Capital Projects Dashboard - Citywide Budget and Schedule

All major capital infrastructure projects with a committed budget. Financial information and agency schedule details for each project are joined via FMS ID. Only projects in the design phase or later have project schedules displayed. This dataset is part of the Capital Projects Dashboard.

Note: Each row is uniquely identified by its Financial Management Service (FMS) ID. FMS ID is the unique ID that OMB uses for the FMS (Financial Information System). This ID can be universally joined with any OMB dataset that has the same field. The Capital Projects Dashboard is the result of joining OMB’s fiscal data with the agency’s schedule data. FMS IDs and agency projects don't always have a one-to-one relationship (i.e., one project schedule may correlate to multiple FMS IDs, and one FMS may correct to multiple projects with different schedules).

City Government Mayor's Office of Operations (OPS) Dataset fb86-vt7u 27 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
202309
Reporting Period: 202309 • Managing Agency: DOT • Fms Id: TYPLREP
Reporting Period
202309
Managing Agency
DOT
Fms Id
TYPLREP
Total Budget
600000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
TRAFFIC PARK & HIGHWAY DISTRIBUTION(TEN YEAR PLAN)
Current Phase
(Lump Sum)
Borough
Citywide
Community Board
Citywide
Budget Line
P-0705, TF-0503
Ten Year Plan Category
REPLACEMENT OF ELECTRICAL DISTRIBUTION SYSTEMS
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Fms Id: TYPLSGM
Reporting Period
202309
Managing Agency
DOT
Fms Id
TYPLSGM
Total Budget
76981000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
TRAFFIC SIGNALS (TEN YEAR PLAN)
Current Phase
(Lump Sum)
Borough
Citywide
Community Board
Citywide
Budget Line
TF-0001, TF-0CH1
Ten Year Plan Category
SIGNAL INSTALLATION AND COMPUTERIZATION
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Fms Id: W147LIGH
Reporting Period
202309
Managing Agency
DOT
Fms Id
W147LIGH
Total Budget
98000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
West 147th Street Sugar Hill Historical Street Lights
Current Phase
(Requirements Contract)
Borough
Manhattan
Community Board
Manhattan 10
Budget Line
TF-M503
Ten Year Plan Category
INSTALLATION OF LAMPPOSTS AND LUMINAIRES
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Fms Id: WHAMBEACH
Reporting Period
202309
Managing Agency
DOT
Fms Id
WHAMBEACH
Total Budget
597000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
HAMILTON BEACH BULKHEADS AND ROADWAYS
Current Phase
(Completed)
Borough
Queens
Community Board
Queens 10
Budget Line
HW-D103
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Fms Id: WHTGIRDS2
Reporting Period
202309
Managing Agency
DOT
Fms Id
WHTGIRDS2
Total Budget
2750000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Whitehall Ferry Terminal-Slip2 Girder Reconstruction
Current Phase
(Pre-Design)
Borough
Manhattan
Community Board
Manhattan
Budget Line
FA-0021
Ten Year Plan Category
RECONSTRUCTION OF FERRY TERMINAL FACILITIES
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Fms Id: WHTGIRDS3
Reporting Period
202309
Managing Agency
DOT
Fms Id
WHTGIRDS3
Total Budget
3000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Whitehall Ferry Terminal-Slip3 Girder Reconstruction
Current Phase
(Pre-Design)
Borough
Manhattan
Community Board
Manhattan
Budget Line
FA-0021
Ten Year Plan Category
RECONSTRUCTION OF FERRY TERMINAL FACILITIES
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
1997
Fms Id
BRC231F
Total Budget
379452558.46
Spend To Date
229844224.27
Spend To Date 1
0.6057
Fms Project Name
QUEENSBORO BRIDGE #10 OVER EAST RIVER
Agency Project Name
BRC231F Ed Koch Queensboro Bridge Contract 10
Agency Project Description
Ed Koch Queensboro Bridge Replacement of Upper RoadwaysAgency PIN 84117MBBR071EPIN 84117B0024
Current Phase
Construction
Current Phase Start
2018-07-09T00:00:00.000
Forecast Current Phase End
2024-12-25T00:00:00.000
Forecast Completion
2026-01-11T00:00:00.000
Actual Design Start
2015-04-01T00:00:00.000
Actual Design End
2017-10-02T00:00:00.000
Actual Construction
2016-12-20T00:00:00.000
Actual Construction 1
2018-06-26T00:00:00.000
Actual Construction Start
2018-07-09T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
BR-0231, HW-D103
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
1998
Fms Id
BRC253D
Total Budget
223234500.64
Spend To Date
20037404.67
Spend To Date 1
0.0897
Fms Project Name
WILLIAMSBURG BRIDGE MISC REPAIRS AND PAINTING FY20
Agency Project Name
BRC253D Williamsburg Bridge Contract 9
Agency Project Description
TD and CSS - Miscellaneous Rehabilitation 284122B0019001
Current Phase
Construction
Current Phase Start
2022-12-05T00:00:00.000
Forecast Current Phase End
2025-12-03T00:00:00.000
Forecast Completion
2026-12-23T00:00:00.000
Actual Design Start
2018-08-20T00:00:00.000
Actual Design End
2021-11-15T00:00:00.000
Actual Construction
2021-05-11T00:00:00.000
Actual Construction 1
2022-10-26T00:00:00.000
Actual Construction Start
2022-12-05T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
BR-0253, BR-0253
Ten Year Plan Category
USEFUL LIFE EXTENSION
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
1999
Fms Id
BRC270D
Total Budget
333280451.07
Spend To Date
228711106.28
Spend To Date 1
0.6862
Fms Project Name
BROOKLYN BRIDGE REHABILITATION OF APPOACH ARCHES FY19
Agency Project Name
BRC270D Brooklyn Bridge Rehabilitation of Approach Arches, Towers and Miscellaneous Rehabilitation
Agency Project Description
Rehabilitation and strengthening of foundation components, new infill walls, rehab of transverse walls, cleaning of brick and granite masonry of approach arches and towers, new tower lighting.
