Capital Projects Dashboard - Citywide Budget and Schedule

All major capital infrastructure projects with a committed budget. Financial information and agency schedule details for each project are joined via FMS ID. Only projects in the design phase or later have project schedules displayed. This dataset is part of the Capital Projects Dashboard.

Note: Each row is uniquely identified by its Financial Management Service (FMS) ID. FMS ID is the unique ID that OMB uses for the FMS (Financial Information System). This ID can be universally joined with any OMB dataset that has the same field. The Capital Projects Dashboard is the result of joining OMB’s fiscal data with the agency’s schedule data. FMS IDs and agency projects don't always have a one-to-one relationship (i.e., one project schedule may correlate to multiple FMS IDs, and one FMS may correct to multiple projects with different schedules).

City Government Mayor's Office of Operations (OPS) Dataset fb86-vt7u 27 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4281
Fms Id
HWS2020Q2
Total Budget
8031394.30
Spend To Date
5858976.91
Spend To Date 1
0.7295
Fms Project Name
Prior Notice Sidewalks- Queens
Agency Project Name
Prior Notice Sidewalks- Queens
Agency Project Description
Replacement of sidewalks that have violations where property owners received prior notice. Locations for prior notice sidewalks will be determined by New York City Department of Transportation, Division of Sidewalks and Inspections Management (SIM).
Current Phase
(Completed)
Actual Design Start
2019-09-16T00:00:00.000
Actual Design End
2019-12-20T00:00:00.000
Actual Construction
2019-12-20T00:00:00.000
Actual Construction 1
2021-08-23T00:00:00.000
Actual Construction Start
2021-08-23T00:00:00.000
Actual Construction End
2023-02-10T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
HW-0200, HW-0200
Ten Year Plan Category
SIDEWALK RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4283
Fms Id
HED-569
Total Budget
71037772.19
Spend To Date
51380906.24
Spend To Date 1
0.7232
Fms Project Name
Replacement of Trunk WM in Bainbridge Ave
Agency Project Name
NSTALLATION OF TRUNK MAIN IN BAINBRIDGE AVE., ETC.
Agency Project Description
Replacement of Trunk Water Main in Bainbridge Avenue Between Gunhill Road and Holly Lane and in Jerome Avenue Between Holly Lane and E233th Street, etc.Also, New 36" WM in West Burnside Avenue & Phelan Place
Current Phase
Construction
Current Phase Start
2016-05-23T00:00:00.000
Forecast Current Phase End
2023-12-22T00:00:00.000
Forecast Completion
2023-12-22T00:00:00.000
Actual Design Start
2014-03-17T00:00:00.000
Actual Design End
2015-04-07T00:00:00.000
Actual Construction
2015-04-07T00:00:00.000
Actual Construction 1
2016-05-23T00:00:00.000
Actual Construction Start
2016-05-23T00:00:00.000
Borough
Bronx
Community Board
Bronx 08
Budget Line
HW-0001X, HW-0200, SE-0002X, WM-0001, WM-0006
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: NYPD
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
NYPD
Pid
4285
Fms Id
SANDELEC8
Total Budget
4599903.88
Spend To Date
829984.41
Spend To Date 1
0.1804
Fms Project Name
ERIE BASIN TOW POUND ELECTRICAL (SANDY)
Agency Project Name
ERIE BASIN TOW POUND ELECTRICAL (SANDY)
Agency Project Description
Restoration and installation of the new electrical power at NYPD's tow pound facility in Red Hook due to flooding during Sandy.
Current Phase
Construction
Current Phase Start
2022-01-24T00:00:00.000
Forecast Current Phase End
2024-06-30T00:00:00.000
Forecast Completion
2024-06-30T00:00:00.000
Actual Design Start
2013-05-16T00:00:00.000
Actual Design End
2017-03-01T00:00:00.000
Actual Construction
2017-03-01T00:00:00.000
Actual Construction 1
2022-01-24T00:00:00.000
Actual Construction Start
2022-01-24T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn, Brooklyn 06
Budget Line
PO-0079
Ten Year Plan Category
POLICE FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4286
Fms Id
GKCI05-1A
Total Budget
24267315.80
Spend To Date
858273.69
Spend To Date 1
0.0353
Fms Project Name
GI- CONS OF ROW GREEN INFRASTRUCTURE IN CI-005 PHASE 1A
Agency Project Name
GI-DDC Projects-Green Infrastructure
Agency Project Description
Right of Way (ROW) Green Infrastructure in Tributary Area CI-005 in Brooklyn.
