Capital Projects Dashboard - Citywide Budget and Schedule

All major capital infrastructure projects with a committed budget. Financial information and agency schedule details for each project are joined via FMS ID. Only projects in the design phase or later have project schedules displayed. This dataset is part of the Capital Projects Dashboard.

Note: Each row is uniquely identified by its Financial Management Service (FMS) ID. FMS ID is the unique ID that OMB uses for the FMS (Financial Information System). This ID can be universally joined with any OMB dataset that has the same field. The Capital Projects Dashboard is the result of joining OMB’s fiscal data with the agency’s schedule data. FMS IDs and agency projects don't always have a one-to-one relationship (i.e., one project schedule may correlate to multiple FMS IDs, and one FMS may correct to multiple projects with different schedules).

City Government Mayor's Office of Operations (OPS) Dataset fb86-vt7u 27 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4239
Fms Id
HWX006-01
Total Budget
12935864.00
Spend To Date
1003332.58
Spend To Date 1
0.0775
Fms Project Name
Henwood Place Step Street
Agency Project Name
RECONSTRUCTION OF THE HENWOOD PLACE STEP STREET
Agency Project Description
RECONSTRUCTION OF THE HENWOOD PLACE STEP STREET. THIS STREET IS CURRENTLY IN STATE OF DISREPAIR AND IS SUBJECT OF FREQUENT COMPLAINTS TO DOT. THE STEPS ON HENWOOD PLACE ARE HIGHLY INEVEN DUE TO SOIL EROSION AND SINKING LANDINGS AND THE STREETS IS BESET BY SIGNIFICANT DRAINAGE ISSUES AND CHRONIC PONDING. THIS PROJECT WILL FULLY RECONSTRUCT THE HENWOOD PLACE STEP STREEET, BRINGING IT UP TO GOOD REPAIR , CREATE SAFER TRAVEL CONDITIONS .
Current Phase
Design
Current Phase Start
2019-09-30T00:00:00.000
Forecast Current Phase End
2024-06-30T00:00:00.000
Forecast Completion
2027-03-23T00:00:00.000
Actual Design Start
2019-09-30T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
HW-0211
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4240
Fms Id
HWXS911
Total Budget
13836076.00
Spend To Date
13336.20
Spend To Date 1
0.0009
Fms Project Name
Reconstruction of the Summit Place Step Street
Agency Project Name
Reconstruction of the Summit Place Step Street
Agency Project Description
Reconstruction of the Summit Place Step Street
Current Phase
Design
Current Phase Start
2023-07-13T00:00:00.000
Forecast Current Phase End
2025-07-11T00:00:00.000
Forecast Completion
2028-02-12T00:00:00.000
Actual Design Start
2023-07-13T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
HW-0211
Ten Year Plan Category
RECONSTRUCTION OF STEP STREETS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4241
Fms Id
HWMWTCB7
Total Budget
35080004.58
Spend To Date
1420846.77
Spend To Date 1
0.0405
Fms Project Name
Reconstruction of Trinity Pl, SEN002182
Agency Project Name
RECONSTRUCTION OF TRINITY PL
Agency Project Description
Reconstruction of Trinity Place from Morris Street to Cedar Street, Borough of Manhattan
Current Phase
Construction
Current Phase Start
2023-09-18T00:00:00.000
Forecast Current Phase End
2027-09-16T00:00:00.000
Forecast Completion
2027-09-16T00:00:00.000
Actual Design Start
2018-10-01T00:00:00.000
Actual Design End
2022-11-22T00:00:00.000
Actual Construction
2022-11-22T00:00:00.000
Actual Construction 1
2023-09-18T00:00:00.000
Actual Construction Start
2023-09-18T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HW-0001M, HW-0200, HW-0944, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4241
Fms Id
SEN002182
Total Budget
2273620.81
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Rplmt SE on Trinity Pl betw Thames & Rector Str MN HWMWTCB7
Agency Project Name
RECONSTRUCTION OF TRINITY PL
Agency Project Description
Reconstruction of Trinity Place from Morris Street to Cedar Street, Borough of Manhattan
Current Phase
Construction
Current Phase Start
2023-09-18T00:00:00.000
Forecast Current Phase End
2027-09-16T00:00:00.000
Forecast Completion
2027-09-16T00:00:00.000
Actual Design Start
2018-10-01T00:00:00.000
Actual Design End
2022-11-22T00:00:00.000
Actual Construction
2022-11-22T00:00:00.000
Actual Construction 1
2023-09-18T00:00:00.000
Actual Construction Start
2023-09-18T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
SE-0002M
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4242
Fms Id
HWMWTCB6
Total Budget
12576679.30
Spend To Date
4110787.02
Spend To Date 1
0.3268
Fms Project Name
Reconstruction of Vesey St, MED-668
Agency Project Name
VESEY STREET RECONSTRUCTION
Agency Project Description
Reconstruction of Vesey Street from Church Street to Broadway, Borough of Manhattan
Current Phase
Construction
Current Phase Start
2022-09-19T00:00:00.000
Forecast Current Phase End
2024-09-17T00:00:00.000
Forecast Completion
2024-09-17T00:00:00.000
Actual Design Start
2018-07-17T00:00:00.000
Actual Design End
2021-05-14T00:00:00.000
Actual Construction
2021-05-14T00:00:00.000
Actual Construction 1
2022-09-19T00:00:00.000
Actual Construction Start
2022-09-19T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HW-0001M
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4242
Fms Id
MED-668
Total Budget
1116349.71
Spend To Date
200143.20
Spend To Date 1
0.1792
Fms Project Name
Installation of Distri WM & appurtenances Vesey st, HWMWTCB6
Agency Project Name
VESEY STREET RECONSTRUCTION
Agency Project Description
Reconstruction of Vesey Street from Church Street to Broadway, Borough of Manhattan
Current Phase
Construction
Current Phase Start
2022-09-19T00:00:00.000
Forecast Current Phase End
2024-09-17T00:00:00.000
Forecast Completion
2024-09-17T00:00:00.000
Actual Design Start
2018-07-17T00:00:00.000
Actual Design End
2021-05-14T00:00:00.000
Actual Construction
2021-05-14T00:00:00.000
Actual Construction 1
2022-09-19T00:00:00.000
Actual Construction Start
2022-09-19T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
WM-0001
Ten Year Plan Category
AUGMENTATION OF WATER SUPPLY SYSTEMS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4243
Fms Id
SEN002169
Total Budget
22419970.04
Spend To Date
16986624.12
Spend To Date 1
0.7576
Fms Project Name
RECON OF COMBINED SEWER & WM IN YORK AVE
Agency Project Name
RECON OF COMB SWR & WM IN YORK AV
Agency Project Description
Reconstruction of Water Main in:York Ave. (East Side) between 61st St. and 63rd St.York Ave. (West Side) between 61st St. and 63rd St.Intersection of York Ave. and 61st St. Intersection of York Ave. and 62nd St.Intersection (West side) of York Ave. and 63rd St.Reconstruction of Combined Sewer:York Ave. between 61st St. and 63nd St.62nd St. between York Ave. and 1st Ave.
