Capital Projects Dashboard - Citywide Budget and Schedule

All major capital infrastructure projects with a committed budget. Financial information and agency schedule details for each project are joined via FMS ID. Only projects in the design phase or later have project schedules displayed. This dataset is part of the Capital Projects Dashboard.

Note: Each row is uniquely identified by its Financial Management Service (FMS) ID. FMS ID is the unique ID that OMB uses for the FMS (Financial Information System). This ID can be universally joined with any OMB dataset that has the same field. The Capital Projects Dashboard is the result of joining OMB’s fiscal data with the agency’s schedule data. FMS IDs and agency projects don't always have a one-to-one relationship (i.e., one project schedule may correlate to multiple FMS IDs, and one FMS may correct to multiple projects with different schedules).

City Government Mayor's Office of Operations (OPS) Dataset fb86-vt7u 27 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4214
Fms Id
HWQ724B
Total Budget
63313435.73
Spend To Date
8151336.12
Spend To Date 1
0.1287
Fms Project Name
Recon of Streets in Brookville-Edgewood Triangle (SEQ200519)
Agency Project Name
Brookville Blvd and Edgewood Triangle (SEQ200519)
Agency Project Description
Reconstruct roadway and extend storm and sanitary sewers in portions of Brookville Boulevard, Edgewood Street, 147th Avenue, and adjacent streets west of 241st Street.
Current Phase
Design
Current Phase Start
2012-08-17T00:00:00.000
Forecast Current Phase End
2024-10-28T00:00:00.000
Forecast Completion
2030-02-18T00:00:00.000
Actual Design Start
2012-08-17T00:00:00.000
Borough
Queens
Community Board
Queens 13
Budget Line
HW-0001Q, HW-0061, HW-0200, HW-0200, HW-0724, TF-0002, TF-0502
Ten Year Plan Category
SIDEWALK RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4214
Fms Id
SEQ200519
Total Budget
61224225.94
Spend To Date
1469663.25
Spend To Date 1
0.024
Fms Project Name
SEQ - Brookville-Edgewood Triangle West - Phase II (HWQ724B)
Agency Project Name
Brookville Blvd and Edgewood Triangle (SEQ200519)
Agency Project Description
Reconstruct roadway and extend storm and sanitary sewers in portions of Brookville Boulevard, Edgewood Street, 147th Avenue, and adjacent streets west of 241st Street.
Current Phase
Design
Current Phase Start
2012-08-17T00:00:00.000
Forecast Current Phase End
2024-10-28T00:00:00.000
Forecast Completion
2030-02-18T00:00:00.000
Actual Design Start
2012-08-17T00:00:00.000
Borough
Queens
Community Board
Queens 13
Budget Line
SE-0002Q, SE-0005, SE-0200Q, WM-0001
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4215
Fms Id
BED-794
Total Budget
55222361.57
Spend To Date
34332419.08
Spend To Date 1
0.6217
Fms Project Name
DUMBO/Vinegar Hill Area Reconstruction & Plaza. HWKKP005
Agency Project Name
DUMBO / VINEGAR HILL AREA-Phase II / BED-794
Agency Project Description
Reconstruction DUMBO/Vinegar Hill Area including Trunk and Distribution water main replacement; Installation of HLSS and Combined Sewer replacement; Restoration of Belgian block in Water Street; Street lighting and Traffic Signal work.
Current Phase
Construction
Current Phase Start
2019-01-07T00:00:00.000
Forecast Current Phase End
2024-06-04T00:00:00.000
Forecast Completion
2024-06-04T00:00:00.000
Actual Design Start
2012-06-07T00:00:00.000
Actual Design End
2017-12-29T00:00:00.000
Actual Construction
2017-12-29T00:00:00.000
Actual Construction 1
2019-01-07T00:00:00.000
Actual Construction Start
2019-01-07T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 02, Brooklyn 06
Budget Line
SE-0004, WM-0001, WM-0006
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4215
Fms Id
HWKKP005
Total Budget
71552294.77
Spend To Date
41055157.03
Spend To Date 1
0.5737
Fms Project Name
DUMBO D.M.A. - VINEGAR HILL AREA, BED-794,SANDHWK05
Agency Project Name
DUMBO / VINEGAR HILL AREA-Phase II / BED-794
Agency Project Description
Reconstruction DUMBO/Vinegar Hill Area including Trunk and Distribution water main replacement; Installation of HLSS and Combined Sewer replacement; Restoration of Belgian block in Water Street; Street lighting and Traffic Signal work.
Current Phase
Construction
Current Phase Start
2019-01-07T00:00:00.000
Forecast Current Phase End
2024-06-04T00:00:00.000
Forecast Completion
2024-06-04T00:00:00.000
Actual Design Start
2012-06-07T00:00:00.000
Actual Design End
2017-12-29T00:00:00.000
Actual Construction
2017-12-29T00:00:00.000
Actual Construction 1
2019-01-07T00:00:00.000
Actual Construction Start
2019-01-07T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 02
Budget Line
HW-0001K
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4215
Fms Id
SANDHWK05
Total Budget
2499357.54
Spend To Date
367754.34
Spend To Date 1
0.1471
Agency Project Name
DUMBO / VINEGAR HILL AREA-Phase II / BED-794
Agency Project Description
Reconstruction DUMBO/Vinegar Hill Area including Trunk and Distribution water main replacement; Installation of HLSS and Combined Sewer replacement; Restoration of Belgian block in Water Street; Street lighting and Traffic Signal work.
