Capital Projects Dashboard - Citywide Budget and Schedule

All major capital infrastructure projects with a committed budget. Financial information and agency schedule details for each project are joined via FMS ID. Only projects in the design phase or later have project schedules displayed. This dataset is part of the Capital Projects Dashboard.

Note: Each row is uniquely identified by its Financial Management Service (FMS) ID. FMS ID is the unique ID that OMB uses for the FMS (Financial Information System). This ID can be universally joined with any OMB dataset that has the same field. The Capital Projects Dashboard is the result of joining OMB’s fiscal data with the agency’s schedule data. FMS IDs and agency projects don't always have a one-to-one relationship (i.e., one project schedule may correlate to multiple FMS IDs, and one FMS may correct to multiple projects with different schedules).

City Government Mayor's Office of Operations (OPS) Dataset fb86-vt7u 27 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2845
Fms Id
P-2FRNDFN
Total Budget
900000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Recon fence at Friends Field Park
Agency Project Name
Citywide Fencing Systems Reconstruction
Agency Project Description
This project will reconstruct fencing systems at various parks citywide.
Current Phase
Construction Procurement
Current Phase Start
2022-05-02T00:00:00.000
Forecast Current Phase End
2020-07-11T00:00:00.000
Forecast Completion
2028-02-24T00:00:00.000
Actual Design Start
2019-09-04T00:00:00.000
Actual Design End
2022-05-02T00:00:00.000
Actual Construction
2022-05-02T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-D017
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2845
Fms Id
P-3SOHAGS
Total Budget
65000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Green Street Fencing - Amsterdam Ave and 126th St.
Agency Project Name
Citywide Fencing Systems Reconstruction
Agency Project Description
This project will reconstruct fencing systems at various parks citywide.
Current Phase
Construction Procurement
Current Phase Start
2022-05-02T00:00:00.000
Forecast Current Phase End
2020-07-11T00:00:00.000
Forecast Completion
2028-02-24T00:00:00.000
Actual Design Start
2019-09-04T00:00:00.000
Actual Design End
2022-05-02T00:00:00.000
Actual Construction
2022-05-02T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-I001, P-M245
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2845
Fms Id
P-6FNCE01
Total Budget
444000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
GreenThumb Capital Fencing Work, Citywide
Agency Project Name
Citywide Fencing Systems Reconstruction
Agency Project Description
This project will reconstruct fencing systems at various parks citywide.
Current Phase
Construction Procurement
Current Phase Start
2022-05-02T00:00:00.000
Forecast Current Phase End
2020-07-11T00:00:00.000
Forecast Completion
2028-02-24T00:00:00.000
Actual Design Start
2019-09-04T00:00:00.000
Actual Design End
2022-05-02T00:00:00.000
Actual Construction
2022-05-02T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2845
Fms Id
P-6STRUC2
Total Budget
700000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Citywide Structural Systems Reconstruction CNYG-2619MA
Agency Project Name
Citywide Fencing Systems Reconstruction
Agency Project Description
This project will reconstruct fencing systems at various parks citywide.
Current Phase
Construction Procurement
Current Phase Start
2022-05-02T00:00:00.000
Forecast Current Phase End
2020-07-11T00:00:00.000
Forecast Completion
2028-02-24T00:00:00.000
Actual Design Start
2019-09-04T00:00:00.000
Actual Design End
2022-05-02T00:00:00.000
Actual Construction
2022-05-02T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
P-1008, P-I001
Ten Year Plan Category
MAJOR RECREATIONAL FACILITIES AND FACILITY RECONSTRUCTION
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2846
Fms Id
P-6OLYMPL
Total Budget
725000.00
Spend To Date
139589.43
Spend To Date 1
0.1925
Fms Project Name
Citywide Olympic Pool Mechanical Systems Recon CNYG-2719M
Agency Project Name
Citywide Olympic Pool Mechanical Systems Reconstruction
Agency Project Description
This project will reconstruct the mechanical systems at various Olympic pools citywide.
Current Phase
Construction
Current Phase Start
2023-10-02T00:00:00.000
Forecast Current Phase End
2024-09-30T00:00:00.000
Forecast Completion
2024-09-30T00:00:00.000
Actual Design Start
2019-09-13T00:00:00.000
Actual Design End
2021-10-06T00:00:00.000
Actual Construction
2021-10-06T00:00:00.000
Actual Construction 1
2023-07-20T00:00:00.000
Actual Construction Start
2023-10-02T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
P-1008, P-I001
Ten Year Plan Category
MAJOR RECREATIONAL FACILITIES AND FACILITY RECONSTRUCTION
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2847
Fms Id
P-407MCN4
Total Budget
774559.84
Spend To Date
178172.52
Spend To Date 1
0.23
Fms Project Name
Herman MacNeil Park Entrance and Pathways
Agency Project Name
MacNeil Park Entrances Reconstruction
Agency Project Description
This project will reconstruct two park entrances at MacNeil Park.
