Capital Projects Dashboard - Citywide Budget and Schedule

All major capital infrastructure projects with a committed budget. Financial information and agency schedule details for each project are joined via FMS ID. Only projects in the design phase or later have project schedules displayed. This dataset is part of the Capital Projects Dashboard.

Note: Each row is uniquely identified by its Financial Management Service (FMS) ID. FMS ID is the unique ID that OMB uses for the FMS (Financial Information System). This ID can be universally joined with any OMB dataset that has the same field. The Capital Projects Dashboard is the result of joining OMB’s fiscal data with the agency’s schedule data. FMS IDs and agency projects don't always have a one-to-one relationship (i.e., one project schedule may correlate to multiple FMS IDs, and one FMS may correct to multiple projects with different schedules).

City Government Mayor's Office of Operations (OPS) Dataset fb86-vt7u 27 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
DPR
Pid
29
Fms Id
SAND79BAS
Total Budget
28281000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Riverside Park 79 ST Boat Basin: C Dock
Agency Project Name
79th Street Boat Basin
Agency Project Description
Reconstruction of bulkhead and piers at 79th St Boat Basin on behalf of NYCDPR .
Current Phase
Design
Current Phase Start
2019-05-15T00:00:00.000
Forecast Current Phase End
2024-09-30T00:00:00.000
Forecast Completion
2027-02-01T00:00:00.000
Actual Design Start
2019-05-15T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-1018
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: EDC
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
EDC
Pid
30
Fms Id
NDF-NWOOD
Total Budget
50000340.00
Spend To Date
489186.60
Spend To Date 1
0.0097
Fms Project Name
NDF - Inwood Greenway and New Parks Development
Agency Project Name
Academy Street and North Cove
Agency Project Description
Design and construction of two parks and esplanades in Inwood to connect with the Manhattan Greenway.
Current Phase
Design
Current Phase Start
2020-03-01T00:00:00.000
Forecast Current Phase End
2024-05-03T00:00:00.000
Forecast Completion
2026-11-01T00:00:00.000
Actual Design Start
2020-03-01T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
ED-0075, ED-0384
Ten Year Plan Category
MISCELLANEOUS
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
DPR
Pid
31
Fms Id
P-2GPWBOX
Total Budget
30504703.00
Spend To Date
413757.72
Spend To Date 1
0.0135
Fms Project Name
GPWB - Box Street Park
Agency Project Name
Box Street / Newtown Barge Parks
Agency Project Description
Design and construction of Box Street Park and Newtown Barge Park
Current Phase
Construction Procurement
Current Phase Start
2022-07-22T00:00:00.000
Forecast Current Phase End
2024-04-30T00:00:00.000
Forecast Completion
2025-10-01T00:00:00.000
Actual Design Start
2013-07-29T00:00:00.000
Actual Design End
2022-07-21T00:00:00.000
Actual Construction
2022-07-22T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 01
Budget Line
P-0839, P-1018
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: DCLA
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
DCLA
Pid
32
Fms Id
PV471SWA2
Total Budget
28895982.58
Spend To Date
1338552.99
Spend To Date 1
0.0463
Fms Project Name
BxMA - South Wing Atrium Renovation
Agency Project Name
Bronx Museum of the Arts
Agency Project Description
Demolition and replacement of the Bronx Museum's South Wing Atrium and connected spaces.
Current Phase
Construction
Current Phase Start
2024-01-01T00:00:00.000
Forecast Current Phase End
2025-12-31T00:00:00.000
Forecast Completion
2025-12-31T00:00:00.000
Actual Design Start
2021-10-13T00:00:00.000
Actual Design End
2023-02-09T00:00:00.000
Actual Construction
2023-02-10T00:00:00.000
Actual Construction 1
2023-12-31T00:00:00.000
Actual Construction Start
2024-01-01T00:00:00.000
Borough
Bronx
Community Board
Bronx 04
Budget Line
PV-0467, PV-0471, PV-D467, PV-D471, PV-X467, PV-X471
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: EDC
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
EDC
Pid
33
Fms Id
BKBRESP
Total Budget
30973235.88
Spend To Date
7524655.25
Spend To Date 1
0.2429
Fms Project Name
Brooklyn Bridge Esplanade
Agency Project Name
Brooklyn Bridge Esplanade
Agency Project Description
The Project seeks to enhance the identity of the Waterfront by creating a pedestrian-oriented environment through landscaping,improving pedestrian safety,maintaining appropriate traffic flow,prioritizing commercial curb access,incorporating traffic calming measures,and including sustainable elements to improve resiliency.
Current Phase
Construction
Current Phase Start
2021-08-01T00:00:00.000
Forecast Current Phase End
2024-12-31T00:00:00.000
Forecast Completion
2024-12-31T00:00:00.000
Actual Design Start
2018-10-15T00:00:00.000
Actual Design End
2021-01-31T00:00:00.000
Actual Construction
2021-02-01T00:00:00.000
Actual Construction 1
2021-07-31T00:00:00.000
Actual Construction Start
2021-08-01T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
ED-0075, ED-0409, ED-D075, ED-M075
Ten Year Plan Category
MISCELLANEOUS
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: EDC
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
EDC
Pid
34
Fms Id
BUSHDEVSP
Total Budget
26006268.04
Spend To Date
12041056.11
Spend To Date 1
0.463
Fms Project Name
Bush Terminal Development Site Preparation
Agency Project Name
Bush Terminal 39/40 & 45 Development Site Preparation
Agency Project Description
Sitework (including but not limited to: excavation,utility,and bulkhead work) at Bush Terminal in preparation of the Steiner Studio campus.