Current Phase
Construction
Current Phase Start
2022-06-06T00:00:00.000
Forecast Current Phase End
2024-06-04T00:00:00.000
Forecast Completion
2024-06-04T00:00:00.000
Actual Design Start
2021-06-30T00:00:00.000
Actual Design End
2021-11-18T00:00:00.000
Actual Construction
2021-11-18T00:00:00.000
Actual Construction 1
2022-06-06T00:00:00.000
Actual Construction Start
2022-06-06T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
WP-0169
Ten Year Plan Category
GREEN INFRASTRUCTURE PROGRAM
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4287
Fms Id
HED-560
Total Budget
12309598.22
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
RECON WM IN WEST FARMS SQUARE (HWXP2007)
Agency Project Name
RECONSTRUCTION OF E 177 STREET/DEVOE AVENUE
Agency Project Description
Road Reconstruction, Water Main and Combined Sewer WorkE 177th Street from Devoe Ave to Bronx Park Ave East Tremont Ave from Bronx Park Ave to Boston RdDevoe Ave from E 177th Street to East Tremont Ave
Current Phase
Design
Current Phase Start
2009-09-03T00:00:00.000
Forecast Current Phase End
2024-02-29T00:00:00.000
Forecast Completion
2027-09-15T00:00:00.000
Actual Design Start
2009-09-03T00:00:00.000
Borough
Bronx
Community Board
Bronx 06
Budget Line
SE-0002X, WM-0001, WM-0006
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4287
Fms Id
HWXP2007
Total Budget
35668010.12
Spend To Date
2753356.73
Spend To Date 1
0.0771
Fms Project Name
E177TH ST/DEVOE AVE BT SHERIDAN (I-895) /E.TREMONT HED-560
Agency Project Name
RECONSTRUCTION OF E 177 STREET/DEVOE AVENUE
Agency Project Description
Road Reconstruction, Water Main and Combined Sewer WorkE 177th Street from Devoe Ave to Bronx Park Ave East Tremont Ave from Bronx Park Ave to Boston RdDevoe Ave from E 177th Street to East Tremont Ave
Current Phase
Design
Current Phase Start
2009-09-03T00:00:00.000
Forecast Current Phase End
2024-02-29T00:00:00.000
Forecast Completion
2027-09-15T00:00:00.000
Actual Design Start
2009-09-03T00:00:00.000
Borough
Bronx
Community Board
Bronx 06
Budget Line
HW-0001X, HW-0200, HW-X006, TF-0002, TF-0502, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4288
Fms Id
BED-768B
Total Budget
58964000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
WATER MAIN CONNECTIONS TO SHAFT 23B - PHASE II (HWK700B)
Agency Project Name
RECONSTRUCTION OF COLUMBIA STREET - PHASE 2
Agency Project Description
Roadway reconstruction including new sewers, water main, street lighting and traffic signals: Columbia Street south of Hamilton Avenue.
Current Phase
Design
Current Phase Start
2019-07-01T00:00:00.000
Forecast Current Phase End
2026-12-31T00:00:00.000
Forecast Completion
2030-08-30T00:00:00.000
Actual Design Start
2019-07-01T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
SE-0002K, WM-0001, WM-0006
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN EXTENSION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4288
Fms Id
HWK700B
Total Budget
51997750.14
Spend To Date
3738746.62
Spend To Date 1
0.0719
Fms Project Name
Reconstruction of Columbia Street Area Phase II (BED-768B)
Agency Project Name
RECONSTRUCTION OF COLUMBIA STREET - PHASE 2
Agency Project Description
Roadway reconstruction including new sewers, water main, street lighting and traffic signals: Columbia Street south of Hamilton Avenue.
Current Phase
Design
Current Phase Start
2019-07-01T00:00:00.000
Forecast Current Phase End
2026-12-31T00:00:00.000
Forecast Completion
2030-08-30T00:00:00.000
Actual Design Start
2019-07-01T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 06
Budget Line
HW-0001K, HW-0200, HW-0200, HW-0700, TF-0002, TF-0502
Ten Year Plan Category
SIDEWALK RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4289
Fms Id
HWQ787B3
Total Budget
1820706.88
Spend To Date
459442.34
Spend To Date 1
0.2523
Fms Project Name
Sutter Ave, Etc - Phase V (B3)
Agency Project Name
SUTTER AVE, ETC - PHASE V (B3)
Agency Project Description
Roadway reconstruction, Sutter Avenue and vicinity including 142nd Street from 135th Avenue to North Conduit Avenue.
Current Phase
Construction Procurement
Current Phase Start
2016-03-29T00:00:00.000
Forecast Current Phase End
2029-09-17T00:00:00.000
Forecast Completion
2031-03-17T00:00:00.000
Actual Design Start
2013-06-17T00:00:00.000
Actual Design End
2016-03-29T00:00:00.000
Actual Construction
2016-03-29T00:00:00.000
Borough
Queens
Community Board
Queens 02
Budget Line
HW-0001Q, HW-0061, HW-0200, HW-0200, HW-0787, TF-0002, TF-0502
Ten Year Plan Category
SIDEWALK RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4290
Fms Id
HWR00508
Total Budget
24117258.07
Spend To Date
2610064.46
Spend To Date 1
0.1082
Fms Project Name
AMBOY ROAD IMPROVEMENTS AT ELTINGVILLE CORRIDOR
Agency Project Name
AMBOY ROAD IMPROVEMENTS AT ELTINGVILLE CORRIDOR
Agency Project Description
Roadway widening and related work on Amboy Road between Richmond Ave. and Armstrong Ave., Borough of Staten Island
Current Phase
Design
Current Phase Start
2014-04-01T00:00:00.000
Forecast Current Phase End
2024-03-16T00:00:00.000
Forecast Completion
2026-09-19T00:00:00.000
Actual Design Start
2014-04-01T00:00:00.000
Borough
Staten Island
Community Board
Staten Island, Staten Island 03
Budget Line
HW-0001R, HW-0061, HW-R005
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: QPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
QPL
Pid
4291
Fms Id
LQRDMASON
Total Budget
5180983.09
Spend To Date
554222.64
Spend To Date 1
0.1069
Fms Project Name
RIDGEWOOD - MASONRY
Agency Project Name
Ridgewood Roof & Masonry Repair
Agency Project Description
Roof & Façade Restoration
Current Phase
Design
Current Phase Start
2016-11-18T00:00:00.000
Forecast Current Phase End
2024-05-01T00:00:00.000
Forecast Completion
2027-07-01T00:00:00.000
Actual Design Start
2016-11-18T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
LQ-0122, LQ-D122, LQ-Q122
Ten Year Plan Category
RECONSTRUCTION NECESSARY TO MAINTAIN FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4292
Fms Id
HWRF05R
Total Budget
16027197.79
Spend To Date
1639369.41
Spend To Date 1
0.1022
Fms Project Name
Dubois Yard Roof
Agency Project Name
Replacement of roof , sprinkler & related repairs
Agency Project Description
Roof replacement and related repairs caused by water damage. Replace wet sprinkler system with dry system. New Scope @ 100%CD phase: installation of swing spaces - trailers- for DOT personnel (including showers, lockers, changing areas, and admin offices) during construction.
