Capital Projects Dashboard - Citywide Budget and Schedule

All major capital infrastructure projects with a committed budget. Financial information and agency schedule details for each project are joined via FMS ID. Only projects in the design phase or later have project schedules displayed. This dataset is part of the Capital Projects Dashboard.

Note: Each row is uniquely identified by its Financial Management Service (FMS) ID. FMS ID is the unique ID that OMB uses for the FMS (Financial Information System). This ID can be universally joined with any OMB dataset that has the same field. The Capital Projects Dashboard is the result of joining OMB’s fiscal data with the agency’s schedule data. FMS IDs and agency projects don't always have a one-to-one relationship (i.e., one project schedule may correlate to multiple FMS IDs, and one FMS may correct to multiple projects with different schedules).

City Government Mayor's Office of Operations (OPS) Dataset fb86-vt7u 27 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2806
Fms Id
P-503TOTT
Total Budget
21455000.00
Spend To Date
254971.44
Spend To Date 1
0.0118
Fms Project Name
Tottenville Shoreline Protection - Staten Island
Agency Project Name
Tottenville Shoreline Protection Construction
Agency Project Description
This project will construct shoreline protection measures in Conference House Park.
Current Phase
Design
Current Phase Start
2018-09-18T00:00:00.000
Forecast Current Phase End
2024-06-29T00:00:00.000
Forecast Completion
2028-02-24T00:00:00.000
Actual Design Start
2018-09-18T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
P-1018, P-I001, PU-0100, PU-0200
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2807
Fms Id
P-4NNANPG
Total Budget
2700327.00
Spend To Date
209970.33
Spend To Date 1
0.0777
Fms Project Name
NOONAN PLAYGROUND- Q044-119M
Agency Project Name
Noonan Playground Dog Run Construction and Seating Area Reconstruction
Agency Project Description
This project will construct a dog run and reconstruct the seating area at Noonan Playground, including new plantings, benches, pavement, stairs, fencing, lighting, and drinking fountains.
Current Phase
Construction
Current Phase Start
2023-03-27T00:00:00.000
Forecast Current Phase End
2024-03-26T00:00:00.000
Forecast Completion
2024-03-26T00:00:00.000
Actual Design Start
2019-06-11T00:00:00.000
Actual Design End
2020-07-01T00:00:00.000
Actual Construction
2020-07-01T00:00:00.000
Actual Construction 1
2022-06-22T00:00:00.000
Actual Construction Start
2023-03-27T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-0245Q, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2808
Fms Id
P-413SPBD
Total Budget
3679984.65
Spend To Date
1841520.12
Spend To Date 1
0.5004
Fms Project Name
Springfield Park Basketball Courts and BBQ Area Q107-119M
Agency Project Name
Springfield Park Basketball Courts and BBQ Area Reconstruction
Current Phase
Construction
Current Phase Start
2022-07-11T00:00:00.000
Forecast Current Phase End
2023-07-10T00:00:00.000
Forecast Completion
2023-07-10T00:00:00.000
Actual Design Start
2018-11-13T00:00:00.000
Actual Design End
2020-03-27T00:00:00.000
Actual Construction
2020-03-27T00:00:00.000
Actual Construction 1
2022-04-27T00:00:00.000
Actual Construction Start
2022-07-11T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-0245Q, P-D019, P-I001, TF-0502
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2809
Fms Id
P-104JRME
Total Budget
2599739.93
Spend To Date
1244519.03
Spend To Date 1
0.4787
Fms Project Name
Jerome Playground S- Handball courts renovation X148C7-120M
Agency Project Name
Jerome Playground South Skate Park Construction
Agency Project Description
This project will demolish the handball courts and construct a new skate park in their place at Jerome Playground South.