Current Phase
Construction
Current Phase Start
2019-09-09T00:00:00.000
Forecast Current Phase End
2024-02-20T00:00:00.000
Forecast Completion
2025-03-12T00:00:00.000
Actual Design Start
2016-04-20T00:00:00.000
Actual Design End
2018-09-13T00:00:00.000
Actual Construction
2018-02-02T00:00:00.000
Actual Construction 1
2019-07-15T00:00:00.000
Actual Construction Start
2019-09-09T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
BR-0270
Ten Year Plan Category
EAST RIVER BRIDGES
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2000
Fms Id
BRKA24039
Total Budget
275318490.04
Spend To Date
3526814.18
Spend To Date 1
0.0128
Fms Project Name
GRAND STREET/ NEWTON CREEK BIN: 2240390
Agency Project Name
BRKA24039 TDCSS for the Reconstruction of Grand Street Bridge over Newtown Creek
Agency Project Description
Reconstruction of Grand Street Bridge over Newtown Creek in the Boroughs of Brooklyn and Queens
Current Phase
Design
Current Phase Start
2019-07-15T00:00:00.000
Forecast Current Phase End
2026-06-03T00:00:00.000
Forecast Completion
2032-03-26T00:00:00.000
Actual Design Start
2019-07-15T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
HB-0215, HB-1012
Ten Year Plan Category
BRIDGE LIFE EXTENSION AND MISCELLANEOUS WORK
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2001
Fms Id
BRX2110
Total Budget
21856126.85
Spend To Date
721688.24
Spend To Date 1
0.033
Fms Project Name
BOSTON ROAD OVER BRONX RIVER BIN: 2242110
Agency Project Name
BRX2110 Boston Road Bridge over Bronx River
Agency Project Description
Boston Rd over Bronx River
Current Phase
Design
Current Phase Start
2019-12-04T00:00:00.000
Forecast Current Phase End
2025-01-09T00:00:00.000
Forecast Completion
2028-08-01T00:00:00.000
Actual Design Start
2019-12-04T00:00:00.000
Borough
Bronx
Community Board
Bronx, Bronx 11
Budget Line
HB-0215
Ten Year Plan Category
BRIDGE LIFE EXTENSION AND MISCELLANEOUS WORK
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2002
Fms Id
BRX287BS
Total Budget
349489.82
Spend To Date
180873.62
Spend To Date 1
0.5175
Fms Project Name
Macombs Dam Bridge- Bus Stop
Agency Project Name
BRX287BS Macombs Dam-Bridge Bus Stop
Agency Project Description
TD/CSS for Bus Stops on West 155th Street Viaduct of the Macombs Dam Bridge, Boroughs of Manhattan and Bronx.
Current Phase
(Cancelled)
Actual Design Start
2018-02-16T00:00:00.000
Actual Construction
2020-01-13T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
BR-0287
Ten Year Plan Category
USEFUL LIFE EXTENSION
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2003
Fms Id
BRX9579
Total Budget
94841574.01
Spend To Date
9226647.16
Spend To Date 1
0.0972
Fms Project Name
BOSTON ROAD OVER HUTCHINSON RIVER BIN: 2229579
Agency Project Name
BRX9579 Boston Road over Hutchinson River
Agency Project Description
Rehabilitation of Boston Road Bridge over Hutchinson River, In Borough of Bronx. 84121B0028001
Current Phase
CONSTRUCTION
Current Phase Start
2023-07-27T00:00:00.000
Forecast Current Phase End
2023-06-30T00:00:00.000
Forecast Completion
2027-11-16T00:00:00.000
Actual Design Start
2016-11-28T00:00:00.000
Actual Design End
2021-03-23T00:00:00.000
Actual Construction
2021-01-15T00:00:00.000
Actual Construction 1
2023-06-17T00:00:00.000
Actual Construction Start
2023-07-27T00:00:00.000
Borough
Bronx
Community Board
Bronx, Bronx 12
Budget Line
HB-0215, HB-1070, TF-0002, TF-0502
Ten Year Plan Category
HIGHWAY DRAWDOWN PROGRAM
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2005
Fms Id
HB1070BR
Total Budget
12359956.48
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Protective Coating of Various Bridges in Brooklyn
Agency Project Name
HB1070BR Protective Coating of Various Bridges in Brooklyn
Agency Project Description
Protective Coating of Various Bridges in Brooklyn
Current Phase
Construction Procurement
Current Phase Start
2022-03-07T00:00:00.000
Forecast Current Phase End
2023-10-08T00:00:00.000
Forecast Completion
2027-08-15T00:00:00.000
Actual Design Start
2021-07-12T00:00:00.000
Actual Design End
2022-09-07T00:00:00.000
Actual Construction
2022-03-07T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
HB-1070
Ten Year Plan Category
Bridge Painting
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2006
Fms Id
HB1070NB
Total Budget
12560020.61
Spend To Date
29153.37
Spend To Date 1
0.0023
Fms Project Name
Protective Coating of N blvd Bridges over Flushing River
Agency Project Name
HB1070NB Protective Coating of Northern Blvd Bridges over Flushing River
