Capital Projects Dashboard - Citywide Budget and Schedule

All major capital infrastructure projects with a committed budget. Financial information and agency schedule details for each project are joined via FMS ID. Only projects in the design phase or later have project schedules displayed. This dataset is part of the Capital Projects Dashboard.

Note: Each row is uniquely identified by its Financial Management Service (FMS) ID. FMS ID is the unique ID that OMB uses for the FMS (Financial Information System). This ID can be universally joined with any OMB dataset that has the same field. The Capital Projects Dashboard is the result of joining OMB’s fiscal data with the agency’s schedule data. FMS IDs and agency projects don't always have a one-to-one relationship (i.e., one project schedule may correlate to multiple FMS IDs, and one FMS may correct to multiple projects with different schedules).

City Government Mayor's Office of Operations (OPS) Dataset fb86-vt7u 27 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BA001-022
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BA001-022
Total Budget
1000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
17 Lexington Multi-purpose Room
Current Phase
(Equipment)
Borough
Manhattan
Community Board
Manhattan
Budget Line
HN-0300
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BA001-023
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BA001-023
Total Budget
425000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
ADA Bathrooms
Current Phase
(Pre-Design)
Borough
Manhattan
Community Board
Manhattan
Budget Line
HN-D300
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BA001-024
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BA001-024
Total Budget
235000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
ONE STOP SHOP (BOSS) STUDENT SUPPORT OFFICES
Current Phase
(Pre-Design)
Borough
Manhattan
Community Board
Manhattan
Budget Line
HN-M300
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BA013-013
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BA013-013
Total Budget
569815.64
Spend To Date
411815.64
Spend To Date 1
0.7227
Fms Project Name
Data Center, UPS, and Cooling
Current Phase
(Equipment)
Borough
Manhattan
Community Board
Manhattan, Manhattan 06
Budget Line
HN-D300
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BA019-016
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BA019-016
Total Budget
1600457.00
Spend To Date
1550457.00
Spend To Date 1
0.9687
Fms Project Name
Library Modernization
Current Phase
(Completed)
Borough
Manhattan
Community Board
Manhattan
Budget Line
HN-D300
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BA024-018
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BA024-018
Total Budget
250000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Modification of Main Entrance at 17 Lexington Avenue
Current Phase
(Pre-Design)
Borough
Manhattan
Community Board
Manhattan
Budget Line
HN-D300
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BA025-018
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BA025-018
Total Budget
260000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Marxe Lab/Public Space Upgrades for School of Public Affairs
Current Phase
(Pre-Design)
Borough
Manhattan
Community Board
Manhattan
Budget Line
HN-D300
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BA030-020
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BA030-020
Total Budget
1950000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Mason Hall A/V System
Current Phase
(Pre-Design)
Borough
Manhattan
Community Board
Manhattan
Budget Line
HN-D300, HN-M300
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BX001-021
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BX001-021
Total Budget
350000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Roscoe Brown Memorial
Current Phase
(Pre-Design)
Borough
Bronx
Community Board
Bronx
Budget Line
HN-D004
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BX001-023
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BX001-023
Total Budget
575000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
GOULD MEMORIAL LIBRARY ELEVATOR INSTALLATION
Current Phase
(Equipment)
Borough
Bronx
Community Board
Bronx 01
Budget Line
HN-D002, HN-X002
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BX001-024
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BX001-024
Total Budget
500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
LIBRARY ELEVATOR INSTALLATION
Current Phase
(Pre-Design)
Borough
Bronx
Community Board
Bronx
Budget Line
HN-X002
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BX002-023
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BX002-023
Total Budget
425000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Elevator Installation
Current Phase
(Pre-Design)
Borough
Bronx
Community Board
Bronx
Budget Line
HN-D002
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BX006-022
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BX006-022
Total Budget
1150000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Food Pantry Construction
Current Phase
(Pre-Design)
Borough
Bronx
Community Board
Bronx
Budget Line
HN-D002
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BX017-004
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BX017-004
Total Budget
836106.00
Spend To Date
608896.39
Spend To Date 1
0.7282
Fms Project Name
Bronx Fire Alarm Upgrade
Current Phase
(Completed)
Borough
Bronx
Community Board
Bronx 05
Budget Line
HN-D004
Ten Year Plan Category
DATA PROCESSING AND OTHER EQUIPMENT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BX022-009
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BX022-009
Total Budget
1092325.00
Spend To Date
925518.88
Spend To Date 1
0.8472
