Capital Projects Dashboard - Citywide Budget and Schedule

All major capital infrastructure projects with a committed budget. Financial information and agency schedule details for each project are joined via FMS ID. Only projects in the design phase or later have project schedules displayed. This dataset is part of the Capital Projects Dashboard.

Note: Each row is uniquely identified by its Financial Management Service (FMS) ID. FMS ID is the unique ID that OMB uses for the FMS (Financial Information System). This ID can be universally joined with any OMB dataset that has the same field. The Capital Projects Dashboard is the result of joining OMB’s fiscal data with the agency’s schedule data. FMS IDs and agency projects don't always have a one-to-one relationship (i.e., one project schedule may correlate to multiple FMS IDs, and one FMS may correct to multiple projects with different schedules).

City Government Mayor's Office of Operations (OPS) Dataset fb86-vt7u 27 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DCLA
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DCLA
Pid
4167
Fms Id
PV272EDUC
Total Budget
28595186.26
Spend To Date
3071659.59
Spend To Date 1
0.1074
Fms Project Name
QBG - Queens Botanical Garden Educ Bldg Renovation
Agency Project Name
Queens Botanical Garden Educ Bldg Renovation
Agency Project Description
New education building at Queens Botanical Garden (QBG). Design and construction of a new 14,500 SF building to provide year-round programming and educational spaces to serve students, children, community gardeners, and others.The New Education Building will add six new teaching spaces, including four classrooms, a teaching kitchen and a teaching greenhouse where educators will be able to grow and maintain plants for educational purposes. Ideally, the four regular classrooms will be able to opened up into one large space to accommodate larger training programs.
Current Phase
Construction Procurement
Current Phase Start
2023-03-21T00:00:00.000
Forecast Current Phase End
2023-11-01T00:00:00.000
Forecast Completion
2025-11-01T00:00:00.000
Actual Design Start
2019-06-18T00:00:00.000
Actual Design End
2023-03-21T00:00:00.000
Actual Construction
2023-03-21T00:00:00.000
Borough
Queens
Community Board
Queens 07
Budget Line
PU-0025, PV-0272, PV-D272, PV-Q272
Ten Year Plan Category
MISCELLANEOUS ENERGY EFFICIENCY AND SUSTAINABILITY
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DHS
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DHS
Pid
4168
Fms Id
HH112SWFA
Total Budget
2549971.49
Spend To Date
257320.28
Spend To Date 1
0.1009
Fms Project Name
SCHWARTZ WARDS ISLAND FIRE SAFETY
Agency Project Name
Schwartz Assessment – Fire Alarm Replacement
Agency Project Description
New fire alarm system at the Shwartz Assessment Center, Wards Island.
Current Phase
Design
Current Phase Start
2018-01-03T00:00:00.000
Forecast Current Phase End
2024-02-28T00:00:00.000
Forecast Completion
2025-12-02T00:00:00.000
Actual Design Start
2018-01-03T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 11
Budget Line
HH-0112
Ten Year Plan Category
SHELTERS FOR HOMELESS INDIVIDUALS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DHS
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DHS
Pid
4169
Fms Id
HH115JCFS
Total Budget
1491659.93
Spend To Date
114667.68
Spend To Date 1
0.0768
Fms Project Name
JACKSON FAMILY FIRE SAFETY
Agency Project Name
Jackson Family Residence:Fire Alarm Upgrade
Agency Project Description
New fire alarm system for the Jackson Family Residence shelter.
Current Phase
Construction Procurement
Current Phase Start
2023-06-28T00:00:00.000
Forecast Current Phase End
2024-04-01T00:00:00.000
Forecast Completion
2025-04-01T00:00:00.000
Actual Design Start
2016-10-19T00:00:00.000
Actual Design End
2023-06-28T00:00:00.000
Actual Construction
2023-06-28T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
HH-0115
Ten Year Plan Category
SHELTERS FOR HOMELESS FAMILIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DHS
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DHS
Pid
4170
Fms Id
HH115LFAU
Total Budget
1264914.10
Spend To Date
116064.62
Spend To Date 1
0.0917
Fms Project Name
LINDEN FIRE ALARM UPGRADE
Agency Project Name
Linden Family Residence:501 New Lots.Fire Alarm
Agency Project Description
New fire alarm system installation at the Linden Family Residence Shelter.
Current Phase
Design
Current Phase Start
2017-09-26T00:00:00.000
Forecast Current Phase End
2024-07-26T00:00:00.000
Forecast Completion
2026-04-22T00:00:00.000
Actual Design Start
2017-09-26T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HH-0112
Ten Year Plan Category
SHELTERS FOR HOMELESS INDIVIDUALS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4171
Fms Id
HBFDR14BP
Total Budget
182567765.33
Spend To Date
438137.38
Spend To Date 1
0.0023
Fms Project Name
East 14th St (near ConEd Plant) Bike Path
Agency Project Name
New Flyover Pedestrian Bridge
Agency Project Description
New Flyover Pedestrian Bridge
Current Phase
Design
Current Phase Start
2022-05-03T00:00:00.000
Forecast Current Phase End
2024-06-15T00:00:00.000
Forecast Completion
2028-02-10T00:00:00.000
Actual Design Start
2022-05-03T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-0508
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: QPL
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
QPL
Pid
4172
Fms Id
LQDL-NEW
Total Budget
32937329.44
Spend To Date
2178667.61
Spend To Date 1
0.0661
Fms Project Name
DOUGLASTON: Replacement Facility
Agency Project Name
Douglaston New Facility
Agency Project Description
New library facility for the Douglaston/Little Neck community.