Current Phase
Construction
Current Phase Start
2015-09-08T00:00:00.000
Forecast Current Phase End
2024-07-23T00:00:00.000
Forecast Completion
2024-07-23T00:00:00.000
Actual Design Start
2009-07-15T00:00:00.000
Actual Design End
2014-12-19T00:00:00.000
Actual Construction
2014-12-19T00:00:00.000
Actual Construction 1
2015-09-08T00:00:00.000
Actual Construction Start
2015-09-08T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 08
Budget Line
HW-0200, SE-0002M, WM-0001
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP, DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP, DOT
Pid
4244
Fms Id
HWK876
Total Budget
40138504.98
Spend To Date
6768603.96
Spend To Date 1
0.1686
Fms Project Name
RECONSTRUCTION OF WYCKOFF AVENUE, BROOKLYN, SEK002351
Agency Project Name
RECON WYCKOFF AV-FLUSHING to COOPER AV/SE
Agency Project Description
Reconstruction of Wyckoff Avenue from Flushing Avenue to Cooper Avenue, in the Boroughs of Brooklyn and Queens..
Current Phase
Design
Current Phase Start
2017-03-29T00:00:00.000
Forecast Current Phase End
2024-12-31T00:00:00.000
Forecast Completion
2028-09-29T00:00:00.000
Actual Design Start
2017-03-29T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 04
Budget Line
HW-0200, HW-0200, HW-0876, HW-0944, HW-D101, HW-K005, TF-0002, TF-0502
Ten Year Plan Category
SIDEWALK RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP, DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP, DOT
Pid
4244
Fms Id
SEK002351
Total Budget
28126119.99
Spend To Date
365642.85
Spend To Date 1
0.013
Fms Project Name
Rehab of SWR & WM in Wycoff Av bt Cooper &Flushing Av,HWK876
Agency Project Name
RECON WYCKOFF AV-FLUSHING to COOPER AV/SE
Agency Project Description
Reconstruction of Wyckoff Avenue from Flushing Avenue to Cooper Avenue, in the Boroughs of Brooklyn and Queens..
Current Phase
Design
Current Phase Start
2017-03-29T00:00:00.000
Forecast Current Phase End
2024-12-31T00:00:00.000
Forecast Completion
2028-09-29T00:00:00.000
Actual Design Start
2017-03-29T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 04
Budget Line
EP-0007, SE-0002K, WM-0001
Ten Year Plan Category
UTILITY RELOCATION FOR SE AND WM PROJECTS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4245
Fms Id
BED829
Total Budget
69250000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Dts WM Rplmt in 4th Av fr Atlantic av to 64th ST-BK HWK1669B
Agency Project Name
4th Ave Safety Improvements - Phase B
Agency Project Description
Redesign of 4th Ave from Atlantic Ave to 64th Street.
Current Phase
Design
Current Phase Start
2022-03-28T00:00:00.000
Forecast Current Phase End
2025-05-27T00:00:00.000
Forecast Completion
2029-08-30T00:00:00.000
Actual Design Start
2022-03-28T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 06
Budget Line
SE-0002K, WM-0001
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4245
Fms Id
HWK1669B
Total Budget
148623323.48
Spend To Date
794432.27
Spend To Date 1
0.0053
Fms Project Name
4th Ave Safety Improvements - Phase B, BED829
Agency Project Name
4th Ave Safety Improvements - Phase B
Agency Project Description
Redesign of 4th Ave from Atlantic Ave to 64th Street.
Current Phase
Design
Current Phase Start
2022-03-28T00:00:00.000
Forecast Current Phase End
2025-05-27T00:00:00.000
Forecast Completion
2029-08-30T00:00:00.000
Actual Design Start
2022-03-28T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0001K, HW-D101
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4246
Fms Id
BED-827
Total Budget
2140904.40
Spend To Date
409639.22
Spend To Date 1
0.1913
Fms Project Name
Regulator Chamber Roof Replacements
Agency Project Name
REGULAR CHAMBER ROOF REPLACEMENT
Agency Project Description
Regulator Chamber Roof Replacements: Five in Brooklyn and one in the Bronx
Current Phase
Construction
Current Phase Start
2023-08-28T00:00:00.000
Forecast Current Phase End
2024-08-26T00:00:00.000
Forecast Completion
2024-08-26T00:00:00.000
Actual Design Start
2018-12-11T00:00:00.000
Actual Design End
2022-11-04T00:00:00.000
Actual Construction
2022-11-04T00:00:00.000
Actual Construction 1
2023-08-28T00:00:00.000
Actual Construction Start
2023-08-28T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
WM-0001
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4247
Fms Id
HWPR23KQ
Total Budget
16337000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Standard Upgrades Ped Ramps - Brooklyn and Queens
Agency Project Name
Simple Upgrades Ped Ramps - Brooklyn and Queens
Agency Project Description
Rehabilitation (repair and upgrade to Federal ADA 2010 and PROWAG specifications) of existing pedestrian ramps in Brooklyn.