Current Phase
Design
Current Phase Start
2016-10-24T00:00:00.000
Forecast Current Phase End
2024-02-29T00:00:00.000
Forecast Completion
2026-07-31T00:00:00.000
Actual Design Start
2016-10-24T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
HW-0003
Ten Year Plan Category
FACILITY RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: BPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
BPL
Pid
4293
Fms Id
LBM15GBRF
Total Budget
2026290.39
Spend To Date
460621.27
Spend To Date 1
0.2273
Fms Project Name
GERRITSEN BEACH ENVELOPE REHAB
Agency Project Name
Gerritsen Beach Building Envelope Rehabilitation
Agency Project Description
Roof replacement and repair/replacement of compromised interior beams.
Current Phase
Construction Procurement
Current Phase Start
2023-06-20T00:00:00.000
Forecast Current Phase End
2024-04-01T00:00:00.000
Forecast Completion
2025-10-02T00:00:00.000
Actual Design Start
2016-03-01T00:00:00.000
Actual Design End
2023-06-20T00:00:00.000
Actual Construction
2023-06-20T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 15
Budget Line
LB-0104, LB-K001
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DHS
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DHS
Pid
4294
Fms Id
HH112FTRF
Total Budget
18947699.00
Spend To Date
890088.51
Spend To Date 1
0.0469
Fms Project Name
FT. WASHINGTON ARMORY ROOF REPLACEMENT
Agency Project Name
Fort Washington Armory Roof Replacement
Agency Project Description
Roof replacement for Ft. Washington Armory
Current Phase
Design
Current Phase Start
2019-06-17T00:00:00.000
Forecast Current Phase End
2024-04-30T00:00:00.000
Forecast Completion
2026-07-28T00:00:00.000
Actual Design Start
2019-06-17T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HH-0112
Ten Year Plan Category
SHELTERS FOR HOMELESS INDIVIDUALS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: BPL
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
BPL
Pid
4295
Fms Id
LBM15RDRF
Total Budget
1429012.43
Spend To Date
409252.69
Spend To Date 1
0.2863
Fms Project Name
Ryder Envelope Rehabilitation
Agency Project Name
Ryder Building Envelope Rehabilitation
Agency Project Description
Ryder Library Building Envelope Rehabilitation
Current Phase
Construction
Current Phase Start
2022-03-21T00:00:00.000
Forecast Current Phase End
2024-02-29T00:00:00.000
Forecast Completion
2024-02-29T00:00:00.000
Actual Design Start
2015-11-24T00:00:00.000
Actual Design End
2020-07-17T00:00:00.000
Actual Construction
2020-07-17T00:00:00.000
Actual Construction 1
2022-03-21T00:00:00.000
Actual Construction Start
2022-03-21T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 12
Budget Line
LB-0104, LB-D104
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4296
Fms Id
HWCSCHPKR
Total Budget
26014214.00
Spend To Date
2663873.70
Spend To Date 1
0.1024
Fms Project Name
Safe Routes to Schools - Brooklyn & Staten Island
Agency Project Name
SAFE ROUTES TO SCHOOLS BK & SI
Agency Project Description
Safe Route to School in Brooklyn and Staten Island
Current Phase
Construction
Current Phase Start
2023-10-16T00:00:00.000
Forecast Current Phase End
2025-10-14T00:00:00.000
Forecast Completion
2025-10-14T00:00:00.000
Actual Design Start
2018-06-27T00:00:00.000
Actual Design End
2023-01-25T00:00:00.000
Actual Construction
2023-01-25T00:00:00.000
Actual Construction 1
2023-10-16T00:00:00.000
Actual Construction Start
2023-10-16T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
HW-0001, HW-0001K, HW-0001R, HW-0200, HW-0944, TF-0002, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4297
Fms Id
HWCSCHPMN
Total Budget
44582712.96
Spend To Date
2853613.52
Spend To Date 1
0.064
Fms Project Name
SAFE ROUTES TO SCHOOLS- MANHATTAN, MED683
Agency Project Name
SAFE ROUTES TO SCHOOL MANHATTAN
Agency Project Description
SAFE ROUTES TO SCHOOLS - MANHATTAN
Current Phase
Design
Current Phase Start
2018-06-25T00:00:00.000
Forecast Current Phase End
2024-03-08T00:00:00.000
Forecast Completion
2028-01-05T00:00:00.000
Actual Design Start
2018-06-25T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
HW-0200, HW-0988, HW-D101, HW-D102, TF-0002, TF-0502, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4297
Fms Id
MED683
Total Budget
6523000.00
Spend To Date
152055.00
Spend To Date 1
0.0233
Fms Project Name
Dist Trunk WM Rplmt at BDWY & W 135 St, Manhattan, HWCSCHPMN
Agency Project Name
SAFE ROUTES TO SCHOOL MANHATTAN
Agency Project Description
SAFE ROUTES TO SCHOOLS - MANHATTAN
Current Phase
Design
Current Phase Start
2018-06-25T00:00:00.000
Forecast Current Phase End
2024-03-08T00:00:00.000
Forecast Completion
2028-01-05T00:00:00.000
Actual Design Start
2018-06-25T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 09, Manhattan 11, Manhattan 12
Budget Line
WM-0001, WM-0006
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4298
Fms Id
BED-828
Total Budget
8739340.00
Spend To Date
42073.20
Spend To Date 1
0.0048
Fms Project Name
Dist WM work in 86th St btw Bay 20th & 28th St,BK, HWSRT200E
Agency Project Name
SAFE ROUTES TO TRANSIT, 86TH S / BED-828
Agency Project Description
Safe Routes to Transit - 86th St Brooklyn
Current Phase
Design
Current Phase Start
2020-10-15T00:00:00.000
Forecast Current Phase End
2024-12-20T00:00:00.000
Forecast Completion
2027-03-30T00:00:00.000
Actual Design Start
2020-10-15T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 11
Budget Line
SE-0002K, SE-0200K, WM-0001
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4298
Fms Id
HWSRT200E
Total Budget
24251080.65
Spend To Date
2004563.88
Spend To Date 1
0.0826
Fms Project Name
Safe Routes to Transit: 86th Street, BED-828
Agency Project Name
SAFE ROUTES TO TRANSIT, 86TH S / BED-828
Agency Project Description
Safe Routes to Transit - 86th St Brooklyn
Current Phase
Design
Current Phase Start
2020-10-15T00:00:00.000
Forecast Current Phase End
2024-12-20T00:00:00.000
Forecast Completion
2027-03-30T00:00:00.000
Actual Design Start
2020-10-15T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0001K, HW-0200, HW-0988
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4299
Fms Id
HWK1674
Total Budget
33910000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Flatbush Avenue Downtown Brooklyn Safety Improvements
Agency Project Name
Flatbush Avenue Downtown Brooklyn Safety Improvements
Agency Project Description
Safety improvements of Flatbush Ave from Livingston St to Pacific Street.
