Capital Projects Dashboard - Citywide Budget and Schedule

All major capital infrastructure projects with a committed budget. Financial information and agency schedule details for each project are joined via FMS ID. Only projects in the design phase or later have project schedules displayed. This dataset is part of the Capital Projects Dashboard.

Note: Each row is uniquely identified by its Financial Management Service (FMS) ID. FMS ID is the unique ID that OMB uses for the FMS (Financial Information System). This ID can be universally joined with any OMB dataset that has the same field. The Capital Projects Dashboard is the result of joining OMB’s fiscal data with the agency’s schedule data. FMS IDs and agency projects don't always have a one-to-one relationship (i.e., one project schedule may correlate to multiple FMS IDs, and one FMS may correct to multiple projects with different schedules).

City Government Mayor's Office of Operations (OPS) Dataset fb86-vt7u 27 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: ID21-PUMP
Reporting Period
202305
Managing Agency
DEP
Fms Id
ID21-PUMP
Total Budget
20000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
REHABILITATION OF VARIOUS PUMP STATIONS DUE TO HURRICANE IDA
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
WP-0269
Ten Year Plan Category
PLANT UPGRADING AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: IN-CITYLS
Reporting Period
202305
Managing Agency
DEP
Fms Id
IN-CITYLS
Total Budget
1148025000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Agency Proposed Outyear Projects
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
SE-0001
Ten Year Plan Category
EXTENSIONS TO ACCOMMODATE NEW DEVELOPMENT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JA-187
Reporting Period
202305
Managing Agency
DEP
Fms Id
JA-187
Total Budget
5000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
REPLACE MAIN SEWAGE PUMP CONTROLS AT JAMAICA WPCP
Current Phase
(Pending)
Borough
Queens
Community Board
Queens
Budget Line
WP-0112
Ten Year Plan Category
PLANT UPGRADING AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JA-STAB
Reporting Period
202305
Managing Agency
DEP
Fms Id
JA-STAB
Total Budget
502116393.47
Spend To Date
494758282.35
Spend To Date 1
0.9853
Fms Project Name
STABILIZATION PROGRAM AT JAMAICA WPCP
Current Phase
(Pending)
Borough
Queens
Community Board
Queens 12
Budget Line
WP-0247
Ten Year Plan Category
PLANT COMPONENT STABILIZATION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JFK-12
Reporting Period
202305
Managing Agency
DEP
Fms Id
JFK-12
Total Budget
13482328.66
Spend To Date
3556330.80
Spend To Date 1
0.2637
Fms Project Name
WATER METER INSTALLATION AT JFK AIRPORT
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
EP-0010
Ten Year Plan Category
CONSERVATION FOR WATER METER REPLACEMENTS
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JFK-INTER
Reporting Period
202305
Managing Agency
DEP
Fms Id
JFK-INTER
Total Budget
7000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
REROUTING OF INTERCEPTOR AT NEW JFK CARGO BUILDIING
Current Phase
(Pending)
Borough
Queens
Community Board
Queens
Budget Line
WP-0269
Ten Year Plan Category
PLANT UPGRADING AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JOC-14-L
Reporting Period
202305
Managing Agency
DEP
Fms Id
JOC-14-L
Total Budget
102900022.26
Spend To Date
84742194.65
Spend To Date 1
0.8235
Fms Project Name
JOB ORDER CONTRACTING WORK IN REGIONS NORTH, SOUTH & EAST
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
WP-0112
Ten Year Plan Category
PLANT UPGRADING AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JOC-15BWS
Reporting Period
202305
Managing Agency
DEP
Fms Id
JOC-15BWS
Total Budget
95266001.06
Spend To Date
31968630.20
Spend To Date 1
0.3355
Fms Project Name
Facilities Improvement Program
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
WM-0011, WM-0030, WM-0030, WM-0105
Ten Year Plan Category
WATER QUALITY PRESERVATION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JOC-16-L
Reporting Period
202305
Managing Agency
DEP
Fms Id
JOC-16-L
Total Budget
63383933.56
Spend To Date
41928682.50
Spend To Date 1
0.6615
Fms Project Name
JOB ORDER CONTRACTING WORK IN REGIONS NORTH, SOUTH & EAST
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
WP-0112
Ten Year Plan Category
PLANT UPGRADING AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JOC-17-L
Reporting Period
202305
Managing Agency
DEP
Fms Id
JOC-17-L
Total Budget
148727376.37
Spend To Date
71199167.68
Spend To Date 1
0.4787
Fms Project Name
JOB ORDER CONTRACTING WORK IN REGIONS NORTH, SOUTH & EAST
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
WP-0112
Ten Year Plan Category