Current Phase
Construction
Current Phase Start
2023-04-24T00:00:00.000
Forecast Current Phase End
2024-04-22T00:00:00.000
Forecast Completion
2024-04-22T00:00:00.000
Actual Design Start
2020-03-13T00:00:00.000
Actual Design End
2021-03-31T00:00:00.000
Actual Construction
2021-03-31T00:00:00.000
Actual Construction 1
2023-03-31T00:00:00.000
Actual Construction Start
2023-04-24T00:00:00.000
Borough
Queens
Community Board
Queens, Queens 07
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2848
Fms Id
P-501LLCS
Total Budget
4511046.00
Spend To Date
1135206.40
Spend To Date 1
0.2516
Fms Project Name
Luis Lopez Park Modular Comfort Station Cons. R125-120M
Agency Project Name
Lopez Playground Modular Public Restroom Building Construction
Agency Project Description
This project will construct a modular public restroom building at Lopez Playground.
Current Phase
Construction
Current Phase Start
2022-09-19T00:00:00.000
Forecast Current Phase End
2023-12-18T00:00:00.000
Forecast Completion
2023-12-18T00:00:00.000
Actual Design Start
2019-11-22T00:00:00.000
Actual Design End
2021-06-03T00:00:00.000
Actual Construction
2021-06-03T00:00:00.000
Actual Construction 1
2022-06-24T00:00:00.000
Actual Construction Start
2022-09-19T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
P-0505, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2849
Fms Id
P-2BKPAV1
Total Budget
4805748.46
Spend To Date
242088.00
Spend To Date 1
0.0503
Fms Project Name
Brooklyn Multisite Pavement Reconstruction
Agency Project Name
Brooklyn Pavement Reconstruction (BG-1019M)
Agency Project Description
This project will reconstruct pavements at various parks in Brooklyn.
Current Phase
(Partner-managed)
Current Phase Start
2023-08-28T00:00:00.000
Forecast Current Phase End
2026-08-26T00:00:00.000
Forecast Completion
2026-08-26T00:00:00.000
Actual Design Start
2020-01-29T00:00:00.000
Actual Design End
2020-12-03T00:00:00.000
Actual Construction
2020-12-03T00:00:00.000
Actual Construction 1
2023-06-05T00:00:00.000
Actual Construction Start
2023-08-28T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2850
Fms Id
P-413READ
Total Budget
436447.60
Spend To Date
68860.03
Spend To Date 1
0.1577
Fms Project Name
Bellerose Playground (PS 133) Creation of Reading Garden
Agency Project Name
Bellerose Playground Reading Garden Construction
Agency Project Description
This project will construct a reading garden at Bellerose Playground.
Current Phase
Construction
Current Phase Start
2023-06-05T00:00:00.000
Forecast Current Phase End
2024-06-03T00:00:00.000
Forecast Completion
2024-06-03T00:00:00.000
Actual Design Start
2020-01-10T00:00:00.000
Actual Design End
2021-01-21T00:00:00.000
Actual Construction
2021-01-21T00:00:00.000
Actual Construction 1
2023-04-07T00:00:00.000
Actual Construction Start
2023-06-05T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-0245Q, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2851
Fms Id
P-1RNQRMP
Total Budget
4147264.97
Spend To Date
524157.97
Spend To Date 1
0.1263
Fms Project Name
Reconstruction of Ranaqua M&O Storehouse Ramp - X002-220M
Agency Project Name
Ranaqua Maintenance and Operations Storehouse Ramp Reconstruction
Agency Project Description
This project will reconstruct the loading ramp at Ranaqua in Bronx Park.
Current Phase
Construction Procurement
Current Phase Start
2020-12-04T00:00:00.000
Forecast Current Phase End
2021-08-31T00:00:00.000
Forecast Completion
2026-08-26T00:00:00.000
Actual Design Start
2019-10-02T00:00:00.000
Actual Design End
2020-12-04T00:00:00.000
Actual Construction
2020-12-04T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2852
Fms Id
P-309JRRC
Total Budget
4779728.00
Spend To Date
408849.88
Spend To Date 1
0.0855
Fms Project Name
Jackie Robinson Recreation Ctr HVAC System RC M014-119M
Agency Project Name
Jackie Robinson Recreation Center HVAC System Reconstruction
Agency Project Description
This project will reconstruct the HVAC system at Jackie Robinson Recreation Center.
Current Phase
Construction
Current Phase Start
2023-10-16T00:00:00.000
Forecast Current Phase End
2025-04-08T00:00:00.000
Forecast Completion
2025-03-10T00:00:00.000
Actual Design Start
2019-04-11T00:00:00.000
Actual Design End
2020-11-04T00:00:00.000
Actual Construction
2020-11-04T00:00:00.000
Actual Construction 1
2022-10-24T00:00:00.000
Actual Construction Start
2023-10-16T00:00:00.000
Borough
Manhattan
Community Board
Manhattan, Manhattan 09, Manhattan 10
Budget Line
P-1250, P-I001
Ten Year Plan Category
MAJOR RECREATIONAL FACILITIES AND FACILITY RECONSTRUCTION
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2853
Fms Id
P-1BRXPK1
Total Budget
736000.00
Spend To Date
395675.92
Spend To Date 1
0.5376
Fms Project Name
Bronx Park, bet. Zones 3 & 5A, Priority 1 XG-419M
Agency Project Name
Bronx Pavement Reconstruction (XG-419M)
Agency Project Description
This project will reconstruct pavements at various parks in the Bronx.