Current Phase
Construction
Current Phase Start
2019-01-07T00:00:00.000
Forecast Current Phase End
2024-06-04T00:00:00.000
Forecast Completion
2024-06-04T00:00:00.000
Actual Design Start
2012-06-07T00:00:00.000
Actual Design End
2017-12-29T00:00:00.000
Actual Construction
2017-12-29T00:00:00.000
Actual Construction 1
2019-01-07T00:00:00.000
Actual Construction Start
2019-01-07T00:00:00.000
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4216
Fms Id
HWR1140A
Total Budget
27531271.37
Spend To Date
3978267.75
Spend To Date 1
0.1444
Fms Project Name
ARTHUR KILL ROAD (PHASE I) - CLARKE AVE, RICHMOD AV, RED-366
Agency Project Name
Reconstruction of Arthur Kill Road, Phase I
Agency Project Description
Reconstruction of Arthur Kill Rd from Clark Avenue to Richmond Avenue including widening of roadway
Current Phase
Design
Current Phase Start
2016-12-16T00:00:00.000
Forecast Current Phase End
2023-07-31T00:00:00.000
Forecast Completion
2028-06-30T00:00:00.000
Actual Design Start
2016-12-16T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 03
Budget Line
HW-0061, HW-0200, HW-0200, HW-0348, HW-1140, HW-D104, TF-0002, TF-0502
Ten Year Plan Category
SIDEWALK RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4216
Fms Id
RED-366
Total Budget
27895366.00
Spend To Date
17583.42
Spend To Date 1
0.0006
Fms Project Name
WM WORK ARTHUR KILL RD BTW RICHMOND & ABINGTON AVE HWR1140A
Agency Project Name
Reconstruction of Arthur Kill Road, Phase I
Agency Project Description
Reconstruction of Arthur Kill Rd from Clark Avenue to Richmond Avenue including widening of roadway
Current Phase
Design
Current Phase Start
2016-12-16T00:00:00.000
Forecast Current Phase End
2023-07-31T00:00:00.000
Forecast Completion
2028-06-30T00:00:00.000
Actual Design Start
2016-12-16T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 03
Budget Line
SE-0002R, SE-0200R, SE-0432, WM-0001
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4217
Fms Id
SANDRDHK
Total Budget
107486000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Red Hook HMGP
Agency Project Name
RED HOOK INTEGRATED FLOOD PROTECTION SYSTEM
Agency Project Description
Reconstruction of Beard Street in the Red Hook neighborhood of Brooklyn, including raising the streets, reconstruction of roadway, curbs and sidewalk, and installing a new bulkhead and floodwall along the waterfront. The reconstruction/raising for Beard Street will cover two blocks (Van Brunt St. to Dwight St).
Current Phase
Design
Current Phase Start
2019-08-19T00:00:00.000
Forecast Current Phase End
2024-07-31T00:00:00.000
Forecast Completion
2027-04-30T00:00:00.000
Actual Design Start
2019-08-19T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
PU-0100, PU-0200
Ten Year Plan Category
MISCELLANEOUS ENERGY EFFICIENCY AND SUSTAINABILITY
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4217
Fms Id
SEK002390
Total Budget
1304000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Guniting of Outfall Sewers on Wolcott St BKLYN, SANDRDHK
Agency Project Name
RED HOOK INTEGRATED FLOOD PROTECTION SYSTEM
Agency Project Description
Reconstruction of Beard Street in the Red Hook neighborhood of Brooklyn, including raising the streets, reconstruction of roadway, curbs and sidewalk, and installing a new bulkhead and floodwall along the waterfront. The reconstruction/raising for Beard Street will cover two blocks (Van Brunt St. to Dwight St).
Current Phase
Design
Current Phase Start
2019-08-19T00:00:00.000
Forecast Current Phase End
2024-07-31T00:00:00.000
Forecast Completion
2027-04-30T00:00:00.000
Actual Design Start
2019-08-19T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 06
Budget Line
SE-0002K
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4218
Fms Id
BED-784
Total Budget
38469237.89
Spend To Date
30408395.52
Spend To Date 1
0.7904
Fms Project Name
RECON OF WM I& STORM SWR IN BERGEN AVE AREA
Agency Project Name
RECONSTRUCTION OF BERGEN AVE AREA, BKLYN/BED-784
Agency Project Description
Reconstruction of Bergen Avenue Area, including Storm Sewers, Water Mains, Street Lighting, Traffic Signal Work, and reconstruction of new outfall at East Mill Basin.
Current Phase
(Completed)
Actual Design Start
2012-12-03T00:00:00.000
Actual Design End
2017-09-21T00:00:00.000
Actual Construction
2017-09-21T00:00:00.000
Actual Construction 1
2019-02-25T00:00:00.000
Actual Construction Start
2019-02-25T00:00:00.000
Actual Construction End
2023-06-24T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 18
Budget Line
SE-0005, SE-0200K, WM-0001
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4218
Fms Id
HWK614D
Total Budget
34443881.00
Spend To Date
29070013.07
Spend To Date 1
0.8439
Fms Project Name
RECONSTRUCTION OF BERGEN AVENUE AREA, BKLYN /BED-784
Agency Project Name
RECONSTRUCTION OF BERGEN AVE AREA, BKLYN/BED-784
Agency Project Description
Reconstruction of Bergen Avenue Area, including Storm Sewers, Water Mains, Street Lighting, Traffic Signal Work, and reconstruction of new outfall at East Mill Basin.
Current Phase
(Completed)
Actual Design Start
2012-12-03T00:00:00.000
Actual Design End
2017-09-21T00:00:00.000
Actual Construction
2017-09-21T00:00:00.000
Actual Construction 1
2019-02-25T00:00:00.000
Actual Construction Start
2019-02-25T00:00:00.000
Actual Construction End
2023-06-24T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 18
Budget Line
HW-0001K, HW-0614, TF-0002, TF-0502
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4219
Fms Id
HWXS711
Total Budget
10049362.84
Spend To Date
1050285.05
Spend To Date 1
0.1045
Fms Project Name
RECONSTRUCTION OF STEP STREET AT DAVIDSON AVE (SEX002272)
Agency Project Name
RECONSTRUCTION OF STEP ST AT DAVIDSON AVE
Agency Project Description
RECONSTRUCTION OF DAVIDSON AVE STEP STREET, BRONX. THE PROJECT WILL PERFORM A REPLACEMENT-IN-KIND OF THE DAVIDSON AVE STEP ST. LOCATED AT DAVIDSON AVE BETWEEN FEATHERBED LANE AND WEST 174TH ST. THE GRANITE STEPS ARE HIGHLY UNEVEN DUE TO EROSION AND ARE AT RISK OF DESTABILIZING THE STRUCTURE. THE JOINTS ARE IN POOR CONDITION WITH CRACKING, SPALLING AND SURROUNDING VOIDS. PORTIONS OF THE EXISTING RAILINGS ARE MISSING OR HAVE DISCONNECTED FROM THE BASE. THE PURPOSE OF THIS RECONSTRUCTION PROJECT IS TO PERFORM A REPLACEMENT-IN-KIND OF THE STEP STREET.