PLANT UPGRADING AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JOC-18-L
Reporting Period
202305
Managing Agency
DEP
Fms Id
JOC-18-L
Total Budget
77775740.49
Spend To Date
47925167.57
Spend To Date 1
0.6161
Fms Project Name
JOB ORDER CONTRACTING WORK IN REGIONS NORTH, SOUTH & EAST
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
WP-0112
Ten Year Plan Category
PLANT UPGRADING AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JOC-19-L
Reporting Period
202305
Managing Agency
DEP
Fms Id
JOC-19-L
Total Budget
22142000.00
Spend To Date
6201988.88
Spend To Date 1
0.2801
Fms Project Name
JOC JOB ORDER CONTRACTING WORK IN REGIONS NORTH,SOUTH & EAST
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
WP-0112
Ten Year Plan Category
PLANT UPGRADING AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JOC-20-L
Reporting Period
202305
Managing Agency
DEP
Fms Id
JOC-20-L
Total Budget
47450000.00
Spend To Date
3413913.15
Spend To Date 1
0.0719
Fms Project Name
JOB ORDER CONTRACTING WORK IN REGIONS NORTH, SOUTH & EAST
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
WP-0112
Ten Year Plan Category
PLANT UPGRADING AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JOC-22-L
Reporting Period
202305
Managing Agency
DEP
Fms Id
JOC-22-L
Total Budget
160880000.00
Spend To Date
3761001.10
Spend To Date 1
0.0233
Fms Project Name
JOB ORDER CONTRACTING WORK IN REGIONS NORTH, SOUTH & EAST
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
WP-0112
Ten Year Plan Category
PLANT UPGRADING AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JOC-23-L
Reporting Period
202305
Managing Agency
DEP
Fms Id
JOC-23-L
Total Budget
14720000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
JOB ORDER CONTRACTING WORK IN REGIONS NORTH, SOUTH & EAST
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
WP-0112
Ten Year Plan Category
PLANT UPGRADING AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JOC-24-L
Reporting Period
202305
Managing Agency
DEP
Fms Id
JOC-24-L
Total Budget
13800000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
JOB ORDER CONTRACTING WORK IN REGIONS NORTH, SOUTH & EAST
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
WP-0112
Ten Year Plan Category
PLANT UPGRADING AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JOC-25-L
Reporting Period
202305
Managing Agency
DEP
Fms Id
JOC-25-L
Total Budget
115000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
JOB ORDER CONTRACTING WORK IN REGIONS NORTH, SOUTH & EAST
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
WP-0112
Ten Year Plan Category
PLANT UPGRADING AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JOC-26-L
Reporting Period
202305
Managing Agency
DEP
Fms Id
JOC-26-L
Total Budget
13800000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
JOB ORDER CONTRACTING WORK IN REGIONS NORTH, SOUTH & EAST
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
WP-0112
Ten Year Plan Category
PLANT UPGRADING AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JOC-27-L
Reporting Period
202305
Managing Agency
DEP
Fms Id
JOC-27-L
Total Budget
13800000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
JOB ORDER CONTRACTING WORK IN REGIONS NORTH, SOUTH & EAST
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
WP-0112
Ten Year Plan Category
PLANT UPGRADING AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JOC-28-L
Reporting Period
202305
Managing Agency
DEP
Fms Id
JOC-28-L
Total Budget
115000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
JOB ORDER CONTRACTING WORK IN REGIONS NORTH, SOUTH & EAST
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
WP-0112
Ten Year Plan Category
PLANT UPGRADING AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JOC-29-L
Reporting Period
202305
Managing Agency
DEP
Fms Id
JOC-29-L
Total Budget
13800000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
JOB ORDER CONTRACTING WORK IN REGIONS NORTH, SOUTH & EAST
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
WP-0112
Ten Year Plan Category
PLANT UPGRADING AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JOC-30-L
Reporting Period
202305
Managing Agency
DEP
Fms Id
JOC-30-L
Total Budget
13800000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
JOB ORDER CONTRACTING WORK IN REGIONS NORTH, SOUTH & EAST
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
WP-0112
Ten Year Plan Category
PLANT UPGRADING AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JOC-31-L
Reporting Period
202305
Managing Agency
DEP
Fms Id
JOC-31-L
Total Budget
42730000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
JOB ORDER CONTRACTING WORK IN REGIONS NORTH, SOUTH & EAST
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
WP-0112
Ten Year Plan Category