Current Phase
Construction
Current Phase Start
2022-07-11T00:00:00.000
Forecast Current Phase End
2025-07-09T00:00:00.000
Forecast Completion
2025-07-09T00:00:00.000
Actual Design Start
2019-09-20T00:00:00.000
Actual Design End
2020-02-10T00:00:00.000
Actual Construction
2020-02-10T00:00:00.000
Actual Construction 1
2022-03-25T00:00:00.000
Actual Construction Start
2022-07-11T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2853
Fms Id
P-1BRXPK2
Total Budget
0.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Bronx Park, bet. Zones 3 & 5A, Priority 2
Agency Project Name
Bronx Pavement Reconstruction (XG-419M)
Agency Project Description
This project will reconstruct pavements at various parks in the Bronx.
Current Phase
Construction
Current Phase Start
2022-07-11T00:00:00.000
Forecast Current Phase End
2025-07-09T00:00:00.000
Forecast Completion
2025-07-09T00:00:00.000
Actual Design Start
2019-09-20T00:00:00.000
Actual Design End
2020-02-10T00:00:00.000
Actual Construction
2020-02-10T00:00:00.000
Actual Construction 1
2022-03-25T00:00:00.000
Actual Construction Start
2022-07-11T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2853
Fms Id
P-1BRXPK3
Total Budget
0.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Bronx Park, Zone 1
Agency Project Name
Bronx Pavement Reconstruction (XG-419M)
Agency Project Description
This project will reconstruct pavements at various parks in the Bronx.
Current Phase
Construction
Current Phase Start
2022-07-11T00:00:00.000
Forecast Current Phase End
2025-07-09T00:00:00.000
Forecast Completion
2025-07-09T00:00:00.000
Actual Design Start
2019-09-20T00:00:00.000
Actual Design End
2020-02-10T00:00:00.000
Actual Construction
2020-02-10T00:00:00.000
Actual Construction 1
2022-03-25T00:00:00.000
Actual Construction Start
2022-07-11T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2853
Fms Id
P-1CRTMAL
Total Budget
668000.00
Spend To Date
514586.16
Spend To Date 1
0.7703
Fms Project Name
Crotona Parkway Mall Recon XG-419M
Agency Project Name
Bronx Pavement Reconstruction (XG-419M)
Agency Project Description
This project will reconstruct pavements at various parks in the Bronx.
Current Phase
Construction
Current Phase Start
2022-07-11T00:00:00.000
Forecast Current Phase End
2025-07-09T00:00:00.000
Forecast Completion
2025-07-09T00:00:00.000
Actual Design Start
2019-09-20T00:00:00.000
Actual Design End
2020-02-10T00:00:00.000
Actual Construction
2020-02-10T00:00:00.000
Actual Construction 1
2022-03-25T00:00:00.000
Actual Construction Start
2022-07-11T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2853
Fms Id
P-1PAVBRX
Total Budget
4480000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Bronx Pavement Reconstruction (SoGR) XG-419M
Agency Project Name
Bronx Pavement Reconstruction (XG-419M)
Agency Project Description
This project will reconstruct pavements at various parks in the Bronx.
Current Phase
Construction
Current Phase Start
2022-07-11T00:00:00.000
Forecast Current Phase End
2025-07-09T00:00:00.000
Forecast Completion
2025-07-09T00:00:00.000
Actual Design Start
2019-09-20T00:00:00.000
Actual Design End
2020-02-10T00:00:00.000
Actual Construction
2020-02-10T00:00:00.000
Actual Construction 1
2022-03-25T00:00:00.000
Actual Construction Start
2022-07-11T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-1018
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2853
Fms Id
P-1STJMPK
Total Budget
2280.20
Spend To Date
2280.20
Spend To Date 1
1.00
Fms Project Name
St. James Park
Agency Project Name
Bronx Pavement Reconstruction (XG-419M)
Agency Project Description
This project will reconstruct pavements at various parks in the Bronx.
Current Phase
Construction
Current Phase Start
2022-07-11T00:00:00.000
Forecast Current Phase End
2025-07-09T00:00:00.000
Forecast Completion
2025-07-09T00:00:00.000
Actual Design Start
2019-09-20T00:00:00.000
Actual Design End
2020-02-10T00:00:00.000
Actual Construction
2020-02-10T00:00:00.000
Actual Construction 1
2022-03-25T00:00:00.000
Actual Construction Start
2022-07-11T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-1018
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2853
Fms Id
P-1VCSHND
Total Budget
1100000.00
Spend To Date
264179.75
Spend To Date 1
0.2401
Fms Project Name
Van Cortlandt Park, Shandler Rec. Area, XG-419M
Agency Project Name
Bronx Pavement Reconstruction (XG-419M)
Agency Project Description
This project will reconstruct pavements at various parks in the Bronx.
Current Phase
Construction
Current Phase Start
2022-07-11T00:00:00.000
Forecast Current Phase End
2025-07-09T00:00:00.000
Forecast Completion
2025-07-09T00:00:00.000
Actual Design Start
2019-09-20T00:00:00.000
Actual Design End
2020-02-10T00:00:00.000
Actual Construction
2020-02-10T00:00:00.000
Actual Construction 1
2022-03-25T00:00:00.000
Actual Construction Start
2022-07-11T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2853
Fms Id
P-1VCTRAL
Total Budget
0.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Van Cortlandt's Tail
Agency Project Name
Bronx Pavement Reconstruction (XG-419M)
Agency Project Description
This project will reconstruct pavements at various parks in the Bronx.