Current Phase
Construction Procurement
Current Phase Start
2023-03-01T00:00:00.000
Forecast Current Phase End
2024-04-30T00:00:00.000
Forecast Completion
2026-09-01T00:00:00.000
Actual Design Start
2020-12-01T00:00:00.000
Actual Design End
2023-02-28T00:00:00.000
Actual Construction
2023-03-01T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
ED-0075
Ten Year Plan Category
WATERFRONT DEVELOPMENT
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: EDC
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
EDC
Pid
35
Fms Id
BUSHUTIL
Total Budget
75852677.18
Spend To Date
29915670.67
Spend To Date 1
0.3943
Fms Project Name
Bush Terminal Site and Utility Improvements
Agency Project Name
Bush Terminal Made in NY (MiNY) – Site Improvements (Waterfront,Streetscapes,& Utility Infrastructure)
Agency Project Description
Sitework (including but not limited to: excavation,utility,and bulkhead work) at Bush Terminal in preparation of the Made in NY campus.
Current Phase
Construction
Current Phase Start
2019-01-01T00:00:00.000
Forecast Current Phase End
2024-02-15T00:00:00.000
Forecast Completion
2024-02-15T00:00:00.000
Actual Design Start
2018-10-29T00:00:00.000
Actual Design End
2018-07-03T00:00:00.000
Actual Construction
2018-07-04T00:00:00.000
Actual Construction 1
2018-12-31T00:00:00.000
Actual Construction Start
2019-01-01T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
ED-0075, ED-0075, ED-0410, ED-0410, SE-0200K
Ten Year Plan Category
MISCELLANEOUS
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: DOT
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
DOT
Pid
37
Fms Id
HWQ187A
Total Budget
48635804.76
Spend To Date
13380890.24
Spend To Date 1
0.2751
Fms Project Name
132nd St Construction - 20th Ave to Linden Place
Agency Project Name
College Point - 132nd Street - Linden Place Extension
Agency Project Description
Design and Construction of 0.7 miles of roadway adjacent to the old Flushing Airport to serves as a critical transportation corridor in the College Point Corporate Park Area.
Current Phase
Construction Procurement
Current Phase Start
2018-07-02T00:00:00.000
Forecast Current Phase End
2024-01-31T00:00:00.000
Forecast Completion
2025-06-15T00:00:00.000
Actual Design Start
2017-01-01T00:00:00.000
Actual Design End
2018-07-01T00:00:00.000
Actual Construction
2018-07-02T00:00:00.000
Borough
Queens
Community Board
Queens 07
Budget Line
ED-0075, HW-0001, HW-0001Q, HW-1674, SE-0200Q
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
DEP
Pid
38
Fms Id
CONEYWEST
Total Budget
205395417.86
Spend To Date
102439552.68
Spend To Date 1
0.4987
Fms Project Name
Coney Island West
Agency Project Name
Coney West
Agency Project Description
Infrastructure improvements and roadway reconstruction to faciliate future development.
Current Phase
Construction
Current Phase Start
2023-02-06T00:00:00.000
Forecast Current Phase End
2024-08-31T00:00:00.000
Forecast Completion
2024-08-31T00:00:00.000
Actual Design Start
2015-03-18T00:00:00.000
Actual Design End
2015-10-31T00:00:00.000
Actual Construction
2015-11-01T00:00:00.000
Actual Construction 1
2023-02-05T00:00:00.000
Actual Construction Start
2023-02-06T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
ED-0075, SE-0002K, SE-0200K, WM-0001, WM-0006
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: DCLA
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
DCLA
Pid
39
Fms Id
PV467-BEY
Total Budget
999999.00
Spend To Date
79205.00
Spend To Date 1
0.0792
Fms Project Name
DCA PFA - Percent for Art Beyond Sims
Agency Project Name
DCLA - Percent For Art - Monuments
Agency Project Description
Design and construction of public art installations selected through DCLA's Percent for Art program.
Current Phase
Design
Current Phase Start
2022-01-01T00:00:00.000
Forecast Current Phase End
2024-12-30T00:00:00.000
Forecast Completion
2025-12-30T00:00:00.000
Actual Design Start
2022-01-01T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 01, Manhattan 02
Budget Line
PV-0467
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: DCLA
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
DCLA
Pid
39
Fms Id
PV467-PCT
Total Budget
500250.00
Spend To Date
40262.21
Spend To Date 1
0.0804
Fms Project Name
DCA PFA - Percent for Art Tito P.
Agency Project Name
DCLA - Percent For Art - Monuments
Agency Project Description
Design and construction of public art installations selected through DCLA's Percent for Art program.
Current Phase
Design
Current Phase Start
2022-01-01T00:00:00.000
Forecast Current Phase End
2024-12-30T00:00:00.000
Forecast Completion
2025-12-30T00:00:00.000
Actual Design Start
2022-01-01T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 01, Manhattan 02
Budget Line
PV-0467
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
DEP
Pid
40
Fms Id
GK26W5-05
Total Budget
175755796.65
Spend To Date
142538314.01
Spend To Date 1
0.811
Fms Project Name
DSGN & CONS OF ROW GI IN 26W-005
Agency Project Name
DEP Green Infrastructure
Agency Project Description
Design and construction of right-of-way and on-site green infrastructure in order for the city to comply with NYS DEC consent order which states that NYC must manage 1” of rain on 10% of impervious surfaces by 2030 to reduce combined sewer overflows.
Current Phase
Close-out
Actual Design Start
2013-04-01T00:00:00.000
Actual Design End
2019-06-30T00:00:00.000
Actual Construction
2019-07-01T00:00:00.000
Actual Construction 1
2019-09-30T00:00:00.000
Actual Construction Start
2019-10-01T00:00:00.000
Actual Construction End
2023-12-31T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
WP-0169, WP-0170
Ten Year Plan Category
GREEN INFRASTRUCTURE PROGRAM
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
DEP
Pid
40
Fms Id
GKCI05-01
Total Budget
6386575.00
Spend To Date
6378856.78
Spend To Date 1
0.9987
Fms Project Name
GI - DSGN & CONS OF ROW GREEN INFRASTRUCTURE IN CI-005 PH 1
Agency Project Name
DEP Green Infrastructure
Agency Project Description
Design and construction of right-of-way and on-site green infrastructure in order for the city to comply with NYS DEC consent order which states that NYC must manage 1” of rain on 10% of impervious surfaces by 2030 to reduce combined sewer overflows.