Current Phase
Construction Procurement
Current Phase Start
2023-08-30T00:00:00.000
Forecast Current Phase End
2024-04-30T00:00:00.000
Forecast Completion
2026-04-29T00:00:00.000
Actual Design Start
2022-11-07T00:00:00.000
Actual Design End
2023-08-30T00:00:00.000
Actual Construction
2023-08-30T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
HW-0200
Ten Year Plan Category
PEDESTRIAN RAMP CONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4248
Fms Id
BLCOMPLNT
Total Budget
6393449.40
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Rehabilitation of Pedestrian Ramps
Agency Project Name
Standard Ped Ramp Upgrades and Installs - Citywide
Agency Project Description
Rehabilitation and Installation of Pedestrian Ramps, Citywide
Current Phase
Construction
Current Phase Start
2023-09-12T00:00:00.000
Forecast Current Phase End
2025-09-10T00:00:00.000
Forecast Completion
2025-09-10T00:00:00.000
Actual Design Start
2022-06-29T00:00:00.000
Actual Design End
2022-09-23T00:00:00.000
Actual Construction
2022-09-23T00:00:00.000
Actual Construction 1
2023-09-12T00:00:00.000
Actual Construction Start
2023-09-12T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
HW-0200
Ten Year Plan Category
PEDESTRIAN RAMP CONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DSNY
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DSNY
Pid
4249
Fms Id
S136-383N
Total Budget
30734950.25
Spend To Date
4939595.49
Spend To Date 1
0.1607
Fms Project Name
Brooklyn 17/18 HVAC and Roof Replacement
Agency Project Name
Brkyln District 17/18 Garage: HVAC Replacement
Agency Project Description
Rehabilitation includes replacement of the roof and select areas of roof drains and domes, structural work; stiffening of structural steel frame supports for new HVAC equipment, solar panels, and select parapet replacements, including fire alarm system work, and select replacement of building systems. Offices, locker rooms, and bathrooms will be phased and temporarily partitioned to allow for overhead HVAC work.
Current Phase
Construction
Current Phase Start
2022-05-23T00:00:00.000
Forecast Current Phase End
2024-10-23T00:00:00.000
Forecast Completion
2024-10-23T00:00:00.000
Actual Design Start
2017-05-11T00:00:00.000
Actual Design End
2020-07-13T00:00:00.000
Actual Construction
2020-07-13T00:00:00.000
Actual Construction 1
2022-05-23T00:00:00.000
Actual Construction Start
2022-05-23T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 17, Brooklyn 18
Budget Line
S-0136
Ten Year Plan Category
GARAGES AND FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DSNY
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DSNY
Pid
4249
Fms Id
SOLARDOS1
Total Budget
9151215.42
Spend To Date
393818.61
Spend To Date 1
0.043
Fms Project Name
Brooklyn 17/18 HVAC AND ROOF REPLACEMENT
Agency Project Name
Brkyln District 17/18 Garage: HVAC Replacement
Agency Project Description
Rehabilitation includes replacement of the roof and select areas of roof drains and domes, structural work; stiffening of structural steel frame supports for new HVAC equipment, solar panels, and select parapet replacements, including fire alarm system work, and select replacement of building systems. Offices, locker rooms, and bathrooms will be phased and temporarily partitioned to allow for overhead HVAC work.
Current Phase
Construction
Current Phase Start
2022-05-23T00:00:00.000
Forecast Current Phase End
2024-10-23T00:00:00.000
Forecast Completion
2024-10-23T00:00:00.000
Actual Design Start
2017-05-11T00:00:00.000
Actual Design End
2020-07-13T00:00:00.000
Actual Construction
2020-07-13T00:00:00.000
Actual Construction 1
2022-05-23T00:00:00.000
Actual Construction Start
2022-05-23T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 01
Budget Line
PU-0025
Ten Year Plan Category
DISTRIBUTED GENERATION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DCAS
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DCAS
Pid
4250
Fms Id
P-303ERPK
Total Budget
9113563.99
Spend To Date
1374107.12
Spend To Date 1
0.1507
Fms Project Name
East River Park
Agency Project Name
East River Park
Agency Project Description
REHABILITATION OF EAST RIVER PARK WATERFRONT STRUCTURE
Current Phase
Construction
Current Phase Start
2023-04-03T00:00:00.000
Forecast Current Phase End
2024-09-28T00:00:00.000
Forecast Completion
2024-09-28T00:00:00.000
Actual Design Start
2018-04-10T00:00:00.000
Actual Design End
2022-05-10T00:00:00.000
Actual Construction
2022-05-10T00:00:00.000
Actual Construction 1
2023-04-03T00:00:00.000
Actual Construction Start
2023-04-03T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
RE-0025
Ten Year Plan Category
REHABILITATION OF WATERFRONT PROPERTIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4251
Fms Id
HWPR22K1
Total Budget
19122298.80
Spend To Date
96003.16
Spend To Date 1
0.005
Fms Project Name
Rehabilitation of Standard Ped Ramps - Brooklyn
Agency Project Name
Simple Upgrades Ped Ramps- Brooklyn
Agency Project Description
Rehabilitation of existing pedestrian ramps in Brooklyn.
Current Phase
Construction
Current Phase Start
2023-07-10T00:00:00.000
Forecast Current Phase End
2025-07-08T00:00:00.000
Forecast Completion
2025-07-08T00:00:00.000
Actual Design Start
2021-11-18T00:00:00.000
Actual Design End
2022-08-18T00:00:00.000
Actual Construction
2022-08-18T00:00:00.000
Actual Construction 1
2023-07-10T00:00:00.000
Actual Construction Start
2023-07-10T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0200
Ten Year Plan Category
PEDESTRIAN RAMP CONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4252
Fms Id
HWPR23K1
Total Budget
16337000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Standard Upgrades Ped Ramps - Brooklyn
Agency Project Name
Simple Upgrades Ped Ramps - Brooklyn
Agency Project Description
Rehabilitation of existing pedestrian ramps in Brooklyn.
