Capital Projects Dashboard - Citywide Budget and Schedule

All major capital infrastructure projects with a committed budget. Financial information and agency schedule details for each project are joined via FMS ID. Only projects in the design phase or later have project schedules displayed. This dataset is part of the Capital Projects Dashboard.

Note: Each row is uniquely identified by its Financial Management Service (FMS) ID. FMS ID is the unique ID that OMB uses for the FMS (Financial Information System). This ID can be universally joined with any OMB dataset that has the same field. The Capital Projects Dashboard is the result of joining OMB’s fiscal data with the agency’s schedule data. FMS IDs and agency projects don't always have a one-to-one relationship (i.e., one project schedule may correlate to multiple FMS IDs, and one FMS may correct to multiple projects with different schedules).

City Government Mayor's Office of Operations (OPS) Dataset fb86-vt7u 27 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4299
Fms Id
HWK1674
Total Budget
33910000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Flatbush Avenue Downtown Brooklyn Safety Improvements
Agency Project Name
Flatbush Avenue Downtown Brooklyn Safety Improvements
Agency Project Description
Safety improvements of Flatbush Ave from Livingston St to Pacific Street.
Current Phase
Pre-Design
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0001K, HW-D101, HW-K005
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4300
Fms Id
HWK002377
Total Budget
5911000.00
Spend To Date
350000.00
Spend To Date 1
0.0592
Fms Project Name
East 72nd Street Reconstruction Brooklyn, SEK002377
Agency Project Name
SANITARY SEWERS & WM IN E 72ND ST, AVE L & ROYCE
Agency Project Description
SANITARY SEWER AND WATER MAIN REPLACEMENT IN EAST 72ND ST BETWEEN AVENUE L AND ROYCE PLACE, BOROUGH OF BROOKLYN.
Current Phase
Design
Current Phase Start
2020-01-22T00:00:00.000
Forecast Current Phase End
2024-06-30T00:00:00.000
Forecast Completion
2027-03-31T00:00:00.000
Actual Design Start
2020-01-22T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0001K, HW-0061
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4300
Fms Id
SEK002377
Total Budget
4497854.95
Spend To Date
765493.51
Spend To Date 1
0.1701
Fms Project Name
San sewer & WM repl 72nd St btwn Av L & Royce Pl, HWK002377
Agency Project Name
SANITARY SEWERS & WM IN E 72ND ST, AVE L & ROYCE
Agency Project Description
SANITARY SEWER AND WATER MAIN REPLACEMENT IN EAST 72ND ST BETWEEN AVENUE L AND ROYCE PLACE, BOROUGH OF BROOKLYN.
Current Phase
Design
Current Phase Start
2020-01-22T00:00:00.000
Forecast Current Phase End
2024-06-30T00:00:00.000
Forecast Completion
2027-03-31T00:00:00.000
Actual Design Start
2020-01-22T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 18
Budget Line
SE-0002K, WM-0001
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4301
Fms Id
SELCDDC10
Total Budget
6180131.96
Spend To Date
1612964.81
Spend To Date 1
0.2609
Fms Project Name
SEWER LINING CONTRACT, CITYWIDE
Agency Project Name
Sewer Lining Contract, Citywide
Agency Project Description
Sewer Lining Contract - Citywide
Current Phase
Construction
Current Phase Start
2022-02-22T00:00:00.000
Forecast Current Phase End
2023-12-01T00:00:00.000
Forecast Completion
2023-12-01T00:00:00.000
Actual Design Start
2020-01-09T00:00:00.000
Actual Design End
2020-06-12T00:00:00.000
Actual Construction
2020-06-12T00:00:00.000
Actual Construction 1
2022-02-22T00:00:00.000
Actual Construction Start
2022-02-22T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
SE-0002K, SE-0002M, SE-0002Q, SE-0002R, SE-0002X
Ten Year Plan Category
REPLACEMENT OF CHRONICALLY FAILING COMPONENTS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4302
Fms Id
SEQNS003
Total Budget
31923499.61
Spend To Date
3790400.01
Spend To Date 1
0.1187
Fms Project Name
SEQ - Sewer When & Where Contract in SE Queens (HWQ1195)
Agency Project Name
SEWER WHEN & WHERE CONTRACT IN S.E. QUEENS (SECONDARY ID: HWQ1195)
Agency Project Description
SEWER WHEN & WHERE CONTRACT IN South East Queens. NEW STORM SEWER CONSTRUCTION, REPLACEMENT OR UPGRADES TO SANITARY SEWERS AND WATER MAIN IN PROJECT AREAS. GREEN INFRASTRUCTURE PROJECTS IN CONJUNCTION WITH WHEN & WHERE PROJECTS.
Current Phase
Construction Procurement
Current Phase Start
2023-02-16T00:00:00.000
Forecast Current Phase End
2024-02-06T00:00:00.000
Forecast Completion
2025-04-14T00:00:00.000
Actual Design Start
2018-05-14T00:00:00.000
Actual Design End
2023-02-16T00:00:00.000
Actual Construction
2023-02-16T00:00:00.000
Borough
Queens
Community Board
Queens 12, Queens 13
Budget Line
SE-0002Q, SE-0005, SE-0200Q, WM-0001
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DCLA
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DCLA
Pid
4303
Fms Id
PV477TEMP
Total Budget
6886541.18
Spend To Date
851528.00
Spend To Date 1
0.1236
Fms Project Name
SICM -Staten Island Children's Museum Temp Control System
Agency Project Name
Staten Island Museum - HVAC Upgrade
Agency Project Description
SICM - HVAC upgrade Buildings M & J
Current Phase
Construction
Current Phase Start
2023-03-21T00:00:00.000
Forecast Current Phase End
2025-03-10T00:00:00.000
Forecast Completion
2025-03-10T00:00:00.000
Actual Design Start
2019-06-04T00:00:00.000
Actual Design End
2022-08-19T00:00:00.000
Actual Construction
2022-08-19T00:00:00.000
Actual Construction 1
2023-03-21T00:00:00.000
Actual Construction Start
2023-03-21T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 01
Budget Line
PV-0477, PV-D477, PV-R477
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4304
Fms Id
HWS2021Q
Total Budget
10292000.00
Spend To Date
111967.54
Spend To Date 1
0.0108
Fms Project Name
PRIOR NOTICE SIDEWALK - QUEENS
Agency Project Name
FY21 Prior Notice Sidewalk contract - Queens
Agency Project Description
Sidewalk repair/replacement Replacement of sidewalks that have violations where property owners received prior notice.