Current Phase
Construction
Current Phase Start
2022-07-11T00:00:00.000
Forecast Current Phase End
2025-07-09T00:00:00.000
Forecast Completion
2025-07-09T00:00:00.000
Actual Design Start
2019-09-20T00:00:00.000
Actual Design End
2020-02-10T00:00:00.000
Actual Construction
2020-02-10T00:00:00.000
Actual Construction 1
2022-03-25T00:00:00.000
Actual Construction Start
2022-07-11T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2854
Fms Id
P-3RVPFWP
Total Budget
2400000.00
Spend To Date
60824.06
Spend To Date 1
0.0253
Fms Project Name
Riverside Park & Fort Washington Park Grnwy Recon M071-322M
Agency Project Name
Riverside Park Cherry Walk Greenway Reconstruction
Agency Project Description
This project will reconstruct portions of the Cherry Walk greenway in Riverside Park.
Current Phase
Construction Procurement
Current Phase Start
2022-06-30T00:00:00.000
Forecast Current Phase End
2023-03-27T00:00:00.000
Forecast Completion
2025-04-24T00:00:00.000
Actual Design Start
2022-05-11T00:00:00.000
Actual Design End
2022-06-30T00:00:00.000
Actual Construction
2022-06-30T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2855
Fms Id
P-3PAVRSP
Total Budget
5000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Riverside Park Pavement Path Reconstruction MG-519M
Agency Project Name
Riverside Park Path Pavement Reconstruction (MG-519M)
Agency Project Description
This project will reconstruct pavement at various locations in Riverside Park.
Current Phase
Construction
Current Phase Start
2022-04-18T00:00:00.000
Forecast Current Phase End
2025-04-17T00:00:00.000
Forecast Completion
2025-04-17T00:00:00.000
Actual Design Start
2019-07-10T00:00:00.000
Actual Design End
2019-12-06T00:00:00.000
Actual Construction
2019-12-06T00:00:00.000
Actual Construction 1
2022-03-25T00:00:00.000
Actual Construction Start
2022-04-18T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-1018
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2855
Fms Id
P-3RIV105
Total Budget
1010000.00
Spend To Date
377571.62
Spend To Date 1
0.3738
Fms Project Name
Riverside Park, 105Street MG-519M
Agency Project Name
Riverside Park Path Pavement Reconstruction (MG-519M)
Agency Project Description
This project will reconstruct pavement at various locations in Riverside Park.
Current Phase
Construction
Current Phase Start
2022-04-18T00:00:00.000
Forecast Current Phase End
2025-04-17T00:00:00.000
Forecast Completion
2025-04-17T00:00:00.000
Actual Design Start
2019-07-10T00:00:00.000
Actual Design End
2019-12-06T00:00:00.000
Actual Construction
2019-12-06T00:00:00.000
Actual Construction 1
2022-03-25T00:00:00.000
Actual Construction Start
2022-04-18T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2855
Fms Id
P-3RIV110
Total Budget
365000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Riverside Park, 110 Street
Agency Project Name
Riverside Park Path Pavement Reconstruction (MG-519M)
Agency Project Description
This project will reconstruct pavement at various locations in Riverside Park.
Current Phase
Construction
Current Phase Start
2022-04-18T00:00:00.000
Forecast Current Phase End
2025-04-17T00:00:00.000
Forecast Completion
2025-04-17T00:00:00.000
Actual Design Start
2019-07-10T00:00:00.000
Actual Design End
2019-12-06T00:00:00.000
Actual Construction
2019-12-06T00:00:00.000
Actual Construction 1
2022-03-25T00:00:00.000
Actual Construction Start
2022-04-18T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2855
Fms Id
P-3RIV148
Total Budget
120000.00
Spend To Date
10000.00
Spend To Date 1
0.0833
Fms Project Name
Riverside Park, 148 Street MG-519M
Agency Project Name
Riverside Park Path Pavement Reconstruction (MG-519M)
Agency Project Description
This project will reconstruct pavement at various locations in Riverside Park.
Current Phase
Construction
Current Phase Start
2022-04-18T00:00:00.000
Forecast Current Phase End
2025-04-17T00:00:00.000
Forecast Completion
2025-04-17T00:00:00.000
Actual Design Start
2019-07-10T00:00:00.000
Actual Design End
2019-12-06T00:00:00.000
Actual Construction
2019-12-06T00:00:00.000
Actual Construction 1
2022-03-25T00:00:00.000
Actual Construction Start
2022-04-18T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2855
Fms Id
P-3RIVS83
Total Budget
395000.00
Spend To Date
373225.12
Spend To Date 1
0.9448
Agency Project Name
Riverside Park Path Pavement Reconstruction (MG-519M)
Agency Project Description
This project will reconstruct pavement at various locations in Riverside Park.
Current Phase
Construction
Current Phase Start
2022-04-18T00:00:00.000
Forecast Current Phase End
2025-04-17T00:00:00.000
Forecast Completion
2025-04-17T00:00:00.000
Actual Design Start
2019-07-10T00:00:00.000
Actual Design End
2019-12-06T00:00:00.000
Actual Construction
2019-12-06T00:00:00.000
Actual Construction 1
2022-03-25T00:00:00.000
Actual Construction Start
2022-04-18T00:00:00.000
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2855
Fms Id
P-3RIVS97
Total Budget
676000.00
Spend To Date
255401.45
Spend To Date 1
0.3778
Agency Project Name
Riverside Park Path Pavement Reconstruction (MG-519M)
Agency Project Description
This project will reconstruct pavement at various locations in Riverside Park.
