Capital Projects Dashboard - Citywide Budget and Schedule

All major capital infrastructure projects with a committed budget. Financial information and agency schedule details for each project are joined via FMS ID. Only projects in the design phase or later have project schedules displayed. This dataset is part of the Capital Projects Dashboard.

Note: Each row is uniquely identified by its Financial Management Service (FMS) ID. FMS ID is the unique ID that OMB uses for the FMS (Financial Information System). This ID can be universally joined with any OMB dataset that has the same field. The Capital Projects Dashboard is the result of joining OMB’s fiscal data with the agency’s schedule data. FMS IDs and agency projects don't always have a one-to-one relationship (i.e., one project schedule may correlate to multiple FMS IDs, and one FMS may correct to multiple projects with different schedules).

City Government Mayor's Office of Operations (OPS) Dataset fb86-vt7u 27 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2982
Fms Id
P-1BOLTPK
Total Budget
8523600.00
Spend To Date
125000.00
Spend To Date 1
0.0146
Fms Project Name
Bolton Park Wetland Restore. & PK Con.
Agency Project Name
Soundview Park Bolton Point Coastal Habitat Restoration and Park Construction
Agency Project Description
This project will restore the coastal wetland and upland maritime area, and construct a park entry, pedestrian pathway, and plaza area at Bolton Point in Soundview Park.
Current Phase
Design
Current Phase Start
2018-11-14T00:00:00.000
Forecast Current Phase End
2023-10-02T00:00:00.000
Forecast Completion
2028-06-02T00:00:00.000
Actual Design Start
2018-11-14T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-1018, P-1245, P-D021, P-I001
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2983
Fms Id
P-4OLMSRF
Total Budget
9326000.00
Spend To Date
299737.69
Spend To Date 1
0.0321
Fms Project Name
RC of the roof at Olmsted Center
Agency Project Name
Olmsted Center Roof Reconstruction
Agency Project Description
This project will reconstruct the roof at the Olmsted Center.
Current Phase
Construction Procurement
Current Phase Start
2023-03-17T00:00:00.000
Forecast Current Phase End
2024-03-16T00:00:00.000
Forecast Completion
2025-11-25T00:00:00.000
Actual Design Start
2021-08-17T00:00:00.000
Actual Design End
2023-03-17T00:00:00.000
Actual Construction
2023-03-17T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-1018, P-1250, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2984
Fms Id
GXBXGI-02
Total Budget
850402.57
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Bronx Green Inrastructure
Agency Project Name
Bronx Green Infrastructure Construction
Agency Project Description
This project will construct green infrastructure to capture storm water at Magenta Playground and Watson Gleason Playground.
Current Phase
Construction
Current Phase Start
2023-11-06T00:00:00.000
Forecast Current Phase End
2024-11-04T00:00:00.000
Forecast Completion
2024-11-04T00:00:00.000
Actual Design Start
2021-05-11T00:00:00.000
Actual Design End
2021-08-20T00:00:00.000
Actual Construction
2021-08-20T00:00:00.000
Actual Construction 1
2023-06-06T00:00:00.000
Actual Construction Start
2023-11-06T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
WP-0169, WP-0170
Ten Year Plan Category
GREEN INFRASTRUCTURE PROGRAM
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2985
Fms Id
EDMFPM
Total Budget
22314606.33
Spend To Date
508651.44
Spend To Date 1
0.0227
Fms Project Name
FERRY PIER AT DYCKMAN MARINA
Agency Project Name
Fort Washington Park Dyckman Marina Reconstruction
Agency Project Description
This project will reconstruct the Inwood Canoe Pier, Dyckman Fishing Pier, Dyckman Marina docks and adjacent shorelines at Fort Washington Park.
Current Phase
Design
Current Phase Start
2022-06-23T00:00:00.000
Forecast Current Phase End
2023-06-23T00:00:00.000
Forecast Completion
2025-02-17T00:00:00.000
Actual Design Start
2022-06-23T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
ED-D401, P-0245M, P-0501, P-D018, P-I001, PU-0200
Ten Year Plan Category
WATERFRONT DEVELOPMENT
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2986
Fms Id
SAND5TREE
Total Budget
5175000.00
Spend To Date
165814.00
Spend To Date 1
0.032
Fms Project Name
ESCR- Right of Way Bioswale Construction
Agency Project Name
Manhattan East Side Coastal Resiliency Sidewalk Bioswales Construction
Agency Project Description
This project will construct sidewalk bioswales and green infrastructure to capture storm water in Community Boards 3 and 6 in Manhattan.