Agency Project Description
Protective Coating of Northern Blvd Bridges over Flushing River
Current Phase
Construction
Current Phase Start
2023-01-17T00:00:00.000
Forecast Current Phase End
2025-01-15T00:00:00.000
Forecast Completion
2026-05-25T00:00:00.000
Actual Design Start
2019-06-29T00:00:00.000
Actual Design End
2021-05-07T00:00:00.000
Actual Construction
2020-06-19T00:00:00.000
Actual Construction 1
2022-09-22T00:00:00.000
Actual Construction Start
2023-01-17T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
HB-1070
Ten Year Plan Category
Bridge Painting
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2007
Fms Id
HB1070QN
Total Budget
12868952.76
Spend To Date
355403.82
Spend To Date 1
0.0276
Fms Project Name
Protective Coating of Various Bridges in Queens
Agency Project Name
HB1070QN Protective Coating of Various Bridges in Queens
Agency Project Description
Protective Coating of Various Bridges in Queens
Current Phase
Construction
Current Phase Start
2023-01-30T00:00:00.000
Forecast Current Phase End
2025-01-28T00:00:00.000
Forecast Completion
2026-06-07T00:00:00.000
Actual Design Start
2019-06-29T00:00:00.000
Actual Design End
2021-05-07T00:00:00.000
Actual Construction
2020-06-23T00:00:00.000
Actual Construction 1
2022-12-16T00:00:00.000
Actual Construction Start
2023-01-30T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
HB-1070
Ten Year Plan Category
Bridge Painting
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2008
Fms Id
HBBA06672
Total Budget
145457245.66
Spend To Date
2345716.05
Spend To Date 1
0.0161
Fms Project Name
EAST 174TH ST/SHERIDAN EXPWY AMTRAK BIN# 2066720
Agency Project Name
HBBA06672 East 174th Street Bridge over Sheridan Expressway and Amtrak
Agency Project Description
Total Design and Construction Support Services for the Rehabilitation of East 174th Street Bridge over Sheridan Expressway/Amtrak, Borough of the Bronx
Current Phase
Design
Current Phase Start
2019-06-07T00:00:00.000
Forecast Current Phase End
2024-07-15T00:00:00.000
Forecast Completion
2030-07-30T00:00:00.000
Actual Design Start
2019-06-07T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
HB-6672
Ten Year Plan Category
FAIR BRIDGES
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2009
Fms Id
HBBA24138
Total Budget
41466996.64
Spend To Date
794069.52
Spend To Date 1
0.0191
Fms Project Name
Pelham Bay Park Equestrian over Amtrak- CSX BIN 2241380
Agency Project Name
HBBA24138 Pelham Bay Park Equestrian Bridge Over Amtrak-CSX
Agency Project Description
Rehabilitation of Pelham Bay Park Equestrian Bridge over Amtrak-CSX
Current Phase
Design
Current Phase Start
2019-01-30T00:00:00.000
Forecast Current Phase End
2024-09-09T00:00:00.000
Forecast Completion
2027-08-24T00:00:00.000
Actual Design Start
2019-01-30T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-0508
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2012
Fms Id
HBBA24245
Total Budget
26143362.58
Spend To Date
1319898.81
Spend To Date 1
0.0504
Fms Project Name
EAST 233RD ST/ BRONX RIVER BIN # 2242459
Agency Project Name
HBBA24245 East 233rd Street Bridge over Bronx River
Agency Project Description
East 233rd Street Bridge over Bronx River
Current Phase
Design
Current Phase Start
2019-10-17T00:00:00.000
Forecast Current Phase End
2025-05-15T00:00:00.000
Forecast Completion
2028-12-05T00:00:00.000
Actual Design Start
2019-10-17T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
HB-0215, HB-1012
Ten Year Plan Category
FAIR BRIDGES
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2019
Fms Id
HBCR03B
Total Budget
50857652.48
Spend To Date
6952086.86
Spend To Date 1
0.1366
Fms Project Name
COMPONENT REHABILITATION 03B CONSTRUCTION
Agency Project Name
HBCR03B Component Rehabilitation 03B Construction
Agency Project Description
Component Rehabilitation 9 Bridges, Bklyn, Queens, SIThe goals of this project are to improve the overall condition ratings of the bridges, rehabilitate the various existing bridge component deficiencies, allow for safe structures for the travelling pub
Current Phase
Construction
Current Phase Start
2022-08-22T00:00:00.000
Forecast Current Phase End
2025-07-07T00:00:00.000
Forecast Completion
2026-09-01T00:00:00.000
Actual Design Start
2017-05-01T00:00:00.000
Actual Design End
2021-10-13T00:00:00.000
Actual Construction
2021-08-03T00:00:00.000
Actual Construction 1
2022-07-21T00:00:00.000
Actual Construction Start
2022-08-22T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
HB-0215, HB-0215