Current Phase
Design
Current Phase Start
2019-11-20T00:00:00.000
Forecast Current Phase End
2024-01-12T00:00:00.000
Forecast Completion
2027-12-04T00:00:00.000
Actual Design Start
2019-11-20T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
LQ-0122, LQ-D122, LQ-Q122, PU-0025
Ten Year Plan Category
REPLACEMENT BRANCHES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: QPL
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
QPL
Pid
4173
Fms Id
LQQ122-RG
Total Budget
46948422.90
Spend To Date
4283927.39
Spend To Date 1
0.0912
Fms Project Name
REGO PARK LIBRARY - REPLACEMENT FACILITY
Agency Project Name
Rego Park New Facility
Agency Project Description
New Library for Rego Park
Current Phase
Design
Current Phase Start
2019-04-11T00:00:00.000
Forecast Current Phase End
2023-12-02T00:00:00.000
Forecast Completion
2027-09-03T00:00:00.000
Actual Design Start
2019-04-11T00:00:00.000
Borough
Queens
Community Board
Queens 06
Budget Line
LQ-0122, LQ-0122, LQ-D122, LQ-D122, LQ-Q122, LQ-Q122
Ten Year Plan Category
SUPPORT SERVICES IMPROVEMENTS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4174
Fms Id
SEQNS005
Total Budget
26600000.00
Spend To Date
1600000.00
Spend To Date 1
0.0601
Fms Project Name
SEQ - Sewer When & Where Contract in SE Queens
Agency Project Name
SEWER WHEN & WHERE SEQ
Agency Project Description
NEW STORM SEWER CONSTRUCTION, REPLACEMENT OR UPGRADES TO SANITARY SEWERS AND WATER MAINS IN PROJECT AREAS. GREEN INFRASTRUCTURE PROJECTS TO BE DONE IN CONJUNCTION WITH THESE CAPITAL IMPROVEMENTS
Current Phase
Design
Current Phase Start
2020-03-09T00:00:00.000
Forecast Current Phase End
2024-09-23T00:00:00.000
Forecast Completion
2026-10-04T00:00:00.000
Actual Design Start
2020-03-09T00:00:00.000
Borough
Queens
Community Board
Queens 12, Queens 13
Budget Line
SE-0002Q, SE-0200Q, WM-0001
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4175
Fms Id
SEQNS004
Total Budget
22896028.09
Spend To Date
6039020.88
Spend To Date 1
0.2637
Fms Project Name
SEQ -SEWER WHEN & WHERE CONTRACT IN S.E. QNS
Agency Project Name
SEWER WHEN & WHERE SEQ
Agency Project Description
NEW STORM SEWER CONSTRUCTION, REPLACEMENT OR UPGRADES TO SANITARY SEWERS AND WATER MAINS IN PROJECT AREAS. GREEN INFRASTRUCTURE PROJECTS TO BE DONE IN CONJUNCTION WITH WHEN AND WHERE PROJECTS
Current Phase
Construction
Current Phase Start
2022-10-11T00:00:00.000
Forecast Current Phase End
2024-10-09T00:00:00.000
Forecast Completion
2024-10-09T00:00:00.000
Actual Design Start
2019-06-18T00:00:00.000
Actual Design End
2022-02-08T00:00:00.000
Actual Construction
2022-02-08T00:00:00.000
Actual Construction 1
2022-10-11T00:00:00.000
Actual Construction Start
2022-10-11T00:00:00.000
Borough
Queens
Community Board
Queens 12, Queens 13
Budget Line
HW-0200, SE-0002Q, SE-0200Q, SE-0944, WM-0001
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4176
Fms Id
SER200247
Total Budget
46266021.15
Spend To Date
299275.81
Spend To Date 1
0.0064
Fms Project Name
New Storm Sewers in King St
Agency Project Name
STORM SEWER IN KING STREET, SI
Agency Project Description
NEW STORM SEWERS IN KING STREET BETWEEN PRESTON AVE AND RIDGECREST AVE, ETC., STATEN ISLAND
Current Phase
Design
Current Phase Start
2017-01-17T00:00:00.000
Forecast Current Phase End
2028-11-27T00:00:00.000
Forecast Completion
2031-06-30T00:00:00.000
Actual Design Start
2017-01-17T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 03
Budget Line
SE-0002R, SE-0200R, WM-0001, WM-0006
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: BPL
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
BPL
Pid
4177
Fms Id
LBM17NUOH
Total Budget
24753478.30
Spend To Date
715540.52
Spend To Date 1
0.0289
Fms Project Name
New Utrecht Overhaul
Agency Project Name
NEW UTRECH LIBRARY MAJOR RENOVATIONS
Agency Project Description
New Utrech branch library is a comprehensive interior and exterior renovation which includes new fire alarm/ BMS, new interior layout, new HVAC, new roof, exterior rehabilitation and landscape.
Current Phase
Pre-Design
Borough
Brooklyn
Community Board
Brooklyn 11
Budget Line
LB-0104, LB-D104
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DCLA
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DCLA
Pid
4178
Fms Id
PV385RLP3
Total Budget
1580768.00
Spend To Date
1179874.60
Spend To Date 1
0.7463
Fms Project Name
SIG - Signature Theater Center - Phase 3
Agency Project Name
signature theater ph 3
Agency Project Description
New work involving an interactive technological experience system for visitors, digital signage, lobby-café lighting and sound system, and IT/network/wireless installation.
Current Phase
Construction
Current Phase Start
2015-07-17T00:00:00.000
Forecast Current Phase End
2024-06-30T00:00:00.000
Forecast Completion
2024-06-30T00:00:00.000
Actual Design Start
2013-11-15T00:00:00.000
Actual Design End
2014-04-22T00:00:00.000
Actual Construction
2014-04-22T00:00:00.000
Actual Construction 1
2015-07-17T00:00:00.000
Actual Construction Start
2015-07-17T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 04
Budget Line
PV-0N385, PV-DN385
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DCAS
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DCAS
Pid
4179
Fms Id
CO304REHB
Total Budget
77186969.00
Spend To Date
1644497.77
Spend To Date 1
0.0213
Fms Project Name
60 CENTRE ST. - RECONSTRUCTION
Agency Project Name
60 CENTRE ST. - RECONSTRUCTION
Agency Project Description
New York County Courthouse, Building Envelope, 60 Centre Street - Restore the building envelope to ensure weather tightness and structural integrity. The work includes facades, roofs, the building’s site perimeter and landscaped areas, and specific electrical and plumbing systems, fire protection equipment and interior finishes affected by the moisture infiltration.