Current Phase
Construction Procurement
Current Phase Start
2022-06-30T00:00:00.000
Forecast Current Phase End
2023-03-27T00:00:00.000
Forecast Completion
2028-03-26T00:00:00.000
Actual Design Start
2021-11-01T00:00:00.000
Actual Design End
2022-06-30T00:00:00.000
Actual Construction
2022-06-30T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-I001, PU-0100
Ten Year Plan Category
MISCELLANEOUS ENERGY EFFICIENCY AND SUSTAINABILITY
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2987
Fms Id
GXBXGI-03
Total Budget
3438000.00
Spend To Date
243094.09
Spend To Date 1
0.0707
Fms Project Name
GI- Van Cortlandt Park
Agency Project Name
Van Cortlandt Park Green Infrastructure Construction
Agency Project Description
This project will install multiple green infrastructure elements throughout Van Cortlandt Park.
Current Phase
Design
Current Phase Start
2022-04-14T00:00:00.000
Forecast Current Phase End
2023-05-08T00:00:00.000
Forecast Completion
2027-08-05T00:00:00.000
Actual Design Start
2022-04-14T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
WP-0169, WP-0170
Ten Year Plan Category
GREEN INFRASTRUCTURE PROGRAM
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2988
Fms Id
P-1MBRKCS
Total Budget
1241000.00
Spend To Date
26687.81
Spend To Date 1
0.0215
Fms Project Name
Millbrook Playground Comfort Station Reconstruction
Agency Project Name
Citywide Building Facility Reconstruction (CNYG-522M)
Agency Project Description
This project will reconstruct various parks facilities.
Current Phase
Construction Procurement
Current Phase Start
2021-11-29T00:00:00.000
Forecast Current Phase End
2022-08-26T00:00:00.000
Forecast Completion
2028-02-24T00:00:00.000
Actual Design Start
2021-07-19T00:00:00.000
Actual Design End
2021-11-29T00:00:00.000
Actual Construction
2021-11-29T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-0505, P-1018, P-1250, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2988
Fms Id
P-3LFLWER
Total Budget
1903000.00
Spend To Date
59703.81
Spend To Date 1
0.0313
Fms Project Name
Little Flower Playground Comfort Station Reconstruction
Agency Project Name
Citywide Building Facility Reconstruction (CNYG-522M)
Agency Project Description
This project will reconstruct various parks facilities.
Current Phase
Construction Procurement
Current Phase Start
2021-11-29T00:00:00.000
Forecast Current Phase End
2022-08-26T00:00:00.000
Forecast Completion
2028-02-24T00:00:00.000
Actual Design Start
2021-07-19T00:00:00.000
Actual Design End
2021-11-29T00:00:00.000
Actual Construction
2021-11-29T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2988
Fms Id
P-3P155CS
Total Budget
1880000.00
Spend To Date
55424.01
Spend To Date 1
0.0294
Fms Project Name
PS 155 Plgd-Comfort Station Recon.-ADA Acessible
Agency Project Name
Citywide Building Facility Reconstruction (CNYG-522M)
Agency Project Description
This project will reconstruct various parks facilities.
Current Phase
Construction Procurement
Current Phase Start
2021-11-29T00:00:00.000
Forecast Current Phase End
2022-08-26T00:00:00.000
Forecast Completion
2028-02-24T00:00:00.000
Actual Design Start
2021-07-19T00:00:00.000
Actual Design End
2021-11-29T00:00:00.000
Actual Construction
2021-11-29T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-1018, P-D018, P-I001, P-M245
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2988
Fms Id
P-407FLPU
Total Budget
2100000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
FRANCIS LEWIS PARK UPGRADE--PUBLIC RESTROOMS, etc.
Agency Project Name
Citywide Building Facility Reconstruction (CNYG-522M)
Agency Project Description
This project will reconstruct various parks facilities.
Current Phase
Construction Procurement
Current Phase Start
2021-11-29T00:00:00.000
Forecast Current Phase End
2022-08-26T00:00:00.000
Forecast Completion
2028-02-24T00:00:00.000
Actual Design Start
2021-07-19T00:00:00.000
Actual Design End
2021-11-29T00:00:00.000
Actual Construction
2021-11-29T00:00:00.000
Borough
Queens
Community Board
Queens, Queens 07
Budget Line
P-D018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2988
Fms Id
P-4HOLSCS
Total Budget
1473000.00
Spend To Date
24520.78
Spend To Date 1
0.0166
Fms Project Name
Hollis Playground Public Restroom Bldg Recon CNYG-522M
Agency Project Name
Citywide Building Facility Reconstruction (CNYG-522M)
Agency Project Description
This project will reconstruct various parks facilities.