Current Phase
Construction
Current Phase Start
2023-08-07T00:00:00.000
Forecast Current Phase End
2025-02-01T00:00:00.000
Forecast Completion
2025-02-01T00:00:00.000
Actual Design Start
2021-12-08T00:00:00.000
Actual Design End
2022-06-22T00:00:00.000
Actual Construction
2022-06-22T00:00:00.000
Actual Construction 1
2023-08-07T00:00:00.000
Actual Construction Start
2023-08-07T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
HW-0200, HW-0200, HW-Q001, P-1331
Ten Year Plan Category
SIDEWALK RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4305
Fms Id
HWS2023K
Total Budget
12029000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Prior Notice Sidewalks - Brooklyn
Agency Project Name
FY23 Prior Notice Sidewalk - Brooklyn
Agency Project Description
Sidewalk repairs and installations
Current Phase
Design
Current Phase Start
2023-05-04T00:00:00.000
Forecast Current Phase End
2023-11-20T00:00:00.000
Forecast Completion
2026-07-19T00:00:00.000
Actual Design Start
2023-05-04T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0200, P-1331
Ten Year Plan Category
SIDEWALK RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4306
Fms Id
HWS2023Q
Total Budget
16541000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Prior Notice Sidewalks - Queens
Agency Project Name
FY23 Prior Notice Sidewalk - Queens
Agency Project Description
Sidewalk repairs/installations - Queens
Current Phase
Design
Current Phase Start
2023-05-02T00:00:00.000
Forecast Current Phase End
2023-12-22T00:00:00.000
Forecast Completion
2026-02-02T00:00:00.000
Actual Design Start
2023-05-02T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
HW-0200, P-1331
Ten Year Plan Category
SIDEWALK RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DCLA
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DCLA
Pid
4307
Fms Id
PV302BPH1
Total Budget
14496303.44
Spend To Date
1837269.35
Spend To Date 1
0.1267
Fms Project Name
SIIAS - Building B at SHCC Phase1 Geo-Thermal & Ground Floor
Agency Project Name
SIM Snug Harbor:Construction,Plumbing & Electrical
Agency Project Description
SIIAS - Building B at SHCC Phase1 Geothermal & Ground Floor
Current Phase
Construction Procurement
Current Phase Start
2023-06-30T00:00:00.000
Forecast Current Phase End
2024-03-11T00:00:00.000
Forecast Completion
2026-03-11T00:00:00.000
Actual Design Start
2018-06-04T00:00:00.000
Actual Design End
2023-06-30T00:00:00.000
Actual Construction
2023-06-30T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 01
Budget Line
PV-0302, PV-D302, PV-R302
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4308
Fms Id
HWPR23MQ
Total Budget
16340000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Standard Upgrades Ped Ramps - Manhattan and Queens
Agency Project Name
Simple Upgrades Ped Ramps - Manhattan and Queens
Agency Project Description
Simple Upgrades Ped Ramps - Manhattan and Queens
Current Phase
Construction Procurement
Current Phase Start
2023-08-31T00:00:00.000
Forecast Current Phase End
2024-06-30T00:00:00.000
Forecast Completion
2026-06-29T00:00:00.000
Actual Design Start
2022-11-09T00:00:00.000
Actual Design End
2023-08-31T00:00:00.000
Actual Construction
2023-08-31T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
HW-0200
Ten Year Plan Category
PEDESTRIAN RAMP CONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4309
Fms Id
HWP15XMCL
Total Budget
9922373.73
Spend To Date
8120124.23
Spend To Date 1
0.8183
Fms Project Name
Simple, Complex & Landmark Ped Ramps - Bronx and Manhattan
Agency Project Name
SIMPLE, COMPLEX & LANDMARKS PED. RAMPS, MN
Agency Project Description
SIMPLE, COMPLEX & LANDMARKS PED. RAMPS, BX & MN
Current Phase
Construction
Current Phase Start
2017-03-20T00:00:00.000
Forecast Current Phase End
2023-10-23T00:00:00.000
Forecast Completion
2023-10-23T00:00:00.000
Actual Design Start
2014-09-26T00:00:00.000
Actual Design End
2015-12-31T00:00:00.000
Actual Construction
2015-12-31T00:00:00.000
Actual Construction 1
2017-03-20T00:00:00.000
Actual Construction Start
2017-03-20T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
HW-0200
Ten Year Plan Category
PEDESTRIAN RAMP CONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DCLA
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DCLA
Pid
4310
Fms Id
PV490-Q3
Total Budget
22901896.52
Spend To Date
20461140.80
Spend To Date 1
0.8934
Fms Project Name
SHCC - Snug Harbor Cult. Ctr. Music Hall, Dressing Rooms
Agency Project Name
SHC Center Music Hall, Dressing and ADA compliance
Agency Project Description
Snug Harbor Campus Center Music Hall (Bldg T)) Renovation to provide back of house amenities
Current Phase
Construction
Current Phase Start
2019-04-02T00:00:00.000
Forecast Current Phase End
2023-09-29T00:00:00.000
Forecast Completion
2023-09-29T00:00:00.000
Actual Design Start
2014-10-16T00:00:00.000
Actual Design End
2017-06-30T00:00:00.000
Actual Construction
2017-06-30T00:00:00.000
Actual Construction 1
2019-04-02T00:00:00.000
Actual Construction Start
2019-04-02T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 01
Budget Line
PV-0490, PV-D490, PV-R490
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DCLA
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DCLA
Pid
4311
Fms Id
PV490JNFC
Total Budget
4103000.00
Spend To Date
510390.35
Spend To Date 1
0.1243
Fms Project Name
SHCC - Building D John Noble Facade/Exterior Wall Renovation
Agency Project Name
NOBLE MARITIME COLLECTION
Agency Project Description
Snug Harbor Cultural Center - Noble Maritime Collection, Building "D" Façade Reconstruction.