Current Phase
Close-out
Actual Design Start
2013-04-01T00:00:00.000
Actual Design End
2019-06-30T00:00:00.000
Actual Construction
2019-07-01T00:00:00.000
Actual Construction 1
2019-09-30T00:00:00.000
Actual Construction Start
2019-10-01T00:00:00.000
Actual Construction End
2023-12-31T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
WP-0169
Ten Year Plan Category
GREEN INFRASTRUCTURE PROGRAM
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
DEP
Pid
40
Fms Id
GKCI05-02
Total Budget
7659266.41
Spend To Date
7658266.41
Spend To Date 1
0.9998
Fms Project Name
GI - DSGN & CONS OF ROW GREEN INFRASTRUCTURE IN CI-005 PH 2
Agency Project Name
DEP Green Infrastructure
Agency Project Description
Design and construction of right-of-way and on-site green infrastructure in order for the city to comply with NYS DEC consent order which states that NYC must manage 1” of rain on 10% of impervious surfaces by 2030 to reduce combined sewer overflows.
Current Phase
Close-out
Actual Design Start
2013-04-01T00:00:00.000
Actual Design End
2019-06-30T00:00:00.000
Actual Construction
2019-07-01T00:00:00.000
Actual Construction 1
2019-09-30T00:00:00.000
Actual Construction Start
2019-10-01T00:00:00.000
Actual Construction End
2023-12-31T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
WP-0169, WP-0170
Ten Year Plan Category
GREEN INFRASTRUCTURE PROGRAM
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
DEP
Pid
40
Fms Id
GKNC15-02
Total Budget
64920307.13
Spend To Date
62472389.82
Spend To Date 1
0.9622
Fms Project Name
GI - Green Infrastructure in Newtown Creek Drainage Area
Agency Project Name
DEP Green Infrastructure
Agency Project Description
Design and construction of right-of-way and on-site green infrastructure in order for the city to comply with NYS DEC consent order which states that NYC must manage 1” of rain on 10% of impervious surfaces by 2030 to reduce combined sewer overflows.
Current Phase
Close-out
Actual Design Start
2013-04-01T00:00:00.000
Actual Design End
2019-06-30T00:00:00.000
Actual Construction
2019-07-01T00:00:00.000
Actual Construction 1
2019-09-30T00:00:00.000
Actual Construction Start
2019-10-01T00:00:00.000
Actual Construction End
2023-12-31T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
WP-0169, WP-0169, WP-0170
Ten Year Plan Category
WATER QUALITY MANDATES
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
DEP
Pid
40
Fms Id
GREEN
Total Budget
59559990.47
Spend To Date
53153846.52
Spend To Date 1
0.8924
Fms Project Name
Green Infrastructure 26W
Agency Project Name
DEP Green Infrastructure
Agency Project Description
Design and construction of right-of-way and on-site green infrastructure in order for the city to comply with NYS DEC consent order which states that NYC must manage 1” of rain on 10% of impervious surfaces by 2030 to reduce combined sewer overflows.
Current Phase
Close-out
Actual Design Start
2013-04-01T00:00:00.000
Actual Design End
2019-06-30T00:00:00.000
Actual Construction
2019-07-01T00:00:00.000
Actual Construction 1
2019-09-30T00:00:00.000
Actual Construction Start
2019-10-01T00:00:00.000
Actual Construction End
2023-12-31T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
WP-0169, WP-0170
Ten Year Plan Category
GREEN INFRASTRUCTURE PROGRAM
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
DEP
Pid
40
Fms Id
GXHP07-02
Total Budget
44807470.70
Spend To Date
39489128.96
Spend To Date 1
0.8813
Fms Project Name
GI - DSGN & CONS OF ROW BIOSWALES & GREENSTREETS IN HP-007
Agency Project Name
DEP Green Infrastructure
Agency Project Description
Design and construction of right-of-way and on-site green infrastructure in order for the city to comply with NYS DEC consent order which states that NYC must manage 1” of rain on 10% of impervious surfaces by 2030 to reduce combined sewer overflows.
Current Phase
Close-out
Actual Design Start
2013-04-01T00:00:00.000
Actual Design End
2019-06-30T00:00:00.000
Actual Construction
2019-07-01T00:00:00.000
Actual Construction 1
2019-09-30T00:00:00.000
Actual Construction Start
2019-10-01T00:00:00.000
Actual Construction End
2023-12-31T00:00:00.000
Borough
Bronx
Community Board
Bronx 12
Budget Line
WP-0169, WP-0170
Ten Year Plan Category
GREEN INFRASTRUCTURE PROGRAM
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
DEP
Pid
40
Fms Id
GXHP14-01
Total Budget
21047006.63
Spend To Date
18278404.09
Spend To Date 1
0.8684
Fms Project Name
GI - Green infrastructure in Westchester Creek HP-14
Agency Project Name
DEP Green Infrastructure
Agency Project Description
Design and construction of right-of-way and on-site green infrastructure in order for the city to comply with NYS DEC consent order which states that NYC must manage 1” of rain on 10% of impervious surfaces by 2030 to reduce combined sewer overflows.
Current Phase
Close-out
Actual Design Start
2013-04-01T00:00:00.000
Actual Design End
2019-06-30T00:00:00.000
Actual Construction
2019-07-01T00:00:00.000
Actual Construction 1
2019-09-30T00:00:00.000
Actual Construction Start
2019-10-01T00:00:00.000
Actual Construction End
2023-12-31T00:00:00.000
Borough
Bronx
Community Board
Bronx 12
Budget Line
WP-0169, WP-0170
Ten Year Plan Category
GREEN INFRASTRUCTURE PROGRAM
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: DEP
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
DEP
Pid
40
Fms Id
GXHP16-01
Total Budget
11731015.69
Spend To Date
8095056.06
Spend To Date 1
0.69
Fms Project Name
GI - Green infrastructure in Westchester Creek HP-12/HP-16
Agency Project Name
DEP Green Infrastructure
Agency Project Description
Design and construction of right-of-way and on-site green infrastructure in order for the city to comply with NYS DEC consent order which states that NYC must manage 1” of rain on 10% of impervious surfaces by 2030 to reduce combined sewer overflows.