Current Phase
Construction Procurement
Current Phase Start
2021-11-29T00:00:00.000
Forecast Current Phase End
2022-08-26T00:00:00.000
Forecast Completion
2028-02-24T00:00:00.000
Actual Design Start
2021-07-19T00:00:00.000
Actual Design End
2021-11-29T00:00:00.000
Actual Construction
2021-11-29T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-0505, P-1008, P-D019, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2989
Fms Id
P-101CGDN
Total Budget
400000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
CENTRO CULTURAL RINCON CRIOLLO COMM GARDEN WATER INSTALL
Agency Project Name
Citywide Utility Reconstruction
Agency Project Description
This project will reconstruct utilities citywide.
Current Phase
Construction Procurement
Current Phase Start
2022-01-06T00:00:00.000
Forecast Current Phase End
2022-10-03T00:00:00.000
Forecast Completion
2027-02-24T00:00:00.000
Actual Design Start
2021-11-17T00:00:00.000
Actual Design End
2022-01-06T00:00:00.000
Actual Construction
2022-01-06T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-D021, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2989
Fms Id
P-102WWGT
Total Budget
480000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
NYC GreenThumb -Wishing Well Community Garden Water System -
Agency Project Name
Citywide Utility Reconstruction
Agency Project Description
This project will reconstruct utilities citywide.
Current Phase
Construction Procurement
Current Phase Start
2022-01-06T00:00:00.000
Forecast Current Phase End
2022-10-03T00:00:00.000
Forecast Completion
2027-02-24T00:00:00.000
Actual Design Start
2021-11-17T00:00:00.000
Actual Design End
2022-01-06T00:00:00.000
Actual Construction
2022-01-06T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-D021, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2989
Fms Id
P-204ELGD
Total Budget
300000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
EL GARDEN--IMPROVEMENTS
Agency Project Name
Citywide Utility Reconstruction
Agency Project Description
This project will reconstruct utilities citywide.
Current Phase
Construction Procurement
Current Phase Start
2022-01-06T00:00:00.000
Forecast Current Phase End
2022-10-03T00:00:00.000
Forecast Completion
2027-02-24T00:00:00.000
Actual Design Start
2021-11-17T00:00:00.000
Actual Design End
2022-01-06T00:00:00.000
Actual Construction
2022-01-06T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-D017, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2989
Fms Id
P-205GTHB
Total Budget
0.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Highland Park Community Garden -Greenthumb
Agency Project Name
Citywide Utility Reconstruction
Agency Project Description
This project will reconstruct utilities citywide.
Current Phase
Construction Procurement
Current Phase Start
2022-01-06T00:00:00.000
Forecast Current Phase End
2022-10-03T00:00:00.000
Forecast Completion
2027-02-24T00:00:00.000
Actual Design Start
2021-11-17T00:00:00.000
Actual Design End
2022-01-06T00:00:00.000
Actual Construction
2022-01-06T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-D017
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2989
Fms Id
P-209MSGT
Total Budget
350000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
GreenThumb Comm Garden Maple Street Garden -- Water line
Agency Project Name
Citywide Utility Reconstruction
Agency Project Description
This project will reconstruct utilities citywide.
Current Phase
Construction Procurement
Current Phase Start
2022-01-06T00:00:00.000
Forecast Current Phase End
2022-10-03T00:00:00.000
Forecast Completion
2027-02-24T00:00:00.000
Actual Design Start
2021-11-17T00:00:00.000
Actual Design End
2022-01-06T00:00:00.000
Actual Construction
2022-01-06T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-D017, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2989
Fms Id
P-2GRNTHB
Total Budget
2845000.00
Spend To Date
91652.82
Spend To Date 1
0.0322
Fms Project Name
Green Thumb Irrigation systems (Brooklyn)
Agency Project Name
Citywide Utility Reconstruction
Agency Project Description
This project will reconstruct utilities citywide.
Current Phase
Construction Procurement
Current Phase Start
2022-01-06T00:00:00.000
Forecast Current Phase End
2022-10-03T00:00:00.000
Forecast Completion
2027-02-24T00:00:00.000
Actual Design Start
2021-11-17T00:00:00.000
Actual Design End
2022-01-06T00:00:00.000
Actual Construction
2022-01-06T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-1018, P-D017, P-I001, P-K011
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2989
Fms Id
P-2ISAGRD
Total Budget
0.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
ISABAHLIA GARDENS WATER SPIGOT
Agency Project Name
Citywide Utility Reconstruction
Agency Project Description
This project will reconstruct utilities citywide.
Current Phase
Construction Procurement
Current Phase Start
2022-01-06T00:00:00.000
Forecast Current Phase End
2022-10-03T00:00:00.000
Forecast Completion
2027-02-24T00:00:00.000
Actual Design Start
2021-11-17T00:00:00.000
Actual Design End
2022-01-06T00:00:00.000
Actual Construction
2022-01-06T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-K011
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2989
Fms Id
P-312FTDR
Total Budget
300000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Ft. Tryon Dog Run -- Install Water Service at Sir William's
Agency Project Name
Citywide Utility Reconstruction
Agency Project Description
This project will reconstruct utilities citywide.