Fms Project Name
Gould Memorial Lib Rotunda Staircase Installation
Current Phase
(Completed)
Borough
Bronx
Community Board
Bronx, Bronx 05
Budget Line
HN-D002
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BX024-011
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BX024-011
Total Budget
15956109.00
Spend To Date
12241794.92
Spend To Date 1
0.7672
Fms Project Name
Roof Replacement
Current Phase
(Completed)
Borough
Bronx
Community Board
Bronx
Budget Line
HN-0206, HN-D004
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BX026-013
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BX026-013
Total Budget
299590.00
Spend To Date
28448.40
Spend To Date 1
0.0949
Fms Project Name
ADA Entrance Ramps
Current Phase
(Pending)
Borough
Bronx
Community Board
Bronx, Bronx 05
Budget Line
HN-X001, HN-X002
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BX027-015
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BX027-015
Total Budget
500000.00
Spend To Date
28859.80
Spend To Date 1
0.0577
Fms Project Name
Ohio Track & Field Restoration
Current Phase
(Pending)
Borough
Bronx
Community Board
Bronx
Budget Line
HN-X002
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BX032-015
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BX032-015
Total Budget
350118.00
Spend To Date
185392.96
Spend To Date 1
0.5295
Fms Project Name
Monument Hills Restoration
Current Phase
(Pending)
Borough
Bronx
Community Board
Bronx
Budget Line
HN-0206, HN-D002
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BX039-016
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BX039-016
Total Budget
1145000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Alumni Gym Locker Room Accessibility Improvements - Bronx CC
Current Phase
(Pending)
Borough
Bronx
Community Board
Bronx
Budget Line
HN-0206, HN-D002, HN-D005
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BX040-017
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BX040-017
Total Budget
8069739.00
Spend To Date
557392.07
Spend To Date 1
0.069
Fms Project Name
Bronx Express
Current Phase
(Pending)
Borough
Bronx
Community Board
Bronx
Budget Line
HN-0206, HN-D002, HN-D003
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BX041-017
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BX041-017
Total Budget
150065.00
Spend To Date
24840.56
Spend To Date 1
0.1655
Fms Project Name
STEM Resource Center
Current Phase
(Pending)
Borough
Bronx
Community Board
Bronx
Budget Line
HN-D002, HN-D004
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BX042-018
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BX042-018
Total Budget
500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Renovate Roscoe Brown Student Center
Current Phase
(Pre-Design)
Borough
Bronx
Community Board
Bronx 07
Budget Line
HN-X002
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BX044-018
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BX044-018
Total Budget
500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Community Hall First Floor Renovation
Current Phase
(Pre-Design)
Borough
Bronx
Community Board
Bronx
Budget Line
HN-D004
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BX045-018
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BX045-018
Total Budget
400000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
ADA Accessibility for Roscoe C Brown Student Center
Current Phase
(Pre-Design)
Borough
Bronx
Community Board
Bronx
Budget Line
HN-D004
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BX046-019
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BX046-019
Total Budget
3000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Alumni Gym HVAC & ADA Improvements
Current Phase
(Pre-Design)
Borough
Bronx
Community Board
Bronx 05
Budget Line
HN-D002, HN-X002
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BX047-020
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BX047-020
Total Budget
500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Ohio Track & Field Upgrade
Current Phase
(Pre-Design)
Borough
Bronx
Community Board
Bronx 05
Budget Line
HN-X002
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BX048-020
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BX048-020
Total Budget
1008000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
ELEVATOR UPGRADES
Current Phase
(Pre-Design)
Borough
Bronx
Community Board
Bronx
Budget Line
HN-D002
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BX049-020
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BX049-020
Total Budget
3000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Carl Polowczyk Hall Upgrades
Current Phase
(Pre-Design)
Borough
Bronx
Community Board
Bronx
Budget Line
HN-D002
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BX050-021
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BX050-021
Total Budget
750000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Elevator Installation Gould Memorial Library
Current Phase
(Pre-Design)
Borough
Bronx
Community Board
Bronx
Budget Line
HN-D004, HN-X002
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BY001-021
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BY001-021
Total Budget
500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Quad Rehab Project
Current Phase
(Pre-Design)
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HN-D300
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BY001-022
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BY001-022
Total Budget
2000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Lecture Halls Upgrades for Science Instruction
Current Phase
(Pre-Design)
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HN-0300
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BY001-023
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BY001-023