Ten Year Plan Category
PRIMARY STREET RE-SURFACING
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2020
Fms Id
HBCR16
Total Budget
21725880.67
Spend To Date
5908848.36
Spend To Date 1
0.2719
Fms Project Name
COMPONENT REHAB OF BRIDGES CITYWIDE (8 BRIDGES)
Agency Project Name
HBCR16 Component Rehab of 7 Bridges in Brooklyn
Agency Project Description
Rehab of 7 Bridges in Brooklyn
Current Phase
Construction
Current Phase Start
2022-07-07T00:00:00.000
Forecast Current Phase End
2025-08-06T00:00:00.000
Forecast Completion
2026-03-17T00:00:00.000
Actual Design Start
2017-06-15T00:00:00.000
Actual Design End
2019-10-08T00:00:00.000
Actual Construction
2019-08-09T00:00:00.000
Actual Construction 1
2022-07-06T00:00:00.000
Actual Construction Start
2022-07-07T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
HB-0215
Ten Year Plan Category
BRIDGE LIFE EXTENSION AND MISCELLANEOUS WORK
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2021
Fms Id
HBCR21A
Total Budget
38879339.08
Spend To Date
2495375.31
Spend To Date 1
0.0641
Fms Project Name
COMPONENT REHAB OF BRIDGES 21A
Agency Project Name
HBCR21A Component Rehab of Bridges 21A
Agency Project Description
Component Rehabilitation of 13 Bridges in Manhattan and Staten Island 84122B0016 (REI 84121P0015001)REBID pin 84123B0009
Current Phase
Construction
Forecast Current Phase End
2026-08-06T00:00:00.000
Forecast Completion
2028-07-07T00:00:00.000
Actual Design Start
2019-02-19T00:00:00.000
Actual Design End
2021-12-09T00:00:00.000
Actual Construction
2021-07-16T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
HB-0215
Ten Year Plan Category
BRIDGE LIFE EXTENSION AND MISCELLANEOUS WORK
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2022
Fms Id
HBCR21B
Total Budget
24417654.99
Spend To Date
3356445.16
Spend To Date 1
0.1374
Fms Project Name
COMPONENT REHAB OF BRIDGES 21B
Agency Project Name
HBCR21B Component Rehabilitation of 8 Bridges
Agency Project Description
Component Rehabilitation 8 Bridges Citywide.Partially Parks Funded. See project site.84121MBBR459
Current Phase
Construction
Current Phase Start
2022-10-03T00:00:00.000
Forecast Current Phase End
2025-04-02T00:00:00.000
Forecast Completion
2025-10-10T00:00:00.000
Actual Design Start
2018-10-09T00:00:00.000
Actual Design End
2021-05-21T00:00:00.000
Actual Construction
2021-01-14T00:00:00.000
Actual Construction 1
2022-06-28T00:00:00.000
Actual Construction Start
2022-10-03T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
HB-0215, P-1018
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2023
Fms Id
HBCR22A
Total Budget
26343243.45
Spend To Date
1040104.78
Spend To Date 1
0.0394
Fms Project Name
COMPONENT REHAB OF BRIDGES 22A
Agency Project Name
HBCR22A Component Rehab of Bridges 22A
Agency Project Description
Component Rehab of 10 Bridges in Bronx.The goals of this project are to improve the overall condition ratings of the bridges, rehabilitate the various existing bridge component deficiencies, allow for safe structures for the travelling public, and extend
Current Phase
Design
Current Phase Start
2019-10-07T00:00:00.000
Forecast Current Phase End
2024-01-28T00:00:00.000
Forecast Completion
2028-11-06T00:00:00.000
Actual Design Start
2019-10-07T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
HB-0215
Ten Year Plan Category
BRIDGE LIFE EXTENSION AND MISCELLANEOUS WORK
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2024
Fms Id
HBCR22B
Total Budget
25851309.29
Spend To Date
1571248.45
Spend To Date 1
0.0607
Fms Project Name
COMPONENT REHAB OF BRIDGES 22B
Agency Project Name
HBCR22B Component Rehab of Bridges 22B
Agency Project Description
The goals of this project are to improve the overall condition ratings of the bridges, rehabilitate the various existing bridge component deficiencies, allow for safe structures for the travelling public, and extend each bridge’s service life for at least
Current Phase
Design
Current Phase Start
2019-10-07T00:00:00.000
Forecast Current Phase End
2023-09-01T00:00:00.000
Forecast Completion
2028-03-07T00:00:00.000
Actual Design Start
2019-10-07T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
HB-0215
Ten Year Plan Category
BRIDGE LIFE EXTENSION AND MISCELLANEOUS WORK
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2025
Fms Id
HBCR23A
Total Budget
25157553.00
Spend To Date
863168.97
Spend To Date 1
0.0343
Fms Project Name
COMPONENT REHAB OF BRIDGES 23A
Agency Project Name
HBCR23A Component Rehab of Bridges 23A
Agency Project Description