Current Phase
Pre-Design
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0001K, HW-D101, HW-K005
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4300
Fms Id
HWK002377
Total Budget
6110917.50
Spend To Date
350000.00
Spend To Date 1
0.0572
Fms Project Name
East 72nd Street Reconstruction Brooklyn, SEK002377
Agency Project Name
SANITARY SEWERS & WM IN E 72ND ST, AVE L & ROYCE
Agency Project Description
SANITARY SEWER AND WATER MAIN REPLACEMENT IN EAST 72ND ST BETWEEN AVENUE L AND ROYCE PLACE, BOROUGH OF BROOKLYN.
Current Phase
Design
Current Phase Start
2020-01-22T00:00:00.000
Forecast Current Phase End
2024-06-30T00:00:00.000
Forecast Completion
2028-03-30T00:00:00.000
Actual Design Start
2020-01-22T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0001K, HW-0061
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4300
Fms Id
SEK002377
Total Budget
4497854.95
Spend To Date
765493.51
Spend To Date 1
0.1701
Fms Project Name
San sewer & WM repl 72nd St btwn Av L & Royce Pl, HWK002377
Agency Project Name
SANITARY SEWERS & WM IN E 72ND ST, AVE L & ROYCE
Agency Project Description
SANITARY SEWER AND WATER MAIN REPLACEMENT IN EAST 72ND ST BETWEEN AVENUE L AND ROYCE PLACE, BOROUGH OF BROOKLYN.
Current Phase
Design
Current Phase Start
2020-01-22T00:00:00.000
Forecast Current Phase End
2024-06-30T00:00:00.000
Forecast Completion
2028-03-30T00:00:00.000
Actual Design Start
2020-01-22T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 18
Budget Line
SE-0002K, WM-0001
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4301
Fms Id
SELCDDC10
Total Budget
6543131.96
Spend To Date
1612964.81
Spend To Date 1
0.2465
Fms Project Name
SEWER LINING CONTRACT, CITYWIDE
Agency Project Name
Sewer Lining Contract, Citywide
Agency Project Description
Sewer Lining Contract - Citywide
Current Phase
Construction
Current Phase Start
2022-02-22T00:00:00.000
Forecast Current Phase End
2023-12-01T00:00:00.000
Forecast Completion
2023-12-01T00:00:00.000
Actual Design Start
2020-01-09T00:00:00.000
Actual Design End
2020-06-12T00:00:00.000
Actual Construction
2020-06-12T00:00:00.000
Actual Construction 1
2022-02-22T00:00:00.000
Actual Construction Start
2022-02-22T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
SE-0002K, SE-0002M, SE-0002Q, SE-0002R, SE-0002X
Ten Year Plan Category
REPLACEMENT OF CHRONICALLY FAILING COMPONENTS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4302
Fms Id
SEQNS003
Total Budget
33604499.61
Spend To Date
3790400.01
Spend To Date 1
0.1127
Fms Project Name
SEQ - Sewer When & Where Contract in SE Queens (HWQ1195)
Agency Project Name
SEWER WHEN & WHERE CONTRACT IN S.E. QUEENS (SECONDARY ID: HWQ1195)
Agency Project Description
SEWER WHEN & WHERE CONTRACT IN South East Queens. NEW STORM SEWER CONSTRUCTION, REPLACEMENT OR UPGRADES TO SANITARY SEWERS AND WATER MAIN IN PROJECT AREAS. GREEN INFRASTRUCTURE PROJECTS IN CONJUNCTION WITH WHEN & WHERE PROJECTS.