Current Phase
Construction
Current Phase Start
2022-09-19T00:00:00.000
Forecast Current Phase End
2023-09-18T00:00:00.000
Forecast Completion
2023-09-18T00:00:00.000
Actual Design Start
2019-11-25T00:00:00.000
Actual Design End
2020-12-28T00:00:00.000
Actual Construction
2020-12-28T00:00:00.000
Actual Construction 1
2022-07-29T00:00:00.000
Actual Construction Start
2022-09-19T00:00:00.000
Borough
Bronx
Community Board
Bronx, Bronx 04
Budget Line
P-D021, P-I001, P-X245
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2810
Fms Id
P-104GBLE
Total Budget
5991589.85
Spend To Date
724878.30
Spend To Date 1
0.1209
Fms Project Name
Goble Playground- new BBall equip., swings, handball court
Agency Project Name
Goble Playground Reconstruction
Agency Project Description
This project will reconstruct Goble Playground, including the play equipment, swings, basketball and handball courts, drainage and water systems, landscaping and park security lighting.
Current Phase
Construction Procurement
Current Phase Start
2022-08-25T00:00:00.000
Forecast Current Phase End
2023-12-31T00:00:00.000
Forecast Completion
2025-07-28T00:00:00.000
Actual Design Start
2021-03-31T00:00:00.000
Actual Design End
2022-08-25T00:00:00.000
Actual Construction
2022-08-25T00:00:00.000
Borough
Bronx
Community Board
Bronx, Bronx 04
Budget Line
P-D021, P-I001, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2811
Fms Id
P-5FABBAS
Total Budget
2258480.00
Spend To Date
278480.49
Spend To Date 1
0.1233
Fms Project Name
Faber Park -Remove Equipment & Install Basketball Court
Agency Project Name
Faber Park Basketball Courts Construction
Agency Project Description
This project will demolish an existing play area and construct two basketball courts at Faber Park with new lighting, bleachers, a drinking fountain, benches, and plantings.
Current Phase
Construction Procurement
Current Phase Start
2021-05-05T00:00:00.000
Forecast Current Phase End
2023-10-31T00:00:00.000
Forecast Completion
2025-05-28T00:00:00.000
Actual Design Start
2019-10-31T00:00:00.000
Actual Design End
2021-05-05T00:00:00.000
Actual Construction
2021-05-05T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
P-D020, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2812
Fms Id
P-215KLLY
Total Budget
3199869.00
Spend To Date
1759829.95
Spend To Date 1
0.5499
Fms Project Name
Kelly Playground Reconstruction B157-119M
Agency Project Name
Kelly Playground Reconstruction
Agency Project Description
This project will reconstruct the children's play area in Kelly Playground.
Current Phase
Construction
Current Phase Start
2022-05-16T00:00:00.000
Forecast Current Phase End
2023-07-30T00:00:00.000
Forecast Completion
2023-07-30T00:00:00.000
Actual Design Start
2019-01-15T00:00:00.000
Actual Design End
2020-01-09T00:00:00.000
Actual Construction
2020-01-09T00:00:00.000
Actual Construction 1
2022-03-29T00:00:00.000
Actual Construction Start
2022-05-16T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn, Brooklyn 15
Budget Line
P-1018, P-D017, P-I001, TF-0502
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2813
Fms Id
P-207RAIN
Total Budget
1910000.00
Spend To Date
804726.07
Spend To Date 1
0.4213
Fms Project Name
Rainbow Playground - Playground Update B265-120M
Agency Project Name
Rainbow Playground Reconstruction
Agency Project Description
This project will reconstruct the play and seating areas in Rainbow Playground, including the play equipment, safety surfacing, spray shower, fencing, benches, pavement, and drinking fountain.
Current Phase
Construction
Current Phase Start
2022-10-11T00:00:00.000
Forecast Current Phase End
2023-10-10T00:00:00.000
Forecast Completion
2023-10-10T00:00:00.000
Actual Design Start
2019-11-25T00:00:00.000
Actual Design End
2020-12-23T00:00:00.000
Actual Construction
2020-12-23T00:00:00.000
Actual Construction 1
2022-08-29T00:00:00.000
Actual Construction Start
2022-10-11T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn, Brooklyn 07
Budget Line
P-D017, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2814
Fms Id
P-207OPML
Total Budget
2879000.00
Spend To Date
405935.97
Spend To Date 1
0.1409
Fms Project Name
Ocean Parkway Malls - RC B065-119M
Agency Project Name
Ocean Parkway Malls Bike Path Reconstruction
Agency Project Description
This project will reconstruct the bike path on the west side of the Ocean Parkway Malls from Avenue R to Avenue X.