Current Phase
Design
Current Phase Start
2019-01-29T00:00:00.000
Forecast Current Phase End
2024-06-30T00:00:00.000
Forecast Completion
2027-03-24T00:00:00.000
Actual Design Start
2019-01-29T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
HW-0211, HW-0211
Ten Year Plan Category
RECONSTRUCTION OF STEP STREETS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4219
Fms Id
SEX002272
Total Budget
267000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Combined SE Replacement in Davidson Avenue. Bronx (HWXS711)
Agency Project Name
RECONSTRUCTION OF STEP ST AT DAVIDSON AVE
Agency Project Description
RECONSTRUCTION OF DAVIDSON AVE STEP STREET, BRONX. THE PROJECT WILL PERFORM A REPLACEMENT-IN-KIND OF THE DAVIDSON AVE STEP ST. LOCATED AT DAVIDSON AVE BETWEEN FEATHERBED LANE AND WEST 174TH ST. THE GRANITE STEPS ARE HIGHLY UNEVEN DUE TO EROSION AND ARE AT RISK OF DESTABILIZING THE STRUCTURE. THE JOINTS ARE IN POOR CONDITION WITH CRACKING, SPALLING AND SURROUNDING VOIDS. PORTIONS OF THE EXISTING RAILINGS ARE MISSING OR HAVE DISCONNECTED FROM THE BASE. THE PURPOSE OF THIS RECONSTRUCTION PROJECT IS TO PERFORM A REPLACEMENT-IN-KIND OF THE STEP STREET.
Current Phase
Design
Current Phase Start
2019-01-29T00:00:00.000
Forecast Current Phase End
2024-06-30T00:00:00.000
Forecast Completion
2027-03-24T00:00:00.000
Actual Design Start
2019-01-29T00:00:00.000
Borough
Bronx
Community Board
Bronx 05
Budget Line
SE-0002X
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4220
Fms Id
P-102DELV
Total Budget
25470900.00
Spend To Date
4929467.52
Spend To Date 1
0.1935
Fms Project Name
Del Valle Square X009-111M
Agency Project Name
Reconstruction of Del Valle Square, Bronx
Agency Project Description
RECONSTRUCTION OF DEL VALLE SQUARE - UPGRADE & EXPAND EXISTING PLAZA AND ENHANCE PEDESTRIAN SAFETY AND IMPROVE A COMMUNITY PUBLIC SPACE
Current Phase
Construction
Current Phase Start
2022-11-14T00:00:00.000
Forecast Current Phase End
2025-11-12T00:00:00.000
Forecast Completion
2025-11-12T00:00:00.000
Actual Design Start
2016-10-19T00:00:00.000
Actual Design End
2021-12-22T00:00:00.000
Actual Construction
2021-12-22T00:00:00.000
Actual Construction 1
2022-11-14T00:00:00.000
Actual Construction Start
2022-11-14T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
HW-0001X, HW-0200, HW-0200, HW-0944, HW-1684, TF-0002, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4221
Fms Id
SEBLQX01
Total Budget
10918364.27
Spend To Date
1638364.27
Spend To Date 1
0.15
Fms Project Name
Reconstruction of existing sewers from back log QN & BX
Agency Project Name
RECONSTRUCTION OF EXISTING SEWERS, BRONX
Agency Project Description
Reconstruction of Existing Sewers from Backlog. Queens and Bronx
Current Phase
Design
Current Phase Start
2018-12-12T00:00:00.000
Forecast Current Phase End
2023-12-15T00:00:00.000
Forecast Completion
2025-06-27T00:00:00.000
Actual Design Start
2018-12-12T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
SE-0002Q, SE-0002X
Ten Year Plan Category
REPLACEMENT OF CHRONICALLY FAILING COMPONENTS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4222
Fms Id
EC-SEKN24
Total Budget
9500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Reconstruction of Existing Sewers, North Brooklyn
Agency Project Name
Reconstruction of Existing Sewers
Agency Project Description
Reconstruction of Existing Sewers, Emergency Contract - North Brooklyn.
Current Phase
Construction Procurement
Current Phase Start
2023-08-03T00:00:00.000
Forecast Current Phase End
2024-06-27T00:00:00.000
Forecast Completion
2025-06-26T00:00:00.000
Actual Design Start
2023-01-19T00:00:00.000
Actual Design End
2023-08-03T00:00:00.000
Actual Construction
2023-08-03T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
EP-0007, SE-0002K
Ten Year Plan Category
UTILITY RELOCATION FOR SE AND WM PROJECTS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4222
Fms Id
EC-SER24
Total Budget
6500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Reconstruction of Existing Sewers, Staten Island
Agency Project Name
Reconstruction of Existing Sewers
Current Phase
Construction Procurement
Current Phase Start
2023-07-11T00:00:00.000
Forecast Current Phase End
2024-05-28T00:00:00.000
Forecast Completion
2025-05-27T00:00:00.000
Actual Design Start
2023-01-18T00:00:00.000
Actual Design End
2023-07-11T00:00:00.000
Actual Construction
2023-07-11T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
EP-0007, SE-0002R
Ten Year Plan Category
UTILITY RELOCATION FOR SE AND WM PROJECTS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4223
Fms Id
EC-SEQN24
Total Budget
12000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Reconstruction of Existing Sewers, North Queens.