Current Phase
Construction
Current Phase Start
2024-01-16T00:00:00.000
Forecast Current Phase End
2026-07-13T00:00:00.000
Forecast Completion
2026-07-13T00:00:00.000
Actual Design Start
2018-05-14T00:00:00.000
Actual Design End
2023-02-16T00:00:00.000
Actual Construction
2023-02-16T00:00:00.000
Actual Construction 1
2024-01-16T00:00:00.000
Actual Construction Start
2024-01-16T00:00:00.000
Borough
Queens
Community Board
Queens 12, Queens 13
Budget Line
EP-0007, SE-0002Q, SE-0005, SE-0200Q, SE-0944, WM-0001
Ten Year Plan Category
UTILITY RELOCATION FOR SE AND WM PROJECTS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DCLA
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DCLA
Pid
4303
Fms Id
PV477TEMP
Total Budget
7037030.18
Spend To Date
851528.00
Spend To Date 1
0.121
Fms Project Name
SICM -Staten Island Children's Museum Temp Control System
Agency Project Name
Staten Island Museum - HVAC Upgrade
Agency Project Description
SICM - HVAC upgrade Buildings M & J
Current Phase
Construction
Current Phase Start
2023-03-21T00:00:00.000
Forecast Current Phase End
2025-03-10T00:00:00.000
Forecast Completion
2025-03-10T00:00:00.000
Actual Design Start
2019-06-04T00:00:00.000
Actual Design End
2022-08-19T00:00:00.000
Actual Construction
2022-08-19T00:00:00.000
Actual Construction 1
2023-03-21T00:00:00.000
Actual Construction Start
2023-03-21T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 01
Budget Line
PV-0477, PV-D477, PV-R477
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4304
Fms Id
HWS2021Q
Total Budget
10812357.50
Spend To Date
111967.54
Spend To Date 1
0.0103
Fms Project Name
PRIOR NOTICE SIDEWALK - QUEENS
Agency Project Name
FY21 Prior Notice Sidewalk contract - Queens
Agency Project Description
Sidewalk repair/replacement Replacement of sidewalks that have violations where property owners received prior notice.
Current Phase
Construction
Current Phase Start
2023-08-07T00:00:00.000
Forecast Current Phase End
2025-02-01T00:00:00.000
Forecast Completion
2025-02-01T00:00:00.000
Actual Design Start
2021-12-08T00:00:00.000
Actual Design End
2022-06-22T00:00:00.000
Actual Construction
2022-06-22T00:00:00.000
Actual Construction 1
2023-08-07T00:00:00.000
Actual Construction Start
2023-08-07T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
HW-0200, HW-0200, P-1331
Ten Year Plan Category
SIDEWALK RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4305
Fms Id
HWS2023K
Total Budget
12029000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Prior Notice Sidewalks - Brooklyn
Agency Project Name
FY23 Prior Notice Sidewalk - Brooklyn
Agency Project Description
Sidewalk repairs and installations
Current Phase
Construction Procurement
Current Phase Start
2023-10-25T00:00:00.000
Forecast Current Phase End
2024-07-20T00:00:00.000
Forecast Completion
2026-07-19T00:00:00.000
Actual Design Start
2023-05-04T00:00:00.000
Actual Design End
2023-10-25T00:00:00.000
Actual Construction
2023-10-25T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0200, P-1331
Ten Year Plan Category
SIDEWALK RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4306
Fms Id
HWS2023Q
Total Budget
16541000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Prior Notice Sidewalks - Queens
Agency Project Name
FY23 Prior Notice Sidewalk - Queens
Agency Project Description
Sidewalk repairs/installations - Queens
Current Phase
Design
Current Phase Start
2023-05-02T00:00:00.000
Forecast Current Phase End
2023-12-22T00:00:00.000
Forecast Completion
2026-02-02T00:00:00.000
Actual Design Start
2023-05-02T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
HW-0200, P-1331
Ten Year Plan Category
SIDEWALK RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DCLA
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DCLA
Pid
4307
Fms Id
PV302BPH1
Total Budget
14696303.44
Spend To Date
1837269.35
Spend To Date 1
0.125
Fms Project Name
SIIAS - Building B at SHCC Phase1 Geo-Thermal & Ground Floor
Agency Project Name
SIM Snug Harbor:Construction,Plumbing & Electrical
Agency Project Description
SIIAS - Building B at SHCC Phase1 Geothermal & Ground Floor
Current Phase
Construction Procurement
Current Phase Start
2023-06-30T00:00:00.000
Forecast Current Phase End
2024-06-03T00:00:00.000
Forecast Completion
2026-06-03T00:00:00.000
Actual Design Start
2018-06-04T00:00:00.000
Actual Design End
2023-06-30T00:00:00.000
Actual Construction
2023-06-30T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 01
Budget Line
PV-0302, PV-D302, PV-R302
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4308
Fms Id
HWPR23MQ
Total Budget
16340000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Standard Upgrades Ped Ramps - Manhattan and Queens
Agency Project Name
Simple Upgrades Ped Ramps - Manhattan and Queens
Agency Project Description
Simple Upgrades Ped Ramps - Manhattan and Queens
Current Phase
Construction Procurement
Current Phase Start
2023-08-31T00:00:00.000
Forecast Current Phase End
2024-06-30T00:00:00.000
Forecast Completion
2026-06-29T00:00:00.000
Actual Design Start
2022-11-09T00:00:00.000
Actual Design End
2023-08-31T00:00:00.000
Actual Construction
2023-08-31T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
HW-0200
Ten Year Plan Category
PEDESTRIAN RAMP CONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4309
Fms Id
HWP15XMCL
Total Budget
10322500.61
Spend To Date
8120124.23
Spend To Date 1
0.7866
Fms Project Name
Simple, Complex & Landmark Ped Ramps - Bronx and Manhattan
Agency Project Name
SIMPLE, COMPLEX & LANDMARKS PED. RAMPS, MN