Current Phase
Construction
Current Phase Start
2023-03-06T00:00:00.000
Forecast Current Phase End
2024-03-04T00:00:00.000
Forecast Completion
2024-03-04T00:00:00.000
Actual Design Start
2019-04-01T00:00:00.000
Actual Design End
2020-05-04T00:00:00.000
Actual Construction
2020-05-04T00:00:00.000
Actual Construction 1
2022-09-29T00:00:00.000
Actual Construction Start
2023-03-06T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-D017, P-I001, P-K011
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2815
Fms Id
P-400FMCP
Total Budget
2400000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
FMCP Vaults
Agency Project Name
Flushing Meadows Corona Park Electrical Vault Reconstruction (Hurricane Sandy)
Agency Project Description
This project will reconstruct the electrical vaults in Flushing Meadows Corona Park that were damaged by Hurricane Sandy.
Current Phase
Design
Current Phase Start
2019-08-21T00:00:00.000
Forecast Current Phase End
2023-06-30T00:00:00.000
Forecast Completion
2028-02-24T00:00:00.000
Actual Design Start
2019-08-21T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-1018
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2815
Fms Id
SANDY4-29
Total Budget
48483909.00
Spend To Date
1483682.09
Spend To Date 1
0.0306
Fms Project Name
FMCP Electrical Repairs Q099-220M
Agency Project Name
Flushing Meadows Corona Park Electrical Vault Reconstruction (Hurricane Sandy)
Agency Project Description
This project will reconstruct the electrical vaults in Flushing Meadows Corona Park that were damaged by Hurricane Sandy.
Current Phase
Design
Current Phase Start
2019-08-21T00:00:00.000
Forecast Current Phase End
2023-06-30T00:00:00.000
Forecast Completion
2028-02-24T00:00:00.000
Actual Design Start
2019-08-21T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2816
Fms Id
P-401APFS
Total Budget
19159349.30
Spend To Date
5532703.59
Spend To Date 1
0.2887
Fms Project Name
Astoria Pool Filtration System
Agency Project Name
Astoria Pool Filtration System Reconstruction
Agency Project Description
This project will reconstruct the filtration system at Astoria Pool.
Current Phase
Construction
Current Phase Start
2022-10-11T00:00:00.000
Forecast Current Phase End
2024-06-06T00:00:00.000
Forecast Completion
2024-06-06T00:00:00.000
Actual Design Start
2019-09-10T00:00:00.000
Actual Design End
2021-06-24T00:00:00.000
Actual Construction
2021-06-24T00:00:00.000
Actual Construction 1
2022-09-28T00:00:00.000
Actual Construction Start
2022-10-11T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-0990, P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2817
Fms Id
P-306TUDO
Total Budget
1605000.00
Spend To Date
710927.23
Spend To Date 1
0.4429
Fms Project Name
Tudor Grove Playground - Manhattan
Agency Project Name
Mary O'Connor and Tudor Grove Playground Reconstruction
Agency Project Description
This project will reconstruct the play equipment and safety surfacing at Mary O'Connor and Tudor Grove playgrounds.
Current Phase
Construction
Current Phase Start
2022-11-14T00:00:00.000
Forecast Current Phase End
2023-11-13T00:00:00.000
Forecast Completion
2023-11-13T00:00:00.000
Actual Design Start
2019-02-13T00:00:00.000
Actual Design End
2020-02-27T00:00:00.000
Actual Construction
2020-02-27T00:00:00.000
Actual Construction 1
2022-08-20T00:00:00.000
Actual Construction Start
2022-11-14T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-0245M, P-D018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2818
Fms Id
NDF-MKETT
Total Budget
10117487.66
Spend To Date
4606932.59
Spend To Date 1
0.4553
Fms Project Name
NDF - Monsignor Kett Playground R/C, M199-219M
Agency Project Name
Monsignor Kett Playground Reconstruction
Current Phase
Construction
Current Phase Start
2022-04-18T00:00:00.000
Forecast Current Phase End
2023-07-17T00:00:00.000
Forecast Completion
2023-07-17T00:00:00.000
Actual Design Start
2019-01-29T00:00:00.000
Actual Design End
2020-04-27T00:00:00.000
Actual Construction
2020-04-27T00:00:00.000
Actual Construction 1
2022-03-22T00:00:00.000
Actual Construction Start
2022-04-18T00:00:00.000
Borough
Manhattan
Community Board
Manhattan, Manhattan 12
Budget Line
ED-0384, P-I001, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2819
Fms Id
NDF-DYMAN
Total Budget
5626300.00
Spend To Date
668138.65
Spend To Date 1
0.1187
Fms Project Name
NDF - Highbridge Park Dyckman Rest Reconstruction M037-121M
Agency Project Name
Highbridge Park Dyckman Rest Reconstruction
Agency Project Description
The project will reconstruct Dyckman Rest in Highbridge Park with a playground and seating areas.