Current Phase
Construction Procurement
Current Phase Start
2023-08-10T00:00:00.000
Forecast Current Phase End
2025-07-01T00:00:00.000
Forecast Completion
2027-06-30T00:00:00.000
Actual Design Start
2022-10-26T00:00:00.000
Actual Design End
2023-08-10T00:00:00.000
Actual Construction
2023-08-10T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0200
Ten Year Plan Category
PEDESTRIAN RAMP CONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4253
Fms Id
HWPR21MQ
Total Budget
18819053.85
Spend To Date
3498687.45
Spend To Date 1
0.1859
Fms Project Name
Rehabilitation of Standard Ped Ramps - Queens & Manhattan
Agency Project Name
Simple Upgrades Ped Ramps- Manhattan and Queens
Agency Project Description
Rehabilitation of Pedestrian Ramps in Manhattan and Queens
Current Phase
Construction
Current Phase Start
2022-08-08T00:00:00.000
Forecast Current Phase End
2024-08-06T00:00:00.000
Forecast Completion
2024-08-06T00:00:00.000
Actual Design Start
2020-04-16T00:00:00.000
Actual Design End
2020-11-23T00:00:00.000
Actual Construction
2020-11-23T00:00:00.000
Actual Construction 1
2022-08-08T00:00:00.000
Actual Construction Start
2022-08-08T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
HW-0200
Ten Year Plan Category
PEDESTRIAN RAMP CONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4254
Fms Id
HWPR21K1
Total Budget
16236834.00
Spend To Date
4244673.95
Spend To Date 1
0.2614
Fms Project Name
Rehabilitation of Standard Ped Ramps - Brooklyn
Agency Project Name
Simple Upgrades Ped Ramps- Brooklyn
Agency Project Description
Rehabilitation of Simple Pedestrian Ramps in the Borough of Brooklyn
Current Phase
Construction
Current Phase Start
2022-08-08T00:00:00.000
Forecast Current Phase End
2024-08-06T00:00:00.000
Forecast Completion
2024-08-06T00:00:00.000
Actual Design Start
2020-04-14T00:00:00.000
Actual Design End
2021-11-05T00:00:00.000
Actual Construction
2021-11-05T00:00:00.000
Actual Construction 1
2022-08-08T00:00:00.000
Actual Construction Start
2022-08-08T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0200
Ten Year Plan Category
PEDESTRIAN RAMP CONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4255
Fms Id
HWPR22MQ
Total Budget
24944560.70
Spend To Date
78213.33
Spend To Date 1
0.0031
Fms Project Name
Rehabilitation of Standard Ped Ramps - Manhattan & Queens
Agency Project Name
Simple Upgrades Ped Ramps- Manhattan and Queens
Agency Project Description
Rehabilitation of Standard Pedestrian Ramps - Manhattan and Queens
Current Phase
Construction
Current Phase Start
2023-07-10T00:00:00.000
Forecast Current Phase End
2025-07-08T00:00:00.000
Forecast Completion
2025-07-08T00:00:00.000
Actual Design Start
2021-12-06T00:00:00.000
Actual Design End
2022-08-22T00:00:00.000
Actual Construction
2022-08-22T00:00:00.000
Actual Construction 1
2023-07-10T00:00:00.000
Actual Construction Start
2023-07-10T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
HW-0200
Ten Year Plan Category
PEDESTRIAN RAMP CONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4256
Fms Id
HBMA24662
Total Budget
15275613.86
Spend To Date
1295058.65
Spend To Date 1
0.0847
Fms Project Name
W 128TH ST PED BRIDGE BIN:2246620
Agency Project Name
E128th Street Pedestrian Bridge, Manhattan
Agency Project Description
Rehabilitation or Replacement of East 128th Street Pedestrian Bridge over 3rd Avenue in Manhattan
Current Phase
Design
Current Phase Start
2020-04-28T00:00:00.000
Forecast Current Phase End
2024-09-29T00:00:00.000
Forecast Completion
2027-11-21T00:00:00.000
Actual Design Start
2020-04-28T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HB-0215, HB-1012, TF-0502
Ten Year Plan Category
Traffic Work in Conjunction with Fair Bridges
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DCAS
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DCAS
Pid
4257
Fms Id
PW77417P2
Total Budget
7846641.41
Spend To Date
751308.62
Spend To Date 1
0.0957
Fms Project Name
120-55 QUEENS BLVD - PLAZA, STEPS AND ENTRANCE
Agency Project Name
Queens Boro Hall Plaza: 120-55 Queens Blvd. Renova
Agency Project Description
Removal and restoration of Queens Borough Hall Plaza main entrance including sloped entryway on Queens Blvd, court house entryway on northeast side of building, and rear building egress at the parking lot. Scope includes installation of automatic doors at main entrance, removal and replacement of handrails and plaza stair treads. Removal and replacement of retaining wall near court house entryway, removal and replacement of stair treads leading down to lower level, and removal and replacement of sidewalk leading from Queens Blvd to court house entryway. Removal and replacement of two stairways leading into the building from the parking, handrails and adjacent walkways along with 5-10' of pavement on either side.
Current Phase
Construction
Current Phase Start
2022-12-19T00:00:00.000
Forecast Current Phase End
2024-10-10T00:00:00.000
Forecast Completion
2024-10-10T00:00:00.000
Actual Design Start
2016-10-18T00:00:00.000
Actual Design End
2022-02-11T00:00:00.000
Actual Construction
2022-02-11T00:00:00.000
Actual Construction 1
2022-12-19T00:00:00.000
Actual Construction Start
2022-12-19T00:00:00.000
Borough
Queens
Community Board
Queens, Queens 09
Budget Line
PW-0077
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DCLA
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DCLA
Pid
4258
Fms Id
PV475ROOF
Total Budget
13276000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
NYST - NYC Ballet Roof Replacement
Agency Project Name
NYST - NYC Ballet Roof Replacement
Agency Project Description
Remove and replace existing 50,000 +/- SF modified bitumen roof and stainless steel flashings. New roof design and installation should accommodate installation of solar panel arrays, and associated equipment. Ancillary MEP work.