Current Phase
Close-out
Actual Design Start
2013-04-01T00:00:00.000
Actual Design End
2019-06-30T00:00:00.000
Actual Construction
2019-07-01T00:00:00.000
Actual Construction 1
2019-09-30T00:00:00.000
Actual Construction Start
2019-10-01T00:00:00.000
Actual Construction End
2023-12-31T00:00:00.000
Borough
Bronx
Community Board
Bronx 12
Budget Line
WP-0169, WP-0170
Ten Year Plan Category
GREEN INFRASTRUCTURE PROGRAM
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: DOHMH
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
DOHMH
Pid
41
Fms Id
HL82PHL
Total Budget
646243044.49
Spend To Date
125713513.88
Spend To Date 1
0.1945
Fms Project Name
DOHMH PHL BUILDING CONSTRUCTION
Agency Project Name
DOH Public Health Lab Relocation
Agency Project Description
Design and construction of a new Public Health laboratory in the Harlem Hospital Campus.
Current Phase
Construction
Current Phase Start
2022-07-06T00:00:00.000
Forecast Current Phase End
2025-12-31T00:00:00.000
Forecast Completion
2025-12-31T00:00:00.000
Actual Design Start
2018-11-01T00:00:00.000
Actual Design End
2019-07-30T00:00:00.000
Actual Construction
2019-07-31T00:00:00.000
Actual Construction 1
2022-07-05T00:00:00.000
Actual Construction Start
2022-07-06T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HL-0082, HO-0214, PU-0025
Ten Year Plan Category
ROUTINE RECONSTRUCTION
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: DCLA
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
DCLA
Pid
42
Fms Id
PV264CINE
Total Budget
28080320.74
Spend To Date
24881649.15
Spend To Date 1
0.886
Fms Project Name
BAM - BAM South Site Theaters
Agency Project Name
Downtown Brooklyn Cultural District (DBCD) South Site Development
Agency Project Description
Design and construction of cultural condo to accommodate four non-profit organizations in Downtown Brooklyn.
Current Phase
Construction
Current Phase Start
2019-12-04T00:00:00.000
Forecast Current Phase End
2024-04-30T00:00:00.000
Forecast Completion
2023-07-01T00:00:00.000
Actual Design Start
2015-11-23T00:00:00.000
Actual Design End
2019-06-05T00:00:00.000
Actual Construction
2019-06-06T00:00:00.000
Actual Construction 1
2019-12-03T00:00:00.000
Actual Construction Start
2019-12-04T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 99
Budget Line
ED-0075, PV-0264, PV-0467, PV-K264
Ten Year Plan Category
MISCELLANEOUS
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: DCLA
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
DCLA
Pid
42
Fms Id
PV467SOST
Total Budget
18723194.14
Spend To Date
11046170.00
Spend To Date 1
0.5899
Fms Project Name
DBCD South Site Cultural Condo Fitout
Agency Project Name
Downtown Brooklyn Cultural District (DBCD) South Site Development
Agency Project Description
Design and construction of cultural condo to accommodate four non-profit organizations in Downtown Brooklyn.
Current Phase
Construction
Current Phase Start
2019-12-04T00:00:00.000
Forecast Current Phase End
2024-04-30T00:00:00.000
Forecast Completion
2023-07-01T00:00:00.000
Actual Design Start
2015-11-23T00:00:00.000
Actual Design End
2019-06-05T00:00:00.000
Actual Construction
2019-06-06T00:00:00.000
Actual Construction 1
2019-12-03T00:00:00.000
Actual Construction Start
2019-12-04T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 02
Budget Line
ED-0075, PV-0467
Ten Year Plan Category
MISCELLANEOUS
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: DCLA
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
DCLA
Pid
42
Fms Id
PV467STFO
Total Budget
18526021.00
Spend To Date
15854740.44
Spend To Date 1
0.8558
Fms Project Name
651 Arts South Site Studios Fitout
Agency Project Name
Downtown Brooklyn Cultural District (DBCD) South Site Development
Agency Project Description
Design and construction of cultural condo to accommodate four non-profit organizations in Downtown Brooklyn.
Current Phase
Construction
Current Phase Start
2019-12-04T00:00:00.000
Forecast Current Phase End
2024-04-30T00:00:00.000
Forecast Completion
2023-07-01T00:00:00.000
Actual Design Start
2015-11-23T00:00:00.000
Actual Design End
2019-06-05T00:00:00.000
Actual Construction
2019-06-06T00:00:00.000
Actual Construction 1
2019-12-03T00:00:00.000
Actual Construction Start
2019-12-04T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 02
Budget Line
PV-0467, PV-D467
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: DCLA
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
DCLA
Pid
42
Fms Id
PVMOCADA
Total Budget
10509818.24
Spend To Date
8801114.78
Spend To Date 1
0.8374
Fms Project Name
MOCADA - MoCADA Museum New Facility
Agency Project Name
Downtown Brooklyn Cultural District (DBCD) South Site Development
Agency Project Description
Design and construction of cultural condo to accommodate four non-profit organizations in Downtown Brooklyn.
Current Phase
Construction
Current Phase Start
2019-12-04T00:00:00.000
Forecast Current Phase End
2024-04-30T00:00:00.000
Forecast Completion
2023-07-01T00:00:00.000
Actual Design Start
2015-11-23T00:00:00.000
Actual Design End
2019-06-05T00:00:00.000
Actual Construction
2019-06-06T00:00:00.000
Actual Construction 1
2019-12-03T00:00:00.000
Actual Construction Start
2019-12-04T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 02
Budget Line
ED-0075, PV-0467, PV-0N680
Ten Year Plan Category
MISCELLANEOUS
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: EDC
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
EDC
Pid
43
Fms Id
SANDG1HP
Total Budget
27759533.47
Spend To Date
1695567.00
Spend To Date 1
0.061
Fms Project Name
FEMA 428 G1 - Homeport Pier
Agency Project Name
FEMA 428 - Homeport Resiliency Projects
Agency Project Description
Critical infrastructure repairs to the Homeport Pier and installation of two elevated substations for both FDNY's Marine 9 and the Homeport Pier itself.