Agency Project Name
Reconstruction of Existing Sewers
Agency Project Description
Reconstruction of Existing Sewers, North Queens
Current Phase
Construction Procurement
Current Phase Start
2023-07-20T00:00:00.000
Forecast Current Phase End
2024-07-23T00:00:00.000
Forecast Completion
2025-07-22T00:00:00.000
Actual Design Start
2023-03-15T00:00:00.000
Actual Design End
2023-07-20T00:00:00.000
Actual Construction
2023-07-20T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
EP-0007, SE-0002Q
Ten Year Plan Category
UTILITY RELOCATION FOR SE AND WM PROJECTS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4224
Fms Id
EC-SEKS24
Total Budget
10500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Reconstruction of Existing Sewers, South Brooklyn
Agency Project Name
Reconstruction of Existing Sewers
Agency Project Description
Reconstruction of Existing Sewers, South Brooklyn
Current Phase
Construction Procurement
Current Phase Start
2023-06-30T00:00:00.000
Forecast Current Phase End
2024-01-10T00:00:00.000
Forecast Completion
2025-01-08T00:00:00.000
Actual Design Start
2023-01-13T00:00:00.000
Actual Design End
2023-06-30T00:00:00.000
Actual Construction
2023-06-30T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
EP-0007, SE-0002K
Ten Year Plan Category
UTILITY RELOCATION FOR SE AND WM PROJECTS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4225
Fms Id
EC-SEQS24
Total Budget
13500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Reconstruction of Existing Sewers, South Queens
Agency Project Name
Reconstruction of Existing Sewers
Agency Project Description
Reconstruction of Existing Sewers, South Queens
Current Phase
Construction Procurement
Current Phase Start
2023-07-17T00:00:00.000
Forecast Current Phase End
2024-07-24T00:00:00.000
Forecast Completion
2025-07-23T00:00:00.000
Actual Design Start
2023-01-30T00:00:00.000
Actual Design End
2023-07-17T00:00:00.000
Actual Construction
2023-07-17T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
EP-0007, SE-0002Q
Ten Year Plan Category
UTILITY RELOCATION FOR SE AND WM PROJECTS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4226
Fms Id
EC-SEX24
Total Budget
7000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Reconstruction of Existing Sewers, The Bronx
Agency Project Name
Reconstruction of Existing Sewers
Agency Project Description
Reconstruction of Existing Sewers, the Bronx
Current Phase
Design
Current Phase Start
2023-02-13T00:00:00.000
Forecast Current Phase End
2023-09-29T00:00:00.000
Forecast Completion
2024-09-08T00:00:00.000
Actual Design Start
2023-02-13T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
EP-0007, SE-0002X
Ten Year Plan Category
UTILITY RELOCATION FOR SE AND WM PROJECTS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4227
Fms Id
SANDHW08
Total Budget
33491443.60
Spend To Date
14055276.23
Spend To Date 1
0.4196
Fms Project Name
Reconstruction of Front Street-Hurricane Sandy
Agency Project Name
RECONSTRUCTION OF FRONT STREET, MANHATTAN
Agency Project Description
Reconstruction of Front Street, Manhattan
Current Phase
Construction
Current Phase Start
2019-10-21T00:00:00.000
Forecast Current Phase End
2024-06-30T00:00:00.000
Forecast Completion
2024-06-30T00:00:00.000
Actual Design Start
2015-07-31T00:00:00.000
Actual Design End
2018-05-02T00:00:00.000
Actual Construction
2018-05-02T00:00:00.000
Actual Construction 1
2019-10-21T00:00:00.000
Actual Construction Start
2019-10-21T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HW-0001M, HW-0944, SE-0002M
Ten Year Plan Category
REPLACEMENT OF CHRONICALLY FAILING COMPONENTS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: HPD
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
HPD
Pid
4228
Fms Id
BED-805
Total Budget
15832568.95
Spend To Date
12392948.20
Spend To Date 1
0.7827
Fms Project Name
New Storm & San Swrs & WM-Gateway Estates, Phase E (HD-161E)
Agency Project Name
GATEWAY ESTATE - PHASE E/BED-805
Agency Project Description
Reconstruction of Gateway Estates Area (Nehemiah Creek) including sewer, watermain, street lighting and traffic signal work. Phase E
Current Phase
Construction
Current Phase Start
2016-09-22T00:00:00.000
Forecast Current Phase End
2024-06-30T00:00:00.000
Forecast Completion
2024-06-30T00:00:00.000
Actual Design Start
2013-11-17T00:00:00.000
Actual Design End
2015-02-11T00:00:00.000
Actual Construction
2015-02-11T00:00:00.000
Actual Construction 1
2016-09-22T00:00:00.000
Actual Construction Start
2016-09-22T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 05
Budget Line
SE-0002K, SE-0200K, WM-0001
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: HPD
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
HPD
Pid
4228
Fms Id
HD-161E
Total Budget
54860421.42
Spend To Date
19138289.82
Spend To Date 1
0.3488
Fms Project Name
GATEWAY ESTATE - PHASE E (BED-805)
Agency Project Name
GATEWAY ESTATE - PHASE E/BED-805
Agency Project Description