Current Phase
Pre-Design
Borough
Manhattan
Community Board
Manhattan
Budget Line
PU-0025, PV-0467, PV-0475, PV-D475, PV-M475
Ten Year Plan Category
MISCELLANEOUS ENERGY EFFICIENCY AND SUSTAINABILITY
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DCAS
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DCAS
Pid
4259
Fms Id
PW77LYA
Total Budget
66529775.29
Spend To Date
51539917.22
Spend To Date 1
0.7746
Fms Project Name
253 BROADWAY- LPC MOVE TO 2nd, 11th, 12th, 13th FLS
Agency Project Name
253 Broadway Landmark's Space Renovations
Agency Project Description
Renovate 4 floors of the building to create new office space for the Landmarks Preservation Commission, including new hearing room.
Current Phase
Construction
Current Phase Start
2016-07-01T00:00:00.000
Forecast Current Phase End
2024-02-29T00:00:00.000
Forecast Completion
2024-02-29T00:00:00.000
Actual Design Start
2013-01-23T00:00:00.000
Actual Design End
2013-12-06T00:00:00.000
Actual Construction
2013-12-06T00:00:00.000
Actual Construction 1
2016-07-01T00:00:00.000
Actual Construction Start
2016-07-01T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
PW-0077, PW-0316, PW-0357
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DHS
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DHS
Pid
4260
Fms Id
HH112BLBR
Total Budget
26007873.00
Spend To Date
1544249.15
Spend To Date 1
0.0593
Fms Project Name
BELLEVUE BATHROOMS RECONSTRUCTION
Agency Project Name
Bellevue Men's Shelter: Bathroom Upgrade
Agency Project Description
Renovation of all bathroom facilities through out the building; to include new fixtures, ventilation, ADA compliance
Current Phase
Design
Current Phase Start
2018-01-29T00:00:00.000
Forecast Current Phase End
2024-10-16T00:00:00.000
Forecast Completion
2027-07-14T00:00:00.000
Actual Design Start
2018-01-29T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HH-0112
Ten Year Plan Category
SHELTERS FOR HOMELESS INDIVIDUALS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: NYCHA
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
NYCHA
Pid
4261
Fms Id
HAM14GOCC
Total Budget
4395608.52
Spend To Date
723684.36
Spend To Date 1
0.1646
Fms Project Name
GOWANUS COMMUNITY CENTER RENOVATIONS
Agency Project Name
Gowanus Community Center Renovation
Agency Project Description
Renovation of the existing community center.
Current Phase
Construction
Current Phase Start
2023-03-31T00:00:00.000
Forecast Current Phase End
2024-03-25T00:00:00.000
Forecast Completion
2024-03-25T00:00:00.000
Actual Design Start
2021-02-08T00:00:00.000
Actual Design End
2022-07-11T00:00:00.000
Actual Construction
2022-07-11T00:00:00.000
Actual Construction 1
2023-03-31T00:00:00.000
Actual Construction Start
2023-03-31T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 06
Budget Line
HA-0001, HA-D001
Ten Year Plan Category
LOW TO MODERATE INCOME PUBLIC HOUSING UPGRADE
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DCAS
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DCAS
Pid
4262
Fms Id
PW3172L
Total Budget
5065844.11
Spend To Date
111447.92
Spend To Date 1
0.0219
Fms Project Name
2 LAFAYETTE STREET - FACADE REPAIRS
Agency Project Name
Court Square BLDG: 2 Lafayette St. Renovation Faca
Agency Project Description
Renovation of the façade and roof replacement at 2 Lafayette St.
Current Phase
Design
Current Phase Start
2023-09-06T00:00:00.000
Forecast Current Phase End
2025-07-15T00:00:00.000
Forecast Completion
2028-07-17T00:00:00.000
Actual Design Start
2023-09-06T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
PW-0077, PW-0080, PW-0317
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DCLA
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DCLA
Pid
4263
Fms Id
PV234CSV1
Total Budget
12748020.97
Spend To Date
503020.97
Spend To Date 1
0.0394
Fms Project Name
CSV - Clemente Soto Velez - Interior Code Compliance
Agency Project Name
CSV - Clemente Soto Velez - Interior Code Complian
Agency Project Description
Renovation to meet ADA requirements with new rear entry and elevator tower. Upgrade fire alarm systems. Reconfigure residual impacts to: entry/circulation; stairs, restrooms, elevator lobby on each floor, electrical works, and service wires.
Current Phase
Construction Procurement
Current Phase Start
2022-07-13T00:00:00.000
Forecast Current Phase End
2023-12-13T00:00:00.000
Forecast Completion
2025-06-09T00:00:00.000
Actual Design Start
2015-02-18T00:00:00.000
Actual Design End
2022-07-13T00:00:00.000
Actual Construction
2022-07-13T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 03
Budget Line
PV-0234, PV-0467, PV-D234, PV-M234, PV-M467, PW-0077, PW-C077
Ten Year Plan Category
MISCELLANEOUS CONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4264
Fms Id
PS-312MX
Total Budget
36936192.61
Spend To Date
790060.73
Spend To Date 1
0.0213
Fms Project Name
REPAIRS & REHAB OF INTERCEPTING SEWERS - MANHATTAN
Agency Project Name
REPAIRS & REHAB OF INTERCEPTING SEWERS, MN & BX
Agency Project Description
Repair and Rehabilitation of Interceptor Sewers at Various Locations in the Boroughs of Manhattan and The Bronx.
Current Phase
Construction
Current Phase Start
2023-07-17T00:00:00.000
Forecast Current Phase End
2025-06-10T00:00:00.000
Forecast Completion
2025-06-10T00:00:00.000
Actual Design Start
2012-12-10T00:00:00.000
Actual Design End
2022-05-23T00:00:00.000
Actual Construction
2022-05-23T00:00:00.000
Actual Construction 1
2023-07-17T00:00:00.000
Actual Construction Start
2023-07-17T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
WP-0269
Ten Year Plan Category
PLANT UPGRADING AND RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DCAS
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DCAS
Pid
4265
Fms Id
TLCWOOD
Total Budget
149015252.12
Spend To Date
23212813.84
Spend To Date 1
0.1557
Fms Project Name
TLC - NEW OFFICE FACILITY - 24-55 BQE WEST
Agency Project Name
TLC - NEW OFFICE FACILITY - 24-55 BQE WEST
Agency Project Description
Replace existing administration wing; provide new parking and new inspection lane within the facility.