Current Phase
Construction
Current Phase Start
2023-03-01T00:00:00.000
Forecast Current Phase End
2024-10-01T00:00:00.000
Forecast Completion
2024-10-01T00:00:00.000
Actual Design Start
2017-01-01T00:00:00.000
Actual Design End
2022-05-01T00:00:00.000
Actual Construction
2022-05-02T00:00:00.000
Actual Construction 1
2023-02-28T00:00:00.000
Actual Construction Start
2023-03-01T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
ED-0075, ED-0075, ED-0409
Ten Year Plan Category
WATERFRONT DEVELOPMENT
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: EDC
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
EDC
Pid
43
Fms Id
SANDG1HS
Total Budget
6398882.44
Spend To Date
478489.84
Spend To Date 1
0.0747
Fms Project Name
FEMA 428 G1 - Homeport Substation
Agency Project Name
FEMA 428 - Homeport Resiliency Projects
Agency Project Description
Critical infrastructure repairs to the Homeport Pier and installation of two elevated substations for both FDNY's Marine 9 and the Homeport Pier itself.
Current Phase
Construction
Current Phase Start
2023-03-01T00:00:00.000
Forecast Current Phase End
2024-10-01T00:00:00.000
Forecast Completion
2024-10-01T00:00:00.000
Actual Design Start
2017-01-01T00:00:00.000
Actual Design End
2022-05-01T00:00:00.000
Actual Construction
2022-05-02T00:00:00.000
Actual Construction 1
2023-02-28T00:00:00.000
Actual Construction Start
2023-03-01T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
ED-0075, ED-0075
Ten Year Plan Category
WATERFRONT DEVELOPMENT
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: H+H
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
H+H
Pid
44
Fms Id
SAND1110
Total Budget
0.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
HHC FEMA BELLEVUE (MEP/VT
Agency Project Name
H+H Bellevue Hospital
Agency Project Description
Priority mitigation projects for the repair/restoration and hazard mitigation for Bellevue Hospital,damaged during Superstorm Sandy
Current Phase
Close-out
Actual Design Start
2014-01-01T00:00:00.000
Actual Design End
2015-09-29T00:00:00.000
Actual Construction
2015-09-30T00:00:00.000
Actual Construction 1
2017-03-31T00:00:00.000
Actual Construction Start
2017-04-01T00:00:00.000
Actual Construction End
2023-04-28T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HO-0214
Ten Year Plan Category
ROUTINE RECONSTRUCTION
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: H+H
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
H+H
Pid
45
Fms Id
SAND6704
Total Budget
888892.40
Spend To Date
888892.40
Spend To Date 1
1.00
Fms Project Name
COLER : AUDITORIUM DESIGN AND CONSTRUCTION MANAGEMENT
Agency Project Name
H+H Coler Hospital
Agency Project Description
The priority mitigation projects at Coler include key critical mitigation projects to improve the resiliency of the campus.
Current Phase
Close-out
Actual Design Start
2014-09-01T00:00:00.000
Actual Design End
2016-05-31T00:00:00.000
Actual Construction
2016-06-01T00:00:00.000
Actual Construction 1
2016-12-31T00:00:00.000
Actual Construction Start
2017-01-01T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: H+H
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
H+H
Pid
45
Fms Id
SAND6705
Total Budget
1587883.94
Spend To Date
1587883.94
Spend To Date 1
1.00
Fms Project Name
COLER : Specialty Hospital First Floor Design
Agency Project Name
H+H Coler Hospital
Agency Project Description
The priority mitigation projects at Coler include key critical mitigation projects to improve the resiliency of the campus.
Current Phase
Close-out
Actual Design Start
2014-09-01T00:00:00.000
Actual Design End
2016-05-31T00:00:00.000
Actual Construction
2016-06-01T00:00:00.000
Actual Construction 1
2016-12-31T00:00:00.000
Actual Construction Start
2017-01-01T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HO-0214
Ten Year Plan Category
ROUTINE RECONSTRUCTION
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: H+H
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
H+H
Pid
46
Fms Id
SAND3705
Total Budget
101568901.89
Spend To Date
39236194.32
Spend To Date 1
0.3863
Fms Project Name
METROPOLITAN HOSPITAL FLOOD MITIGATION SYSTEM
Agency Project Name
H+H Metropolitan Hospital
Agency Project Description
Flood mitigation system to protect Metropolitan's campus from future flooding due and sea level rise.
Current Phase
Construction
Current Phase Start
2022-05-19T00:00:00.000
Forecast Current Phase End
2024-11-21T00:00:00.000
Forecast Completion
2024-11-21T00:00:00.000
Actual Design Start
2016-12-01T00:00:00.000
Actual Design End
2021-10-31T00:00:00.000
Actual Construction
2021-11-01T00:00:00.000
Actual Construction 1
2022-05-18T00:00:00.000
Actual Construction Start
2022-05-19T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HO-0214
Ten Year Plan Category
ROUTINE RECONSTRUCTION
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: H+H
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
H+H
Pid
47
Fms Id
SAND2605
Total Budget
770736969.58
Spend To Date
616464710.38
Spend To Date 1
0.7998
Fms Project Name
CIH: DESIGN & CONSTRUCTION MANAGEMENT FOR HOSPITAL CAMPUS
Agency Project Name
HHC FEMA - Coney Island Hospital
Agency Project Description
Renovation of CIH to advance the City’s resiliency plan,repair damages, and protect the hospital from future disasters.