Current Phase
Design
Current Phase Start
2018-06-29T00:00:00.000
Forecast Current Phase End
2025-08-31T00:00:00.000
Forecast Completion
2028-11-01T00:00:00.000
Actual Design Start
2018-06-29T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
CO-0304
Ten Year Plan Category
RECONSTRUCTION/RENOVATION OF COURT FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4180
Fms Id
HWMNYPL
Total Budget
10004083.71
Spend To Date
699204.09
Spend To Date 1
0.0698
Fms Project Name
New York Public Library Pedestrian Improvements
Agency Project Name
New York Public Library Pedestrian Improvements
Agency Project Description
New York Public Library Pedestrian Improvements at the following locations in Manhattan:- Southern sidewalk and curb of West 42nd Street between 5th Avenue and 6th Avenue- Northern sidewalk and curb of West 40th Street between 5th Avenue and 6th Avenue- Curb extension at 6th Avenue on West 40th Street
Current Phase
Design
Current Phase Start
2018-10-23T00:00:00.000
Forecast Current Phase End
2026-09-01T00:00:00.000
Forecast Completion
2029-05-02T00:00:00.000
Actual Design Start
2018-10-23T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HW-0001M, HW-0200, HW-0200, TF-0002, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4181
Fms Id
SER20079
Total Budget
16357913.91
Spend To Date
5608662.10
Spend To Date 1
0.3428
Fms Project Name
RECON OF STORM SEWER, WILLOW AV(TOMPKINS-EDGEWATER AVS)
Agency Project Name
NEW STRM/SAN SWRS IN WILLOW AVE., SI
Agency Project Description
NSTALLATION OF NEW STORM SEWERS AND REPLACEMENT OF SANITARY SEWERS AND WATER MAINS IN WILLOW AVENUE BETWEEN TOMPKINS AVENUE AND BAY STREET, SI
Current Phase
Construction
Current Phase Start
2022-02-14T00:00:00.000
Forecast Current Phase End
2023-12-29T00:00:00.000
Forecast Completion
2023-12-29T00:00:00.000
Actual Design Start
2018-11-27T00:00:00.000
Actual Design End
2019-12-27T00:00:00.000
Actual Construction
2019-12-27T00:00:00.000
Actual Construction 1
2022-02-14T00:00:00.000
Actual Construction Start
2022-02-14T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 01
Budget Line
HW-0200, SE-0200R, WM-0001
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN EXTENSION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4182
Fms Id
GI-BX-PP
Total Budget
49500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
GI - POROUS PAVEMENT INSTALLATIONS, BRONX
Agency Project Name
Design-Bid-Build Green Infrastructure Precast Porous Concrete Panels within the Bronx River and Westchester Creek Watersheds
Agency Project Description
NYC DEP has expanded the Standard Designs for Green Infrastructure to include precast porous concrete panels (PPCP). The DDC design consultant will perform, analyze, and review previous geotechnical investigation and utility information, performing walkthroughs and geotechnical investigations as required, survey and advance 50,000LF of PPCP to final design using DEP GI Standard Procedures and Designs for Green Infrastructure.
Current Phase
Design
Current Phase Start
2023-05-15T00:00:00.000
Forecast Current Phase End
2024-12-23T00:00:00.000
Forecast Completion
2027-08-10T00:00:00.000
Actual Design Start
2023-05-15T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
WP-0169
Ten Year Plan Category
GREEN INFRASTRUCTURE PROGRAM
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DCLA
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DCLA
Pid
4183
Fms Id
PV274KITR
Total Budget
5870828.96
Spend To Date
431329.93
Spend To Date 1
0.0734
Fms Project Name
NYHOS - NY Hall of Science,Great Hall, Kitchen & Restroom
Agency Project Name
NYHOS: GREAT HALL, KITCHEN & RESTROOM RECON
Agency Project Description
NYHOS: GREAT HALL Kitchen and restrooms renovation to provide additional services to the public.