Current Phase
Construction
Current Phase Start
2022-04-18T00:00:00.000
Forecast Current Phase End
2025-04-17T00:00:00.000
Forecast Completion
2025-04-17T00:00:00.000
Actual Design Start
2019-07-10T00:00:00.000
Actual Design End
2019-12-06T00:00:00.000
Actual Construction
2019-12-06T00:00:00.000
Actual Construction 1
2022-03-25T00:00:00.000
Actual Construction Start
2022-04-18T00:00:00.000
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2856
Fms Id
P-3NRGF01
Total Budget
1146000.00
Spend To Date
111000.00
Spend To Date 1
0.0968
Fms Project Name
NRG- Manhattan Reforestation FY 20- MG-619MA
Agency Project Name
Manhattan Reforestation FY20
Agency Project Description
This project will remove invasive species and plant new and replacement trees in Manhattan.
Current Phase
Construction
Current Phase Start
2023-10-02T00:00:00.000
Forecast Current Phase End
2026-09-30T00:00:00.000
Forecast Completion
2026-09-30T00:00:00.000
Actual Design Start
2019-05-01T00:00:00.000
Actual Design End
2020-12-24T00:00:00.000
Actual Construction
2020-12-24T00:00:00.000
Actual Construction 1
2023-04-10T00:00:00.000
Actual Construction Start
2023-10-02T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-0822, P-I001
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2857
Fms Id
P-6NRGF01
Total Budget
1110000.00
Spend To Date
10000.00
Spend To Date 1
0.009
Fms Project Name
NRG - Bronx & Queens Reforestation FY'20 CNYG-3019MA
Agency Project Name
Bronx and Queens Reforestation FY20
Agency Project Description
This project will remove invasive species and plant new and replacement trees in the Bronx and Queens.
Current Phase
Construction Procurement
Current Phase Start
2023-04-04T00:00:00.000
Forecast Current Phase End
2021-06-06T00:00:00.000
Forecast Completion
2027-10-29T00:00:00.000
Actual Design Start
2019-05-01T00:00:00.000
Actual Design End
2023-04-04T00:00:00.000
Actual Construction
2023-04-04T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
P-0822, P-D019, P-I001
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2858
Fms Id
P-5BLOOMB
Total Budget
1300000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
BLOOMINGDALE PARK : RECONSTRUCT TWO BASKETBALL COURTS.
Agency Project Name
Staten Island Pavement Reconstruction (RG-120M)
Agency Project Description
This project will reconstruct pavements at various parks in Staten Island.
Current Phase
Construction
Current Phase Start
2023-03-15T00:00:00.000
Forecast Current Phase End
2026-03-13T00:00:00.000
Forecast Completion
2026-03-13T00:00:00.000
Actual Design Start
2019-10-18T00:00:00.000
Actual Design End
2020-06-09T00:00:00.000
Actual Construction
2020-06-09T00:00:00.000
Actual Construction 1
2022-11-15T00:00:00.000
Actual Construction Start
2023-03-15T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
P-D020, P-I001, P-R245
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2858
Fms Id
P-5CLVLKP
Total Budget
6464000.00
Spend To Date
322783.05
Spend To Date 1
0.0499
Fms Project Name
Clove Lakes Park RG-120M
Agency Project Name
Staten Island Pavement Reconstruction (RG-120M)
Agency Project Description
This project will reconstruct pavements at various parks in Staten Island.
Current Phase
Construction
Current Phase Start
2023-03-15T00:00:00.000
Forecast Current Phase End
2026-03-13T00:00:00.000
Forecast Completion
2026-03-13T00:00:00.000
Actual Design Start
2019-10-18T00:00:00.000
Actual Design End
2020-06-09T00:00:00.000
Actual Construction
2020-06-09T00:00:00.000
Actual Construction 1
2022-11-15T00:00:00.000
Actual Construction Start
2023-03-15T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
P-0245R, P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2858
Fms Id
P-5HEROPK
Total Budget
222000.00
Spend To Date
26603.40
Spend To Date 1
0.1198
Fms Project Name
Hero Park Path Reconstruction RG-120M
Agency Project Name
Staten Island Pavement Reconstruction (RG-120M)
Agency Project Description
This project will reconstruct pavements at various parks in Staten Island.
Current Phase
Construction
Current Phase Start
2023-03-15T00:00:00.000
Forecast Current Phase End
2026-03-13T00:00:00.000
Forecast Completion
2026-03-13T00:00:00.000
Actual Design Start
2019-10-18T00:00:00.000
Actual Design End
2020-06-09T00:00:00.000
Actual Construction
2020-06-09T00:00:00.000
Actual Construction 1
2022-11-15T00:00:00.000
Actual Construction Start
2023-03-15T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2858
Fms Id
P-5SLVLK1
Total Budget
1080000.00
Spend To Date
47536.83
Spend To Date 1
0.044
Fms Project Name
Silver Lake Park RG-120M
Agency Project Name
Staten Island Pavement Reconstruction (RG-120M)
Agency Project Description
This project will reconstruct pavements at various parks in Staten Island.