Current Phase
Construction
Current Phase Start
2021-03-22T00:00:00.000
Forecast Current Phase End
2026-05-01T00:00:00.000
Forecast Completion
2026-05-01T00:00:00.000
Actual Design Start
2015-09-15T00:00:00.000
Actual Design End
2019-08-20T00:00:00.000
Actual Construction
2019-08-20T00:00:00.000
Actual Construction 1
2021-03-22T00:00:00.000
Actual Construction Start
2021-03-22T00:00:00.000
Borough
Queens
Community Board
Queens 01
Budget Line
PW-0077
Ten Year Plan Category
RENOVATION OF OTHER CITY-OWNED FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DCAS
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DCAS
Pid
4265
Fms Id
TLCWOOD1
Total Budget
31600000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
TLC - NEW OFFICE FACILITY -FY22 April Plan
Agency Project Name
TLC - NEW OFFICE FACILITY - 24-55 BQE WEST
Agency Project Description
Replace existing administration wing; provide new parking and new inspection lane within the facility.
Current Phase
Construction
Current Phase Start
2021-03-22T00:00:00.000
Forecast Current Phase End
2026-05-01T00:00:00.000
Forecast Completion
2026-05-01T00:00:00.000
Actual Design Start
2015-09-15T00:00:00.000
Actual Design End
2019-08-20T00:00:00.000
Actual Construction
2019-08-20T00:00:00.000
Actual Construction 1
2021-03-22T00:00:00.000
Actual Construction Start
2021-03-22T00:00:00.000
Borough
Queens
Community Board
Queens 01
Budget Line
PW-0077
Ten Year Plan Category
RENOVATION OF OTHER CITY-OWNED FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: NYPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
NYPL
Pid
4266
Fms Id
LNCA13MLB
Total Budget
980020.91
Spend To Date
844254.69
Spend To Date 1
0.8614
Fms Project Name
MUHLENBERG: Elevator
Agency Project Name
Muhlenberg Elevator Upgrade
Agency Project Description
Replace existing deteriorated elevator with higher capacity and improved ventilation, and clear existing multiple violations .
Current Phase
Construction
Current Phase Start
2022-01-18T00:00:00.000
Forecast Current Phase End
2024-03-06T00:00:00.000
Forecast Completion
2024-03-06T00:00:00.000
Actual Design Start
2014-12-09T00:00:00.000
Actual Design End
2020-12-04T00:00:00.000
Actual Construction
2020-12-04T00:00:00.000
Actual Construction 1
2022-01-18T00:00:00.000
Actual Construction Start
2022-01-18T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 04
Budget Line
LN-0008, LN-0101M, LN-D008
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4267
Fms Id
HWXF2000B
Total Budget
10605784.70
Spend To Date
6218938.21
Spend To Date 1
0.5863
Fms Project Name
1400 WILLIAMSBRIDGE RD - HVAC AND FIRE ALARM SYS
Agency Project Name
1400 Williamsbridge Rd, BX.HVAC Replacement
Agency Project Description
Replace existing mechanical system with new systems and a BMS, replacement of the windows (1st & 2nd flr) and upgrade the existing fire alarm system.
Current Phase
Construction
Current Phase Start
2019-07-31T00:00:00.000
Forecast Current Phase End
2024-08-19T00:00:00.000
Forecast Completion
2024-08-19T00:00:00.000
Actual Design Start
2016-08-10T00:00:00.000
Actual Design End
2018-06-22T00:00:00.000
Actual Construction
2018-06-22T00:00:00.000
Actual Construction 1
2019-07-31T00:00:00.000
Actual Construction Start
2019-07-31T00:00:00.000
Borough
Bronx
Community Board
Bronx 11
Budget Line
HW-0003
Ten Year Plan Category
FACILITY RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: BPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
BPL
Pid
4268
Fms Id
LBC15BWHC
Total Budget
4109918.16
Spend To Date
734838.53
Spend To Date 1
0.1787
Fms Project Name
Bushwick Heating & Cooling
Agency Project Name
Bushwick HVAC Upgrade
Agency Project Description
Replace HVAC and install new Building Management System (BMS).
Current Phase
Design
Current Phase Start
2016-01-31T00:00:00.000
Forecast Current Phase End
2024-02-29T00:00:00.000
Forecast Completion
2026-06-08T00:00:00.000
Actual Design Start
2016-01-31T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 01
Budget Line
LB-0104, LB-D104
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: BPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
BPL
Pid
4269
Fms Id
LBM15RDHC
Total Budget
3619851.44
Spend To Date
1151073.65
Spend To Date 1
0.3179
Fms Project Name
Ryder Heating & Cooling
Agency Project Name
RYDER LIBRARY HVAC
Agency Project Description
Replace HVAC systems.
Current Phase
Construction
Current Phase Start
2022-03-21T00:00:00.000
Forecast Current Phase End
2024-02-29T00:00:00.000
Forecast Completion
2024-02-29T00:00:00.000
Actual Design Start
2015-11-24T00:00:00.000
Actual Design End
2020-07-17T00:00:00.000
Actual Construction
2020-07-17T00:00:00.000
Actual Construction 1
2022-03-21T00:00:00.000
Actual Construction Start
2022-03-21T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 12
Budget Line
LB-0104
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4270
Fms Id
SE-860
Total Budget
75522158.00
Spend To Date
3142000.00
Spend To Date 1
0.0416
Fms Project Name
Combined Swr Replac & WM work 71st, QNS
Agency Project Name
COMBINED SEWER AND WM WORK IN 71 STREET, QUEENS
Agency Project Description
Replacement of combined sewer in 71st Street between Juniper Boulevard South and Queens Midtown Expressway, etc.