Reconstruction of Gateway Estates Area (Nehemiah Creek) including sewer, watermain, street lighting and traffic signal work. Phase E
Current Phase
Construction
Current Phase Start
2016-09-22T00:00:00.000
Forecast Current Phase End
2024-06-30T00:00:00.000
Forecast Completion
2024-06-30T00:00:00.000
Actual Design Start
2013-11-17T00:00:00.000
Actual Design End
2015-02-11T00:00:00.000
Actual Construction
2015-02-11T00:00:00.000
Actual Construction 1
2016-09-22T00:00:00.000
Actual Construction Start
2016-09-22T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 05
Budget Line
ED-0075, HD-0161, HD-0161, HW-0200, TF-0002, TF-0502
Ten Year Plan Category
PEDESTRIAN RAMP CONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4229
Fms Id
HWMWTCB2
Total Budget
35844084.31
Spend To Date
8268069.37
Spend To Date 1
0.2306
Fms Project Name
Reconstruction of Greenwich
Agency Project Name
GREENWICH STREET RECONSTRUCTION
Agency Project Description
RECONSTRUCTION OF GREENWICH STREET FROM BARCLAY STREET TO CHAMBERS STREET, MANHATTAN
Current Phase
Construction
Current Phase Start
2021-11-08T00:00:00.000
Forecast Current Phase End
2024-11-06T00:00:00.000
Forecast Completion
2024-11-06T00:00:00.000
Actual Design Start
2018-04-25T00:00:00.000
Actual Design End
2019-12-02T00:00:00.000
Actual Construction
2019-12-02T00:00:00.000
Actual Construction 1
2021-11-08T00:00:00.000
Actual Construction Start
2021-11-08T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HW-0001M, HW-0944, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4230
Fms Id
HWMWTCB1
Total Budget
15835792.75
Spend To Date
1392181.18
Spend To Date 1
0.0879
Fms Project Name
Reconstruction of Nassau St
Agency Project Name
NASSAU STRET RECONSTRUCTION
Agency Project Description
Reconstruction of Nassau Street from Pine Street to Maiden Lane, Manhattan
Current Phase
Construction
Current Phase Start
2023-01-30T00:00:00.000
Forecast Current Phase End
2025-06-27T00:00:00.000
Forecast Completion
2025-06-27T00:00:00.000
Actual Design Start
2018-06-21T00:00:00.000
Actual Design End
2021-12-13T00:00:00.000
Actual Construction
2021-12-13T00:00:00.000
Actual Construction 1
2023-01-30T00:00:00.000
Actual Construction Start
2023-01-30T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HW-0001M, HW-0200, HW-0944, TF-0002, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4231
Fms Id
HWPLZ015M
Total Budget
15575726.62
Spend To Date
5362124.88
Spend To Date 1
0.3442
Fms Project Name
Pershing Square East Plaza/Streetscape Reconstruction
Agency Project Name
PERSHING SQUARE EAST PLAZA / STREETSCAPE
Agency Project Description
RECONSTRUCTION OF PERSHING SQUARE EAST - EASTERN SEGMENT OF PARK AVENUE BETWEEN 41ST AND 42ND STREETS
Current Phase
Construction
Current Phase Start
2021-10-12T00:00:00.000
Forecast Current Phase End
2023-10-11T00:00:00.000
Forecast Completion
2023-10-11T00:00:00.000
Actual Design Start
2018-11-09T00:00:00.000
Actual Design End
2020-12-02T00:00:00.000
Actual Construction
2020-12-02T00:00:00.000
Actual Construction 1
2021-10-12T00:00:00.000
Actual Construction Start
2021-10-12T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HW-0001M
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4232
Fms Id
HWR00512
Total Budget
12774788.00
Spend To Date
1791210.37
Spend To Date 1
0.1402
Fms Project Name
Richmond Valley Road
Agency Project Name
RICHMOND VALLEY ROAD, SI
Agency Project Description
Re-construction of Richmond Valley Road Between Arthur Kill Road and Page Avenue
Current Phase
Design
Current Phase Start
2018-04-04T00:00:00.000
Forecast Current Phase End
2024-08-31T00:00:00.000
Forecast Completion
2026-09-29T00:00:00.000
Actual Design Start
2018-04-04T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
HW-0001R, HW-0061, HW-D104, HW-R005, HW-R988
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DPR
Pid
4233
Fms Id
P-3RANDAL
Total Budget
40207618.00
Spend To Date
1584812.71
Spend To Date 1
0.0394
Fms Project Name
Randall's Island Infrastructure, Roadways, Drainage, & CS
Agency Project Name
RECONSTRUCTION OF ROADWAYS AT RANDALL'S ISLAND
Agency Project Description
Reconstruction of Roadways at Randall's Island
Current Phase
Design
Current Phase Start
2016-11-10T00:00:00.000
Forecast Current Phase End
2024-10-30T00:00:00.000
Forecast Completion
2027-01-22T00:00:00.000
Actual Design Start
2016-11-10T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 11
Budget Line
P-0944, P-1018
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4234
Fms Id
HWK797W
Total Budget
18294096.91
Spend To Date
1506186.22
Spend To Date 1
0.0823
Fms Project Name
Schenck Avenue, BED-803
Agency Project Name
Reconstruction of Schenck Avenue
Agency Project Description
Reconstruction of Schenck Avenue
Current Phase
Construction
Current Phase Start
2023-01-09T00:00:00.000
Forecast Current Phase End
2025-06-06T00:00:00.000
Forecast Completion
2025-06-06T00:00:00.000
Actual Design Start
2014-12-01T00:00:00.000
Actual Design End