Agency Project Description
SIMPLE, COMPLEX & LANDMARKS PED. RAMPS, BX & MN
Current Phase
Construction
Current Phase Start
2017-03-20T00:00:00.000
Forecast Current Phase End
2024-05-16T00:00:00.000
Forecast Completion
2024-05-16T00:00:00.000
Actual Design Start
2014-09-26T00:00:00.000
Actual Design End
2015-12-31T00:00:00.000
Actual Construction
2015-12-31T00:00:00.000
Actual Construction 1
2017-03-20T00:00:00.000
Actual Construction Start
2017-03-20T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
HW-0200
Ten Year Plan Category
PEDESTRIAN RAMP CONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DCLA
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DCLA
Pid
4310
Fms Id
PV490-Q3
Total Budget
23611839.29
Spend To Date
20461140.80
Spend To Date 1
0.8665
Fms Project Name
SHCC - Snug Harbor Cult. Ctr. Music Hall, Dressing Rooms
Agency Project Name
SHC Center Music Hall, Dressing and ADA compliance
Agency Project Description
Snug Harbor Campus Center Music Hall (Bldg T)) Renovation to provide back of house amenities
Current Phase
Construction
Current Phase Start
2019-04-02T00:00:00.000
Forecast Current Phase End
2023-09-29T00:00:00.000
Forecast Completion
2023-09-29T00:00:00.000
Actual Design Start
2014-10-16T00:00:00.000
Actual Design End
2017-06-30T00:00:00.000
Actual Construction
2017-06-30T00:00:00.000
Actual Construction 1
2019-04-02T00:00:00.000
Actual Construction Start
2019-04-02T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 01
Budget Line
PV-0490, PV-D490, PV-R490
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DCLA
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DCLA
Pid
4311
Fms Id
PV490JNFC
Total Budget
4315132.00
Spend To Date
510390.35
Spend To Date 1
0.1182
Fms Project Name
SHCC - Building D John Noble Facade/Exterior Wall Renovation
Agency Project Name
NOBLE MARITIME COLLECTION
Agency Project Description
Snug Harbor Cultural Center - Noble Maritime Collection, Building "D" Façade Reconstruction.
Current Phase
Design
Current Phase Start
2023-01-06T00:00:00.000
Forecast Current Phase End
2024-03-18T00:00:00.000
Forecast Completion
2025-10-10T00:00:00.000
Actual Design Start
2023-01-06T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 01
Budget Line
PV-0N954, PV-D490, PV-I001, PV-R490, PW-I001
Ten Year Plan Category
MISCELLANEOUS CONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4312
Fms Id
SE-885
Total Budget
152097806.00
Spend To Date
2497946.40
Spend To Date 1
0.0164
Fms Project Name
SEQ - 150th St Spine: Phase I, Outlet at Bergen Basin
Agency Project Name
150TH ST SPINE PHASE 1 STORM SEWER AT BERGEN BASIN
Agency Project Description
SOUTHEAST QUEENS 150TH STREET SPINE, PHASE 1. DOUBLE BARREL STORM SEWER AND OUTFALL AT BERGEN BASIN FOR THE 150TH STREET TRUNK SEWER WHICH SHARES AN OUTFALL WITH THE GUY R BREWER TRUNK SEWER
Current Phase
Design
Current Phase Start
2019-07-23T00:00:00.000
Forecast Current Phase End
2024-12-06T00:00:00.000
Forecast Completion
2028-06-28T00:00:00.000
Actual Design Start
2019-07-23T00:00:00.000
Borough
Queens
Community Board
Queens 13
Budget Line
SE-0200Q
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4313
Fms Id
SE-885A
Total Budget
49857389.00
Spend To Date
6458239.96
Spend To Date 1
0.1295
Fms Project Name
SEQ - 150th St Spine: Phase II, Trunk Storm Sewer in JFK
Agency Project Name
150 ST SPINE: PHASE II TRUNK SEWER AT BERGEN BASIN
Agency Project Description
Southeast Queens 150th Street Spine, Phase II - Installation of a new double barrel trunk storm sewer that will run through JFK airport; approximately 1,000 feet east of Bergen Basin, to the north side of the Belt Parkway at Inwood Street and 150th Street
Current Phase
Design
Current Phase Start
2020-03-02T00:00:00.000
Forecast Current Phase End
2024-08-02T00:00:00.000
Forecast Completion
2027-01-15T00:00:00.000
Actual Design Start
2020-03-02T00:00:00.000
Borough
Queens
Community Board
Queens 12, Queens 13
Budget Line
SE-0200Q
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4314
Fms Id
SEQPGRD1
Total Budget
34611541.00
Spend To Date
1445028.07
Spend To Date 1
0.0417
Fms Project Name
Southeast Queens Priority Grids -- Group 1 (DOTSEQ01)
Agency Project Name
SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 1 (SECONDARY ID: DOTSEQ01)
Agency Project Description
SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 1
Current Phase
Construction
Current Phase Start
2023-11-13T00:00:00.000
Forecast Current Phase End
2026-11-11T00:00:00.000
Forecast Completion
2026-11-11T00:00:00.000
Actual Design Start
2018-07-10T00:00:00.000
Actual Design End
2023-01-05T00:00:00.000
Actual Construction
2023-01-05T00:00:00.000
Actual Construction 1
2023-11-13T00:00:00.000
Actual Construction Start
2023-11-13T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
HW-0001Q, HW-0200, HW-0944, HW-1684, TF-0002, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4315
Fms Id
SEQPGRD2
Total Budget
32206015.00
Spend To Date
1277974.40
Spend To Date 1
0.0396
Fms Project Name
Southeast Queens Priority Grids -- Group 2 (DOTSEQ02)
Agency Project Name
SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 2 (SECONDARY ID: DOTSEQ02)
Agency Project Description
SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 2
Current Phase
Design
Current Phase Start
2018-10-09T00:00:00.000
Forecast Current Phase End
2025-11-20T00:00:00.000
Forecast Completion
2028-08-15T00:00:00.000
Actual Design Start
2018-10-09T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
HW-0001Q, HW-0061
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4316