Current Phase
Construction
Current Phase Start
2023-03-14T00:00:00.000
Forecast Current Phase End
2024-06-20T00:00:00.000
Forecast Completion
2024-06-20T00:00:00.000
Actual Design Start
2016-07-07T00:00:00.000
Actual Design End
2022-08-19T00:00:00.000
Actual Construction
2022-08-19T00:00:00.000
Actual Construction 1
2023-03-14T00:00:00.000
Actual Construction Start
2023-03-14T00:00:00.000
Borough
Queens
Community Board
Queens 01
Budget Line
PV-0274, PV-D274, PV-D467, PV-Q274, PV-Q467
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: NYPL
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
NYPL
Pid
4184
Fms Id
LNCA13HAM
Total Budget
18564935.05
Spend To Date
1803025.71
Spend To Date 1
0.0971
Fms Project Name
HAMILTON FISH: REHABILITATION
Agency Project Name
Hamilton Fish Park Branch Renovation
Agency Project Description
NYPL - Hamilton Fish Branch Library - Interior & Exterior Renovation, New Fire Alarm, HVAC, and Boiler
Current Phase
Construction Procurement
Current Phase Start
2022-11-02T00:00:00.000
Forecast Current Phase End
2023-10-02T00:00:00.000
Forecast Completion
2025-11-28T00:00:00.000
Actual Design Start
2013-11-19T00:00:00.000
Actual Design End
2022-11-02T00:00:00.000
Actual Construction
2022-11-02T00:00:00.000
Borough
Manhattan
Community Board
Manhattan, Manhattan 03
Budget Line
LN-0008, LN-D008, LN-I001, LN-M001, PU-0025
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4185
Fms Id
HWD007K03
Total Budget
7825356.00
Spend To Date
1260667.25
Spend To Date 1
0.1611
Fms Project Name
Park Avenue Ped Safety Improvement at the Crossover,BED-830
Agency Project Name
Park Avenue Pedestrian Safety Improvements at the
Agency Project Description
Park Avenue Pedestrian Safety Improvements
Current Phase
Design
Current Phase Start
2018-12-14T00:00:00.000
Forecast Current Phase End
2024-10-30T00:00:00.000
Forecast Completion
2027-07-29T00:00:00.000
Actual Design Start
2018-12-14T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 02, Brooklyn 03, Brooklyn 04
Budget Line
HW-0001K, HW-D101, HW-K005
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4186
Fms Id
HWD10105A
Total Budget
37984375.52
Spend To Date
7172399.36
Spend To Date 1
0.1888
Fms Project Name
Ped Safety Upgrades on Atlantic Ave - Phase 2 (BED-785B)
Agency Project Name
ATLANTIC AVE SAFETY IMPROVEMENTS - PH 2, BROOKLYN
Agency Project Description
PED. SAFETY UPGRADES ON ATLANTIC AVE - PH 2, BROOKLYN
Current Phase
Construction
Current Phase Start
2021-07-06T00:00:00.000
Forecast Current Phase End
2024-05-30T00:00:00.000
Forecast Completion
2024-05-30T00:00:00.000
Actual Design Start
2016-08-04T00:00:00.000
Actual Design End
2019-12-23T00:00:00.000
Actual Construction
2019-12-23T00:00:00.000
Actual Construction 1
2021-07-06T00:00:00.000
Actual Construction Start
2021-07-06T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0001K, HW-0001Q
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4187
Fms Id
HWKDTBK
Total Budget
10118700.00
Spend To Date
580769.12
Spend To Date 1
0.0573
Fms Project Name
Park Avenue - Ingersoll Safety Improvements
Agency Project Name
Park Ave - Ingersoll Houses Safety Improvements
Agency Project Description
Pedestrian and cyclist Safety Improvements near Ingersoll Houses in downtown Brooklyn.
Current Phase
Design
Current Phase Start
2022-04-05T00:00:00.000
Forecast Current Phase End
2024-03-24T00:00:00.000
Forecast Completion
2028-06-23T00:00:00.000
Actual Design Start
2022-04-05T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0001K
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4188
Fms Id
HWPR20K1
Total Budget
14098934.26
Spend To Date
12766674.16
Spend To Date 1
0.9055
Fms Project Name
Pedestrian Ramps Rehabilitation - Brooklyn
Agency Project Name
Pedestrian Ramps Rehabilitation - Brooklyn
Agency Project Description
Pedestrian ramp rehabilitation in the Borough of Brooklyn.
Current Phase
Close-out
Actual Design Start
2019-06-03T00:00:00.000
Actual Design End
2019-10-28T00:00:00.000
Actual Construction
2019-10-28T00:00:00.000
Actual Construction 1
2021-06-14T00:00:00.000
Actual Construction Start
2021-06-14T00:00:00.000
Actual Construction End
2023-04-17T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0200
Ten Year Plan Category
PEDESTRIAN RAMP CONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4188
Fms Id
HWPR20K3
Total Budget
13645163.91
Spend To Date
2410005.60
Spend To Date 1
0.1766
Fms Project Name
Pedestrian Ramp Rehabilitation - Brooklyn
Agency Project Name
Pedestrian Ramps Rehabilitation - Brooklyn
Agency Project Description
Pedestrian ramp rehabilitation in the Borough of Brooklyn.
Current Phase
Construction
Current Phase Start
2023-04-17T00:00:00.000
Forecast Current Phase End
2025-04-15T00:00:00.000
Forecast Completion
2025-04-15T00:00:00.000
Actual Design Start
2019-06-03T00:00:00.000
Actual Design End
2022-07-27T00:00:00.000
Actual Construction
2022-07-27T00:00:00.000
Actual Construction 1
2023-04-17T00:00:00.000
Actual Construction Start
2023-04-17T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0200
Ten Year Plan Category
PEDESTRIAN RAMP CONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4189
Fms Id
HWPR20K2
Total Budget
14373969.60
Spend To Date
10982901.17
Spend To Date 1
0.764
Fms Project Name
Pedestrian Ramp Rehabilitation - Brooklyn
Agency Project Name
Pedestrian Ramp Rehabilitation - Brooklyn
Agency Project Description
Pedestrian ramp rehabilitation in the Borough of Brooklyn.
Current Phase
Construction
Current Phase Start
2021-08-09T00:00:00.000
Forecast Current Phase End
2023-11-09T00:00:00.000
Forecast Completion
2023-11-09T00:00:00.000
Actual Design Start
2019-06-03T00:00:00.000
Actual Design End
2019-10-28T00:00:00.000
Actual Construction
2019-10-28T00:00:00.000
Actual Construction 1
2021-08-09T00:00:00.000
Actual Construction Start
2021-08-09T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0200
Ten Year Plan Category
PEDESTRIAN RAMP CONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4191
Fms Id
HWPR22MC
Total Budget
16329000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
FY24 Non-Standard Pedestrian Ramp Upgrades
Agency Project Name
Pedestrian Ramp Upgrades at 81 non-standard locations in Manhattan.
Agency Project Description
Pedestrian Ramp Upgrades at 81 non-standard locations in Manhattan
Current Phase
Pre-Design
Borough
Citywide
Community Board
Citywide
Budget Line
HW-0200, TF-0001
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4192
Fms Id
HWPR22KRC
Total Budget
19012000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
FY24 Non-Standard Pedestrian Ramp Upgrades
Agency Project Name
Pedestrian Ramp Upgrades at 91 non-standard locations in Brooklyn and Staten Island.