Current Phase
Construction Procurement
Current Phase Start
2022-01-06T00:00:00.000
Forecast Current Phase End
2022-10-03T00:00:00.000
Forecast Completion
2027-02-24T00:00:00.000
Actual Design Start
2021-11-17T00:00:00.000
Actual Design End
2022-01-06T00:00:00.000
Actual Construction
2022-01-06T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-D018, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2989
Fms Id
P-406PEGT
Total Budget
350000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Project Eden- Greenthumb Community Gardens--Internal Water I
Agency Project Name
Citywide Utility Reconstruction
Agency Project Description
This project will reconstruct utilities citywide.
Current Phase
Construction Procurement
Current Phase Start
2022-01-06T00:00:00.000
Forecast Current Phase End
2022-10-03T00:00:00.000
Forecast Completion
2027-02-24T00:00:00.000
Actual Design Start
2021-11-17T00:00:00.000
Actual Design End
2022-01-06T00:00:00.000
Actual Construction
2022-01-06T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-I001, P-Q245
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2989
Fms Id
P-412GECG
Total Budget
350000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
George Eagle Carr Comm Garden -- Install water infrastructur
Agency Project Name
Citywide Utility Reconstruction
Agency Project Description
This project will reconstruct utilities citywide.
Current Phase
Construction Procurement
Current Phase Start
2022-01-06T00:00:00.000
Forecast Current Phase End
2022-10-03T00:00:00.000
Forecast Completion
2027-02-24T00:00:00.000
Actual Design Start
2021-11-17T00:00:00.000
Actual Design End
2022-01-06T00:00:00.000
Actual Construction
2022-01-06T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-D019, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2989
Fms Id
P-412WATR
Total Budget
1050000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
DPR Greenthumb Paradise & 2 Discovery Gardens -- Water sourc
Agency Project Name
Citywide Utility Reconstruction
Agency Project Description
This project will reconstruct utilities citywide.
Current Phase
Construction Procurement
Current Phase Start
2022-01-06T00:00:00.000
Forecast Current Phase End
2022-10-03T00:00:00.000
Forecast Completion
2027-02-24T00:00:00.000
Actual Design Start
2021-11-17T00:00:00.000
Actual Design End
2022-01-06T00:00:00.000
Actual Construction
2022-01-06T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-D019, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2989
Fms Id
P-6WTRSWR
Total Budget
1400000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Citywide Multisite Water and Sewer Reconstruction
Agency Project Name
Citywide Utility Reconstruction
Agency Project Description
This project will reconstruct utilities citywide.
Current Phase
Construction Procurement
Current Phase Start
2022-01-06T00:00:00.000
Forecast Current Phase End
2022-10-03T00:00:00.000
Forecast Completion
2027-02-24T00:00:00.000
Actual Design Start
2021-11-17T00:00:00.000
Actual Design End
2022-01-06T00:00:00.000
Actual Construction
2022-01-06T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2990
Fms Id
P-4UNION
Total Budget
500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Union Street Beautification
Agency Project Name
Queens Council District 20 Sidewalk Reconstruction
Agency Project Description
This project will reconstruct tree pits and sidewalks in Council District 20 in Queens.
Current Phase
Construction Procurement
Current Phase Start
2023-10-16T00:00:00.000
Forecast Current Phase End
2024-10-15T00:00:00.000
Forecast Completion
2026-05-12T00:00:00.000
Actual Design Start
2022-02-07T00:00:00.000
Actual Design End
2023-10-16T00:00:00.000
Actual Construction
2023-10-16T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-D019, P-I001
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2991
Fms Id
P-3RIVRMP
Total Budget
2940000.00
Spend To Date
220579.41
Spend To Date 1
0.075
Fms Project Name
RIVERSIDE PARK: RIVERSIDE PARK 105TH STREET STEP RAMP RECON
Agency Project Name
Riverside Park 105th Street Staircase Reconstruction
Agency Project Description
This project will reconstruct the staircase at West 105th Street in Riverside Park.
Current Phase
Construction Procurement
Current Phase Start
2023-12-27T00:00:00.000
Forecast Current Phase End
2024-12-26T00:00:00.000
Forecast Completion
2026-08-26T00:00:00.000
Actual Design Start
2022-05-18T00:00:00.000
Actual Design End
2023-12-27T00:00:00.000
Actual Construction
2023-12-27T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-0380, P-D018, P-I001, P-M245
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2992
Fms Id
P-3FCSADA
Total Budget
3890000.00
Spend To Date
389927.89
Spend To Date 1
0.1002
Fms Project Name
Fort Washington Park CS-Renovate CS to Make it ADA Compliant
Agency Project Name
Fort Washington Park Discovery Playground Public Restroom Building Construction
Agency Project Description
This project will construct a public restroom building at Discovery Playground in Fort Washington Park.
