Trunk and Distribution Water Main
Agency Project Name
STM, SAN SEWERS & WM IN CONEY ISLAND AREA, PH3A,BK
Agency Project Description
Reconstruction of Storm and Sanitary sewer, Trunk and distribution water main in Coney Island area - Phase 3A, Borough of Brooklyn
Current Phase
Construction
Current Phase Start
2019-10-28T00:00:00.000
Forecast Current Phase End
2024-09-18T00:00:00.000
Forecast Completion
2024-09-18T00:00:00.000
Actual Design Start
2014-03-17T00:00:00.000
Actual Design End
2017-11-29T00:00:00.000
Actual Construction
2017-11-29T00:00:00.000
Actual Construction 1
2019-10-28T00:00:00.000
Actual Construction Start
2019-10-28T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 13
Budget Line
SE-0200K
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4236
Fms Id
HWQ274F2
Total Budget
57790693.27
Spend To Date
5742900.77
Spend To Date 1
0.0993
Fms Project Name
RECON OF STREETS IN ROSEDALE AREA - PHASE 2 (SEQ200592)
Agency Project Name
RECONSTRUCTION OF ROSEDALE AREA, PHASE 2
Agency Project Description
RECONSTRUCTION OF STREETS IN ROSEDALE AREA - PHASE 2
Current Phase
Construction
Current Phase Start
2023-12-04T00:00:00.000
Forecast Current Phase End
2026-12-02T00:00:00.000
Forecast Completion
2026-12-02T00:00:00.000
Actual Design Start
2018-06-07T00:00:00.000
Actual Design End
2023-01-18T00:00:00.000
Actual Construction
2023-01-18T00:00:00.000
Actual Construction 1
2023-12-04T00:00:00.000
Actual Construction Start
2023-12-04T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
HW-0001Q, HW-0061, HW-0200, HW-0274, HW-0944, TF-0002, TF-0002
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4236
Fms Id
SEQ200592
Total Budget
51336814.46
Spend To Date
12500.00
Spend To Date 1
0.0002
Fms Project Name
SEQ - Rosedale South, HWQ274F2
Agency Project Name
RECONSTRUCTION OF ROSEDALE AREA, PHASE 2
Agency Project Description
RECONSTRUCTION OF STREETS IN ROSEDALE AREA - PHASE 2
Current Phase
Construction
Current Phase Start
2023-12-04T00:00:00.000
Forecast Current Phase End
2026-12-02T00:00:00.000
Forecast Completion
2026-12-02T00:00:00.000
Actual Design Start
2018-06-07T00:00:00.000
Actual Design End
2023-01-18T00:00:00.000
Actual Construction
2023-01-18T00:00:00.000
Actual Construction 1
2023-12-04T00:00:00.000
Actual Construction Start
2023-12-04T00:00:00.000
Borough
Queens
Community Board
Queens 13
Budget Line
SE-0002Q, SE-0200Q, WM-0001
Ten Year Plan Category
EXTENSIONS TO ACCOMMODATE NEW DEVELOPMENT
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4237
Fms Id
BED-807
Total Budget
3255000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
WM work in Brooklyn Waterfront Greenway. SAND1048
Agency Project Name
SUNSET PARK NORTH BK WATERFRONT GREENWAY
Agency Project Description
Reconstruction of Sunset Park North Section of the Brooklyn Waterfront Greenway.
Current Phase
Construction Procurement
Current Phase Start
2024-01-10T00:00:00.000
Forecast Current Phase End
2024-10-09T00:00:00.000
Forecast Completion
2026-10-08T00:00:00.000
Actual Design Start
2018-09-06T00:00:00.000
Actual Design End
2024-01-10T00:00:00.000
Actual Construction
2024-01-10T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 01
Budget Line
EP-0007, SE-0002K, WM-0001
Ten Year Plan Category
UTILITY RELOCATION FOR SE AND WM PROJECTS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4237
Fms Id
SAND1048
Total Budget
22319654.39
Spend To Date
692588.77
Spend To Date 1
0.031
Fms Project Name
BWG - Sunset Park North, BED-807
Agency Project Name
SUNSET PARK NORTH BK WATERFRONT GREENWAY
Agency Project Description
Reconstruction of Sunset Park North Section of the Brooklyn Waterfront Greenway.
Current Phase
Construction Procurement
Current Phase Start
2024-01-10T00:00:00.000
Forecast Current Phase End
2024-10-09T00:00:00.000
Forecast Completion
2026-10-08T00:00:00.000
Actual Design Start
2018-09-06T00:00:00.000
Actual Design End
2024-01-10T00:00:00.000
Actual Construction
2024-01-10T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0001K, HW-0200, HW-0944, HW-K005, TF-0002, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DCAS
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DCAS
Pid
4238
Fms Id
CO306EXT2
Total Budget
4359008.00
Spend To Date
468008.00
Spend To Date 1
0.1073
Fms Project Name
170 E121 St. Exterior Reconstruction
Agency Project Name
170 East 121 Street - Harlem Courthouse Facade
Agency Project Description
Reconstruction of the Harlem Courthouse's facade and roof to increase the lifespan of this important landmarked building.
Current Phase
Design
Current Phase Start
2021-05-24T00:00:00.000
Forecast Current Phase End
2024-08-09T00:00:00.000
Forecast Completion
2027-01-22T00:00:00.000
Actual Design Start
2021-05-24T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 11
Budget Line
CO-0306
Ten Year Plan Category
RECONSTRUCTION/RENOVATION OF COURT FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000