Current Phase
Design
Current Phase Start
2023-01-06T00:00:00.000
Forecast Current Phase End
2024-01-17T00:00:00.000
Forecast Completion
2025-10-10T00:00:00.000
Actual Design Start
2023-01-06T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 01
Budget Line
PV-0N954, PV-D490, PV-I001, PV-R490, PW-I001
Ten Year Plan Category
MISCELLANEOUS CONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4312
Fms Id
SE-885
Total Budget
151452806.00
Spend To Date
2497946.40
Spend To Date 1
0.0164
Fms Project Name
SEQ - 150th St Spine: Phase I, Outlet at Bergen Basin
Agency Project Name
150TH ST SPINE PHASE 1 STORM SEWER AT BERGEN BASIN
Agency Project Description
SOUTHEAST QUEENS 150TH STREET SPINE, PHASE 1. DOUBLE BARREL STORM SEWER AND OUTFALL AT BERGEN BASIN FOR THE 150TH STREET TRUNK SEWER WHICH SHARES AN OUTFALL WITH THE GUY R BREWER TRUNK SEWER
Current Phase
Design
Current Phase Start
2019-07-23T00:00:00.000
Forecast Current Phase End
2023-12-29T00:00:00.000
Forecast Completion
2027-10-21T00:00:00.000
Actual Design Start
2019-07-23T00:00:00.000
Borough
Queens
Community Board
Queens 13
Budget Line
SE-0200Q
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4313
Fms Id
SE-885A
Total Budget
49858469.00
Spend To Date
6458239.96
Spend To Date 1
0.1295
Fms Project Name
SEQ - 150th St Spine: Phase II, Trunk Storm Sewer in JFK
Agency Project Name
150 ST SPINE: PHASE II TRUNK SEWER AT BERGEN BASIN
Agency Project Description
Southeast Queens 150th Street Spine, Phase II - Installation of a new double barrel trunk storm sewer that will run through JFK airport; approximately 1,000 feet east of Bergen Basin, to the north side of the Belt Parkway at Inwood Street and 150th Street
Current Phase
Design
Current Phase Start
2020-03-02T00:00:00.000
Forecast Current Phase End
2024-03-11T00:00:00.000
Forecast Completion
2029-10-20T00:00:00.000
Actual Design Start
2020-03-02T00:00:00.000
Borough
Queens
Community Board
Queens 12, Queens 13
Budget Line
SE-0002Q, SE-0200Q
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4314
Fms Id
SEQPGRD1
Total Budget
34510541.00
Spend To Date
1445028.07
Spend To Date 1
0.0418
Fms Project Name
Southeast Queens Priority Grids -- Group 1 (DOTSEQ01)
Agency Project Name
SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 1 (SECONDARY ID: DOTSEQ01)
Agency Project Description
SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 1
Current Phase
Construction Procurement
Current Phase Start
2023-01-05T00:00:00.000
Forecast Current Phase End
2023-09-20T00:00:00.000
Forecast Completion
2025-09-18T00:00:00.000
Actual Design Start
2018-07-10T00:00:00.000
Actual Design End
2023-01-05T00:00:00.000
Actual Construction
2023-01-05T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
HW-0001Q, HW-0200, HW-0944, HW-1684, TF-0002, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4315
Fms Id
SEQPGRD2
Total Budget
32205565.00
Spend To Date
1277974.40
Spend To Date 1
0.0396
Fms Project Name
Southeast Queens Priority Grids -- Group 2 (DOTSEQ02)
Agency Project Name
SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 2 (SECONDARY ID: DOTSEQ02)
Agency Project Description
SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 2
Current Phase
Design
Current Phase Start
2018-10-09T00:00:00.000
Forecast Current Phase End
2024-11-20T00:00:00.000
Forecast Completion
2027-09-21T00:00:00.000
Actual Design Start
2018-10-09T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
HW-0001Q, HW-0061
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4316
Fms Id
HWQ662G
Total Budget
24431520.00
Spend To Date
1682419.68
Spend To Date 1
0.0688
Fms Project Name
Springfield Gardens Phase V (SE-862)
Agency Project Name
STORM SANITARY SEWER REPL SPRINGFIELD GARDENS
Agency Project Description
SPRINGFIELD GARDENS RECONSTRUCTION PHASE 5; STORM AND SANITARY SEWER EXTENSIONS AND UPGRADES AND WATER MAIN REPLACEMENT IN 146TH AVENUE BETWEEN 153RD PLACE AND 159TH STREET, ETC, BOROUGH OF QUEENS (HWQ662G)
Current Phase
Design
Current Phase Start
2018-05-09T00:00:00.000
Forecast Current Phase End
2024-06-21T00:00:00.000
Forecast Completion
2029-07-02T00:00:00.000
Actual Design Start
2018-05-09T00:00:00.000
Borough
Queens
Community Board
Queens 13
Budget Line
HW-0001Q, HW-0061, HW-0200, HW-0200, HW-0662, TF-0002, TF-0502
Ten Year Plan Category
SIDEWALK RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4316
Fms Id
SE-862
Total Budget
86426856.41
Spend To Date
2341856.41
Spend To Date 1
0.027
Fms Project Name
SEQ - Storm & Sanitary Sewer Replcmnt/Ext. 146 Ave (HWQ662G)
Agency Project Name
STORM SANITARY SEWER REPL SPRINGFIELD GARDENS
Agency Project Description
SPRINGFIELD GARDENS RECONSTRUCTION PHASE 5; STORM AND SANITARY SEWER EXTENSIONS AND UPGRADES AND WATER MAIN REPLACEMENT IN 146TH AVENUE BETWEEN 153RD PLACE AND 159TH STREET, ETC, BOROUGH OF QUEENS (HWQ662G)
Current Phase
Design
Current Phase Start
2018-05-09T00:00:00.000
Forecast Current Phase End
2024-06-21T00:00:00.000
Forecast Completion
2029-07-02T00:00:00.000
Actual Design Start
2018-05-09T00:00:00.000
Borough
Queens
Community Board
Queens 13
Budget Line
SE-0002Q, SE-0200Q, SE-0200Q, WM-0001, WM-0006
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DCLA
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DCLA
Pid
4317
Fms Id
PV394AMBR
Total Budget
12210000.00
Spend To Date
920232.92
Spend To Date 1
0.0753
Fms Project Name
SSS - Ambrose Restoration
Agency Project Name
Ambrose Restoration
Agency Project Description
Stabilization and Restoration of 1907 Lightship Ambrose for the South Street Seaport Museum.
Current Phase
Design
Current Phase Start
2021-09-02T00:00:00.000
Forecast Current Phase End
2024-01-31T00:00:00.000
Forecast Completion
2026-05-27T00:00:00.000
Actual Design Start
2021-09-02T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
PV-0N394, PV-DN394, PV-MN394
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DPR
Pid
4318
Fms Id
P109STARA
Total Budget
5738765.20
Spend To Date
4927705.73
Spend To Date 1
0.8586
Fms Project Name
STARLIGHT PARK COMFORT STATION X147-111M
Agency Project Name
Starlight Park Comfort Station
Agency Project Description
Starlight Park Comfort Station Construction and maintenance garage in the Bronx.