Current Phase
Construction Procurement
Current Phase Start
2022-02-23T00:00:00.000
Forecast Current Phase End
2023-08-30T00:00:00.000
Forecast Completion
2025-06-25T00:00:00.000
Actual Design Start
2021-02-24T00:00:00.000
Actual Design End
2022-02-23T00:00:00.000
Actual Construction
2022-02-23T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
ED-0384, P-I001, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2820
Fms Id
NDF-IWOOD
Total Budget
9397000.00
Spend To Date
678919.99
Spend To Date 1
0.0722
Fms Project Name
NDF - Inwood Hill Park Soccer Field #1 R/C
Agency Project Name
Inwood Hill Park Soccer Field 1 Reconstruction
Agency Project Description
This project will reconstruct soccer field 1 at Inwood Hill Park.
Current Phase
Construction Procurement
Current Phase Start
2022-06-30T00:00:00.000
Forecast Current Phase End
2024-01-31T00:00:00.000
Forecast Completion
2025-08-28T00:00:00.000
Actual Design Start
2019-11-19T00:00:00.000
Actual Design End
2022-06-30T00:00:00.000
Actual Construction
2022-06-30T00:00:00.000
Borough
Manhattan
Community Board
Manhattan, Manhattan 12
Budget Line
ED-0384, P-1018, P-D018, P-I001
Ten Year Plan Category
NEIGHBORHOOD REVITALIZATION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2821
Fms Id
P-304CBBC
Total Budget
1204428.91
Spend To Date
908567.65
Spend To Date 1
0.7543
Fms Project Name
Chelsea Basketball Court Renovation, Manhattan
Agency Project Name
Chelsea Park Basketball Court Reconstruction
Current Phase
Construction
Current Phase Start
2022-06-27T00:00:00.000
Forecast Current Phase End
2023-06-26T00:00:00.000
Forecast Completion
2023-06-26T00:00:00.000
Actual Design Start
2019-04-16T00:00:00.000
Actual Design End
2020-04-14T00:00:00.000
Actual Construction
2020-04-14T00:00:00.000
Actual Construction 1
2022-06-01T00:00:00.000
Actual Construction Start
2022-06-27T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-D018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2822
Fms Id
SANDY4-27
Total Budget
1167338.00
Spend To Date
88843.82
Spend To Date 1
0.0761
Fms Project Name
Little Bay Revetment
Agency Project Name
Little Bay Park Waterfront Reconstruction
Agency Project Description
This project will reconstruct the waterfront Parks infrastructure damaged by Hurricane Sandy at Little Bay Park.
Current Phase
Design
Current Phase Start
2020-01-06T00:00:00.000
Forecast Current Phase End
2024-07-09T00:00:00.000
Forecast Completion
2027-03-06T00:00:00.000
Actual Design Start
2020-01-06T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2823
Fms Id
P-500LEM2
Total Budget
6000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
LEMON CREEK MARINA WATERFRONT RC R079
Agency Project Name
Lemon Creek Marina Waterfront Reconstruction
Agency Project Description
This project will reconstruct the waterfront Parks infrastructure damaged by Hurricane Sandy at Lemon Creek Marina.