Current Phase
Construction
Current Phase Start
2016-03-01T00:00:00.000
Forecast Current Phase End
2024-07-03T00:00:00.000
Forecast Completion
2024-07-03T00:00:00.000
Actual Design Start
2016-02-01T00:00:00.000
Actual Design End
2015-10-31T00:00:00.000
Actual Construction
2015-11-01T00:00:00.000
Actual Construction 1
2016-02-29T00:00:00.000
Actual Construction Start
2016-03-01T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HO-0214
Ten Year Plan Category
ROUTINE RECONSTRUCTION
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
DPR
Pid
48
Fms Id
P-3HIGHLL
Total Budget
5650400.63
Spend To Date
1848009.59
Spend To Date 1
0.327
Fms Project Name
FRIENDS OF THE HIGH LINE-LIFE SAFETY UPGRADES & CIRCULATION
Agency Project Name
High Line Improvement Fund Projects
Agency Project Description
Abatement,structural repairs and painting of the High Line structure at 28th Street.
Current Phase
Construction
Current Phase Start
2022-09-01T00:00:00.000
Forecast Current Phase End
2024-12-30T00:00:00.000
Forecast Completion
2024-12-30T00:00:00.000
Actual Construction Start
2022-09-01T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-0245M, P-D018
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: EDC
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
EDC
Pid
49
Fms Id
NYCFHP2
Total Budget
116220358.66
Spend To Date
20728714.60
Spend To Date 1
0.1783
Fms Project Name
NYC Ferry Homeport 2
Agency Project Name
Homeport II
Agency Project Description
Design and construction of a second homeport facility for NYC Ferry vessels in the Atlantic Basin.
Current Phase
Construction
Current Phase Start
2022-09-12T00:00:00.000
Forecast Current Phase End
2024-12-31T00:00:00.000
Forecast Completion
2024-12-31T00:00:00.000
Actual Design Start
2018-11-09T00:00:00.000
Actual Design End
2022-09-11T00:00:00.000
Actual Construction Start
2022-09-12T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
ED-0409
Ten Year Plan Category
WATERFRONT DEVELOPMENT
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
DPR
Pid
50
Fms Id
SANDBATTR
Total Budget
216076570.99
Spend To Date
8936964.14
Spend To Date 1
0.0413
Fms Project Name
CITYWIDE RESILIENCY MEASURES - BATTERY FLOOD PROTECTION
Agency Project Name
LMCR- Battery
Agency Project Description
Implementation of coastal resiliency measures to protect Battery Park and adjacent upland neighborhoods from storm surges and sea level rise.
Current Phase
Construction Procurement
Current Phase Start
2022-11-01T00:00:00.000
Forecast Current Phase End
2024-01-15T00:00:00.000
Forecast Completion
2026-07-01T00:00:00.000
Actual Design Start
2020-12-01T00:00:00.000
Actual Design End
2022-10-31T00:00:00.000
Actual Construction
2022-11-01T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
PU-0100
Ten Year Plan Category
MISCELLANEOUS ENERGY EFFICIENCY AND SUSTAINABILITY
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: EDC
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
EDC
Pid
51
Fms Id
LCNPARK
Total Budget
35408847.50
Spend To Date
3034858.41
Spend To Date 1
0.0857
Fms Project Name
Lower Concourse Park
Agency Project Name
Lower Concourse Initiative
Agency Project Description
Design and reconstruction of Exterior Street between East 138th Street and East 150th Street and design and construction of new public park in Lower Concourse.
Current Phase
Construction
Current Phase Start
2021-05-01T00:00:00.000
Forecast Current Phase End
2024-12-01T00:00:00.000
Forecast Completion
2024-12-01T00:00:00.000
Actual Design Start
2016-12-01T00:00:00.000
Actual Design End
2020-10-31T00:00:00.000
Actual Construction
2020-11-01T00:00:00.000
Actual Construction 1
2021-04-30T00:00:00.000
Actual Construction Start
2021-05-01T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
ED-0384, ED-0384
Ten Year Plan Category
NEIGHBORHOOD REVITALIZATION
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: EDC
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
EDC
Pid
51
Fms Id
SWBXINFRA
Total Budget
118491293.74
Spend To Date
21252164.57
Spend To Date 1
0.1793
Fms Project Name
LC - Southwest Bronx Infrastructure Improvements
Agency Project Name
Lower Concourse Initiative
Agency Project Description
Design and reconstruction of Exterior Street between East 138th Street and East 150th Street and design and construction of new public park in Lower Concourse.
Current Phase
Construction
Current Phase Start
2021-05-01T00:00:00.000
Forecast Current Phase End
2024-12-01T00:00:00.000
Forecast Completion
2024-12-01T00:00:00.000
Actual Design Start
2016-12-01T00:00:00.000
Actual Design End
2020-10-31T00:00:00.000
Actual Construction
2020-11-01T00:00:00.000
Actual Construction 1
2021-04-30T00:00:00.000
Actual Construction Start
2021-05-01T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
ED-0384
Ten Year Plan Category
NEIGHBORHOOD REVITALIZATION
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: EDC
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
EDC
Pid
51
Fms Id
SWBXLCN
Total Budget
800348.00
Spend To Date
85142.32
Spend To Date 1
0.1063
Fms Project Name
Lower Concourse North
Agency Project Name
Lower Concourse Initiative
Agency Project Description
Design and reconstruction of Exterior Street between East 138th Street and East 150th Street and design and construction of new public park in Lower Concourse.
Current Phase
Construction
Current Phase Start
2021-05-01T00:00:00.000
Forecast Current Phase End
2024-12-01T00:00:00.000
Forecast Completion
2024-12-01T00:00:00.000
Actual Design Start
2016-12-01T00:00:00.000
Actual Design End
2020-10-31T00:00:00.000
Actual Construction
2020-11-01T00:00:00.000
Actual Construction 1
2021-04-30T00:00:00.000
Actual Construction Start
2021-05-01T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
ED-0384
Ten Year Plan Category
NEIGHBORHOOD REVITALIZATION
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
DPR
Pid
52
Fms Id
NDF-3HRGL
Total Budget
83000529.00
Spend To Date
3792529.00
Spend To Date 1
0.0456
Fms Project Name
NDF - Harlem River Greenway Link - New Park Development
Agency Project Name
Manhattan Greenway - Harlem River
Agency Project Description
The Manhattan Greenway Harlem River project,between West 125th Street and Swindler Cove,involves the creation of a park,greenway,and the reconstruction of the bulkhead.