Current Phase
(Completed)
Actual Design Start
2013-03-27T00:00:00.000
Actual Design End
2017-06-20T00:00:00.000
Actual Construction
2017-06-20T00:00:00.000
Actual Construction 1
2019-01-04T00:00:00.000
Actual Construction Start
2019-01-04T00:00:00.000
Actual Construction End
2023-06-27T00:00:00.000
Borough
Bronx
Community Board
Bronx 09
Budget Line
P-0245X, P-1018, P-1018
Ten Year Plan Category
MAJOR RECREATIONAL FACILITIES AND FACILITY RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DCAS
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DCAS
Pid
4319
Fms Id
CO302ST
Total Budget
7613664.36
Spend To Date
6726013.50
Spend To Date 1
0.8834
Fms Project Name
18 RICHMOND TERRACE - EXTERIOR STEPS RECONSTRUCTION
Agency Project Name
18 RICHMOND TERRACE - EXTERIOR STEPS RECONSTRUCTI
Agency Project Description
Staten Island Supreme Court, Monumental Stairs, 18 Richmond Terrace - Reconstruct the monumental stair at the main entrance of the building, including the limestone steps and platforms, adjacent concrete public sidewalk and street curbs, structural support system and handrails.
Current Phase
(Completed)
Actual Design Start
2018-10-31T00:00:00.000
Actual Design End
2020-10-08T00:00:00.000
Actual Construction
2020-10-08T00:00:00.000
Actual Construction 1
2022-02-14T00:00:00.000
Actual Construction Start
2022-02-14T00:00:00.000
Actual Construction End
2023-04-28T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 01
Budget Line
CO-0302
Ten Year Plan Category
RECONSTRUCTION/RENOVATION OF COURT FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4320
Fms Id
SER200258
Total Budget
21541508.50
Spend To Date
9208787.45
Spend To Date 1
0.4274
Fms Project Name
Sanitary and Storm Sewer in West Castor Place between Alvers
Agency Project Name
STORM & SANITARY SEWERS IN ALVERSON AVENUE, SI
Agency Project Description
STORM & SANITARY SEWERS IN WEST CASTOR PLACE, SI
Current Phase
Construction
Current Phase Start
2022-07-18T00:00:00.000
Forecast Current Phase End
2024-07-16T00:00:00.000
Forecast Completion
2024-07-16T00:00:00.000
Actual Design Start
2014-06-16T00:00:00.000
Actual Design End
2021-12-14T00:00:00.000
Actual Construction
2021-12-14T00:00:00.000
Actual Construction 1
2022-07-18T00:00:00.000
Actual Construction Start
2022-07-18T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 03
Budget Line
HW-0200, SE-0002R, SE-0200R
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4321
Fms Id
SE-807
Total Budget
140676912.18
Spend To Date
99865447.30
Spend To Date 1
0.7098
Fms Project Name
Storm & San Sewers in 20th Ave b/t 126 St & US Bulkhead Line
Agency Project Name
STM & SAN SEWERS IN 20 AVE B/T126 ST & US BULKHEAD
Agency Project Description
Storm and sanitary sewers in 20th Ave between 126th Street and U.S. Bulkhead Line, etc. Water main works.
Current Phase
Construction
Current Phase Start
2017-01-02T00:00:00.000
Forecast Current Phase End
2023-10-31T00:00:00.000
Forecast Completion
2023-10-31T00:00:00.000
Actual Design Start
2012-07-10T00:00:00.000
Actual Design End
2015-06-12T00:00:00.000
Actual Construction
2015-06-12T00:00:00.000
Actual Construction 1
2017-01-02T00:00:00.000
Actual Construction Start
2017-01-02T00:00:00.000
Borough
Queens
Community Board
Queens 07
Budget Line
SE-0002Q, SE-0004, SE-0200Q, WM-0001
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4322
Fms Id
SEX200400
Total Budget
24103416.76
Spend To Date
1967341.35
Spend To Date 1
0.0816
Fms Project Name
STORM & SAN SEWERS REPL & EXT IN MININIEFORD AVE AREA
Agency Project Name
STM AND SAN SEWERS IN MINNIEFORD AVENUE AREA
Agency Project Description
Storm and Sanitary Sewers in:Terrace St. between Minnieford Ave. and King Ave.
Current Phase
Construction Procurement
Current Phase Start
2022-12-28T00:00:00.000
Forecast Current Phase End
2023-09-04T00:00:00.000
Forecast Completion
2026-09-02T00:00:00.000
Actual Design Start
2017-03-27T00:00:00.000
Actual Design End
2022-12-28T00:00:00.000
Actual Construction
2022-12-28T00:00:00.000
Borough
Bronx
Community Board
Bronx 10
Budget Line
EP-0007, HW-0001X, HW-0200, HW-0200, SE-0002X, SE-0200X, SE-0944, TF-0002, TF-0502, WM-0001, WM-0001
Ten Year Plan Category
UTILITY RELOCATION FOR SE AND WM PROJECTS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4323
Fms Id
HWTRK883
Total Budget
5379000.00
Spend To Date
106118.53
Spend To Date 1
0.0197
Fms Project Name
Trench Restoration -- Bay Parkway, Brooklyn, SE-883
Agency Project Name
STORM, HLSS & SANITARY SEWER & WM IN CROPSEY AVE
Agency Project Description
Storm, high level storm and sanitary sewer construction and water main replacement in Cropsey Avenue between Bay 20th Street and Bay 32nd Street.