Current Phase
Construction
Current Phase Start
2023-03-15T00:00:00.000
Forecast Current Phase End
2026-03-13T00:00:00.000
Forecast Completion
2026-03-13T00:00:00.000
Actual Design Start
2019-10-18T00:00:00.000
Actual Design End
2020-06-09T00:00:00.000
Actual Construction
2020-06-09T00:00:00.000
Actual Construction 1
2022-11-15T00:00:00.000
Actual Construction Start
2023-03-15T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2858
Fms Id
P-5SOBLPK
Total Budget
216000.00
Spend To Date
16000.00
Spend To Date 1
0.074
Fms Project Name
Sobel Park Path Reconstruction RG-120M
Agency Project Name
Staten Island Pavement Reconstruction (RG-120M)
Agency Project Description
This project will reconstruct pavements at various parks in Staten Island.
Current Phase
Construction
Current Phase Start
2023-03-15T00:00:00.000
Forecast Current Phase End
2026-03-13T00:00:00.000
Forecast Completion
2026-03-13T00:00:00.000
Actual Design Start
2019-10-18T00:00:00.000
Actual Design End
2020-06-09T00:00:00.000
Actual Construction
2020-06-09T00:00:00.000
Actual Construction 1
2022-11-15T00:00:00.000
Actual Construction Start
2023-03-15T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2858
Fms Id
P-6PAVESI
Total Budget
1600000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Staten Island Pavement Reconstruction (SoGR) RG-120M
Agency Project Name
Staten Island Pavement Reconstruction (RG-120M)
Agency Project Description
This project will reconstruct pavements at various parks in Staten Island.
Current Phase
Construction
Current Phase Start
2023-03-15T00:00:00.000
Forecast Current Phase End
2026-03-13T00:00:00.000
Forecast Completion
2026-03-13T00:00:00.000
Actual Design Start
2019-10-18T00:00:00.000
Actual Design End
2020-06-09T00:00:00.000
Actual Construction
2020-06-09T00:00:00.000
Actual Construction 1
2022-11-15T00:00:00.000
Actual Construction Start
2023-03-15T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
P-1018
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2859
Fms Id
P-4QSTORE
Total Budget
16437965.00
Spend To Date
896208.00
Spend To Date 1
0.0545
Fms Project Name
QUEENS STOREHOUSE Q099-520M
Agency Project Name
Flushing Meadows Corona Park Queens Storehouse Reconstruction
Agency Project Description
This project will reconstruct the Queens Storehouse in Flushing Meadows Corona Park. The work will include reconstructing portions of the roof, exterior walls, and floor slab; new screening, signage, and a staging yard; and improved drainage and landscape restoration.
Current Phase
Construction Procurement
Current Phase Start
2022-03-29T00:00:00.000
Forecast Current Phase End
2022-12-24T00:00:00.000
Forecast Completion
2026-03-18T00:00:00.000
Actual Design Start
2020-05-28T00:00:00.000
Actual Design End
2022-03-29T00:00:00.000
Actual Construction
2022-03-29T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-0245Q, P-I001
Ten Year Plan Category
MAJOR RECREATIONAL FACILITIES AND FACILITY RECONSTRUCTION
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2860
Fms Id
P-1TREL21
Total Budget
11277623.00
Spend To Date
4901192.87
Spend To Date 1
0.4345
Fms Project Name
FY21 Street Trees BX CB's5-8,11,12 (3Y)
Agency Project Name
Bronx Street Tree Planting FY21 - Community Boards 5-8, 11, 12
Agency Project Description
This project will plant new trees in Community Boards 5-8, 11, and 12 in the Bronx.
Current Phase
Construction
Current Phase Start
2022-03-14T00:00:00.000
Forecast Current Phase End
2025-03-12T00:00:00.000
Forecast Completion
2025-03-12T00:00:00.000
Actual Design Start
2019-06-03T00:00:00.000
Actual Design End
2019-09-04T00:00:00.000
Actual Construction
2019-09-04T00:00:00.000
Actual Construction 1
2022-01-27T00:00:00.000
Actual Construction Start
2022-03-14T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-0822, P-1018, P-I001
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2861
Fms Id
P-2TREL21
Total Budget
11817000.00
Spend To Date
7203139.95
Spend To Date 1
0.6095
Fms Project Name
FY21 Street Trees BK CB's9,17,18 (3Y)BG-1319M
Agency Project Name
Brooklyn Street Tree Planting FY21 - Community Boards 8, 9, 17, 18
Agency Project Description
This project will plant new trees in Community Boards 8, 9, 17, and 18 in Brooklyn.
Current Phase
Construction
Current Phase Start
2021-08-25T00:00:00.000
Forecast Current Phase End
2024-08-24T00:00:00.000
Forecast Completion
2024-08-24T00:00:00.000
Actual Design Start
2019-06-03T00:00:00.000
Actual Design End
2019-09-04T00:00:00.000
Actual Construction
2019-09-04T00:00:00.000
Actual Construction 1
2021-06-25T00:00:00.000
Actual Construction Start
2021-08-25T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-0822, P-1018, P-D822, P-I001, P-K822
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2862
Fms Id
P-3TREL21
Total Budget
14350000.00
Spend To Date
3319899.12
Spend To Date 1
0.2313
Fms Project Name
FY21 Street Trees MN CB's 1,2,4,5,,7-12 (3Y) MG-1319M
Agency Project Name
Manhattan Street Tree Planting FY21 - Community Boards 1, 2, 4, 5, 7-12
Agency Project Description
This project will plant new trees in Community Boards 1, 2, 4, 5, and 7-12 in Manhattan.