COMPONENT REHABILITATION OF NINE BRIDGES IN THE BOROUGHS OF THE BRONX, BROOKLYN, MANHATTAN AND QUEENS ( BINs: 2241139, 2243410, 2243440; 2243510; 224007A; 2267130; 2230190; 2247490; 2247620 )
Current Phase
Design
Current Phase Start
2021-03-01T00:00:00.000
Forecast Current Phase End
2024-05-12T00:00:00.000
Forecast Completion
2029-02-19T00:00:00.000
Actual Design Start
2021-03-01T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
HB-0215
Ten Year Plan Category
BRIDGE LIFE EXTENSION AND MISCELLANEOUS WORK
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2026
Fms Id
HBCR23B
Total Budget
23500896.77
Spend To Date
497449.89
Spend To Date 1
0.0211
Fms Project Name
COMPONENT REHAB OF BRIDGES 23B
Agency Project Name
HBCR23B Component Rehab of 10 Bridges
Agency Project Description
Component Rehabilitation 10 Bridges in Queens and Staten Island
Current Phase
Design
Current Phase Start
2021-09-08T00:00:00.000
Forecast Current Phase End
2024-12-31T00:00:00.000
Forecast Completion
2029-12-05T00:00:00.000
Actual Design Start
2021-09-08T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
HB-0215
Ten Year Plan Category
BRIDGE LIFE EXTENSION AND MISCELLANEOUS WORK
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2031
Fms Id
HBK1205
Total Budget
91587248.58
Spend To Date
7876663.26
Spend To Date 1
0.086
Fms Project Name
RECON OF 5TH AVE BRIDGE OVER LIRR AND SEA BEACH, BR 2-243580
Agency Project Name
HBK1205 Reconstruction of 5th Avenue Bridge over LIRR and Sea Beach
Agency Project Description
5th Avenue over LIRR and Sea Beach, Brooklyn
Current Phase
Construction
Forecast Current Phase End
2023-07-15T00:00:00.000
Forecast Completion
2027-11-02T00:00:00.000
Actual Design Start
2018-09-05T00:00:00.000
Actual Design End
2022-06-09T00:00:00.000
Actual Construction
2020-07-30T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 07, Brooklyn 10
Budget Line
HB-1012, HB-1205
Ten Year Plan Category
FAIR BRIDGES
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2032
Fms Id
HBK244120
Total Budget
28370517.72
Spend To Date
1032745.45
Spend To Date 1
0.0364
Fms Project Name
HILL DR (TERRACE BR) OVER PROSPECT PARK LAKE BIN:2244120
Agency Project Name
HBK244120 Hill Dr (Terrace Br) over Prospect Park Lake
Agency Project Description
Hill Dr (Terrace Br) over Prospect Park Lake
Current Phase
Design
Current Phase Start
2020-01-06T00:00:00.000
Forecast Current Phase End
2025-04-22T00:00:00.000
Forecast Completion
2030-01-11T00:00:00.000
Actual Design Start
2020-01-06T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-0508
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2033
Fms Id
HBK4470
Total Budget
32137267.11
Spend To Date
1157679.47
Spend To Date 1
0.036
Fms Project Name
SEELY STREET OVER PROSPECT AVENUE BIN: 2244470
Agency Project Name
HBK4470 Seeley Street Bridge over Prospect Avenue
Agency Project Description
Seeley Street Bridge over Prospect Avenue, Brooklyn.(On May 7, 2020 AC/DCE Dunn sent the letter of :suspension of work order" to STV)
Current Phase
Design
Current Phase Start
2019-11-12T00:00:00.000
Forecast Current Phase End
2025-03-05T00:00:00.000
Forecast Completion
2029-08-09T00:00:00.000
Actual Design Start
2019-11-12T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HB-0215, HB-1070
Ten Year Plan Category
BRIDGE LIFE EXTENSION AND MISCELLANEOUS WORK
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2034
Fms Id
HBK530
Total Budget
49471486.39
Spend To Date
3119715.55
Spend To Date 1
0.063
Fms Project Name
PARKSIDE AVE AND OCEAN AVE RR BR #2-24302-0
Agency Project Name
HBK530 Parkside Avenue and Ocean Avenue RR BR
Agency Project Description
Rehab of Ocean & Parkside Avenue Bridge over NYCTA Brighton Line
Current Phase
Design
Current Phase Start
2018-01-04T00:00:00.000
Forecast Current Phase End
2024-08-07T00:00:00.000
Forecast Completion
2030-02-25T00:00:00.000
Actual Design Start
2018-01-04T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 09, Brooklyn 14
Budget Line
HB-0530, HB-0530
Ten Year Plan Category
FAIR BRIDGES
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2039
Fms Id
HBKA23308
Total Budget
24987117.69
Spend To Date
3139170.11
Spend To Date 1
0.1256
Fms Project Name
E 14TH ST PED BRIDGE BIN:2233080
Agency Project Name
HBKA23308 East 14th Street Pedestrian Bridge over BSHP
Agency Project Description
Total Design (TD) and Construction Support Services (CSS) for the Rehabilitation of East 14th Street Pedestrian Bridge over Belt-Shore Parkway in the Borough of Brooklyn.