2022-01-06T00:00:00.000
Actual Construction
2022-01-06T00:00:00.000
Actual Construction 1
2023-01-09T00:00:00.000
Actual Construction Start
2023-01-09T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 05
Budget Line
HW-0200, HW-0200, HW-0796, HW-0944, HW-D101, TF-0002, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4235
Fms Id
CONISPH3A
Total Budget
62839197.41
Spend To Date
39674672.29
Spend To Date 1
0.6313
Fms Project Name
Storm and Sanitary Sewer, Trunk and Distribution Water Main
Agency Project Name
STM, SAN SEWERS & WM IN CONEY ISLAND AREA, PH3A,BK
Agency Project Description
Reconstruction of Storm and Sanitary sewer, Trunk and distribution water main in Coney Island area - Phase 3A, Borough of Brooklyn
Current Phase
Construction
Current Phase Start
2019-10-28T00:00:00.000
Forecast Current Phase End
2023-11-27T00:00:00.000
Forecast Completion
2023-11-27T00:00:00.000
Actual Design Start
2014-03-17T00:00:00.000
Actual Design End
2017-11-29T00:00:00.000
Actual Construction
2017-11-29T00:00:00.000
Actual Construction 1
2019-10-28T00:00:00.000
Actual Construction Start
2019-10-28T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 13
Budget Line
SE-0200K, WM-0006
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4236
Fms Id
HWQ274F2
Total Budget
57753968.78
Spend To Date
5742900.77
Spend To Date 1
0.0994
Fms Project Name
RECON OF STREETS IN ROSEDALE AREA - PHASE 2 (SEQ200592)
Agency Project Name
RECONSTRUCTION OF ROSEDALE AREA, PHASE 2
Agency Project Description
RECONSTRUCTION OF STREETS IN ROSEDALE AREA - PHASE 2
Current Phase
Construction Procurement
Current Phase Start
2023-01-18T00:00:00.000
Forecast Current Phase End
2023-12-04T00:00:00.000
Forecast Completion
2026-12-03T00:00:00.000
Actual Design Start
2018-06-07T00:00:00.000
Actual Design End
2023-01-18T00:00:00.000
Actual Construction
2023-01-18T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
HW-0001Q, HW-0061, HW-0200, HW-0274, HW-0944, TF-0002, TF-0002, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4236
Fms Id
SEQ200592
Total Budget
51990000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
SEQ - Rosedale South, HWQ274F2
Agency Project Name
RECONSTRUCTION OF ROSEDALE AREA, PHASE 2
Agency Project Description
RECONSTRUCTION OF STREETS IN ROSEDALE AREA - PHASE 2
Current Phase
Construction Procurement
Current Phase Start
2023-01-18T00:00:00.000
Forecast Current Phase End
2023-12-04T00:00:00.000
Forecast Completion
2026-12-03T00:00:00.000
Actual Design Start
2018-06-07T00:00:00.000
Actual Design End
2023-01-18T00:00:00.000
Actual Construction
2023-01-18T00:00:00.000
Borough
Queens
Community Board
Queens 13
Budget Line
EP-0007, SE-0002Q, SE-0200Q, WM-0001
Ten Year Plan Category
UTILITY RELOCATION FOR SE AND WM PROJECTS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4237
Fms Id
SAND1048
Total Budget
21320000.00
Spend To Date
692588.77
Spend To Date 1
0.0324
Fms Project Name
BWG - Sunset Park North, BED-807
Agency Project Name
SUNSET PARK NORTH BK WATERFRONT GREENWAY
Agency Project Description
Reconstruction of Sunset Park North Section of the Brooklyn Waterfront Greenway.
Current Phase
Design
Current Phase Start
2018-09-06T00:00:00.000
Forecast Current Phase End
2024-12-31T00:00:00.000
Forecast Completion
2027-09-30T00:00:00.000
Actual Design Start
2018-09-06T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0001K, HW-0200, HW-0944, TF-0002, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DCAS
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DCAS
Pid
4238
Fms Id
CO306EXT2
Total Budget
4229008.00
Spend To Date
468008.00
Spend To Date 1
0.1106
Fms Project Name
170 E121 St. Exterior Reconstruction
Agency Project Name
170 East 121 Street - Harlem Courthouse Facade
Agency Project Description
Reconstruction of the Harlem Courthouse's facade and roof to increase the lifespan of this important landmarked building.
Current Phase
Design
Current Phase Start
2021-05-24T00:00:00.000
Forecast Current Phase End
2025-01-23T00:00:00.000
Forecast Completion
2027-07-07T00:00:00.000
Actual Design Start
2021-05-24T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 11
Budget Line
CO-0306
Ten Year Plan Category
RECONSTRUCTION/RENOVATION OF COURT FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4239
Fms Id
HWX006-01
Total Budget
12735864.00
Spend To Date
1003332.58
Spend To Date 1
0.0787
Fms Project Name
Henwood Place Step Street
Agency Project Name
RECONSTRUCTION OF THE HENWOOD PLACE STEP STREET
Agency Project Description
RECONSTRUCTION OF THE HENWOOD PLACE STEP STREET. THIS STREET IS CURRENTLY IN STATE OF DISREPAIR AND IS SUBJECT OF FREQUENT COMPLAINTS TO DOT. THE STEPS ON HENWOOD PLACE ARE HIGHLY INEVEN DUE TO SOIL EROSION AND SINKING LANDINGS AND THE STREETS IS BESET BY SIGNIFICANT DRAINAGE ISSUES AND CHRONIC PONDING. THIS PROJECT WILL FULLY RECONSTRUCT THE HENWOOD PLACE STEP STREEET, BRINGING IT UP TO GOOD REPAIR , CREATE SAFER TRAVEL CONDITIONS .