Agency Project Description
Pedestrian Ramp Upgrades at non-standard locations in Brooklyn and Staten Island.
Current Phase
Pre-Design
Borough
Citywide
Community Board
Citywide
Budget Line
HW-0200, TF-0001
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4193
Fms Id
HWPR21KR
Total Budget
18990534.18
Spend To Date
4266446.89
Spend To Date 1
0.2246
Fms Project Name
Rehabilitation of Standard Ped Ramps - Brooklyn&Staten Islan
Agency Project Name
Simple Upgrades Ped Ramps- Brooklyn and Staten Island
Agency Project Description
Pedestrian Ramps rehabilitation (repair and upgrade to Federal ADA 2010 specifications to the maximum extent feasible) of existing pedestrian ramps in Brooklyn and Staten Island.
Current Phase
Construction
Current Phase Start
2022-08-08T00:00:00.000
Forecast Current Phase End
2024-07-27T00:00:00.000
Forecast Completion
2024-07-27T00:00:00.000
Actual Design Start
2020-04-07T00:00:00.000
Actual Design End
2020-08-04T00:00:00.000
Actual Construction
2020-08-04T00:00:00.000
Actual Construction 1
2022-08-08T00:00:00.000
Actual Construction Start
2022-08-08T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
HW-0200
Ten Year Plan Category
PEDESTRIAN RAMP CONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4193
Fms Id
HWPR22KR
Total Budget
18369000.00
Spend To Date
123687.72
Spend To Date 1
0.0067
Fms Project Name
Rehabilitation of Standard Ped Ramps - Brooklyn & SI
Agency Project Name
Simple Upgrades Ped Ramps- Brooklyn and Staten Island
Current Phase
Construction
Current Phase Start
2023-07-10T00:00:00.000
Forecast Current Phase End
2025-07-08T00:00:00.000
Forecast Completion
2025-07-08T00:00:00.000
Actual Design Start
2022-01-03T00:00:00.000
Actual Design End
2022-08-18T00:00:00.000
Actual Construction
2022-08-18T00:00:00.000
Actual Construction 1
2023-07-10T00:00:00.000
Actual Construction Start
2023-07-10T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
HW-0200, TF-0002
Ten Year Plan Category
PEDESTRIAN RAMP CONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4194
Fms Id
HWPEDSF5
Total Budget
24960994.66
Spend To Date
8419954.58
Spend To Date 1
0.3373
Fms Project Name
Multi-Site Pedestrian Safety Phase 5
Agency Project Name
MULTI-SITE PEDESTRIAN SAFETY PHASE 5
Agency Project Description
PEDESTRIAN SAFETY GEOMETRIC IMPROVEMENTS AT VARIOUS SPECIFIED LOCATIONS, CITYWIDE
Current Phase
Construction
Current Phase Start
2021-01-04T00:00:00.000
Forecast Current Phase End
2024-06-01T00:00:00.000
Forecast Completion
2024-06-01T00:00:00.000
Actual Design Start
2017-08-01T00:00:00.000
Actual Design End
2018-12-28T00:00:00.000
Actual Construction
2018-12-28T00:00:00.000
Actual Construction 1
2021-01-04T00:00:00.000
Actual Construction Start
2021-01-04T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0001K, HW-0001X, HW-D102, TF-0002
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4195
Fms Id
HWCSCHPQN
Total Budget
14078375.00
Spend To Date
1790968.73
Spend To Date 1
0.1272
Fms Project Name
SAFE ROUTES TO SCHOOLS- QUEENS
Agency Project Name
SAFE ROUTES TO SCHOOLS, QNS
Agency Project Description
Pedestrian safety improvements at the following eight schools in Queens: P.S. 50, P.S. 71 – Forest School, P. S 89, P.S. 220, I.S. 125, St. Elizabeth School and JHS 210 and Epic High School North (previously known as Benedict Joseph Labre School)
Current Phase
Design
Current Phase Start
2018-06-27T00:00:00.000
Forecast Current Phase End
2023-12-29T00:00:00.000
Forecast Completion
2026-08-18T00:00:00.000
Actual Design Start
2018-06-27T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
HW-0988, HW-D103, HW-D105, TF-0002
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4196
Fms Id
HWK1673
Total Budget
29538000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
South Brooklyn Pedestrian Safety Improvements
Agency Project Name
South Brooklyn Pedestrian Safety Improvements
Agency Project Description
Pedestrian Safety Improvements in South Brooklyn
Current Phase
Pre-Design
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0001K, HW-K005
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4197
Fms Id
HWX710A
Total Budget
149159527.20
Spend To Date
133859951.03
Spend To Date 1
0.8974
Fms Project Name
Pelham Pkwy - West & East and North & South Bounds (Phase A)
Agency Project Name
PELHAM PKWY - Phase 2
Agency Project Description
Pelham Pkwy main road W/B from Bronx River Pkwy to Hutchinson River PkwyPelham Pkwy North Service Rd. (S/R) from Bronx Park East to Eastchester Rd.Stillwell Ave from westbound mainline to north service road
Current Phase
Construction
Current Phase Start
2017-08-01T00:00:00.000
Forecast Current Phase End
2023-12-22T00:00:00.000
Forecast Completion
2023-12-22T00:00:00.000
Actual Design Start
2002-02-15T00:00:00.000
Actual Design End
2016-11-30T00:00:00.000
Actual Construction
2016-11-30T00:00:00.000
Actual Construction 1
2017-08-01T00:00:00.000
Actual Construction Start
2017-08-01T00:00:00.000
Borough
Bronx
Community Board
Bronx 11
Budget Line
HW-0001X, HW-0710, HW-0944, HW-1684, TF-0002, TF-0002, TF-0502, WM-0001, WM-0006
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4197
Fms Id
SEX002247
Total Budget
4344615.06
Spend To Date
4344615.06
Spend To Date 1
1.00
Agency Project Name
PELHAM PKWY - Phase 2
Agency Project Description
Pelham Pkwy main road W/B from Bronx River Pkwy to Hutchinson River PkwyPelham Pkwy North Service Rd. (S/R) from Bronx Park East to Eastchester Rd.Stillwell Ave from westbound mainline to north service road
Current Phase
Construction
Current Phase Start
2017-08-01T00:00:00.000
Forecast Current Phase End
2023-12-22T00:00:00.000
Forecast Completion
2023-12-22T00:00:00.000
Actual Design Start
2002-02-15T00:00:00.000
Actual Design End
2016-11-30T00:00:00.000
Actual Construction
2016-11-30T00:00:00.000
Actual Construction 1
2017-08-01T00:00:00.000
Actual Construction Start
2017-08-01T00:00:00.000
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: NYPL
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
NYPL
Pid
4198
Fms Id
LNMNA08LS
Total Budget
6322278.95
Spend To Date
5119562.81
Spend To Date 1
0.8097
Fms Project Name
MANHATTAN - Life Safety Projects @ 17 Branch Libraries
Agency Project Name
Muhlenberg Fire Alarm Upgrade
Agency Project Description
Pending Task order registration By comptroller office.