Current Phase
Design
Current Phase Start
2020-01-06T00:00:00.000
Forecast Current Phase End
2024-05-06T00:00:00.000
Forecast Completion
2027-01-01T00:00:00.000
Actual Design Start
2020-01-06T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
P-0501
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2823
Fms Id
SANDY5-43
Total Budget
12102593.00
Spend To Date
818430.06
Spend To Date 1
0.0676
Fms Project Name
Lemon Creek Marina R079-120M
Agency Project Name
Lemon Creek Marina Waterfront Reconstruction
Agency Project Description
This project will reconstruct the waterfront Parks infrastructure damaged by Hurricane Sandy at Lemon Creek Marina.
Current Phase
Design
Current Phase Start
2020-01-06T00:00:00.000
Forecast Current Phase End
2024-05-06T00:00:00.000
Forecast Completion
2027-01-01T00:00:00.000
Actual Design Start
2020-01-06T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2824
Fms Id
P-6REF20B
Total Budget
1330000.00
Spend To Date
946999.74
Spend To Date 1
0.712
Fms Project Name
Reforestation FY20 BX & Que CB 1-7
Agency Project Name
Queens Community Boards 8-14 and Bronx Reforestation FY20
Agency Project Description
This project will remove invasive species and plant new and replacement trees in the Bronx, and in Queens Community Boards 8-14.
Current Phase
Construction
Current Phase Start
2021-06-07T00:00:00.000
Forecast Current Phase End
2023-12-03T00:00:00.000
Forecast Completion
2023-12-03T00:00:00.000
Actual Design Start
2018-10-29T00:00:00.000
Actual Design End
2019-03-07T00:00:00.000
Actual Construction
2019-03-07T00:00:00.000
Actual Construction 1
2021-04-22T00:00:00.000
Actual Construction Start
2021-06-07T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
P-0822, P-I001
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2825
Fms Id
P-6SUSTN1
Total Budget
2227000.00
Spend To Date
51444.38
Spend To Date 1
0.0231
Fms Project Name
Citywide Dollar Sustainability Contract CNYG-319MA
Agency Project Name
Citywide Sustainability and Energy-Efficiency Utility Systems Reconstruction (CNYG-319MA)
Agency Project Description
This project will reconstruct utility systems to increase the energy-efficiency and sustainability of various parks facilities citywide.
Current Phase
Construction
Current Phase Start
2023-03-15T00:00:00.000
Forecast Current Phase End
2026-03-13T00:00:00.000
Forecast Completion
2026-03-13T00:00:00.000
Actual Design Start
2018-10-05T00:00:00.000
Actual Design End
2020-07-01T00:00:00.000
Actual Construction
2020-07-01T00:00:00.000
Actual Construction 1
2022-10-31T00:00:00.000
Actual Construction Start
2023-03-15T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
P-I001, PU-0025
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2826
Fms Id
P-6PLFLTR
Total Budget
2514000.00
Spend To Date
1062244.84
Spend To Date 1
0.4225
Fms Project Name
Recon of intermediate pool filter plants citywide CNYG-619M
Agency Project Name
Citywide Intermediate Pool Filter Plants Reconstruction
Current Phase
Construction
Current Phase Start
2021-09-20T00:00:00.000
Forecast Current Phase End
2023-09-19T00:00:00.000
Forecast Completion
2023-09-19T00:00:00.000
Actual Design Start
2018-10-01T00:00:00.000
Actual Design End
2019-06-25T00:00:00.000
Actual Construction
2019-06-25T00:00:00.000
Actual Construction 1
2021-06-17T00:00:00.000
Actual Construction Start
2021-09-20T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
P-1008, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2827
Fms Id
P-308EPOA
Total Budget
15199995.74
Spend To Date
38440.73
Spend To Date 1
0.0025
Fms Project Name
POA East River Esplanade Improvements, Manhattan
Agency Project Name
East River Esplanade Stabilization and Reconstruction Phase 2
Agency Project Description
This project will stabilize and reconstruct portions of the East River Esplanade.
Current Phase
Construction Procurement
Current Phase Start
2022-06-23T00:00:00.000
Forecast Current Phase End
2024-03-31T00:00:00.000
Forecast Completion
2026-04-28T00:00:00.000
Actual Design Start
2019-02-01T00:00:00.000
Actual Design End
2022-06-23T00:00:00.000
Actual Construction
2022-06-23T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-0501
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2827
Fms Id
P-308ERP2
Total Budget
11708752.26
Spend To Date
374507.69
Spend To Date 1
0.0319
Fms Project Name
East River Esplanade Stabilization And Reconstruction PHASE
Agency Project Name
East River Esplanade Stabilization and Reconstruction Phase 2
Agency Project Description
This project will stabilize and reconstruct portions of the East River Esplanade.