Current Phase
Construction
Current Phase Start
2022-06-13T00:00:00.000
Forecast Current Phase End
2025-06-11T00:00:00.000
Forecast Completion
2025-06-11T00:00:00.000
Actual Design Start
2019-06-03T00:00:00.000
Actual Design End
2020-07-27T00:00:00.000
Actual Construction
2020-07-27T00:00:00.000
Actual Construction 1
2022-06-06T00:00:00.000
Actual Construction Start
2022-06-13T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-1018, P-D822
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2863
Fms Id
P-4TREL21
Total Budget
9450400.00
Spend To Date
3074844.02
Spend To Date 1
0.3253
Fms Project Name
FY21 Street Trees QN CB's 8,11-13, QG-1219M
Agency Project Name
Queens Street Tree Planting FY21 - Community Boards 8, 11-13
Agency Project Description
This project will plant new trees in Community Boards 8 and 11-13 in Queens.
Current Phase
Construction
Current Phase Start
2021-10-25T00:00:00.000
Forecast Current Phase End
2024-10-23T00:00:00.000
Forecast Completion
2024-10-23T00:00:00.000
Actual Design Start
2019-06-03T00:00:00.000
Actual Design End
2019-09-04T00:00:00.000
Actual Construction
2019-09-04T00:00:00.000
Actual Construction 1
2021-09-27T00:00:00.000
Actual Construction Start
2021-10-25T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-0822, P-1018, P-D822, P-I001, SE-0002Q
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2863
Fms Id
SEQ-TREES
Total Budget
8964000.00
Spend To Date
1096300.00
Spend To Date 1
0.1223
Fms Project Name
South East Queens Sewer Build-out Trees Restitution
Agency Project Name
Queens Street Tree Planting FY21 - Community Boards 8, 11-13
Agency Project Description
This project will plant new trees in Community Boards 8 and 11-13 in Queens.
Current Phase
Construction
Current Phase Start
2021-10-25T00:00:00.000
Forecast Current Phase End
2024-10-23T00:00:00.000
Forecast Completion
2024-10-23T00:00:00.000
Actual Design Start
2019-06-03T00:00:00.000
Actual Design End
2019-09-04T00:00:00.000
Actual Construction
2019-09-04T00:00:00.000
Actual Construction 1
2021-09-27T00:00:00.000
Actual Construction Start
2021-10-25T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
SE-0002Q, SE-0004
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2864
Fms Id
P-2PKTR21
Total Budget
3516000.00
Spend To Date
1348514.01
Spend To Date 1
0.3835
Fms Project Name
FY21-Park Trees - Brooklyn
Agency Project Name
Brooklyn Park Tree Planting FY21 (BG-1119M)
Agency Project Description
This project will plant new park trees in various parks in Brooklyn.
Current Phase
(Completed)
Actual Design Start
2019-06-03T00:00:00.000
Actual Design End
2019-10-21T00:00:00.000
Actual Construction
2019-10-21T00:00:00.000
Actual Construction 1
2022-11-14T00:00:00.000
Actual Construction Start
2022-11-21T00:00:00.000
Actual Construction End
2023-11-16T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-I001
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2865
Fms Id
SAND3TREE
Total Budget
23009000.00
Spend To Date
789741.94
Spend To Date 1
0.0343
Fms Project Name
FY21- ESCR Tree Planting, Manhattan MG-1219M
Agency Project Name
Manhattan Street Tree Planting FY21 - Community Boards 3, 6
Agency Project Description
This project will plant new trees in Community Boards 3 and 6 in Manhattan.
Current Phase
Construction
Current Phase Start
2022-11-07T00:00:00.000
Forecast Current Phase End
2024-11-05T00:00:00.000
Forecast Completion
2024-11-05T00:00:00.000
Actual Design Start
2019-06-03T00:00:00.000
Actual Design End
2021-03-03T00:00:00.000
Actual Construction
2021-03-03T00:00:00.000
Actual Construction 1
2022-10-31T00:00:00.000
Actual Construction Start
2022-11-07T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-I001, PU-0100
Ten Year Plan Category
MISCELLANEOUS ENERGY EFFICIENCY AND SUSTAINABILITY
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2866
Fms Id
P-1TRE21A
Total Budget
3425000.00
Spend To Date
1053420.82
Spend To Date 1
0.3075
Fms Project Name
FY21 Street Trees Bronx CB's 1-4,9,10 XG-
Agency Project Name
Bronx Street Tree Planting FY21 - Community Boards 1-4, 9, 10
Agency Project Description
This project will plant new trees in Community Boards 1-4, 9, and 10 in the Bronx.
Current Phase
(Completed)
Actual Design Start
2019-06-03T00:00:00.000
Actual Design End
2019-09-10T00:00:00.000
Actual Construction
2019-09-10T00:00:00.000
Actual Construction 1
2022-11-18T00:00:00.000
Actual Construction Start
2022-11-28T00:00:00.000
Actual Construction End
2023-07-03T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-I001
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2867
Fms Id
P-4JMMPP2
Total Budget
3400000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
JOE MICHAEL MILE PHASE 2 PATH RENO NORTH
Agency Project Name
Joe Michael's Mile Waterfront Structural Reconstruction (Hurricane Sandy)
Agency Project Description
This project will reconstruct the waterfront Parks infrastructure damaged by Hurricane Sandy at Joe Michael's Mile.