Fms Id
HWQ662G
Total Budget
24831520.00
Spend To Date
1682419.68
Spend To Date 1
0.0677
Fms Project Name
Springfield Gardens Phase V (SE-862)
Agency Project Name
STORM SANITARY SEWER REPL SPRINGFIELD GARDENS
Agency Project Description
SPRINGFIELD GARDENS RECONSTRUCTION PHASE 5; STORM AND SANITARY SEWER EXTENSIONS AND UPGRADES AND WATER MAIN REPLACEMENT IN 146TH AVENUE BETWEEN 153RD PLACE AND 159TH STREET, ETC, BOROUGH OF QUEENS (HWQ662G)
Current Phase
Design
Current Phase Start
2018-05-09T00:00:00.000
Forecast Current Phase End
2025-01-28T00:00:00.000
Forecast Completion
2029-07-02T00:00:00.000
Actual Design Start
2018-05-09T00:00:00.000
Borough
Queens
Community Board
Queens 13
Budget Line
HW-0001Q, HW-0061, HW-0200, HW-0200, HW-0662, TF-0002, TF-0502
Ten Year Plan Category
SIDEWALK RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4316
Fms Id
SE-862
Total Budget
86496856.41
Spend To Date
2341856.41
Spend To Date 1
0.027
Fms Project Name
SEQ - Storm & Sanitary Sewer Replcmnt/Ext. 146 Ave (HWQ662G)
Agency Project Name
STORM SANITARY SEWER REPL SPRINGFIELD GARDENS
Agency Project Description
SPRINGFIELD GARDENS RECONSTRUCTION PHASE 5; STORM AND SANITARY SEWER EXTENSIONS AND UPGRADES AND WATER MAIN REPLACEMENT IN 146TH AVENUE BETWEEN 153RD PLACE AND 159TH STREET, ETC, BOROUGH OF QUEENS (HWQ662G)
Current Phase
Design
Current Phase Start
2018-05-09T00:00:00.000
Forecast Current Phase End
2025-01-28T00:00:00.000
Forecast Completion
2029-07-02T00:00:00.000
Actual Design Start
2018-05-09T00:00:00.000
Borough
Queens
Community Board
Queens 13
Budget Line
SE-0002Q, SE-0200Q, SE-0200Q, WM-0001, WM-0006
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DCLA
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DCLA
Pid
4317
Fms Id
PV394AMBR
Total Budget
12910000.00
Spend To Date
920232.92
Spend To Date 1
0.0712
Fms Project Name
SSS - Ambrose Restoration
Agency Project Name
Ambrose Restoration
Agency Project Description
Stabilization and Restoration of 1907 Lightship Ambrose for the South Street Seaport Museum.
Current Phase
Design
Current Phase Start
2021-09-02T00:00:00.000
Forecast Current Phase End
2024-05-14T00:00:00.000
Forecast Completion
2026-09-08T00:00:00.000
Actual Design Start
2021-09-02T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
PV-0N394, PV-DN394, PV-MN394
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DPR
Pid
4318
Fms Id
P109STARA
Total Budget
5747631.16
Spend To Date
4927705.73
Spend To Date 1
0.8573
Fms Project Name
STARLIGHT PARK COMFORT STATION X147-111M
Agency Project Name
Starlight Park Comfort Station
Agency Project Description
Starlight Park Comfort Station Construction and maintenance garage in the Bronx.
Current Phase
(Completed)
Actual Design Start
2013-03-27T00:00:00.000
Actual Design End
2017-06-20T00:00:00.000
Actual Construction
2017-06-20T00:00:00.000
Actual Construction 1
2019-01-04T00:00:00.000
Actual Construction Start
2019-01-04T00:00:00.000
Actual Construction End
2023-06-27T00:00:00.000
Borough
Bronx
Community Board
Bronx 09
Budget Line
P-0245X, P-1018, P-1018
Ten Year Plan Category
MAJOR RECREATIONAL FACILITIES AND FACILITY RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DCAS
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DCAS
Pid
4319
Fms Id
CO302ST
Total Budget
8069667.90
Spend To Date
6726013.50
Spend To Date 1
0.8334
Fms Project Name
18 RICHMOND TERRACE - EXTERIOR STEPS RECONSTRUCTION
Agency Project Name
18 RICHMOND TERRACE - EXTERIOR STEPS RECONSTRUCTI
Agency Project Description
Staten Island Supreme Court, Monumental Stairs, 18 Richmond Terrace - Reconstruct the monumental stair at the main entrance of the building, including the limestone steps and platforms, adjacent concrete public sidewalk and street curbs, structural support system and handrails.
Current Phase
(Completed)
Actual Design Start
2018-10-31T00:00:00.000
Actual Design End
2020-10-08T00:00:00.000
Actual Construction
2020-10-08T00:00:00.000
Actual Construction 1
2022-02-14T00:00:00.000
Actual Construction Start
2022-02-14T00:00:00.000
Actual Construction End
2023-04-28T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 01
Budget Line
CO-0302
Ten Year Plan Category
RECONSTRUCTION/RENOVATION OF COURT FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4320
Fms Id
SER200258
Total Budget
22552290.96
Spend To Date
9208787.45
Spend To Date 1
0.4083
Fms Project Name
Sanitary and Storm Sewer in West Castor Place between Alvers
Agency Project Name
STORM & SANITARY SEWERS IN ALVERSON AVENUE, SI
Agency Project Description
STORM & SANITARY SEWERS IN WEST CASTOR PLACE, SI
Current Phase
Construction
Current Phase Start
2022-07-18T00:00:00.000
Forecast Current Phase End
2024-03-31T00:00:00.000
Forecast Completion
2024-03-31T00:00:00.000
Actual Design Start
2014-06-16T00:00:00.000
Actual Design End
2021-12-14T00:00:00.000
Actual Construction
2021-12-14T00:00:00.000
Actual Construction 1
2022-07-18T00:00:00.000
Actual Construction Start
2022-07-18T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 03
Budget Line
HW-0200, SE-0002R, SE-0200R, WM-0001
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4321
Fms Id
SE-807
Total Budget
144958767.56
Spend To Date
99865447.30
Spend To Date 1
0.6889
Fms Project Name
Storm & San Sewers in 20th Ave b/t 126 St & US Bulkhead Line
Agency Project Name
STM & SAN SEWERS IN 20 AVE B/T126 ST & US BULKHEAD
Agency Project Description
Storm and sanitary sewers in 20th Ave between 126th Street and U.S. Bulkhead Line, etc. Water main works.