Current Phase
Design
Current Phase Start
2017-09-05T00:00:00.000
Forecast Current Phase End
2024-12-31T00:00:00.000
Forecast Completion
2029-08-30T00:00:00.000
Actual Design Start
2017-09-05T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0001K
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4324
Fms Id
SE-889
Total Budget
112710350.47
Spend To Date
329716.37
Spend To Date 1
0.0029
Fms Project Name
SEQ - New Storm Sewer N. Conduit Ave
Agency Project Name
NEW STORM SEWER N CONDUIT AV-BAISLEY BLVD
Agency Project Description
Storm, Sanitary and Water Mains work in North Conduit between Baisley Blvd and Guy Brewer Blvd, South Queens
Current Phase
Design
Current Phase Start
2018-07-30T00:00:00.000
Forecast Current Phase End
2025-11-10T00:00:00.000
Forecast Completion
2029-04-01T00:00:00.000
Actual Design Start
2018-07-30T00:00:00.000
Borough
Queens
Community Board
Queens 12
Budget Line
SE-0002Q, SE-0200Q, WM-0001, WM-0006
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4325
Fms Id
CONISPH04
Total Budget
28713000.00
Spend To Date
1190000.00
Spend To Date 1
0.0414
Fms Project Name
SAN & STRM SWR, WM1, IN CONEY ISL AREA, PH 4
Agency Project Name
SAN & STRM SEWER, WM IN CONEY ISLAND AREA, PH 4
Agency Project Description
Storm, Sanitary Sewers & Water Mains in Coney Island Area - Phase 04, Brooklyn
Current Phase
Design
Current Phase Start
2019-07-25T00:00:00.000
Forecast Current Phase End
2024-10-31T00:00:00.000
Forecast Completion
2028-06-28T00:00:00.000
Actual Design Start
2019-07-25T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 13
Budget Line
SE-0200K, WM-0001, WM-0006
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4326
Fms Id
HWK1048D
Total Budget
27516234.42
Spend To Date
8868854.88
Spend To Date 1
0.3223
Fms Project Name
BK Waterfront Greenway:Sunset Pk Gowanus Connect BED-802
Agency Project Name
SUNSET PARK GOWANUS CONNECTOR, BK
Agency Project Description
Sunset Park Gowanus Connector - Brooklyn Waterfront Greenway.
Current Phase
Construction
Current Phase Start
2020-06-01T00:00:00.000
Forecast Current Phase End
2024-03-20T00:00:00.000
Forecast Completion
2024-03-20T00:00:00.000
Actual Design Start
2017-09-18T00:00:00.000
Actual Design End
2019-06-26T00:00:00.000
Actual Construction
2019-06-26T00:00:00.000
Actual Construction 1
2020-06-01T00:00:00.000
Actual Construction Start
2020-06-01T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 07
Budget Line
HW-0001K, HW-0200, HW-K005
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DCLA
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DCLA
Pid
4327
Fms Id
ACEDCA702
Total Budget
3080000.00
Spend To Date
66401.92
Spend To Date 1
0.0215
Fms Project Name
DCLA - REPLACEMENT OF 7 AIR HANDLING UNITS
Agency Project Name
METS REPLACEMENT OF 7 AIR HANDLING UNITS
Agency Project Description
The Air handler replacement project will replace seven air handler systems throughout the building, with six new state of the art units, all of which are past their useful life. The work will entail replacing the units, related duct work, insulation and associated temperature controls that service the galleries.
Current Phase
Construction
Current Phase Start
2019-05-17T00:00:00.000
Forecast Current Phase End
2024-08-31T00:00:00.000
Forecast Completion
2024-08-31T00:00:00.000
Actual Design Start
2018-08-22T00:00:00.000
Actual Design End
2018-09-24T00:00:00.000
Actual Construction
2018-09-24T00:00:00.000
Actual Construction 1
2019-05-17T00:00:00.000
Actual Construction Start
2019-05-17T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
PV-0022
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: BPL
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
BPL
Pid
4328
Fms Id
LBM18BVOH
Total Budget
30484340.92
Spend To Date
3443220.28
Spend To Date 1
0.1129
Fms Project Name
Brownsville Overhaul
Agency Project Name
BROWNSVILLE LIBRARY MAJOR RENOVATIONS
Agency Project Description
The Brownsville Library is a comprehensive interior/exterior renovation and addition which includes new fire alarm/BMS, new interior layout, new HVAC, new accessible restrooms, exterior rehabilitation and landscape.
Current Phase
Design
Current Phase Start
2018-07-27T00:00:00.000
Forecast Current Phase End
2023-11-15T00:00:00.000
Forecast Completion
2027-11-15T00:00:00.000
Actual Design Start
2018-07-27T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 16
Budget Line
LB-0104, LB-D104
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DCLA
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DCLA
Pid
4329
Fms Id
PV354HVAC
Total Budget
2998666.00
Spend To Date
2782976.54
Spend To Date 1
0.928
Agency Project Name
Roundabout Theatre Company HVAC Upgrade
Agency Project Description
The City funded portion of this project is the installation of a new HVAC system at the American Airlines Theater on 42nd Street. The project will replace the 11 separate HVAC units ranging from 1.5 to 100 tons, located throughout the theater and on the roof.
Current Phase
Construction
Current Phase Start
2018-06-21T00:00:00.000
Forecast Current Phase End
2023-12-31T00:00:00.000
Forecast Completion
2023-12-31T00:00:00.000
Actual Design Start
2017-06-26T00:00:00.000
Actual Design End
2017-10-20T00:00:00.000
Actual Construction
2017-10-20T00:00:00.000
Actual Construction 1
2018-06-21T00:00:00.000
Actual Construction Start
2018-06-21T00:00:00.000
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4330
Fms Id
HWK100SBC
Total Budget
122692659.61
Spend To Date
4678669.71
Spend To Date 1
0.0381
Fms Project Name
South Brooklyn Crosstown SBS
Agency Project Name
SOUTH BROOKLYN CROSSTOWN SBS
Agency Project Description
The construction of Southern Brooklyn Crosstown Select Bus Service (SBS)
Current Phase
Construction
Current Phase Start
2023-09-05T00:00:00.000
Forecast Current Phase End
2028-09-03T00:00:00.000
Forecast Completion
2028-09-03T00:00:00.000
Actual Design Start
2018-07-17T00:00:00.000
Actual Design End
2022-12-29T00:00:00.000
Actual Construction
2022-12-29T00:00:00.000
Actual Construction 1
2023-09-05T00:00:00.000
Actual Construction Start
2023-09-05T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
HW-0200, HW-0200, HW-0944, HW-1684, HW-D101, TF-0002, TF-0002, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DPR
Pid
4332
Fms Id
P-1TREREC
Total Budget
89250000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Construction of a New Recreation Center at Tremont Park
Agency Project Name
Construction of a New Recreation Center at Tremont Park
Agency Project Description
The Department of Parks and Recreation, in consultation with local elected officials and community stakeholders, has identified the need for a new Recreation Center to be located at Walter Gladwin Park in the Tremont neighborhood.The purpose of the project is to provide a Parks run Recreation Center to serve the community in an area identified by the Agency as under-served.