Current Phase
Construction Procurement
Current Phase Start
2013-01-03T00:00:00.000
Forecast Current Phase End
2023-07-28T00:00:00.000
Forecast Completion
2024-02-14T00:00:00.000
Actual Design Start
2009-12-27T00:00:00.000
Actual Design End
2013-01-03T00:00:00.000
Actual Construction
2013-01-03T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
LN-0008, LN-0101M, LN-0101X, LN-D003, LN-D008
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4199
Fms Id
HWQ1187
Total Budget
45113025.86
Spend To Date
1359262.73
Spend To Date 1
0.0301
Fms Project Name
Westbourne-Dunbar Roadways & Bulkheads (SAND1187, SEQ200595)
Agency Project Name
WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS
Agency Project Description
PRELIMINARY AND FINAL DESIGN SERVICES FOR RECONSTRUCTION OF WESTBOURNE NORTON DRIVE. BOROUGH OF QUEENS
Current Phase
Design
Current Phase Start
2016-12-15T00:00:00.000
Forecast Current Phase End
2026-12-31T00:00:00.000
Forecast Completion
2030-09-12T00:00:00.000
Actual Design Start
2016-12-15T00:00:00.000
Borough
Queens
Community Board
Queens, Queens 14
Budget Line
HW-0001Q, HW-0061
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4199
Fms Id
SEQ200595
Total Budget
44200000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Westbourne Ave-Norton Drive Recon (HWQ1187, SAND1187)
Agency Project Name
WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS
Agency Project Description
PRELIMINARY AND FINAL DESIGN SERVICES FOR RECONSTRUCTION OF WESTBOURNE NORTON DRIVE. BOROUGH OF QUEENS
Current Phase
Design
Current Phase Start
2016-12-15T00:00:00.000
Forecast Current Phase End
2026-12-31T00:00:00.000
Forecast Completion
2030-09-12T00:00:00.000
Actual Design Start
2016-12-15T00:00:00.000
Borough
Queens
Community Board
Queens 14
Budget Line
SE-0002Q, SE-0200Q, WM-0001
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4200
Fms Id
HWS2020XM
Total Budget
4848035.82
Spend To Date
3983550.92
Spend To Date 1
0.8216
Fms Project Name
Prior Notice Sidewalks- Manhattan & Bronx
Agency Project Name
Prior Notice Sidewalks- Manhattan & Bronx
Agency Project Description
PRIOR NOTICE SIDEWALKS - THE BRONX & MANHATTAN
Current Phase
(Completed)
Actual Design Start
2019-08-01T00:00:00.000
Actual Design End
2019-12-20T00:00:00.000
Actual Construction
2019-12-20T00:00:00.000
Actual Construction 1
2021-09-07T00:00:00.000
Actual Construction Start
2021-09-07T00:00:00.000
Actual Construction End
2023-02-24T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
HW-0200, P-1018
Ten Year Plan Category
SIDEWALK RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4201
Fms Id
HWS2021K
Total Budget
9384000.00
Spend To Date
148676.09
Spend To Date 1
0.0158
Fms Project Name
PRIOR NOTICE SIDEWALK - BROOKLYN
Agency Project Name
FY21 Prior Notice Sidewalks -Brooklyn
Agency Project Description
Prior Notice Sidewalks -Brooklyn
Current Phase
Construction
Current Phase Start
2023-08-07T00:00:00.000
Forecast Current Phase End
2025-02-01T00:00:00.000
Forecast Completion
2025-02-01T00:00:00.000
Actual Design Start
2021-12-08T00:00:00.000
Actual Design End
2022-05-20T00:00:00.000
Actual Construction
2022-05-20T00:00:00.000
Actual Construction 1
2023-08-07T00:00:00.000
Actual Construction Start
2023-08-07T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0200, HW-0200, P-1331
Ten Year Plan Category
SIDEWALK RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4202
Fms Id
HWS2020K1
Total Budget
11454913.59
Spend To Date
3297432.43
Spend To Date 1
0.2878
Fms Project Name
Prior Notice Sidewalks- Brooklyn
Agency Project Name
Prior Notice Sidewalks- Brooklyn
Agency Project Description
Prior Notice Sidewalks, Brooklyn
Current Phase
Construction
Current Phase Start
2022-08-08T00:00:00.000
Forecast Current Phase End
2024-02-03T00:00:00.000
Forecast Completion
2024-02-03T00:00:00.000
Actual Design Start
2019-07-30T00:00:00.000
Actual Design End
2022-02-04T00:00:00.000
Actual Construction
2022-02-04T00:00:00.000
Actual Construction 1
2022-08-08T00:00:00.000
Actual Construction Start
2022-08-08T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0200, HW-0200, P-1018
Ten Year Plan Category
SIDEWALK RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DSNY
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DSNY
Pid
4203
Fms Id
S216-415A
Total Budget
101258897.71
Spend To Date
95698175.06
Spend To Date 1
0.945
Fms Project Name
WEST 59th STREET MTS
Agency Project Name
West 59th St. MTS - Project 2
Agency Project Description
Project 2 Scope: Refurbishment of the existing pier building including: repair of existing pier structure including pile caps and fendering; construction of new emergency generator, electrical, mechanical, fire pump and fire valve rooms; new exit passageway construction and existing exit passageway refurbishment; re-arrangement and refurbishment of the Operations Building interiors; replacement of fire suppression system throughout the entire pier structure; mechanical, electrical and plumbing system upgrades; refurbishment and painting the existing pier interior steel framing and wall/roof surfaces; recoating the structure's exterior cladding systems including metal wall and roof panel system and translucent panel wall cladding system.