Current Phase
Design
Current Phase Start
2022-04-01T00:00:00.000
Forecast Current Phase End
2023-04-28T00:00:00.000
Forecast Completion
2027-06-23T00:00:00.000
Actual Design Start
2022-04-01T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-D018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2993
Fms Id
P-404ATRI
Total Budget
846000.00
Spend To Date
84000.04
Spend To Date 1
0.0992
Fms Project Name
AMERICAN TRIANGLE RECON
Agency Project Name
American Triangle Reconstruction
Agency Project Description
This project will reconstruct American Triangle.
Current Phase
Construction Procurement
Current Phase Start
2023-05-01T00:00:00.000
Forecast Current Phase End
2024-04-30T00:00:00.000
Forecast Completion
2026-02-24T00:00:00.000
Actual Design Start
2022-04-26T00:00:00.000
Actual Design End
2023-05-01T00:00:00.000
Actual Construction
2023-05-01T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-D019, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2994
Fms Id
P-404GSPS
Total Budget
394000.00
Spend To Date
89329.77
Spend To Date 1
0.2267
Fms Project Name
GRAND SLOPE PK STAIRCASE RECON
Agency Project Name
Grand Slope Staircase Reconstruction
Agency Project Description
This project will reconstruct the staircase at Grand Slope.
Current Phase
Construction Procurement
Current Phase Start
2022-11-30T00:00:00.000
Forecast Current Phase End
2023-08-27T00:00:00.000
Forecast Completion
2025-12-25T00:00:00.000
Actual Design Start
2021-11-23T00:00:00.000
Actual Design End
2022-11-30T00:00:00.000
Actual Construction
2022-11-30T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-D019, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2995
Fms Id
P-404HOPK
Total Budget
7190000.00
Spend To Date
89535.97
Spend To Date 1
0.0124
Fms Project Name
CPI - HOFFMAN PARK RECON Q360N-122M
Agency Project Name
Hoffman Park Reconstruction
Agency Project Description
This project will reconstruct Hoffman Park.
Current Phase
Design
Current Phase Start
2022-06-23T00:00:00.000
Forecast Current Phase End
2023-09-29T00:00:00.000
Forecast Completion
2026-12-25T00:00:00.000
Actual Design Start
2022-06-23T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-0245Q, P-1018, P-I001, P-Q245
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2996
Fms Id
P-405BENN
Total Budget
4309535.64
Spend To Date
419873.30
Spend To Date 1
0.0974
Fms Project Name
BENNINGER PK PLGD RENO
Agency Project Name
Benninger Playground Reconstruction
Agency Project Description
This project will reconstruct Benninger Playground.
Current Phase
Construction Procurement
Current Phase Start
2023-09-27T00:00:00.000
Forecast Current Phase End
2024-09-26T00:00:00.000
Forecast Completion
2026-05-26T00:00:00.000
Actual Design Start
2022-01-20T00:00:00.000
Actual Design End
2023-09-27T00:00:00.000
Actual Construction
2023-09-27T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-D019, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2997
Fms Id
P-405HIDR
Total Budget
2000000.00
Spend To Date
260000.00
Spend To Date 1
0.13
Fms Project Name
HIGHLAND PARK DOG RUN
Agency Project Name
Highland Park Dog Run Construction
Agency Project Description
This project will construct a dog run in Highland Park.
Current Phase
Construction Procurement
Current Phase Start
2023-07-19T00:00:00.000
Forecast Current Phase End
2024-07-18T00:00:00.000
Forecast Completion
2026-07-27T00:00:00.000
Actual Design Start
2022-06-28T00:00:00.000
Actual Design End
2023-07-19T00:00:00.000
Actual Construction
2023-07-19T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-1018, P-D017, P-D019, P-I001, TF-0502
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2998
Fms Id
P-407BBSF
Total Budget
4767972.71
Spend To Date
432587.28
Spend To Date 1
0.0907
Fms Project Name
COLLEGE PT FIELDS CONVERT BASEBALL TO SOCCER FIELD
Agency Project Name
College Point Fields Soccer Field Construction
Agency Project Description
This project will replace baseball field 3 with a natural turf soccer field at College Point Fields.