Current Phase
Design
Current Phase Start
2018-09-10T00:00:00.000
Forecast Current Phase End
2025-12-15T00:00:00.000
Forecast Completion
2029-08-15T00:00:00.000
Actual Design Start
2018-09-10T00:00:00.000
Borough
Queens
Community Board
Queens 05
Budget Line
EP-0007, HW-0200, SE-0002Q, TF-0002, TF-0502, WM-0001
Ten Year Plan Category
UTILITY RELOCATION FOR SE AND WM PROJECTS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4271
Fms Id
SEK002386
Total Budget
16148407.37
Spend To Date
10409801.79
Spend To Date 1
0.6446
Fms Project Name
Replace combined sewer & WM work,Park Pl & Underhill Ave, BK
Agency Project Name
REPLACE COMBINED SEWER & WM PARK PL & UNDERHILL AV
Agency Project Description
Replacement of Combined Sewer in Park Place from Underhill Ave to Flatbush Ave
Current Phase
Construction
Current Phase Start
2021-02-15T00:00:00.000
Forecast Current Phase End
2024-08-24T00:00:00.000
Forecast Completion
2024-08-24T00:00:00.000
Actual Design Start
2017-07-25T00:00:00.000
Actual Design End
2019-03-21T00:00:00.000
Actual Construction
2019-03-21T00:00:00.000
Actual Construction 1
2021-02-15T00:00:00.000
Actual Construction Start
2021-02-15T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 08
Budget Line
SE-0002K, WM-0001, WM-0006
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4272
Fms Id
HWCURB10
Total Budget
3033000.00
Spend To Date
58924.80
Spend To Date 1
0.0194
Fms Project Name
Curb Reconstruction
Agency Project Name
FY23 Curb contract
Agency Project Description
Replacement of concrete, steel-faced, and granite curbs and related sidewalk and roadway restoration, Citywide
Current Phase
Construction Procurement
Current Phase Start
2023-10-24T00:00:00.000
Forecast Current Phase End
2024-06-17T00:00:00.000
Forecast Completion
2025-12-13T00:00:00.000
Actual Design Start
2022-06-30T00:00:00.000
Actual Design End
2023-10-24T00:00:00.000
Actual Construction
2023-10-24T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
HW-0200, HW-0CH1
Ten Year Plan Category
SIDEWALK RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4273
Fms Id
HED-578
Total Budget
9523385.50
Spend To Date
1063745.51
Spend To Date 1
0.1116
Fms Project Name
Replcmt of Dist WM In Mundy Lane btwn Cranford & Nereid Ave
Agency Project Name
Replacement of Dist. Water Main in Mundy Lane
Agency Project Description
Replacement of Distribution Water Main in Mundy Lane between Cranford Ave and Nereid Ave. This project is needed to replace an old water main as directed by DEP Distribution Engineers due to water main break history. The project will replace approximately 1,400 LF of old cast iron (CIP) and lined cast iron (LCP) dist. water mains.
Current Phase
Construction
Current Phase Start
2023-08-21T00:00:00.000
Forecast Current Phase End
2025-08-19T00:00:00.000
Forecast Completion
2025-08-19T00:00:00.000
Actual Design Start
2022-02-15T00:00:00.000
Actual Design End
2023-02-02T00:00:00.000
Actual Construction
2023-02-02T00:00:00.000
Actual Construction 1
2023-08-21T00:00:00.000
Actual Construction Start
2023-08-21T00:00:00.000
Borough
Bronx
Community Board
Bronx 12
Budget Line
HW-0200, SE-0002X, WM-0001, WM-0944
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: NYPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
NYPL
Pid
4274
Fms Id
LNXEA08BA
Total Budget
1619000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
BAYCHESTER: HVAC
Agency Project Name
Replacement of HVAC & BMS:Baychester Branch Librar
Agency Project Description
Replacement of HVAC and BMS at the NYPL Baychester Branch Library
Current Phase
Design
Current Phase Start
2015-11-05T00:00:00.000
Forecast Current Phase End
2024-07-02T00:00:00.000
Forecast Completion
2026-03-13T00:00:00.000
Actual Design Start
2015-11-05T00:00:00.000
Borough
Bronx
Community Board
Bronx, Bronx 12
Budget Line
LN-0008, LN-0101M, LN-0101X, LN-D008, LN-X001
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DSNY
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DSNY
Pid
4275
Fms Id
S136-383S
Total Budget
25676999.34
Spend To Date
11094703.11
Spend To Date 1
0.432
Fms Project Name
STATEN ISLAND 3 GARAGE HVAC
Agency Project Name
Staten Island 3 Garage - HVAC Replacement
Agency Project Description
Replacement of HVAC System and Roof at Staten Island District 3 DSNY Garage and Boro Repair Shop
Current Phase
Construction
Current Phase Start
2021-05-27T00:00:00.000
Forecast Current Phase End
2024-05-27T00:00:00.000
Forecast Completion
2024-05-27T00:00:00.000
Actual Design Start
2017-07-14T00:00:00.000
Actual Design End
2019-09-18T00:00:00.000
Actual Construction
2019-09-18T00:00:00.000
Actual Construction 1
2021-05-27T00:00:00.000
Actual Construction Start
2021-05-27T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 03
Budget Line
S-0136
Ten Year Plan Category
GARAGES AND FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DSNY
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DSNY
Pid
4275
Fms Id
SOLARDOS2
Total Budget
3528601.74
Spend To Date
29596.74
Spend To Date 1
0.0083
Fms Project Name
Staten Island 3 Garage HVAC
Agency Project Name
Staten Island 3 Garage - HVAC Replacement
Agency Project Description
Replacement of HVAC System and Roof at Staten Island District 3 DSNY Garage and Boro Repair Shop
Current Phase
Construction
Current Phase Start
2021-05-27T00:00:00.000
Forecast Current Phase End
2024-05-27T00:00:00.000
Forecast Completion
2024-05-27T00:00:00.000
Actual Design Start
2017-07-14T00:00:00.000
Actual Design End
2019-09-18T00:00:00.000
Actual Construction
2019-09-18T00:00:00.000
Actual Construction 1
2021-05-27T00:00:00.000
Actual Construction Start
2021-05-27T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 03
Budget Line
PU-0025, PU-0025
Ten Year Plan Category
DISTRIBUTED GENERATION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: NYPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
NYPL
Pid
4276
Fms Id
LNEA14VNT
Total Budget
4696270.88
Spend To Date
664728.25
Spend To Date 1
0.1415
Fms Project Name
HVAC Replacement
Agency Project Name
Van Nest HVAC Upgrade
Agency Project Description
Replacement of HVAC system, including air conditioning, boiler, fans, pumps, piping, and automatic temperature controls.