Current Phase
Design
Current Phase Start
2019-09-30T00:00:00.000
Forecast Current Phase End
2024-06-30T00:00:00.000
Forecast Completion
2027-03-23T00:00:00.000
Actual Design Start
2019-09-30T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
HW-0211
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4240
Fms Id
HWXS911
Total Budget
13385000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Reconstruction of the Summit Place Step Street
Agency Project Name
Reconstruction of the Summit Place Step Street
Agency Project Description
Reconstruction of the Summit Place Step Street
Current Phase
Design
Current Phase Start
2023-07-13T00:00:00.000
Forecast Current Phase End
2025-07-11T00:00:00.000
Forecast Completion
2028-02-12T00:00:00.000
Actual Design Start
2023-07-13T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
HW-0211
Ten Year Plan Category
RECONSTRUCTION OF STEP STREETS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4241
Fms Id
HWMWTCB7
Total Budget
43802674.00
Spend To Date
1420846.77
Spend To Date 1
0.0324
Fms Project Name
Reconstruction of Trinity Pl, SEN002182
Agency Project Name
RECONSTRUCTION OF TRINITY PL
Agency Project Description
Reconstruction of Trinity Place from Morris Street to Cedar Street, Borough of Manhattan
Current Phase
Construction Procurement
Current Phase Start
2022-11-22T00:00:00.000
Forecast Current Phase End
2023-09-18T00:00:00.000
Forecast Completion
2027-09-16T00:00:00.000
Actual Design Start
2018-10-01T00:00:00.000
Actual Design End
2022-11-22T00:00:00.000
Actual Construction
2022-11-22T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HW-0001M, HW-0200, HW-0944, TF-0002, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4241
Fms Id
SEN002182
Total Budget
2275000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Rplmt SE on Trinity Pl betw Thames & Rector Str MN HWMWTCB7
Agency Project Name
RECONSTRUCTION OF TRINITY PL
Agency Project Description
Reconstruction of Trinity Place from Morris Street to Cedar Street, Borough of Manhattan
Current Phase
Construction Procurement
Current Phase Start
2022-11-22T00:00:00.000
Forecast Current Phase End
2023-09-18T00:00:00.000
Forecast Completion
2027-09-16T00:00:00.000
Actual Design Start
2018-10-01T00:00:00.000
Actual Design End
2022-11-22T00:00:00.000
Actual Construction
2022-11-22T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
EP-0007, SE-0002M
Ten Year Plan Category
UTILITY RELOCATION FOR SE AND WM PROJECTS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4242
Fms Id
HWMWTCB6
Total Budget
12058679.30
Spend To Date
4110787.02
Spend To Date 1
0.3408
Fms Project Name
Reconstruction of Vesey St, MED-668
Agency Project Name
VESEY STREET RECONSTRUCTION
Agency Project Description
Reconstruction of Vesey Street from Church Street to Broadway, Borough of Manhattan
Current Phase
Construction
Current Phase Start
2022-09-19T00:00:00.000
Forecast Current Phase End
2024-09-17T00:00:00.000
Forecast Completion
2024-09-17T00:00:00.000
Actual Design Start
2018-07-17T00:00:00.000
Actual Design End
2021-05-14T00:00:00.000
Actual Construction
2021-05-14T00:00:00.000
Actual Construction 1
2022-09-19T00:00:00.000
Actual Construction Start
2022-09-19T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
HW-0001M
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4242
Fms Id
MED-668
Total Budget
1116349.71
Spend To Date
200143.20
Spend To Date 1
0.1792
Fms Project Name
Installation of Distri WM & appurtenances Vesey st, HWMWTCB6
Agency Project Name
VESEY STREET RECONSTRUCTION
Agency Project Description
Reconstruction of Vesey Street from Church Street to Broadway, Borough of Manhattan
Current Phase
Construction
Current Phase Start
2022-09-19T00:00:00.000
Forecast Current Phase End
2024-09-17T00:00:00.000
Forecast Completion
2024-09-17T00:00:00.000
Actual Design Start
2018-07-17T00:00:00.000
Actual Design End
2021-05-14T00:00:00.000
Actual Construction
2021-05-14T00:00:00.000
Actual Construction 1
2022-09-19T00:00:00.000
Actual Construction Start
2022-09-19T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
WM-0001
Ten Year Plan Category
AUGMENTATION OF WATER SUPPLY SYSTEMS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4243
Fms Id
SEN002169
Total Budget
22191818.45
Spend To Date
16986624.12
Spend To Date 1
0.7654
Fms Project Name
RECON OF COMBINED SEWER & WM IN YORK AVE
Agency Project Name
RECON OF COMB SWR & WM IN YORK AV
Agency Project Description
Reconstruction of Water Main in:York Ave. (East Side) between 61st St. and 63rd St.York Ave. (West Side) between 61st St. and 63rd St.Intersection of York Ave. and 61st St. Intersection of York Ave. and 62nd St.Intersection (West side) of York Ave. and 63rd St.Reconstruction of Combined Sewer:York Ave. between 61st St. and 63nd St.62nd St. between York Ave. and 1st Ave.
Current Phase
Construction
Current Phase Start
2015-09-08T00:00:00.000
Forecast Current Phase End
2024-01-04T00:00:00.000
Forecast Completion
2024-01-04T00:00:00.000
Actual Design Start
2009-07-15T00:00:00.000
Actual Design End
2014-12-19T00:00:00.000
Actual Construction
2014-12-19T00:00:00.000
Actual Construction 1
2015-09-08T00:00:00.000
Actual Construction Start
2015-09-08T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 08
Budget Line
HW-0200, HW-0200, SE-0002M, WM-0001
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP, DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP, DOT
Pid
4244
Fms Id
HWK876
Total Budget
39221939.98
Spend To Date
6768603.96
Spend To Date 1
0.1725
Fms Project Name
RECONSTRUCTION OF WYCKOFF AVENUE, BROOKLYN, SEK002351
Agency Project Name
RECON WYCKOFF AV-FLUSHING to COOPER AV/SE
Agency Project Description
Reconstruction of Wyckoff Avenue from Flushing Avenue to Cooper Avenue, in the Boroughs of Brooklyn and Queens..
Current Phase
Design
Current Phase Start
2017-03-29T00:00:00.000
Forecast Current Phase End
2023-11-30T00:00:00.000
Forecast Completion
2027-08-29T00:00:00.000
Actual Design Start
2017-03-29T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 04
Budget Line
HW-0200, HW-0200, HW-0876, HW-0944, HW-D101, HW-K005, TF-0002, TF-0502
Ten Year Plan Category
SIDEWALK RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP, DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP, DOT
Pid
4244
Fms Id
SEK002351
Total Budget
28126119.99
Spend To Date
365642.85
Spend To Date 1
0.013
Fms Project Name
Rehab of SWR & WM in Wycoff Av bt Cooper &Flushing Av,HWK876
Agency Project Name
RECON WYCKOFF AV-FLUSHING to COOPER AV/SE
Agency Project Description
Reconstruction of Wyckoff Avenue from Flushing Avenue to Cooper Avenue, in the Boroughs of Brooklyn and Queens..