Current Phase
Construction
Current Phase Start
2015-05-20T00:00:00.000
Forecast Current Phase End
2023-09-30T00:00:00.000
Forecast Completion
2023-09-30T00:00:00.000
Actual Design Start
2012-01-17T00:00:00.000
Actual Design End
2014-06-30T00:00:00.000
Actual Construction
2014-06-30T00:00:00.000
Actual Construction 1
2015-05-20T00:00:00.000
Actual Construction Start
2015-05-20T00:00:00.000
Borough
Manhattan
Community Board
Manhattan, Manhattan 04, Manhattan 07
Budget Line
S-0216
Ten Year Plan Category
SOLID WASTE MANAGEMENT
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DHS
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DHS
Pid
4204
Fms Id
HH112BEES
Total Budget
24508513.68
Spend To Date
17293901.98
Spend To Date 1
0.7056
Fms Project Name
BELLEVUE - ELECT SVC UPGRADE
Agency Project Name
Bellevue Electrical Upgrade & New Generator
Agency Project Description
Project ID for bidding HH112BEES and HH112BEGE combined.
Current Phase
Construction
Current Phase Start
2019-05-10T00:00:00.000
Forecast Current Phase End
2024-07-12T00:00:00.000
Forecast Completion
2024-07-12T00:00:00.000
Actual Design Start
2016-07-22T00:00:00.000
Actual Design End
2018-01-11T00:00:00.000
Actual Construction
2018-01-11T00:00:00.000
Actual Construction 1
2019-05-10T00:00:00.000
Actual Construction Start
2019-05-10T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HH-0112
Ten Year Plan Category
SHELTERS FOR HOMELESS INDIVIDUALS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DCLA
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DCLA
Pid
4205
Fms Id
PV669-NPC
Total Budget
25219476.11
Spend To Date
2888333.61
Spend To Date 1
0.1145
Fms Project Name
NPC - Nuyorican Poets Cafe Renovation
Agency Project Name
Nuyorican Poets Cafe Renovation
Agency Project Description
Project is to rehabilitate the Nuyorican Poet’s Café facility for expanded spaces and ADA accessibility. The base scope of work includes renovation with new finishes, power, and lighting to accommodate three flexible classroom/rehearsal spaces. Additional staff office space and an additional publicly-accessible performance space will be created as part of this renovation.
Current Phase
Construction Procurement
Current Phase Start
2023-03-02T00:00:00.000
Forecast Current Phase End
2024-01-15T00:00:00.000
Forecast Completion
2026-01-02T00:00:00.000
Actual Design Start
2015-12-14T00:00:00.000
Actual Design End
2023-03-02T00:00:00.000
Actual Construction
2023-03-02T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 03
Budget Line
PV-0467, PV-0N669, PV-D467, PV-DN669, PV-I001, PV-MN669
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4206
Fms Id
REG-HP06
Total Budget
62987886.38
Spend To Date
21549171.97
Spend To Date 1
0.3421
Fms Project Name
RECONSTRUCTION OF REGULATOR HP-06
Agency Project Name
Reconstruction of Regulator HP06
Agency Project Description
Project REG-HP06 is for the reconstruction of Regulator HP06 . The work shall include, but is not limited to, the following items:1. Reconstruction of the existing Diversion Chamber (see attachment labeled 'REG-HP06 As-builts').2. Reconstruction of the existing Regulator Chamber (see attachment labeled 'REG-HP06 As-builts').3. Rehabilitation of the existing Interceptor (scope previously included in PS-312MX)4. Replacement of existing instrumentation and monitoring systems, as needed (i.e., sensors, probes, conduits, cables, etc.).5. Restoration of construction areas as needed (i.e., roadways, sidewalks, etc.)6. Implementation of an approved plan to maintain regulator and interceptor operations during construction.7. Shop drawings, as-built drawings, and equipment information.
Current Phase
Construction
Current Phase Start
2022-02-14T00:00:00.000
Forecast Current Phase End
2025-06-12T00:00:00.000
Forecast Completion
2025-06-12T00:00:00.000
Actual Design Start
2020-10-27T00:00:00.000
Actual Design End
2021-11-04T00:00:00.000
Actual Construction
2021-11-04T00:00:00.000
Actual Construction 1
2022-02-14T00:00:00.000
Actual Construction Start
2022-02-14T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
SE-0002X, WP-0169
Ten Year Plan Category
WATER QUALITY MANDATES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DHS
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DHS
Pid
4207
Fms Id
HH112CGIU
Total Budget
928773.91
Spend To Date
265246.60
Spend To Date 1
0.2855
Fms Project Name
Keener Assessment Shelter - Fire Alarm Upgrade
Agency Project Name
Keener Assessment Shelter: Fire Alarm Upgrade
Agency Project Description
Provide a new code compliant fire alarm system meet to meet FDNY and State OTDA standards.