Current Phase
Design
Current Phase Start
2023-01-23T00:00:00.000
Forecast Current Phase End
2024-07-18T00:00:00.000
Forecast Completion
2028-08-28T00:00:00.000
Actual Design Start
2023-01-23T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-0245X, P-0506
Ten Year Plan Category
MAJOR RECREATIONAL FACILITIES AND FACILITY RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DSNY
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DSNY
Pid
4333
Fms Id
S136-367
Total Budget
200026538.36
Spend To Date
103755608.85
Spend To Date 1
0.5187
Fms Project Name
Staten Island 1 and 3 Garage Construction + SOLARGR10
Agency Project Name
Staten Island 1 & 3 Garage Construction & Rehab
Agency Project Description
The Department of Sanitation of the City of New York (DSNY) is planning to develop a Staten Island Districts 1 and 3 campus that will include a new garage serving both districts and renovation of the existing Borough Repair Shop. The site is to be reconfigured with new grading and drainage, new covered salt storage, new outdoor fueling, new household special waste collection, outdoor DSNY truck parking and a new force main sanitary line to connect to the NYC DEP sewer.
Current Phase
Construction
Current Phase Start
2020-03-06T00:00:00.000
Forecast Current Phase End
2024-09-12T00:00:00.000
Forecast Completion
2024-09-12T00:00:00.000
Actual Design Start
2017-07-14T00:00:00.000
Actual Design End
2019-06-28T00:00:00.000
Actual Construction
2019-06-28T00:00:00.000
Actual Construction 1
2020-03-06T00:00:00.000
Actual Construction Start
2020-03-06T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 01, Staten Island 03
Budget Line
PU-0025, S-0136
Ten Year Plan Category
GARAGES AND FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DSNY
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DSNY
Pid
4333
Fms Id
SOLARGR10
Total Budget
8484222.61
Spend To Date
2754108.63
Spend To Date 1
0.3246
Fms Project Name
DSNY - PV INSTALLATION ON NEW GARAGE- STATEN ISLAND 1/3
Agency Project Name
Staten Island 1 & 3 Garage Construction & Rehab
Agency Project Description
The Department of Sanitation of the City of New York (DSNY) is planning to develop a Staten Island Districts 1 and 3 campus that will include a new garage serving both districts and renovation of the existing Borough Repair Shop. The site is to be reconfigured with new grading and drainage, new covered salt storage, new outdoor fueling, new household special waste collection, outdoor DSNY truck parking and a new force main sanitary line to connect to the NYC DEP sewer.
Current Phase
Construction
Current Phase Start
2020-03-06T00:00:00.000
Forecast Current Phase End
2024-09-12T00:00:00.000
Forecast Completion
2024-09-12T00:00:00.000
Actual Design Start
2017-07-14T00:00:00.000
Actual Design End
2019-06-28T00:00:00.000
Actual Construction
2019-06-28T00:00:00.000
Actual Construction 1
2020-03-06T00:00:00.000
Actual Construction Start
2020-03-06T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 01
Budget Line
PU-0025
Ten Year Plan Category
DISTRIBUTED GENERATION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DSNY
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DSNY
Pid
4334
Fms Id
S136-423
Total Budget
80180530.65
Spend To Date
6275364.59
Spend To Date 1
0.0782
Fms Project Name
Queens 11/13 FLOOR SLAB REPLACEMENT
Agency Project Name
Rehab of Queens District 11/13 Sanitation Garage
Agency Project Description
The Department of Sanitation of the City of New York (DSNY) is planning to rehabilitate Queens Districts 11 and 13 garage. The renovation serving both districts is to extend the useful life of the facility through rehabilitation of the building structure and systems. The renovation includes: Extensive structural work that includes the replacement of reinforced concrete slabs and stiffening of the existing steel frame, select replacement of building MEP systems, including BMS systems, architectural renovation of the entire building, study and implementation of deep energy conservation measures (DECMs), and site work which includes new landscape work and replacement of sidewalks and driveways. Rehabilitation is required to meet LEED Silver requirements.
Current Phase
Design
Current Phase Start
2017-03-06T00:00:00.000
Forecast Current Phase End
2024-03-31T00:00:00.000
Forecast Completion
2029-03-30T00:00:00.000
Actual Design Start
2017-03-06T00:00:00.000
Borough
Queens
Community Board
Queens 11
Budget Line
PU-0025, S-0136
Ten Year Plan Category
GARAGES AND FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4335
Fms Id
HWXP136D
Total Budget
55345109.00
Spend To Date
2135557.57
Spend To Date 1
0.0385
Fms Project Name
Grand Concourse Phase 5, SEX002275
Agency Project Name
GRAND CONCOURSE, PHASE 5
Agency Project Description
THE FIFTH PHASE OF THE RECONSTRUCTION OF THE GRAND CONCOURSE WILL CONTINUE THE DESIGN AND SAFETY IMPROVEMENTS IMPLEMENTED IN THE PREVIOUS PHASES OF THIS VISION ZERO GREAT STREETS PROJECTS. . AS IN THE PREVIOUS PHASES, PHASE 5 WILL INCLUDE THE RECONSTRUCTION OF THE CONCOURSES SERVICE ROADS AND RESURFACING OF THE MAINLINE ROADWAY WHERE NECESSARY.
Current Phase
Design
Current Phase Start
2019-09-16T00:00:00.000
Forecast Current Phase End
2023-12-30T00:00:00.000
Forecast Completion
2027-09-30T00:00:00.000
Actual Design Start
2019-09-16T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
HW-0001X, HW-0944
Ten Year Plan Category
PRIMARY STREET RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4335
Fms Id
SEX002275
Total Budget
2604000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Reconstruction of Grand Concourse Phase 5, Bronx, HWXP136D
Agency Project Name
GRAND CONCOURSE, PHASE 5
Agency Project Description
THE FIFTH PHASE OF THE RECONSTRUCTION OF THE GRAND CONCOURSE WILL CONTINUE THE DESIGN AND SAFETY IMPROVEMENTS IMPLEMENTED IN THE PREVIOUS PHASES OF THIS VISION ZERO GREAT STREETS PROJECTS. . AS IN THE PREVIOUS PHASES, PHASE 5 WILL INCLUDE THE RECONSTRUCTION OF THE CONCOURSES SERVICE ROADS AND RESURFACING OF THE MAINLINE ROADWAY WHERE NECESSARY.