Current Phase
Construction Procurement
Current Phase Start
2022-06-23T00:00:00.000
Forecast Current Phase End
2024-03-31T00:00:00.000
Forecast Completion
2026-04-28T00:00:00.000
Actual Design Start
2019-02-01T00:00:00.000
Actual Design End
2022-06-23T00:00:00.000
Actual Construction
2022-06-23T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-0501, P-D018, P-I001
Ten Year Plan Category
MAJOR RECREATIONAL FACILITIES AND FACILITY RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2828
Fms Id
P-306GLIC
Total Budget
15969000.00
Spend To Date
193180.98
Spend To Date 1
0.012
Fms Project Name
Glick Park
Agency Project Name
East River Esplanade East 36th-38th Streets Seawall Reconstruction
Agency Project Description
This project will reconstruct the seawall and waterfront infrastructure at the East River Esplanade .
Current Phase
Design
Current Phase Start
2019-10-21T00:00:00.000
Forecast Current Phase End
2023-12-31T00:00:00.000
Forecast Completion
2027-02-26T00:00:00.000
Actual Design Start
2019-10-21T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-0501, P-I001, PU-0200
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2829
Fms Id
P-4CPTLCS
Total Budget
2412088.00
Spend To Date
784363.73
Spend To Date 1
0.3251
Fms Project Name
Captain Tilly Park Comfort Station
Agency Project Name
Captain Tilly Park Public Restroom Building Reconstruction
Agency Project Description
This project will reconstruct the public restroom building in Captain Tilly Park.
Current Phase
Construction
Current Phase Start
2022-09-19T00:00:00.000
Forecast Current Phase End
2024-03-11T00:00:00.000
Forecast Completion
2024-03-11T00:00:00.000
Actual Design Start
2018-11-14T00:00:00.000
Actual Design End
2020-01-24T00:00:00.000
Actual Construction
2020-01-24T00:00:00.000
Actual Construction 1
2022-01-11T00:00:00.000
Actual Construction Start
2022-09-19T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-0505, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2830
Fms Id
P-414THUR
Total Budget
582999.90
Spend To Date
39707.15
Spend To Date 1
0.0681
Fms Project Name
Thursby Basin Park Construction
Agency Project Name
Thursby Basin Park Construction
Agency Project Description
This project will construct Thursby Basin Park.
Current Phase
Construction Procurement
Current Phase Start
2023-02-21T00:00:00.000
Forecast Current Phase End
2024-04-30T00:00:00.000
Forecast Completion
2025-11-26T00:00:00.000
Actual Design Start
2020-03-10T00:00:00.000
Actual Design End
2023-02-21T00:00:00.000
Actual Construction
2023-02-21T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-D019, P-D171
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2830
Fms Id
SANDY4-45
Total Budget
12142955.00
Spend To Date
1008096.49
Spend To Date 1
0.083
Fms Project Name
SANDY - Thursby Basin Park Construction Q479-120M
Agency Project Name
Thursby Basin Park Construction
Agency Project Description
This project will construct Thursby Basin Park.
Current Phase
Construction Procurement
Current Phase Start
2023-02-21T00:00:00.000
Forecast Current Phase End
2024-04-30T00:00:00.000
Forecast Completion
2025-11-26T00:00:00.000
Actual Design Start
2020-03-10T00:00:00.000
Actual Design End
2023-02-21T00:00:00.000
Actual Construction
2023-02-21T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2831
Fms Id
P-1HVMRCS
Total Budget
1657998.50
Spend To Date
810771.96
Spend To Date 1
0.489
Fms Project Name
Havemeyer Playground C.S.
Agency Project Name
Havemeyer Playground Public Restroom Building Reconstruction
Agency Project Description
This project will reconstruct the public restroom building in Havemeyer Playground.