Current Phase
Design
Current Phase Start
2022-07-12T00:00:00.000
Forecast Current Phase End
2024-01-31T00:00:00.000
Forecast Completion
2026-09-27T00:00:00.000
Actual Design Start
2022-07-12T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-0510, P-D019, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2999
Fms Id
P-412RKPP
Total Budget
2824905.95
Spend To Date
489924.91
Spend To Date 1
0.1734
Fms Project Name
RUFUS KING PARK RENO OF PLGD
Agency Project Name
Rufus King Park Playground Reconstruction
Agency Project Description
This project will reconstruct the playground at Rufus King Park.
Current Phase
Design
Current Phase Start
2022-03-24T00:00:00.000
Forecast Current Phase End
2023-06-30T00:00:00.000
Forecast Completion
2026-12-25T00:00:00.000
Actual Design Start
2022-03-24T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-0506, P-D019, P-I001, TF-0502
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3000
Fms Id
P-4BLISSV
Total Budget
580000.00
Spend To Date
77581.54
Spend To Date 1
0.1337
Fms Project Name
BLISSVILLE VET MEMORIAL FLAGPOLE & UPGRADES
Agency Project Name
Blissville Veterans Memorial Flagpole Construction
Agency Project Description
This project will construct a flagpole at Blissville Veterans Memorial.
Current Phase
Construction Procurement
Current Phase Start
2023-05-15T00:00:00.000
Forecast Current Phase End
2024-05-14T00:00:00.000
Forecast Completion
2026-02-24T00:00:00.000
Actual Design Start
2021-12-08T00:00:00.000
Actual Design End
2023-05-15T00:00:00.000
Actual Construction
2023-05-15T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-D019, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3001
Fms Id
P-4CAPTGP
Total Budget
2086791.79
Spend To Date
294299.59
Spend To Date 1
0.141
Fms Project Name
CAPT. TILLY PK RESTORE GOOSE POND
Agency Project Name
Captain Tilly Park Goose Pond Restoration
Agency Project Description
This project will restore the Goose Pond at Captain Tilly Park.
Current Phase
Design
Current Phase Start
2022-06-29T00:00:00.000
Forecast Current Phase End
2023-12-29T00:00:00.000
Forecast Completion
2027-02-24T00:00:00.000
Actual Design Start
2022-06-29T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-D019, P-I001, P-Q245
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3002
Fms Id
P-4KCPPAV
Total Budget
1000000.00
Spend To Date
50000.00
Spend To Date 1
0.05
Fms Project Name
KISSENA CORRIDOR PARK: NEW SECURITY LIGHTING AND REPAVING
Agency Project Name
Kissena Corridor Park Lighting Construction
Agency Project Description
This project will construct lighting and a pathway at Kissena Corridor Park.
Current Phase
Construction Procurement
Current Phase Start
2023-06-28T00:00:00.000
Forecast Current Phase End
2024-06-27T00:00:00.000
Forecast Completion
2025-02-10T00:00:00.000
Actual Design Start
2022-06-17T00:00:00.000
Actual Design End
2023-06-28T00:00:00.000
Actual Construction
2023-06-28T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-D019, P-I001, P-Q245, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3003
Fms Id
P-404LIND
Total Budget
5160273.47
Spend To Date
184000.01
Spend To Date 1
0.0356
Fms Project Name
LINDEN PK RENOVATIONS
Agency Project Name
Park of the Americas Basketball Court Reconstruction
Agency Project Description
This project will reconstruct the basketball court and adjacent entrance at Park of the Americas.
Current Phase
Construction Procurement
Current Phase Start
2023-08-30T00:00:00.000
Forecast Current Phase End
2024-08-29T00:00:00.000
Forecast Completion
2026-03-27T00:00:00.000
Actual Design Start
2022-01-26T00:00:00.000
Actual Design End
2023-08-30T00:00:00.000
Actual Construction
2023-08-30T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-D019, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3004
Fms Id
P-4WATEDG
Total Budget
12009846.16
Spend To Date
671161.14
Spend To Date 1
0.0558
Fms Project Name
Cross Island Parkway Waters Edge Drive PLGD CONS Q135-122M
Agency Project Name
Cross Island Parkway Waters Edge Drive Playground Construction
Agency Project Description
This project will construct a playground next to the Cross Island Parkway near Waters Edge Drive.
Current Phase
Design
Current Phase Start
2021-10-21T00:00:00.000
Forecast Current Phase End
2023-04-28T00:00:00.000
Forecast Completion
2026-06-16T00:00:00.000
Actual Design Start
2021-10-21T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-0245Q, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3005
Fms Id
P-4WOODPG
Total Budget
4149825.80
Spend To Date
455194.49
Spend To Date 1
0.1096
Fms Project Name
WOODTREE PLAYGROUND: RENOVATE THE BASKETBALL COURTS
Agency Project Name
Woodtree Playground Basketball Courts Reconstruction
Agency Project Description
This project will reconstruct the basketball courts at Woodtree Playground.