Current Phase
Construction
Current Phase Start
2023-10-01T00:00:00.000
Forecast Current Phase End
2026-08-01T00:00:00.000
Forecast Completion
2026-08-01T00:00:00.000
Actual Design Start
2019-03-25T00:00:00.000
Actual Design End
2023-03-08T00:00:00.000
Actual Construction
2023-03-09T00:00:00.000
Actual Construction 1
2023-09-30T00:00:00.000
Actual Construction Start
2023-10-01T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
ED-0384, ED-0384
Ten Year Plan Category
NEIGHBORHOOD REVITALIZATION
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: DPR
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
DPR
Pid
52
Fms Id
P-3HRP132
Total Budget
396979603.00
Spend To Date
9034426.10
Spend To Date 1
0.0227
Fms Project Name
Harlem River Park 132-135
Agency Project Name
Manhattan Greenway - Harlem River
Agency Project Description
The Manhattan Greenway Harlem River project,between West 125th Street and Swindler Cove,involves the creation of a park,greenway,and the reconstruction of the bulkhead.
Current Phase
Construction
Current Phase Start
2023-10-01T00:00:00.000
Forecast Current Phase End
2026-08-01T00:00:00.000
Forecast Completion
2026-08-01T00:00:00.000
Actual Design Start
2019-03-25T00:00:00.000
Actual Design End
2023-03-08T00:00:00.000
Actual Construction
2023-03-09T00:00:00.000
Actual Construction 1
2023-09-30T00:00:00.000
Actual Construction Start
2023-10-01T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
ED-0075, P-0501, PU-0200
Ten Year Plan Category
MISCELLANEOUS ENERGY EFFICIENCY AND SUSTAINABILITY
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: EDC
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
EDC
Pid
53
Fms Id
AHGREEN
Total Budget
42729810.64
Spend To Date
29594719.01
Spend To Date 1
0.6926
Fms Project Name
Andrew Haswell Green Park - Phase 2B
Agency Project Name
Manhattan Greenway East Midtown/Andrew Haswell Green
Agency Project Description
The East Midtown Waterfront Greenway project involves the creation of a waterfront esplanade between East 53rd and East 59th Streets.
Current Phase
Close-out
Actual Design Start
2017-10-01T00:00:00.000
Actual Design End
2019-04-30T00:00:00.000
Actual Construction
2019-05-01T00:00:00.000
Actual Construction 1
2019-09-30T00:00:00.000
Actual Construction Start
2019-10-01T00:00:00.000
Actual Construction End
2023-12-19T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
ED-0075, ED-0409, P-0245M, P-1018, P-1018
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: EDC
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
EDC
Pid
53
Fms Id
MANHGREEN
Total Budget
173042065.55
Spend To Date
129703994.59
Spend To Date 1
0.7495
Fms Project Name
Manhattan Greenway
Agency Project Name
Manhattan Greenway East Midtown/Andrew Haswell Green
Agency Project Description
The East Midtown Waterfront Greenway project involves the creation of a waterfront esplanade between East 53rd and East 59th Streets.
Current Phase
Close-out
Actual Design Start
2017-10-01T00:00:00.000
Actual Design End
2019-04-30T00:00:00.000
Actual Construction
2019-05-01T00:00:00.000
Actual Construction 1
2019-09-30T00:00:00.000
Actual Construction Start
2019-10-01T00:00:00.000
Actual Construction End
2023-12-19T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
ED-0075, ED-0075
Ten Year Plan Category
MISCELLANEOUS
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: EDC
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
EDC
Pid
54
Fms Id
HOMEPORT2
Total Budget
170980087.73
Spend To Date
14225055.94
Spend To Date 1
0.0831
Fms Project Name
Stapleton Waterfront Phase II & III
Agency Project Name
New Stapleton Waterfront Phase 2 & 3
Agency Project Description
Reconstruction of streets and infrastructure along Staten Island's Front Street to generate affordable housing and provide waterfront access,open space,and enhanced pedestrian/bike pathways.
Current Phase
Construction
Current Phase Start
2023-04-01T00:00:00.000
Forecast Current Phase End
2026-06-01T00:00:00.000
Forecast Completion
2026-06-01T00:00:00.000
Actual Design Start
2015-08-31T00:00:00.000
Actual Design End
2023-02-14T00:00:00.000
Actual Construction
2023-02-15T00:00:00.000
Actual Construction 1
2023-03-31T00:00:00.000
Actual Construction Start
2023-04-01T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
ED-0075, P-1018
Ten Year Plan Category
NEIGHBORHOOD REVITALIZATION
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: EDC
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
EDC
Pid
54
Fms Id
SANDSIHP2
Total Budget
25640000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Stapleton Waterfront Phase II & III - Sandy Repairs
Agency Project Name
New Stapleton Waterfront Phase 2 & 3
Agency Project Description
Reconstruction of streets and infrastructure along Staten Island's Front Street to generate affordable housing and provide waterfront access,open space,and enhanced pedestrian/bike pathways.
Current Phase
Construction
Current Phase Start
2023-04-01T00:00:00.000
Forecast Current Phase End
2026-06-01T00:00:00.000
Forecast Completion
2026-06-01T00:00:00.000
Actual Design Start
2015-08-31T00:00:00.000
Actual Design End
2023-02-14T00:00:00.000
Actual Construction
2023-02-15T00:00:00.000
Actual Construction 1
2023-03-31T00:00:00.000
Actual Construction Start
2023-04-01T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
ED-0075
Ten Year Plan Category
NEIGHBORHOOD REVITALIZATION
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: H+H
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
H+H
Pid
55
Fms Id
SAND3705
Total Budget
101568901.89
Spend To Date
39236194.32
Spend To Date 1
0.3863
Fms Project Name
METROPOLITAN HOSPITAL FLOOD MITIGATION SYSTEM
Agency Project Name
NYC Health and Hospitals Metropolitan Hospital
Agency Project Description
Design and construction of flood wall mitigation systems due to Hurricane Sandy across NYC and particularly,H+H facilities.