Current Phase
Design
Current Phase Start
2019-09-16T00:00:00.000
Forecast Current Phase End
2023-12-30T00:00:00.000
Forecast Completion
2027-09-30T00:00:00.000
Actual Design Start
2019-09-16T00:00:00.000
Borough
Bronx
Community Board
Bronx 05, Bronx 07
Budget Line
SE-0002X
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DCAS
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DCAS
Pid
4336
Fms Id
PW77DCA
Total Budget
4636457.79
Spend To Date
4523688.87
Spend To Date 1
0.9756
Fms Project Name
245 MESEROLE ST. - DCA TEST STATION REHABILITATION
Agency Project Name
245 MESEROLE ST. - DCA Test Station Energy Efficie
Agency Project Description
The goal of this project is to provide an energy efficient upgrade for the facility. New LED lighting to be provided as well as the associated lighting controls. New retrofit kits are to be mounted within the existing recessed ceiling light fixture housings. Each retrofit kit covers the existing ceiling aperture and includes integral LEDs, diffuser lens, driver, and an occupancy/motion sensor.
Current Phase
(Completed)
Actual Design Start
2018-07-31T00:00:00.000
Actual Design End
2019-03-08T00:00:00.000
Actual Construction
2019-03-08T00:00:00.000
Actual Construction 1
2021-09-28T00:00:00.000
Actual Construction Start
2021-09-28T00:00:00.000
Actual Construction End
2023-02-03T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 01
Budget Line
PU-0025, PW-0077
Ten Year Plan Category
RENOVATION OF OTHER CITY-OWNED FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4337
Fms Id
HWD105-03
Total Budget
9582852.31
Spend To Date
1831834.55
Spend To Date 1
0.1911
Fms Project Name
LIBRARY LANE PROJECT
Agency Project Name
LIBRARY LANE PROJECT
Agency Project Description
The Library Lane project consists of the full reconstruction of Coles lane, a short street between East Kingsbridge Road and Bainbridge Ave in the Fordham section of the Bronx including WM works.
Current Phase
Design
Current Phase Start
2011-11-15T00:00:00.000
Forecast Current Phase End
2023-11-30T00:00:00.000
Forecast Completion
2026-05-10T00:00:00.000
Actual Design Start
2011-11-15T00:00:00.000
Borough
Bronx
Community Board
Bronx, Bronx 10
Budget Line
HW-0001X, HW-0061, HW-0200, HW-D105, WM-0001
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOT
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOT
Pid
4338
Fms Id
HWHARPADM
Total Budget
140551265.52
Spend To Date
2300464.41
Spend To Date 1
0.0163
Fms Project Name
Harper Street Administration Building Reconstruction DB
Agency Project Name
Harper Street Administration Building Reconstruction
Agency Project Description
The main scope of this project is to construct a new Administration and Personnel Building at the northwest corner, limiting relocation and operational disruptions during construction as wells as to accommodate future growth.
Current Phase
Design
Current Phase Start
2023-04-20T00:00:00.000
Forecast Current Phase End
2024-01-31T00:00:00.000
Forecast Completion
2026-03-26T00:00:00.000
Actual Design Start
2023-04-20T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
HW-0003
Ten Year Plan Category
FACILITY RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4339
Fms Id
CRO-AGS
Total Budget
84590255.79
Spend To Date
59967763.05
Spend To Date 1
0.7089
Fms Project Name
CROTON ABOVE-GROUND STRUCTURE AND LANDSCAPING
Agency Project Name
CROTON ABOVE GROUND STRUCTURE AND LANDSCAPING
Agency Project Description
The new Mosholu Golf Course Club House, together with fifty-five Driving Range Tee Boxes and ten-acres of re-landscaping comprise the phase IV and final of the vast DEP Croton Water Treatment Plant project, currently under construction in Van Cortlandt Park in the Bronx. Through a multifunctional design strategy the project reinstates the pre-existing golf program and facility, creates civic space for community use and ensures security for a multi-billion dollar public works facility.
Current Phase
Construction
Current Phase Start
2018-10-01T00:00:00.000
Forecast Current Phase End
2024-07-03T00:00:00.000
Forecast Completion
2024-07-03T00:00:00.000
Actual Design Start
2012-05-23T00:00:00.000
Actual Design End
2017-10-26T00:00:00.000
Actual Construction
2017-10-26T00:00:00.000
Actual Construction 1
2018-10-01T00:00:00.000
Actual Construction Start
2018-10-01T00:00:00.000
Borough
Bronx
Community Board
Bronx 07, Bronx 08
Budget Line
WM-0011
Ten Year Plan Category
CROTON FILTER PROJECT
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4340
Fms Id
HED-CLUB
Total Budget
12218971.86
Spend To Date
10455950.85
Spend To Date 1
0.8557
Fms Project Name
CROTON ABOVE-GROUND STRUCTURE AND LANDSCAPING
Agency Project Name
CROTON FILTRATION PLANT
Agency Project Description
The new Mosholu Golf Course Club House, together with fifty-five Driving Range Tee Boxes and ten-acres of re-landscaping comprise the phase IV and final of the vast DEP Croton Water Treatment Plant project, currently under construction in Van Cortlandt Park in the Bronx.Through a multifunctional design strategy the project reinstates the pre-existing golf program and facility, creates civic space for community use and ensures security for a multi-billion dollar public works facility.
Current Phase
Construction
Current Phase Start
2018-10-01T00:00:00.000
Forecast Current Phase End
2024-07-03T00:00:00.000
Forecast Completion
2024-07-03T00:00:00.000
Actual Design Start
2012-05-23T00:00:00.000
Actual Design End
2017-10-26T00:00:00.000
Actual Construction
2017-10-26T00:00:00.000
Actual Construction 1
2018-10-01T00:00:00.000
Actual Construction Start
2018-10-01T00:00:00.000
Borough
Bronx
Community Board
Bronx 07, Bronx 08
Budget Line
WM-0011
Ten Year Plan Category
CROTON FILTER PROJECT
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DPR
Pid
4341
Fms Id
P-413QCF1
Total Budget
12458477.17
Spend To Date
1117833.95
Spend To Date 1
0.0897
Fms Project Name
QUEENS CTY FARM MUSEUM PHASE 2 FARMLAND RESTORATION
Agency Project Name
Queens County Farm Museum Phase 2 Restoration
Agency Project Description
The project consists of restoring the reconstructed barn and garage buildings at the Queens County Farm Museum currently used for administrative and public gathering purposes. The scope includes installing new HVAC systems, improving the building envelope, structural changes and stabilization, exterior replacement of faux garage doors and ADA access ramp.