Current Phase
Construction Procurement
Current Phase Start
2023-03-30T00:00:00.000
Forecast Current Phase End
2024-03-29T00:00:00.000
Forecast Completion
2026-05-27T00:00:00.000
Actual Design Start
2021-12-01T00:00:00.000
Actual Design End
2023-03-30T00:00:00.000
Actual Construction
2023-03-30T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-D019, P-Q245, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3006
Fms Id
P-4RRDPK
Total Budget
17925036.92
Spend To Date
495444.39
Spend To Date 1
0.0276
Fms Project Name
Gwen Ifill Park Construction Q412-122M
Agency Project Name
Gwen Ifill Park Construction
Agency Project Description
This project will construct a playground, basketball courts, adult fitness equipment, entry plazas, and pathways at Gwen Ifill Park.
Current Phase
Design
Current Phase Start
2021-09-16T00:00:00.000
Forecast Current Phase End
2023-09-29T00:00:00.000
Forecast Completion
2028-02-22T00:00:00.000
Actual Design Start
2021-09-16T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-0245Q, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3007
Fms Id
P-210MCKP
Total Budget
5234627.00
Spend To Date
263896.12
Spend To Date 1
0.0504
Fms Project Name
McKinley Park Playground Reconstruction (B060-122M)
Agency Project Name
McKinley Park Playground Reconstruction
Agency Project Description
This project will reconstruct the playground at McKinley Park.
Current Phase
Construction Procurement
Current Phase Start
2023-08-11T00:00:00.000
Forecast Current Phase End
2024-08-10T00:00:00.000
Forecast Completion
2026-04-22T00:00:00.000
Actual Design Start
2022-05-26T00:00:00.000
Actual Design End
2023-08-11T00:00:00.000
Actual Construction
2023-08-11T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 10
Budget Line
P-D017, P-I001, TF-0502
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3008
Fms Id
P-215MCDP
Total Budget
9184536.08
Spend To Date
395359.28
Spend To Date 1
0.043
Fms Project Name
PO Jeff Herman Ballfield Recon. - McDonald Plgd. B244-122M
Agency Project Name
PO Jeff Herman Ballfield Reconstruction
Agency Project Description
This project will convert the existing asphalt field to a synthetic turf field and reconstruct the handball court and basketball courts at Police Officer Jeff Herman Ballfield in McDonald Playground.
Current Phase
Construction Procurement
Current Phase Start
2023-06-27T00:00:00.000
Forecast Current Phase End
2024-06-26T00:00:00.000
Forecast Completion
2025-12-23T00:00:00.000
Actual Design Start
2021-12-08T00:00:00.000
Actual Design End
2023-06-27T00:00:00.000
Actual Construction
2023-06-27T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 15
Budget Line
P-D017, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3009
Fms Id
P-217PADG
Total Budget
5714631.78
Spend To Date
323460.79
Spend To Date 1
0.0566
Fms Project Name
Paerdegat Park - Reconstruction of Turf B218-122M
Agency Project Name
Paerdegat Park Ballfields Reconstruction
Agency Project Description
This project will reconstruct the ballfields at Paerdegat Park.
Current Phase
Construction Procurement
Current Phase Start
2023-02-28T00:00:00.000
Forecast Current Phase End
2024-02-28T00:00:00.000
Forecast Completion
2025-11-25T00:00:00.000
Actual Design Start
2021-12-10T00:00:00.000
Actual Design End
2023-02-28T00:00:00.000
Actual Construction
2023-02-28T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 17
Budget Line
P-0245K, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3010
Fms Id
P-2PWPADT
Total Budget
3170000.00
Spend To Date
145212.76
Spend To Date 1
0.0458
Fms Project Name
Power Memorial Plgd. Phase 2 Reconstruction
Agency Project Name
Power Playground Skate Park Construction
Agency Project Description
This project will construct a skate park at Power Playground.
Current Phase
Construction Procurement
Current Phase Start
2023-07-28T00:00:00.000
Forecast Current Phase End
2024-07-27T00:00:00.000
Forecast Completion
2026-01-13T00:00:00.000
Actual Design Start
2022-05-19T00:00:00.000
Actual Design End
2023-07-28T00:00:00.000
Actual Construction
2023-07-28T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-D017, P-I001, P-K011
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3011
Fms Id
P-108EWPK
Total Budget
4129845.60
Spend To Date
304101.21
Spend To Date 1
0.0736
Fms Project Name
Ewen Park - Reconstruct. Staircase
Agency Project Name
Ewen Park Staircase Reconstruction
Agency Project Description
This project will reconstruct the staircase at Ewen Park.