Current Phase
Design
Current Phase Start
2018-07-10T00:00:00.000
Forecast Current Phase End
2023-10-29T00:00:00.000
Forecast Completion
2027-09-20T00:00:00.000
Actual Design Start
2018-07-10T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HB-1012, HB-1028, TF-0502
Ten Year Plan Category
Traffic Work in Conjunction with Fair Bridges
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2040
Fms Id
HBKA24310
Total Budget
48481645.78
Spend To Date
1225695.01
Spend To Date 1
0.0252
Fms Project Name
Beverly Road over BMT Subway, Brighton BIN 2243100
Agency Project Name
HBKA24310 Beverley Road over BMT Subway Brighton
Agency Project Description
Rehabilitation of Beverley Road over BMT Subway Brighton
Current Phase
Design
Current Phase Start
2020-01-06T00:00:00.000
Forecast Current Phase End
2025-06-25T00:00:00.000
Forecast Completion
2030-01-14T00:00:00.000
Actual Design Start
2020-01-06T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HB-4310
Ten Year Plan Category
FAIR BRIDGES
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2041
Fms Id
HBM1147
Total Budget
156756722.72
Spend To Date
60640690.99
Spend To Date 1
0.3868
Fms Project Name
BROADWAY BRIDGE/HARLEM RIVER (BIN 2-24013-7)
Agency Project Name
HBM1147 Rehabilitation of Broadway Bridge over Harlem River
Agency Project Description
Rehabilitation of Broadway Bridge over Harlem River, Borough of Manhattan.Construction Agency PIN 84118MNBR160Construction EPIN 84118B0013
Current Phase
Construction
Current Phase Start
2018-09-04T00:00:00.000
Forecast Current Phase End
2027-04-02T00:00:00.000
Forecast Completion
2028-04-10T00:00:00.000
Actual Design Start
2006-06-26T00:00:00.000
Actual Design End
2017-09-15T00:00:00.000
Actual Construction
2017-07-14T00:00:00.000
Actual Construction 1
2018-07-26T00:00:00.000
Actual Construction Start
2018-09-04T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 12
Budget Line
HB-1147
Ten Year Plan Category
BRIDGE LIFE EXTENSION AND MISCELLANEOUS WORK
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2042
Fms Id
HBM1165
Total Budget
177478758.79
Spend To Date
98463761.07
Spend To Date 1
0.5547
Fms Project Name
RIVERSIDE DRIVE BR/WEST 158TH 2-24672-0
Agency Project Name
HBM1165 Rehabilitation of Riverside Drive Viaduct Over West 158th St
Agency Project Description
Rehabilitation of the existing steel viaduct carrying Riverside Drive West from 153rd Street to west 161th Street. Construction scope includes the following major items of work: deck replacement, historic parapet and lighting refurbishment, steel repairs,
Current Phase
Construction
Current Phase Start
2018-10-29T00:00:00.000
Forecast Current Phase End
2025-05-21T00:00:00.000
Forecast Completion
2025-12-01T00:00:00.000
Actual Design Start
2014-10-22T00:00:00.000
Actual Design End
2017-09-14T00:00:00.000
Actual Construction
2017-07-06T00:00:00.000
Actual Construction 1
2018-07-19T00:00:00.000
Actual Construction Start
2018-10-29T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 12
Budget Line
HB-1012, HB-1165
Ten Year Plan Category
FAIR BRIDGES
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2043
Fms Id
HBM1171
Total Budget
33115876.13
Spend To Date
20398786.36
Spend To Date 1
0.6159
Fms Project Name
W 31ST ST BR/AMTRAK LAYUP TRACKS 2-26672-A
Agency Project Name
HBM1171 West 31st Street over AMTRAK Lay Up Tracks
Agency Project Description
pending transfer to Brookfield
Current Phase
Close-out
Actual Design Start
2017-02-15T00:00:00.000
Actual Design End
2018-07-30T00:00:00.000
Actual Construction
2016-09-01T00:00:00.000
Actual Construction 1
2019-07-26T00:00:00.000
Actual Construction Start
2019-07-26T00:00:00.000
Actual Construction End
2022-09-09T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 04
Budget Line
HB-0215
Ten Year Plan Category
FAIR BRIDGES
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2044
Fms Id
HBM1189
Total Budget
200177607.29
Spend To Date
39790347.67
Spend To Date 1
0.1987
Fms Project Name
WEST 79TH STREET/ AMTRAK (7 BIN#'S)
Agency Project Name
HBM1189 West 79th Street over AMTRAK
Agency Project Description
HBMF26771 is a project ID which was created for Parks portion of funding for the Construction procurement of this project. CDOT and Parks funded.