PLANT UPGRADING AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JOC-BWS
Reporting Period
202305
Managing Agency
DEP
Fms Id
JOC-BWS
Total Budget
32983000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
BWS JOC Contracts (E-O-H & W-O-H)
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
WM-0030
Ten Year Plan Category
WATER QUALITY PRESERVATION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JOC-BWSO
Reporting Period
202305
Managing Agency
DEP
Fms Id
JOC-BWSO
Total Budget
120308922.24
Spend To Date
22873897.51
Spend To Date 1
0.1901
Fms Project Name
BWSO Facilities Improvement Program
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
WM-0105
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JOC-FMC
Reporting Period
202305
Managing Agency
DEP
Fms Id
JOC-FMC
Total Budget
1943338.02
Spend To Date
1757579.57
Spend To Date 1
0.9044
Fms Project Name
FMC Facilities Improvement Program
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
EP-0006
Ten Year Plan Category
FACILITY PURCHASES AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JOC-FMC3
Reporting Period
202305
Managing Agency
DEP
Fms Id
JOC-FMC3
Total Budget
5137000.00
Spend To Date
2974272.49
Spend To Date 1
0.5789
Fms Project Name
FMC Facilities Improvement Program
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
EP-0006
Ten Year Plan Category
FACILITY PURCHASES AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JOC-FMC4
Reporting Period
202305
Managing Agency
DEP
Fms Id
JOC-FMC4
Total Budget
5323000.00
Spend To Date
2163016.28
Spend To Date 1
0.4063
Fms Project Name
Job Order Contract 2 - CIitywide
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
EP-0006
Ten Year Plan Category
FACILITY PURCHASES AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JOC-FMC6
Reporting Period
202305
Managing Agency
DEP
Fms Id
JOC-FMC6
Total Budget
3600000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
FMC Facilities Improvement Program
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
EP-0006
Ten Year Plan Category
FACILITY PURCHASES AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JOC-FMC7
Reporting Period
202305
Managing Agency
DEP
Fms Id
JOC-FMC7
Total Budget
3600000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Job Order Contract 2 - Citywide
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
EP-0006
Ten Year Plan Category
FACILITY PURCHASES AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JOC-FMC8
Reporting Period
202305
Managing Agency
DEP
Fms Id
JOC-FMC8
Total Budget
3600000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
FMC Facilities Improvement Program
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
EP-0006
Ten Year Plan Category
FACILITY PURCHASES AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JOC-FMC9
Reporting Period
202305
Managing Agency
DEP
Fms Id
JOC-FMC9
Total Budget
3600000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Job Order Contract 2 - Citywide
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
EP-0006
Ten Year Plan Category
FACILITY PURCHASES AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JOC-WSO20
Reporting Period
202305
Managing Agency
DEP
Fms Id
JOC-WSO20
Total Budget
19200000.00
Spend To Date
10168514.27
Spend To Date 1
0.5296
Fms Project Name
BWSO Facilities Improvement Program Citywide
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
WM-0105
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: JPSCOMPEH
Reporting Period
202305
Managing Agency
DEP
Fms Id
JPSCOMPEH
Total Budget
6000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
JEROME PS ELECTRIC & HYDRAULIC SVC REPLAMNT
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
WM-0105
Ten Year Plan Category
WATER QUALITY PRESERVATION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: LFK-RELO
Reporting Period
202305
Managing Agency
DEP
Fms Id
LFK-RELO
Total Budget
9363000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Lefrak Relocation
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
EP-0006
Ten Year Plan Category
FACILITY PURCHASES AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: MASPETH
Reporting Period
202305
Managing Agency
DEP
Fms Id
MASPETH
Total Budget
16542888.48
Spend To Date
5542888.48
Spend To Date 1
0.335
Fms Project Name
RECONSTRUCTION OF BUILDING, MASPETH, QUEENS
Current Phase
(Pending)
Borough
Queens
Community Board
Queens
Budget Line
EP-0006
Ten Year Plan Category
FACILITY PURCHASES AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: MED677
Reporting Period
202305
Managing Agency
DEP
Fms Id
MED677
Total Budget
10612000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
WM work in 10th Ave, Union Sq E, FDR Drive, MN
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 04
Budget Line