Total Budget
1000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Main Quad Rehabilitation
Current Phase
(Pre-Design)
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HN-D300
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BY003-021
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BY003-021
Total Budget
6505000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Ingersoll Lecture Hall Upgrades
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HN-D300
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BY024-012
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BY024-012
Total Budget
100000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Haitian Studies Institute Initial Outfitting
Current Phase
(Pre-Design)
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HN-D300
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BY025-012
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BY025-012
Total Budget
100000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Haitian Studies Institute Initial Outfitting
Current Phase
(Pre-Design)
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HN-D300
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BY031-017
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BY031-017
Total Budget
500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Electrical Upgrades
Current Phase
(Pre-Design)
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HN-K300
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BY032-018
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BY032-018
Total Budget
2500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
ADA Upgrades for the Brooklyn College Student Center
Current Phase
(Pre-Design)
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HN-D300
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BY034-019
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BY034-019
Total Budget
724000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Restoration of Main Quad
Current Phase
(Pre-Design)
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HN-D300
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: BY036-020
Reporting Period
202305
Managing Agency
CUNY
Fms Id
BY036-020
Total Budget
2500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Main Quad Restoration
Current Phase
(Pre-Design)
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HN-D300, HN-K300
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: CA001-021
Reporting Period
202305
Managing Agency
CUNY
Fms Id
CA001-021
Total Budget
150000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
SLUS - Facility Upgrades
Current Phase
(Pre-Design)
Borough
Manhattan
Community Board
Manhattan
Budget Line
HN-M300
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: CA001-023
Reporting Period
202305
Managing Agency
CUNY
Fms Id
CA001-023
Total Budget
200000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
EXPANSION OF SLU CLASSROOM SPACE AND CREATION OF LABOR MUSEU
Current Phase
(Pre-Design)
Borough
Manhattan
Community Board
Manhattan
Budget Line
HN-D002, HN-M300
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: CA002-021
Reporting Period
202305
Managing Agency
CUNY
Fms Id
CA002-021
Total Budget
100000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
SPS - Virtual Online Desktop - Informatics & Data Analytics
Current Phase
(Equipment)
Borough
Manhattan
Community Board
Manhattan
Budget Line
HN-M300
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: CA002-022
Reporting Period
202305
Managing Agency
CUNY
Fms Id
CA002-022
Total Budget
1500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Technology Equipment and Facility upgrades
Current Phase
(Equipment)
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HN-0206, HN-0300
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: CA002-023
Reporting Period
202305
Managing Agency
CUNY
Fms Id
CA002-023
Total Budget
10000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Health, Safety and ADA Projects
Current Phase
(Pre-Design)
Borough
Citywide
Community Board
Citywide
Budget Line
HN-D002
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: CA002CA01
Reporting Period
202305
Managing Agency
CUNY
Fms Id
CA002CA01
Total Budget
600000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
CUNY Prep HVAC Upgrade Project
Current Phase
(Pending)
Borough
Bronx
Community Board
Bronx
Budget Line
HN-0206
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: CA003-021
Reporting Period
202305
Managing Agency
CUNY
Fms Id
CA003-021
Total Budget
6851000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Critical Maintenance
Current Phase
(Pre-Design)
Borough
Manhattan
Community Board
Manhattan
Budget Line
HN-D004
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: CA003-023
Reporting Period
202305
Managing Agency
CUNY
Fms Id
CA003-023
Total Budget
350000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Restroom Renovations
Current Phase
(Pre-Design)
Borough
Manhattan
Community Board
Manhattan
Budget Line
HN-D300
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: CA004-021
Reporting Period
202305
Managing Agency
CUNY
Fms Id
CA004-021
Total Budget
5000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
CUNY STEM Institute
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan
Budget Line
HN-D004
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: CUNY • Fms Id: CA004-023
Reporting Period
202305
Managing Agency
CUNY
Fms Id
CA004-023
Total Budget
1500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Workspace Expansion & Welcome Center Relocation
Current Phase
(Pre-Design)
Borough
Manhattan
Community Board
Manhattan
Budget Line
HN-D300
Ten Year Plan Category
MISCELLANEOUS RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000