Current Phase
Design
Current Phase Start
2018-01-03T00:00:00.000
Forecast Current Phase End
2024-07-05T00:00:00.000
Forecast Completion
2026-04-03T00:00:00.000
Actual Design Start
2018-01-03T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HH-0112
Ten Year Plan Category
SHELTERS FOR HOMELESS INDIVIDUALS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DCAS
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DCAS
Pid
4208
Fms Id
PW29310R
Total Budget
11444365.00
Spend To Date
560305.92
Spend To Date 1
0.0489
Fms Project Name
10 RICHMOND TERRACE - FIRE ALARM
Agency Project Name
10 RICHMOND TERRACE - FIRE ALARM
Agency Project Description
Provide new Fire Detection & Alarm system in in full compliance with the latest (2008/2014 or later) codes and install a sprinkler system throughout the Landmark building, including pumps.
Current Phase
Design
Current Phase Start
2022-07-08T00:00:00.000
Forecast Current Phase End
2024-04-23T00:00:00.000
Forecast Completion
2027-10-07T00:00:00.000
Actual Design Start
2022-07-08T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 01
Budget Line
PW-0293
Ten Year Plan Category
LEGAL MANDATES AND CORRECTION OF UNSAFE CONDITIONS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DCLA
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DCLA
Pid
4209
Fms Id
PV501BOIL
Total Budget
4130828.87
Spend To Date
3342513.84
Spend To Date 1
0.8091
Fms Project Name
PS1 - PS1 Boiler Replacement
Agency Project Name
MOMA PS1-BOILER REPLACEMENT
Agency Project Description
PS-1 MOMA Boiler Replacement and Lighting upgrade
Current Phase
Construction
Current Phase Start
2020-10-20T00:00:00.000
Forecast Current Phase End
2023-10-31T00:00:00.000
Forecast Completion
2023-10-31T00:00:00.000
Actual Design Start
2017-09-13T00:00:00.000
Actual Design End
2019-07-19T00:00:00.000
Actual Construction
2019-07-19T00:00:00.000
Actual Construction 1
2020-10-20T00:00:00.000
Actual Construction Start
2020-10-20T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
PV-0501
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DCAS
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DCAS
Pid
4210
Fms Id
CO299FIRE
Total Budget
23647348.53
Spend To Date
1260845.63
Spend To Date 1
0.0533
Fms Project Name
89-17 SUTPHIN BLVD - FIRE ALARM DESIGN & REPLACEMENT
Agency Project Name
Civil Courthouse:89-17 Sutphin BLVD,NY.FireAlarmUp
Agency Project Description
Queens Civil Courthouse at 89-17 Sutphin Blvd. - Fire alarm replacement. The goal of the project is to improve the building's life safety system and provide infrastructure for future office space renovations over the next 20 years.
Current Phase
Construction Procurement
Current Phase Start
2023-04-20T00:00:00.000
Forecast Current Phase End
2024-01-02T00:00:00.000
Forecast Completion
2026-12-29T00:00:00.000
Actual Design Start
2019-06-26T00:00:00.000
Actual Design End
2023-04-20T00:00:00.000
Actual Construction
2023-04-20T00:00:00.000
Borough
Queens
Community Board
Queens 01
Budget Line
CO-0299
Ten Year Plan Category
RECONSTRUCTION/RENOVATION OF COURT FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DCAS
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DCAS
Pid
4211
Fms Id
CO296RF
Total Budget
20795701.02
Spend To Date
956665.52
Spend To Date 1
0.046
Fms Project Name
125-01 QUEENS BLVD.- ROOF
Agency Project Name
125-01 QUEENS BLVD.- ROOF
Agency Project Description
Queens County Criminal Court, Facade and Roof, 125-01 Queens Boulevard - Restore the façades and replace the roofs of the Main, Annex and DA Buildings to ensure weather-tightness and structural integrity.
Current Phase
Design
Current Phase Start
2018-09-18T00:00:00.000
Forecast Current Phase End
2024-05-31T00:00:00.000
Forecast Completion
2027-03-03T00:00:00.000
Actual Design Start
2018-09-18T00:00:00.000
Borough
Queens
Community Board
Queens 09
Budget Line
CO-0296
Ten Year Plan Category
RECONSTRUCTION/RENOVATION OF COURT FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DCLA
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DCLA
Pid
4212
Fms Id
PV291-QM2
Total Budget
33962598.00
Spend To Date
1031583.97
Spend To Date 1
0.0303
Fms Project Name
QMA - Queen's Museum of Art Expansion Phase II
Agency Project Name
Queens Museum of Art- Phase 2 Expansion
Agency Project Description
Queens Museum of Art - Phase 2
Current Phase
Design
Current Phase Start
2022-03-23T00:00:00.000
Forecast Current Phase End
2024-04-30T00:00:00.000
Forecast Completion
2027-04-20T00:00:00.000
Actual Design Start
2022-03-23T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
PV-0291, PV-D291, PV-D467, PV-Q291
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: QPL
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
QPL
Pid
4213
Fms Id
LQQBHHVAC
Total Budget
2981785.44
Spend To Date
550343.80
Spend To Date 1
0.1845
Fms Project Name
QUEENSBORO HILL - HVAC
Agency Project Name
Queensboro Hill HVAC Upgrade
Agency Project Description
Queensboro Hill Library HVAC system upgrade and related work.
Current Phase
Construction
Current Phase Start
2023-04-11T00:00:00.000
Forecast Current Phase End
2024-04-29T00:00:00.000
Forecast Completion
2024-04-29T00:00:00.000
Actual Design Start
2017-01-17T00:00:00.000
Actual Design End
2022-04-21T00:00:00.000
Actual Construction
2022-04-21T00:00:00.000
Actual Construction 1
2023-04-11T00:00:00.000
Actual Construction Start
2023-04-11T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
LQ-0122, LQ-0122, LQ-D122
Ten Year Plan Category
REPLACEMENT BRANCHES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000