Current Phase
Construction Procurement
Current Phase Start
2023-07-25T00:00:00.000
Forecast Current Phase End
2024-07-24T00:00:00.000
Forecast Completion
2026-07-27T00:00:00.000
Actual Design Start
2022-06-15T00:00:00.000
Actual Design End
2023-07-25T00:00:00.000
Actual Construction
2023-07-25T00:00:00.000
Borough
Bronx
Community Board
Bronx, Bronx 08
Budget Line
P-D021, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3012
Fms Id
P-1PBEAST
Total Budget
4157197.14
Spend To Date
304238.70
Spend To Date 1
0.0731
Fms Project Name
Bronx Park East - Ped Access Ramp
Agency Project Name
Bronx Park East Botanical Garden Pedestrian Access Ramp Construction
Agency Project Description
This project will construct an accessible pedestrian ramp to the New York Botanical Garden in Bronx Park.
Current Phase
Construction Procurement
Current Phase Start
2023-07-25T00:00:00.000
Forecast Current Phase End
2024-07-24T00:00:00.000
Forecast Completion
2025-02-24T00:00:00.000
Actual Design Start
2022-06-29T00:00:00.000
Actual Design End
2023-07-25T00:00:00.000
Actual Construction
2023-07-25T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-D021, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3013
Fms Id
P-111ESPG
Total Budget
5015293.88
Spend To Date
325297.80
Spend To Date 1
0.0648
Fms Project Name
Eastchester Playground
Agency Project Name
Eastchester Playground Reconstruction
Agency Project Description
This project will reconstruct the playground and handball courts in Eastchester Playground.
Current Phase
Construction Procurement
Current Phase Start
2023-04-28T00:00:00.000
Forecast Current Phase End
2024-04-27T00:00:00.000
Forecast Completion
2025-12-22T00:00:00.000
Actual Design Start
2021-12-08T00:00:00.000
Actual Design End
2023-04-28T00:00:00.000
Actual Construction
2023-04-28T00:00:00.000
Borough
Bronx
Community Board
Bronx, Bronx 11
Budget Line
P-0245X, P-I001, TF-0502
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3014
Fms Id
P-1DBPLYG
Total Budget
8835486.03
Spend To Date
645083.86
Spend To Date 1
0.073
Fms Project Name
DANIEL BOONE PLAYGROUND - CONSTRUCT A PLAYGROUND
Agency Project Name
Daniel Boone Playground Reconstruction
Agency Project Description
This project will reconstruct Daniel Boone Playground.
Current Phase
Construction Procurement
Current Phase Start
2023-06-26T00:00:00.000
Forecast Current Phase End
2024-06-25T00:00:00.000
Forecast Completion
2025-12-23T00:00:00.000
Actual Design Start
2022-04-05T00:00:00.000
Actual Design End
2023-06-26T00:00:00.000
Actual Construction
2023-06-26T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-D021, P-I001, P-X245, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3015
Fms Id
P-503LEMN
Total Budget
1725000.00
Spend To Date
213640.31
Spend To Date 1
0.1238
Fms Project Name
Lemon Creek Park- Reconstruction
Agency Project Name
Lemon Creek Park Playground Reconstruction
Agency Project Description
This project will reconstruct the playground in Lemon Creek Park.
Current Phase
Construction Procurement
Current Phase Start
2023-07-20T00:00:00.000
Forecast Current Phase End
2024-07-19T00:00:00.000
Forecast Completion
2026-07-27T00:00:00.000
Actual Design Start
2022-06-14T00:00:00.000
Actual Design End
2023-07-20T00:00:00.000
Actual Construction
2023-07-20T00:00:00.000
Borough
Staten Island
Community Board
Staten Island, Staten Island 03
Budget Line
P-D020, TF-0502
Ten Year Plan Category
MAJOR RECREATIONAL FACILITIES AND FACILITY RECONSTRUCTION
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3016
Fms Id
P-503AESP
Total Budget
6840000.00
Spend To Date
174863.01
Spend To Date 1
0.0255
Fms Project Name
Aesop Park - Safety Surface
Agency Project Name
Aesop Park Playground Reconstruction
Agency Project Description
This project will reconstruct the playground, including play equipment and safety surface at Aesop Park.
Current Phase
Construction Procurement
Current Phase Start
2023-11-02T00:00:00.000
Forecast Current Phase End
2024-11-01T00:00:00.000
Forecast Completion
2026-09-20T00:00:00.000
Actual Design Start
2022-06-08T00:00:00.000
Actual Design End
2023-11-02T00:00:00.000
Actual Construction
2023-11-02T00:00:00.000
Borough
Staten Island
Community Board
Staten Island, Staten Island 03
Budget Line
P-D020, P-I001, P-R245
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-02-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000