Current Phase
Construction Procurement
Current Phase Start
2023-11-01T00:00:00.000
Forecast Current Phase End
2024-08-30T00:00:00.000
Forecast Completion
2025-08-29T00:00:00.000
Actual Design Start
2015-08-28T00:00:00.000
Actual Design End
2023-11-01T00:00:00.000
Actual Construction
2023-11-01T00:00:00.000
Borough
Bronx
Community Board
Bronx, Bronx 11
Budget Line
LN-0008, LN-0101X
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Pid: 4277
Reporting Period
202309
Managing Agency
DDC
Pid
4277
Fms Id
SER002329
Total Budget
31500381.92
Spend To Date
1737664.07
Spend To Date 1
0.0551
Fms Project Name
SAN, STM & WM IN LANDMARK COLONY
Agency Project Name
REPLACEMENT SAN SWRS & DIST WMS IN FOREST HILL RD
Agency Project Description
REPLACEMENT OF SANITARY SEWERS AND DISTRIBUTION WATER MAINS IN FOREST HILL ROAD BETWEEN NORWICH STREET AND WILLOWBROOK ROAD AND DISTRIBUTION WATER MAIN REPLACEMENT IN HAROLD STREET BETWEEN FOREST HILL ROAD AND FIELDS AVENUE IN STATEN ISLAND
Current Phase
Construction
Current Phase Start
2023-08-14T00:00:00.000
Forecast Current Phase End
2026-06-08T00:00:00.000
Forecast Completion
2026-06-08T00:00:00.000
Actual Design Start
2019-06-05T00:00:00.000
Actual Design End
2023-01-26T00:00:00.000
Actual Construction
2023-01-26T00:00:00.000
Actual Construction 1
2023-08-14T00:00:00.000
Actual Construction Start
2023-08-14T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
HW-0200, SE-0002R, SE-0200R, SE-0944, TF-0502, WM-0001
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DCAS
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DCAS
Pid
4278
Fms Id
PW195SW2
Total Budget
7813384.52
Spend To Date
890693.78
Spend To Date 1
0.1139
Fms Project Name
80 CENTRE ST. - SIDEWALK REHABILITATION
Agency Project Name
80 CENTRE ST. - SIDEWALK REHABILITATION
Agency Project Description
Replacement of sidewalk at 80 Centre St.
Current Phase
Construction Procurement
Current Phase Start
2023-06-29T00:00:00.000
Forecast Current Phase End
2024-04-22T00:00:00.000
Forecast Completion
2025-01-24T00:00:00.000
Actual Design Start
2015-01-28T00:00:00.000
Actual Design End
2023-06-29T00:00:00.000
Actual Construction
2023-06-29T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
PW-0077, PW-0195
Ten Year Plan Category
REHABILITATION OF CITY-OWNED OFFICE SPACE
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4279
Fms Id
HWS2020K2
Total Budget
7600707.95
Spend To Date
4593200.99
Spend To Date 1
0.6043
Fms Project Name
Prior Notice Sidewalks- Brooklyn
Agency Project Name
Prior Notice Sidewalks- Brooklyn
Agency Project Description
Replacement of sidewalks at various locations in Brooklyn that have violations where property owners received prior notice.
Current Phase
Construction
Current Phase Start
2022-03-21T00:00:00.000
Forecast Current Phase End
2023-09-16T00:00:00.000
Forecast Completion
2023-09-16T00:00:00.000
Actual Design Start
2019-07-30T00:00:00.000
Actual Design End
2019-12-23T00:00:00.000
Actual Construction
2019-12-23T00:00:00.000
Actual Construction 1
2022-03-21T00:00:00.000
Actual Construction Start
2022-03-21T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0200
Ten Year Plan Category
SIDEWALK RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4280
Fms Id
HWS2021X
Total Budget
2971060.69
Spend To Date
86863.93
Spend To Date 1
0.0292
Fms Project Name
PRIOR NOTICE SIDEWALK - BRONX
Agency Project Name
FY21 Prior Notice Sidewalk contract -Bronx
Agency Project Description
Replacement of sidewalks that have violations where property owners received prior notice.
Current Phase
Construction
Current Phase Start
2023-07-17T00:00:00.000
Forecast Current Phase End
2025-01-11T00:00:00.000
Forecast Completion
2025-01-11T00:00:00.000
Actual Design Start
2021-12-08T00:00:00.000
Actual Design End
2022-06-28T00:00:00.000
Actual Construction
2022-06-28T00:00:00.000
Actual Construction 1
2023-07-17T00:00:00.000
Actual Construction Start
2023-07-17T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
HW-0200, HW-0200, P-1331
Ten Year Plan Category
SIDEWALK RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4281
Fms Id
HWS2020Q1
Total Budget
8337863.17
Spend To Date
6361977.59
Spend To Date 1
0.763
Fms Project Name
Prior Notice Sidewalks- Queens
Agency Project Name
Prior Notice Sidewalks- Queens
Agency Project Description
Replacement of sidewalks that have violations where property owners received prior notice. Locations for prior notice sidewalks will be determined by New York City Department of Transportation, Division of Sidewalks and Inspections Management (SIM).
Current Phase
(Completed)
Actual Design Start
2019-09-16T00:00:00.000
Actual Design End
2019-12-20T00:00:00.000
Actual Construction
2019-12-20T00:00:00.000
Actual Construction 1
2021-08-23T00:00:00.000
Actual Construction Start
2021-08-23T00:00:00.000
Actual Construction End
2023-02-10T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
HW-0200, HW-0200, P-1018
Ten Year Plan Category
SIDEWALK RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000