Current Phase
Construction Procurement
Current Phase Start
2018-10-05T00:00:00.000
Forecast Current Phase End
2024-06-28T00:00:00.000
Forecast Completion
2025-12-28T00:00:00.000
Actual Design Start
2016-07-11T00:00:00.000
Actual Design End
2018-10-05T00:00:00.000
Actual Construction
2018-10-05T00:00:00.000
Borough
Queens
Community Board
Queens 99
Budget Line
P-0245Q, P-0245X, P-0882, P-D019, P-Q010, P-Q245, PV-0N655, PV-DN655
Ten Year Plan Category
MAJOR RECREATIONAL FACILITIES AND FACILITY RECONSTRUCTION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DOHMH
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DOHMH
Pid
4342
Fms Id
HL82CORHC
Total Budget
10659755.00
Spend To Date
1790658.54
Spend To Date 1
0.1679
Fms Project Name
Corona Health Center-Exterior Facade, Basement and Lobby
Agency Project Name
Renovations at Corona Health Center
Agency Project Description
The project is an overall building envelope renovation/upgrade. Upgrades will include roof, skylights and facade work. The Entrance and Lobby will be redesigned as well for accessibility.
Current Phase
Construction Procurement
Current Phase Start
2022-10-11T00:00:00.000
Forecast Current Phase End
2024-03-01T00:00:00.000
Forecast Completion
2025-10-30T00:00:00.000
Actual Design Start
2018-11-30T00:00:00.000
Actual Design End
2022-10-11T00:00:00.000
Actual Construction
2022-10-11T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
HL-0082
Ten Year Plan Category
CLINIC RENOVATION AND REHABILITATION
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DCLA
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DCLA
Pid
4343
Fms Id
PVDTA-PH2
Total Budget
3166079.40
Spend To Date
1817869.56
Spend To Date 1
0.5741
Fms Project Name
DTA - Downtown Art Bldg Renovation Phase 2 (Upper Floors)
Agency Project Name
Downtown Art-70 East 4th ST.Renovation
Agency Project Description
The project is to renovate the 2nd and 3rd floors of Downtown Art's home at 70 East 4th Street. This project will provide the necessary administrative office and meeting spaces, rehearsal studio, kitchen, and ancillary space to support Downtown Art’s current programs and future growth, which aims to build a community of engagement, creativity, and mutual support through artistic
Current Phase
Construction
Current Phase Start
2022-06-30T00:00:00.000
Forecast Current Phase End
2024-04-03T00:00:00.000
Forecast Completion
2024-04-03T00:00:00.000
Actual Design Start
2016-01-21T00:00:00.000
Actual Design End
2017-06-28T00:00:00.000
Actual Construction
2017-06-28T00:00:00.000
Actual Construction 1
2022-06-30T00:00:00.000
Actual Construction Start
2022-06-30T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
PV-0467, PV-0N131, PV-DN031, PV-DN131, PV-M467, PV-MN131
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DCLA
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DCLA
Pid
4344
Fms Id
PV525STUD
Total Budget
59071000.00
Spend To Date
19143669.41
Spend To Date 1
0.324
Fms Project Name
SMH - Studio Museum in Harlem New Building
Agency Project Name
Studio Museum in Harlem New Building
Agency Project Description
The Project will combine two adjacent lots on 125th Street: the sculpture court, City-owned lot 11, and the Museum building on lot 9, owned by the Museum. Existing structures on both lots will be demolished for the new, six story 82,000sf City owned building.
Current Phase
Construction
Current Phase Start
2019-02-26T00:00:00.000
Forecast Current Phase End
2024-06-30T00:00:00.000
Forecast Completion
2024-06-30T00:00:00.000
Actual Design Start
2018-09-25T00:00:00.000
Actual Design End
2018-11-28T00:00:00.000
Actual Construction
2018-11-28T00:00:00.000
Actual Construction 1
2019-02-26T00:00:00.000
Actual Construction Start
2019-02-26T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
PV-0467
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DDC • Sponsor Agency: DEP
Reporting Period
202305
Managing Agency
DDC
Sponsor Agency
DEP
Pid
4345
Fms Id
SEQ002715
Total Budget
10522819.36
Spend To Date
2116260.52
Spend To Date 1
0.2011
Fms Project Name
Replmnt & repair of combined SE outfall north 81st &19 Ave
Agency Project Name
COMBINED SEWER OUTFALL N. 81ST & 19TH AVE, LAG
Agency Project Description
The proposed project involves the reconstruction and replacement of a short length of an existing sewer and an outfall that discharges into Bowery Bay (see Figures C-4a and C-4b); this sewer and outfall reconstruction is proposed to address what is currently a partially collapsed outfall. Replacement would restore the outfall’s necessary functions and avoid a potential full collapse and failure. Specifically, the proposed project includes the following: Installation of a new a 14-foot 7-inch-wide by 8-foot-high combined sewer outfall (referenced as the Bowery Bay [BB]-005 outfall) which discharges into Bowery Bay, thereby replacing the currently collapsed outfall. The proposed outfall would be reconstructed at the same location as the existing outfall and within an existing sewer easement across land that is owned by the City of New York and under the jurisdiction of the Department of Small Business Services. The proposed sewer and outfall design calls for a reinforced concrete structure supported on a concrete cradle with a flap gate at the outlet to control any inflow of tidal water from the bay. Additionally, boulders are proposed to be installed to stabilize the bottom of the bay to minimize the potential for scour and resuspension of sediments into the water column that may otherwise occur when there is flow from the outfall. Reconstruction of a 60-foot-long by 14-foot-7-inch wide and 8-foot-high combined sewer that flows into and connects with the proposed outfall.
Current Phase
Construction
Current Phase Start
2022-08-22T00:00:00.000
Forecast Current Phase End
2024-02-17T00:00:00.000
Forecast Completion
2024-02-17T00:00:00.000
Actual Design Start
2020-01-13T00:00:00.000
Actual Design End
2021-12-06T00:00:00.000
Actual Construction
2021-12-06T00:00:00.000
Actual Construction 1
2022-08-22T00:00:00.000
Actual Construction Start
2022-08-22T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
SE-0002Q
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2023-09-01T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000