Current Phase
Design
Current Phase Start
2020-01-06T00:00:00.000
Forecast Current Phase End
2022-01-06T00:00:00.000
Forecast Completion
2027-09-27T00:00:00.000
Actual Design Start
2020-01-06T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-D019, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2867
Fms Id
SANDY4-46
Total Budget
2924592.00
Spend To Date
126496.39
Spend To Date 1
0.0432
Fms Project Name
Joe Michael's Mile (Q012-120M)
Agency Project Name
Joe Michael's Mile Waterfront Structural Reconstruction (Hurricane Sandy)
Agency Project Description
This project will reconstruct the waterfront Parks infrastructure damaged by Hurricane Sandy at Joe Michael's Mile.
Current Phase
Design
Current Phase Start
2020-01-06T00:00:00.000
Forecast Current Phase End
2022-01-06T00:00:00.000
Forecast Completion
2027-09-27T00:00:00.000
Actual Design Start
2020-01-06T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2868
Fms Id
P-2BSKBL1
Total Budget
3721000.00
Spend To Date
501741.25
Spend To Date 1
0.1348
Fms Project Name
Brooklyn Basketball Courts Reconstruction (SoGR) BG-320M
Agency Project Name
Brooklyn Basketball Courts Reconstruction
Agency Project Description
This project will reconstruct basketball courts at Potomac Playground, Star Spangled Playground, and Taaffe Playground in Brooklyn.
Current Phase
(Completed)
Actual Design Start
2019-11-18T00:00:00.000
Actual Design End
2020-09-02T00:00:00.000
Actual Construction
2020-09-02T00:00:00.000
Actual Construction 1
2022-06-08T00:00:00.000
Actual Construction Start
2022-12-05T00:00:00.000
Actual Construction End
2024-01-08T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2869
Fms Id
P-215SPBK
Total Budget
1300000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
SHEEPSHEAD PLAYGROUND BASKETBALL COURT
Agency Project Name
Brooklyn Multipurpose Play Areas Reconstruction
Agency Project Description
This project will reconstruct the multipurpose play areas at Dyker Playground in Dyker Beach Park, Patrick O'Rourke Playground and Wilson Playground.
Current Phase
(Completed)
Actual Design Start
2019-11-25T00:00:00.000
Actual Design End
2020-09-18T00:00:00.000
Actual Construction
2020-09-18T00:00:00.000
Actual Construction 1
2022-09-23T00:00:00.000
Actual Construction Start
2023-03-15T00:00:00.000
Actual Construction End
2023-11-29T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-0245K, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2869
Fms Id
P-2BKPLG1
Total Budget
7655590.50
Spend To Date
912775.95
Spend To Date 1
0.1192
Fms Project Name
Brooklyn MPPA SOGR Reconstruction BG-220M
Agency Project Name
Brooklyn Multipurpose Play Areas Reconstruction
Agency Project Description
This project will reconstruct the multipurpose play areas at Dyker Playground in Dyker Beach Park, Patrick O'Rourke Playground and Wilson Playground.
Current Phase
(Completed)
Actual Design Start
2019-11-25T00:00:00.000
Actual Design End
2020-09-18T00:00:00.000
Actual Construction
2020-09-18T00:00:00.000
Actual Construction 1
2022-09-23T00:00:00.000
Actual Construction Start
2023-03-15T00:00:00.000
Actual Construction End
2023-11-29T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2870
Fms Id
P-1HUNTPT
Total Budget
843000.00
Spend To Date
168.91
Spend To Date 1
0.0002
Fms Project Name
HUNTS POINT RECREATION CENTER - REPLACE GYMNASIUM FLOOR
Agency Project Name
Citywide Buildings Reconstruction (CNYG-420M)
Agency Project Description
This project will partially reconstruct various buildings and facilities citywide.
Current Phase
Construction
Current Phase Start
2022-09-05T00:00:00.000
Forecast Current Phase End
2025-09-03T00:00:00.000
Forecast Completion
2025-09-03T00:00:00.000
Actual Design Start
2019-07-24T00:00:00.000
Actual Design End
2020-01-27T00:00:00.000
Actual Construction
2020-01-27T00:00:00.000
Actual Construction 1
2022-06-22T00:00:00.000
Actual Construction Start
2022-09-05T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-1018, P-1249, P-I001
Ten Year Plan Category
MAJOR RECREATIONAL FACILITIES AND FACILITY RECONSTRUCTION
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2870
Fms Id
P-303ASRC
Total Budget
800000.00
Spend To Date
33923.76
Spend To Date 1
0.0424
Fms Project Name
Al Smith Rec Cntr-replace a/c & new windows
Agency Project Name
Citywide Buildings Reconstruction (CNYG-420M)
Agency Project Description
This project will partially reconstruct various buildings and facilities citywide.
Current Phase
Construction
Current Phase Start
2022-09-05T00:00:00.000
Forecast Current Phase End
2025-09-03T00:00:00.000
Forecast Completion
2025-09-03T00:00:00.000
Actual Design Start
2019-07-24T00:00:00.000
Actual Design End
2020-01-27T00:00:00.000
Actual Construction
2020-01-27T00:00:00.000
Actual Construction 1
2022-06-22T00:00:00.000
Actual Construction Start
2022-09-05T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000