Current Phase
Construction
Current Phase Start
2021-05-17T00:00:00.000
Forecast Current Phase End
2025-05-16T00:00:00.000
Forecast Completion
2026-05-23T00:00:00.000
Actual Design Start
2000-07-06T00:00:00.000
Actual Design End
2020-01-22T00:00:00.000
Actual Construction
2019-01-23T00:00:00.000
Actual Construction 1
2021-04-29T00:00:00.000
Actual Construction Start
2021-05-17T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 07
Budget Line
HB-1189, P-0508, P-1018
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2045
Fms Id
HBM1221
Total Budget
19340199.48
Spend To Date
905487.48
Spend To Date 1
0.0468
Fms Project Name
E25TH STREET PEDESTRIAN BRIDGE OVER FDR
Agency Project Name
HBM1221 E25th Street Pedestrian Bridge over FDR
Agency Project Description
E 25th St Ped Bridge
Current Phase
(On-hold)
Actual Design Start
2007-05-14T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 06
Budget Line
HB-1221
Ten Year Plan Category
FAIR BRIDGES
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2047
Fms Id
HBM551
Total Budget
51847868.23
Spend To Date
45113175.15
Spend To Date 1
0.8701
Fms Project Name
PARK AVE TUNNEL FROM E34TH TO E39TH ST'S #2-24654-0/TN61420
Agency Project Name
HBM551 Reconst Park Ave Tunnel under E 33rd to 40th St
Agency Project Description
Reconstruction of Park Avenue Tunnel
Current Phase
Construction
Current Phase Start
2016-07-25T00:00:00.000
Forecast Current Phase End
2023-09-26T00:00:00.000
Forecast Completion
2024-10-05T00:00:00.000
Actual Design Start
2006-07-13T00:00:00.000
Actual Design End
2015-12-14T00:00:00.000
Actual Construction
2015-12-01T00:00:00.000
Actual Construction 1
2016-06-06T00:00:00.000
Actual Construction Start
2016-07-25T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 06
Budget Line
HB-0551
Ten Year Plan Category
FAIR BRIDGES
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2048
Fms Id
HBM702990
Total Budget
6140977.83
Spend To Date
318792.27
Spend To Date 1
0.0519
Fms Project Name
Rehabilitation of Fort Washington Pedestrian Bridge over AMT
Agency Project Name
HBM702990 Fort Washington Pedestrian Bridge over Amtrak, BIN 7702990
Agency Project Description
Total Design (TD) and Construction Support Services (CSS) for the Rehabilitation of Fort Washington Pedestrian Bridge over Amtrak, Borough of Manhattan
Current Phase
Design
Current Phase Start
2019-03-06T00:00:00.000
Forecast Current Phase End
2024-05-31T00:00:00.000
Forecast Completion
2026-10-16T00:00:00.000
Actual Design Start
2019-03-06T00:00:00.000
Actual Construction
2020-07-27T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-0245M, P-0861
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2049
Fms Id
HBM8650
Total Budget
104584619.31
Spend To Date
7692158.65
Spend To Date 1
0.0735
Fms Project Name
REHAB FDR NORTHBOUND FROM EAST 42-49TH ST BIN: 2268650
Agency Project Name
HBM8650 Rehab for FDR Northbound from East 42-49th St
Agency Project Description
FDR NB E42nd to E49th84123B0006
Current Phase
Design
Current Phase Start
2016-08-18T00:00:00.000
Forecast Current Phase End
2023-09-15T00:00:00.000
Forecast Completion
2028-05-10T00:00:00.000
Actual Design Start
2016-08-18T00:00:00.000
Actual Design End
2022-11-07T00:00:00.000
Actual Construction
2022-05-06T00:00:00.000
Borough
Manhattan
Community Board
Manhattan, Manhattan 06
Budget Line
HB-0215
Ten Year Plan Category
BRIDGE LIFE EXTENSION AND MISCELLANEOUS WORK
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2050
Fms Id
HBMA22934
Total Budget
54674624.79
Spend To Date
1461832.69
Spend To Date 1
0.0267
Fms Project Name
RAMP TO NB HHP OVER AMTRAK WEST SIDE BIN 222934A
Agency Project Name
HBMA22934 Ramp to NB HHP over Amtrak West Side
Agency Project Description
Total Design (TD) and Construction Support Services (CSS) for the Rehabilitation of Ramp to NB Henry Hudson Pkwy Bridge over Amtrak West Side, Borough of Manhattan
Current Phase
Design
Current Phase Start
2020-01-02T00:00:00.000
Forecast Current Phase End
2024-12-25T00:00:00.000
Forecast Completion
2030-02-19T00:00:00.000
Actual Design Start
2020-01-02T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HB-2934
Ten Year Plan Category
FAIR BRIDGES
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2051
Fms Id
HBMA23216
Total Budget
116877653.62
Spend To Date
5641067.93
Spend To Date 1
0.0482
Fms Project Name
Promenade over FDR E81st - 90th St Bin 2232167
Agency Project Name
HBMA23216 Promenade over FDR Drive E81st - 90th Streets
Agency Project Description
Total Design and Construction Support Services for the Rehabilitation of Promenade over FDR Dr E 81st - E 90th St
Current Phase
Design
Current Phase Start
2018-01-10T00:00:00.000
Forecast Current Phase End
2024-11-13T00:00:00.000
Forecast Completion
2029-04-10T00:00:00.000
Actual Design Start
2018-01-10T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-1018
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2052
Fms Id
HBMA24501
Total Budget
33171033.57
Spend To Date
838470.65
Spend To Date 1
0.0252
Fms Project Name
WEST 35TH ST/ AMTRAK 30ST BRANCH BIN# 224501E
Agency Project Name
HBMA24501 West 35th Street over AMTRAK 30th Street Branch
Agency Project Description
Total design and Construction Support Services for Rehabilitation of West 35th Street Over Amtrak 30th Street Branch
Current Phase
(On-hold)
Current Phase Start
2018-11-18T00:00:00.000
Actual Design Start
2018-11-18T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HB-0215, HB-1012
Ten Year Plan Category
FAIR BRIDGES
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2053
Fms Id
HBMA24544
Total Budget
51073176.23
Spend To Date
1416373.46
Spend To Date 1
0.0277
Fms Project Name
WEST 40TH ST / AMTRAK 30ST BRANCH BIN# 2245440
Agency Project Name
HBMA24544 West 40th Street over AMTRAK 30th Street Branch
Agency Project Description
Total Design and Construction Support Services for Rehabilitation of West 40th Street Over Amtrak 30th Street Branch
Current Phase
(On-hold)
Current Phase Start
2018-11-20T00:00:00.000
Actual Design Start
2018-11-20T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HB-0215, HB-1012
Ten Year Plan Category
FAIR BRIDGES
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2054
Fms Id
HBMA26724
Total Budget
469556130.48
Spend To Date
4406940.01
Spend To Date 1
0.0093
Fms Project Name
Trans-Manhattan Expressway BIN 2267240
Agency Project Name
HBMA26724 Trans-Manhattan Expressway BIN 2267240
Agency Project Description
REHABILITATION AND/OR REPLACEMENT OF THE HRD RAMP TO GWB (TRANS-MANHATTAN EXPWY (I95) CONNECTOR RAMP) OVER HARLEM RIVER DR. SB IN THE HIGH BRIDGE AREA OF MANHATTAN.