Current Phase
Design
Current Phase Start
2017-03-29T00:00:00.000
Forecast Current Phase End
2023-11-30T00:00:00.000
Forecast Completion
2027-08-29T00:00:00.000
Actual Design Start
2017-03-29T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 04
Budget Line
EP-0007, SE-0002K, WM-0001
Ten Year Plan Category
UTILITY RELOCATION FOR SE AND WM PROJECTS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4245
Fms Id
BED829
Total Budget
69250000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Dts WM Rplmt in 4th Av fr Atlantic av to 64th ST-BK HWK1669B
Agency Project Name
4th Ave Safety Improvements - Phase B
Agency Project Description
Redesign of 4th Ave from Atlantic Ave to 64th Street.
Current Phase
Design
Current Phase Start
2022-03-28T00:00:00.000
Forecast Current Phase End
2024-07-14T00:00:00.000
Forecast Completion
2029-01-29T00:00:00.000
Actual Design Start
2022-03-28T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 06
Budget Line
SE-0002K, WM-0001
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4245
Fms Id
HWK1669B
Total Budget
148123323.48
Spend To Date
794432.27
Spend To Date 1
0.0053
Fms Project Name
4th Ave Safety Improvements - Phase B, BED829
Agency Project Name
4th Ave Safety Improvements - Phase B
Agency Project Description
Redesign of 4th Ave from Atlantic Ave to 64th Street.
Current Phase
Design
Current Phase Start
2022-03-28T00:00:00.000
Forecast Current Phase End
2024-07-14T00:00:00.000
Forecast Completion
2029-01-29T00:00:00.000
Actual Design Start
2022-03-28T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0001K
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4246
Fms Id
BED-827
Total Budget
1939387.00
Spend To Date
409639.22
Spend To Date 1
0.2112
Fms Project Name
Regulator Chamber Roof Replacements
Agency Project Name
REGULAR CHAMBER ROOF REPLACEMENT
Agency Project Description
Regulator Chamber Roof Replacements: Five in Brooklyn and one in the Bronx
Current Phase
Construction
Current Phase Start
2023-08-28T00:00:00.000
Forecast Current Phase End
2024-08-26T00:00:00.000
Forecast Completion
2024-08-26T00:00:00.000
Actual Design Start
2018-12-11T00:00:00.000
Actual Design End
2022-11-04T00:00:00.000
Actual Construction
2022-11-04T00:00:00.000
Actual Construction 1
2023-08-28T00:00:00.000
Actual Construction Start
2023-08-28T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
EP-0007, WM-0001, WM-0944
Ten Year Plan Category
UTILITY RELOCATION FOR SE AND WM PROJECTS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4247
Fms Id
HWPR23KQ
Total Budget
16337000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Standard Upgrades Ped Ramps - Brooklyn and Queens
Agency Project Name
Simple Upgrades Ped Ramps - Brooklyn and Queens
Agency Project Description
Rehabilitation (repair and upgrade to Federal ADA 2010 and PROWAG specifications) of existing pedestrian ramps in Brooklyn.
Current Phase
Construction Procurement
Current Phase Start
2023-08-30T00:00:00.000
Forecast Current Phase End
2024-04-30T00:00:00.000
Forecast Completion
2026-04-29T00:00:00.000
Actual Design Start
2022-11-07T00:00:00.000
Actual Design End
2023-08-30T00:00:00.000
Actual Construction
2023-08-30T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
HW-0200
Ten Year Plan Category
PEDESTRIAN RAMP CONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DSNY
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DSNY
Pid
4249
Fms Id
S136-383N
Total Budget
23795577.34
Spend To Date
4939595.49
Spend To Date 1
0.2075
Fms Project Name
Brooklyn 17/18 HVAC and Roof Replacement
Agency Project Name
Brkyln District 17/18 Garage: HVAC Replacement
Agency Project Description
Rehabilitation includes replacement of the roof and select areas of roof drains and domes, structural work; stiffening of structural steel frame supports for new HVAC equipment, solar panels, and select parapet replacements, including fire alarm system work, and select replacement of building systems. Offices, locker rooms, and bathrooms will be phased and temporarily partitioned to allow for overhead HVAC work.
Current Phase
Construction
Current Phase Start
2022-05-23T00:00:00.000
Forecast Current Phase End
2024-10-31T00:00:00.000
Forecast Completion
2024-10-31T00:00:00.000
Actual Design Start
2017-05-11T00:00:00.000
Actual Design End
2020-07-13T00:00:00.000
Actual Construction
2020-07-13T00:00:00.000
Actual Construction 1
2022-05-23T00:00:00.000
Actual Construction Start
2022-05-23T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 17, Brooklyn 18
Budget Line
S-0136
Ten Year Plan Category
GARAGES AND FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DSNY
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DSNY
Pid
4249
Fms Id
SOLARDOS1
Total Budget
9151215.42
Spend To Date
393818.61
Spend To Date 1
0.043
Fms Project Name
Brooklyn 17/18 HVAC AND ROOF REPLACEMENT
Agency Project Name
Brkyln District 17/18 Garage: HVAC Replacement
Agency Project Description
Rehabilitation includes replacement of the roof and select areas of roof drains and domes, structural work; stiffening of structural steel frame supports for new HVAC equipment, solar panels, and select parapet replacements, including fire alarm system work, and select replacement of building systems. Offices, locker rooms, and bathrooms will be phased and temporarily partitioned to allow for overhead HVAC work.
Current Phase
Construction
Current Phase Start
2022-05-23T00:00:00.000
Forecast Current Phase End
2024-10-31T00:00:00.000
Forecast Completion
2024-10-31T00:00:00.000
Actual Design Start
2017-05-11T00:00:00.000
Actual Design End
2020-07-13T00:00:00.000
Actual Construction
2020-07-13T00:00:00.000
Actual Construction 1
2022-05-23T00:00:00.000
Actual Construction Start
2022-05-23T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 01
Budget Line
PU-0025
Ten Year Plan Category
DISTRIBUTED GENERATION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000