WM-0001
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: MED680
Reporting Period
202305
Managing Agency
DEP
Fms Id
MED680
Total Budget
17702000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Dist & Trunk WM in Broadway btwn W 60 ST & W 64 ST, MN
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 04, Manhattan 07
Budget Line
WM-0001, WM-0006
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: MED681
Reporting Period
202305
Managing Agency
DEP
Fms Id
MED681
Total Budget
17251000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Dist WM work in W 34 St from 7th to 9th Ave, MN
Current Phase
(Pending)
Borough
Manhattan
Community Board
Manhattan 04, Manhattan 06
Budget Line
WM-0001
Ten Year Plan Category
TRUNK AND DISTRIBUTION MAIN REPLACEMENT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: MIBBNC002
Reporting Period
202305
Managing Agency
DEP
Fms Id
MIBBNC002
Total Budget
25000.00
Spend To Date
25000.00
Spend To Date 1
1.00
Current Phase
(Pending)
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: MIBBNC05B
Reporting Period
202305
Managing Agency
DEP
Fms Id
MIBBNC05B
Total Budget
79132000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Instal New Storm SE & Rplmt San SE & Dist WM Hylan Blvd SI
Current Phase
(Pending)
Borough
Staten Island
Community Board
Staten Island 02
Budget Line
SE-0002R, SE-0200R, WM-0001
Ten Year Plan Category
BLUEBELT PROGRAM
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: MONIT-13
Reporting Period
202305
Managing Agency
DEP
Fms Id
MONIT-13
Total Budget
364475.00
Spend To Date
214475.00
Spend To Date 1
0.5884
Fms Project Name
FAD 13-17 Monitoring
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
WM-0030
Ten Year Plan Category
FILTRATION AVOIDANCE DETERMINATION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: MONIT-18
Reporting Period
202305
Managing Agency
DEP
Fms Id
MONIT-18
Total Budget
739000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
FAD MONITORING
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
WM-0030
Ten Year Plan Category
FILTRATION AVOIDANCE DETERMINATION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: MS4-GRANT
Reporting Period
202305
Managing Agency
DEP
Fms Id
MS4-GRANT
Total Budget
3000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
GREEN INFRASTRUCTURE GRANT PROGRAM - MS4 PROJECTS
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
SE-0005
Ten Year Plan Category
BLUEBELT PROGRAM
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: MS4-STORM
Reporting Period
202305
Managing Agency
DEP
Fms Id
MS4-STORM
Total Budget
51360439.44
Spend To Date
5066445.84
Spend To Date 1
0.0986
Fms Project Name
MS4 CITYWIDE STORMWATER MANAGEMENT PROGRAM
Current Phase
(Pending)
Borough
Citywide
Community Board
Citywide
Budget Line
SE-0005, WP-0169
Ten Year Plan Category
WATER QUALITY MANDATES
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: NC-163
Reporting Period
202305
Managing Agency
DEP
Fms Id
NC-163
Total Budget
6765152.68
Spend To Date
6245575.29
Spend To Date 1
0.9231
Fms Project Name
CONSTRUCTION OF PERIMETER FENCE AT NEWTOWN CREEK WPCP
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
WP-0112
Ten Year Plan Category
PLANT UPGRADING AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: NC-173
Reporting Period
202305
Managing Agency
DEP
Fms Id
NC-173
Total Budget
36001000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
INSTALL GRAVITY BELT THICKENERS AT NEWTOWN CREEK WPCP
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
WP-0112
Ten Year Plan Category
PLANT UPGRADING AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: NC-179
Reporting Period
202305
Managing Agency
DEP
Fms Id
NC-179
Total Budget
1000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
INSTALLATION OF 2ND GAS HOLDER @NEWTOWN CREEK WRRF
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
WP-0112
Ten Year Plan Category
PLANT UPGRADING AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: NC-36
Reporting Period
202305
Managing Agency
DEP
Fms Id
NC-36
Total Budget
303517399.22
Spend To Date
271370399.87
Spend To Date 1
0.894
Fms Project Name
MAIN BUILDING NORTH NEWTOWN CREEK WPCP UPGRADING
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
WP-0283
Ten Year Plan Category
CONSENT DECREE UPGRADING AND CONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DEP • Fms Id: NC-40
Reporting Period
202305
Managing Agency
DEP
Fms Id
NC-40
Total Budget
233167167.53
Spend To Date
220103806.49
Spend To Date 1
0.9439
Fms Project Name
RECONSTRUCTION OF MANHATTAN PUMP STATION
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
WP-0283
Ten Year Plan Category
CONSENT DECREE UPGRADING AND CONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000