Current Phase
Design
Current Phase Start
2019-02-14T00:00:00.000
Forecast Current Phase End
2026-12-30T00:00:00.000
Forecast Completion
2035-03-25T00:00:00.000
Actual Design Start
2019-02-14T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HB-1078
Ten Year Plan Category
BRIDGE LIFE EXTENSION AND MISCELLANEOUS WORK
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2056
Fms Id
HBMFDNY20
Total Budget
57207040.44
Spend To Date
2207521.02
Spend To Date 1
0.0385
Fms Project Name
FDNY/NFPA CODE UPDATE HHP VARIOUS AND PARK AVE TUNNEL
Agency Project Name
HBMFDNY20 FDNY NFPA Code Update HHP Various and Park Ave Tunnel
Agency Project Description
Total Design and Construction Support Services to Bring Following Three Locations in Compliance with NYC Fire Codes: Overbuild Bridge (Amtrak Tunnel) Situated over Amtrak Rail Tracks within Riverside Park between West 72nd St to West 123rd St (BIN: Variou
Current Phase
Design
Current Phase Start
2019-07-08T00:00:00.000
Forecast Current Phase End
2025-07-12T00:00:00.000
Forecast Completion
2031-05-28T00:00:00.000
Actual Design Start
2019-07-08T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HB-0215
Ten Year Plan Category
BRIDGE LIFE EXTENSION AND MISCELLANEOUS WORK
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2058
Fms Id
HBPK17K
Total Budget
28099760.19
Spend To Date
9972336.30
Spend To Date 1
0.3548
Fms Project Name
17TH AVENUE PEDESTRIAN BRIDGE OVER BELT PARKWAY 2231300
Agency Project Name
HBPK17K Pedestrian Bridge Over Belt Parkway
Agency Project Description
The existing 17th Avenue and 27th Avenue Pedestrian Bridges over Belt-Parkway were constructed under the Robert Moses era Master Plan for NYC. Because the existing 17th Avenue and 27th Avenue Pedestrian Bridges, sloping over the Belt Parkway Highway, ac
Current Phase
Construction
Current Phase Start
2021-05-24T00:00:00.000
Forecast Current Phase End
2024-06-12T00:00:00.000
Forecast Completion
2025-06-27T00:00:00.000
Actual Design Start
2010-10-14T00:00:00.000
Actual Design End
2019-12-13T00:00:00.000
Actual Construction
2018-12-10T00:00:00.000
Actual Construction 1
2020-12-23T00:00:00.000
Actual Construction Start
2021-05-24T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 10
Budget Line
P-0956
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2059
Fms Id
HBPK27K
Total Budget
26948584.44
Spend To Date
7880604.06
Spend To Date 1
0.2924
Fms Project Name
27TH AVENUE PEDESTRIAN BRIDGE OVER BELT PARKWAY
Agency Project Name
HBPK27K Pedestrian Bridges Over Belt Parkway
Current Phase
Construction
Current Phase Start
2021-05-24T00:00:00.000
Forecast Current Phase End
2024-06-12T00:00:00.000
Forecast Completion
2025-06-22T00:00:00.000
Actual Design Start
2010-10-14T00:00:00.000
Actual Design End
2019-12-13T00:00:00.000
Actual Construction
2018-12-10T00:00:00.000
Actual Construction 1
2020-12-23T00:00:00.000
Actual Construction Start
2021-05-24T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 13
Budget Line
P-0507
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DOT • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
DOT
Sponsor Agency
DOT
Pid
2060
Fms Id
HBQ1114
Total Budget
75367189.17
Spend To Date
2048320.25
Spend To Date 1
0.0271
Fms Project Name
HEMPSTEAD AVE BR/CIP 2231780
Agency Project Name
HBQ1114 Hempstead Avenue Bridge over CIP
Agency Project Description
Rehabilitation of Hempstead Avenue Bridge over Cross Island Parkway, In Borough of Queens
Current Phase
Design
Current Phase Start
2022-01-31T00:00:00.000
Forecast Current Phase End
2025-12-18T00:00:00.000
Forecast Completion
2030-12-24T00:00:00.000
Actual Design Start
2022-01-31T00:00:00.000
Borough
Queens
Community Board
Queens 13
Budget Line
HB-1114
Ten Year Plan Category
FAIR BRIDGES
Agency Data Date
2024-02-01T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000