Current Phase
Construction
Current Phase Start
2022-05-19T00:00:00.000
Forecast Current Phase End
2024-11-21T00:00:00.000
Forecast Completion
2024-11-21T00:00:00.000
Actual Design Start
2016-07-15T00:00:00.000
Actual Design End
2021-11-18T00:00:00.000
Actual Construction
2021-11-19T00:00:00.000
Actual Construction 1
2022-05-18T00:00:00.000
Actual Construction Start
2022-05-19T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HO-0214
Ten Year Plan Category
ROUTINE RECONSTRUCTION
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: EDC
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
EDC
Pid
56
Fms Id
CWFSBARGE
Total Budget
131145692.17
Spend To Date
102502518.75
Spend To Date 1
0.7815
Fms Project Name
New York City Ferry Barges
Agency Project Name
NYCF Hunters Point South
Agency Project Description
Expansion of NYCF Landing and Barge Capacity at Hunters Point South
Current Phase
Design
Current Phase Start
2021-05-20T00:00:00.000
Forecast Current Phase End
2025-09-09T00:00:00.000
Forecast Completion
2026-01-15T00:00:00.000
Actual Design Start
2021-05-20T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
ED-0409
Ten Year Plan Category
WATERFRONT DEVELOPMENT
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: EDC
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
EDC
Pid
56
Fms Id
NYCFBARGE
Total Budget
75462988.92
Spend To Date
51476589.38
Spend To Date 1
0.6821
Fms Project Name
New York City Ferry - Barge Expansion
Agency Project Name
NYCF Hunters Point South
Agency Project Description
Expansion of NYCF Landing and Barge Capacity at Hunters Point South
Current Phase
Design
Current Phase Start
2021-05-20T00:00:00.000
Forecast Current Phase End
2025-09-09T00:00:00.000
Forecast Completion
2026-01-15T00:00:00.000
Actual Design Start
2021-05-20T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
ED-0409
Ten Year Plan Category
MISCELLANEOUS
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: NYPL
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
NYPL
Pid
57
Fms Id
LNEA16PRT
Total Budget
26706120.14
Spend To Date
9402219.60
Spend To Date 1
0.352
Fms Project Name
PORT RICHMOND: MAJOR RENOVATION
Agency Project Name
NYPL Carnegie - Port Richmond
Agency Project Description
Comprehensive renovation of landmarked NYPL Carnegie Branch at 75 Bennett Street
Current Phase
Construction
Current Phase Start
2021-11-01T00:00:00.000
Forecast Current Phase End
2024-05-01T00:00:00.000
Forecast Completion
2024-05-01T00:00:00.000
Actual Construction
2021-05-04T00:00:00.000
Actual Construction 1
2021-10-31T00:00:00.000
Actual Construction Start
2021-11-01T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
LN-0008, LN-D008
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: NYPL
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
NYPL
Pid
58
Fms Id
LNEA16125
Total Budget
31789190.33
Spend To Date
10501133.63
Spend To Date 1
0.3303
Fms Project Name
125th St: Interior and Exterior Comprehensive Renovation
Agency Project Name
NYPL Carnegie- 125th Street
Agency Project Description
Comprehensive renovation of NYPL Carnegie Branch
Current Phase
Construction
Current Phase Start
2021-12-01T00:00:00.000
Forecast Current Phase End
2024-05-01T00:00:00.000
Forecast Completion
2024-05-01T00:00:00.000
Actual Construction
2021-06-03T00:00:00.000
Actual Construction 1
2021-11-30T00:00:00.000
Actual Construction Start
2021-12-01T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
LN-0008, LN-D008, LN-M001
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: NYPL
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
NYPL
Pid
59
Fms Id
LNEA16FWT
Total Budget
35995809.75
Spend To Date
12226961.73
Spend To Date 1
0.3396
Fms Project Name
FORT WASHINGTON: MAJOR RENOVATION
Agency Project Name
NYPL Carnegie- Fort Washington
Agency Project Description
Comprehensive renovation of NYPL Carnegie Branch
Current Phase
Construction
Current Phase Start
2021-09-01T00:00:00.000
Forecast Current Phase End
2024-07-01T00:00:00.000
Forecast Completion
2024-07-01T00:00:00.000
Actual Construction
2021-03-04T00:00:00.000
Actual Construction 1
2021-08-31T00:00:00.000
Actual Construction Start
2021-09-01T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
LN-0008, LN-D008
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000
202309
Reporting Period: 202309 • Managing Agency: EDC • Sponsor Agency: NYPL
Reporting Period
202309
Managing Agency
EDC
Sponsor Agency
NYPL
Pid
60
Fms Id
LNEA16HPT
Total Budget
30405502.64
Spend To Date
13671085.87
Spend To Date 1
0.4496
Fms Project Name
HUNTS POINT: MAJOR RENOVATION
Agency Project Name
NYPL Carnegie- Hunt’s Point
Agency Project Description
Comprehensive renovation of landmarked NYPL Carnegie Branch
Current Phase
Construction
Current Phase Start
2021-09-01T00:00:00.000
Forecast Current Phase End
2024-03-01T00:00:00.000
Forecast Completion
2024-03-01T00:00:00.000
Actual Construction
2021-03-04T00:00:00.000
Actual Construction 1
2021-08-31T00:00:00.000
Actual Construction Start
2021-09-01T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
LN-0008, LN-D008
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2024-01-23T00:00:00.000
Fms Data Date
2023-10-23T00:00:00.000