Current Phase
Construction
Current Phase Start
2017-01-02T00:00:00.000
Forecast Current Phase End
2024-05-30T00:00:00.000
Forecast Completion
2024-05-30T00:00:00.000
Actual Design Start
2012-07-10T00:00:00.000
Actual Design End
2015-06-12T00:00:00.000
Actual Construction
2015-06-12T00:00:00.000
Actual Construction 1
2017-01-02T00:00:00.000
Actual Construction Start
2017-01-02T00:00:00.000
Borough
Queens
Community Board
Queens 07
Budget Line
SE-0002Q, SE-0004, SE-0200Q, WM-0001
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4322
Fms Id
SEX200400
Total Budget
25175107.91
Spend To Date
1967341.35
Spend To Date 1
0.0781
Fms Project Name
STORM & SAN SEWERS REPL & EXT IN MININIEFORD AVE AREA
Agency Project Name
STM AND SAN SEWERS IN MINNIEFORD AVENUE AREA
Agency Project Description
Storm and Sanitary Sewers in:Terrace St. between Minnieford Ave. and King Ave.
Current Phase
Construction
Current Phase Start
2023-10-10T00:00:00.000
Forecast Current Phase End
2026-10-08T00:00:00.000
Forecast Completion
2026-10-08T00:00:00.000
Actual Design Start
2017-03-27T00:00:00.000
Actual Design End
2022-12-28T00:00:00.000
Actual Construction
2022-12-28T00:00:00.000
Actual Construction 1
2023-10-10T00:00:00.000
Actual Construction Start
2023-10-10T00:00:00.000
Borough
Bronx
Community Board
Bronx 10
Budget Line
HW-0001X, HW-0200, SE-0002X, SE-0200X, SE-0944, TF-0502, WM-0001
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4323
Fms Id
HWTRK883
Total Budget
5378396.01
Spend To Date
105514.54
Spend To Date 1
0.0196
Fms Project Name
Trench Restoration -- Bay Parkway, Brooklyn, SE-883
Agency Project Name
STORM, HLSS & SANITARY SEWER & WM IN CROPSEY AVE
Agency Project Description
Storm, high level storm and sanitary sewer construction and water main replacement in Cropsey Avenue between Bay 20th Street and Bay 32nd Street.
Current Phase
Design
Current Phase Start
2017-09-05T00:00:00.000
Forecast Current Phase End
2024-12-31T00:00:00.000
Forecast Completion
2029-08-30T00:00:00.000
Actual Design Start
2017-09-05T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0001K
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4324
Fms Id
SE-889
Total Budget
112710350.47
Spend To Date
329716.37
Spend To Date 1
0.0029
Fms Project Name
SEQ - New Storm Sewer N. Conduit Ave
Agency Project Name
NEW STORM SEWER N CONDUIT AV-BAISLEY BLVD
Agency Project Description
Storm, Sanitary and Water Mains work in North Conduit between Baisley Blvd and Guy Brewer Blvd, South Queens
Current Phase
Pre-Design
Borough
Queens
Community Board
Queens 12
Budget Line
SE-0002Q, SE-0200Q, WM-0001, WM-0006
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4325
Fms Id
CONISPH04
Total Budget
28912069.97
Spend To Date
1190000.00
Spend To Date 1
0.0411
Fms Project Name
SAN & STRM SWR, WM1, IN CONEY ISL AREA, PH 4
Agency Project Name
SAN & STRM SEWER, WM IN CONEY ISLAND AREA, PH 4
Agency Project Description
Storm, Sanitary Sewers & Water Mains in Coney Island Area - Phase 04, Brooklyn
Current Phase
Design
Current Phase Start
2019-07-25T00:00:00.000
Forecast Current Phase End
2024-10-31T00:00:00.000
Forecast Completion
2029-07-29T00:00:00.000
Actual Design Start
2019-07-25T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 13
Budget Line
SE-0200K, WM-0001, WM-0006
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4326
Fms Id
HWK1048D
Total Budget
27969502.54
Spend To Date
8868854.88
Spend To Date 1
0.317
Fms Project Name
BK Waterfront Greenway:Sunset Pk Gowanus Connect BED-802
Agency Project Name
SUNSET PARK GOWANUS CONNECTOR, BK
Agency Project Description
Sunset Park Gowanus Connector - Brooklyn Waterfront Greenway.
Current Phase
Construction
Current Phase Start
2020-06-01T00:00:00.000
Forecast Current Phase End
2024-05-20T00:00:00.000
Forecast Completion
2024-05-20T00:00:00.000
Actual Design Start
2017-09-18T00:00:00.000
Actual Design End
2019-06-26T00:00:00.000
Actual Construction
2019-06-26T00:00:00.000
Actual Construction 1
2020-06-01T00:00:00.000
Actual Construction Start
2020-06-01T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 07
Budget Line
HW-0001K, HW-0200, HW-K005
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2024-02-16T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000