Current Phase
Construction
Current Phase Start
2022-07-11T00:00:00.000
Forecast Current Phase End
2024-01-09T00:00:00.000
Forecast Completion
2024-01-09T00:00:00.000
Actual Design Start
2018-10-16T00:00:00.000
Actual Design End
2019-11-22T00:00:00.000
Actual Construction
2019-11-22T00:00:00.000
Actual Construction 1
2022-05-03T00:00:00.000
Actual Construction Start
2022-07-11T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-0505, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2832
Fms Id
P-306ASLV
Total Budget
5055610.23
Spend To Date
202865.01
Spend To Date 1
0.0401
Fms Project Name
Asser Levy Recreation Center
Agency Project Name
Asser Levy Recreation Center HVAC System Reconstruction (Hurricane Sandy)
Agency Project Description
This project will reconstruct the HVAC system at Asser Levy Recreation Center.
Current Phase
Construction Procurement
Current Phase Start
2022-11-28T00:00:00.000
Forecast Current Phase End
2024-03-31T00:00:00.000
Forecast Completion
2026-04-20T00:00:00.000
Actual Design Start
2019-09-25T00:00:00.000
Actual Design End
2022-11-28T00:00:00.000
Actual Construction
2022-11-28T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-0506, P-1250, P-D018, P-M245
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2832
Fms Id
SANDY6-08
Total Budget
5532709.37
Spend To Date
377537.81
Spend To Date 1
0.0682
Fms Project Name
Asser Levy HMP (Hazard Mitigation Plan ) Funding
Agency Project Name
Asser Levy Recreation Center HVAC System Reconstruction (Hurricane Sandy)
Agency Project Description
This project will reconstruct the HVAC system at Asser Levy Recreation Center.
Current Phase
Construction Procurement
Current Phase Start
2022-11-28T00:00:00.000
Forecast Current Phase End
2024-03-31T00:00:00.000
Forecast Completion
2026-04-20T00:00:00.000
Actual Design Start
2019-09-25T00:00:00.000
Actual Design End
2022-11-28T00:00:00.000
Actual Construction
2022-11-28T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2833
Fms Id
P-1VCTURF
Total Budget
2860000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Van Cortlandt Park Limited Scope Syn Turf & Track Recon
Agency Project Name
Citywide Synthetic Turf Field Reconstruction (CNYG-1119MA)
Agency Project Description
This project will reconstruct synthetic turf fields citywide.
Current Phase
Construction
Current Phase Start
2023-03-15T00:00:00.000
Forecast Current Phase End
2025-03-13T00:00:00.000
Forecast Completion
2025-03-13T00:00:00.000
Actual Design Start
2018-11-26T00:00:00.000
Actual Design End
2020-12-23T00:00:00.000
Actual Construction
2020-12-23T00:00:00.000
Actual Construction 1
2022-12-23T00:00:00.000
Actual Construction Start
2023-03-15T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-0245Q, P-0510, P-1018, P-I001
Ten Year Plan Category
MAJOR RECREATIONAL FACILITIES AND FACILITY RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2833
Fms Id
P-304CPTF
Total Budget
1650000.00
Spend To Date
171438.92
Spend To Date 1
0.1039
Fms Project Name
Chelsea Park-Replace the synthetic turf field and track M011
Agency Project Name
Citywide Synthetic Turf Field Reconstruction (CNYG-1119MA)
Agency Project Description
This project will reconstruct synthetic turf fields citywide.
Current Phase
Construction
Current Phase Start
2023-03-15T00:00:00.000
Forecast Current Phase End
2025-03-13T00:00:00.000
Forecast Completion
2025-03-13T00:00:00.000
Actual Design Start
2018-11-26T00:00:00.000
Actual Design End
2020-12-23T00:00:00.000
Actual Construction
2020-12-23T00:00:00.000
Actual Construction 1
2022-12-23T00:00:00.000
Actual Construction Start
2023-03-15T00:00:00.000
Borough
Manhattan
Community Board
Manhattan 04
Budget Line
P-D018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2833
Fms Id
P-309ANUN
Total Budget
682000.00
Spend To Date
58974.21
Spend To Date 1
0.0864
Fms Project Name
Annunciation Playground
Agency Project Name
Citywide Synthetic Turf Field Reconstruction (CNYG-1119MA)
Agency Project Description
This project will reconstruct synthetic turf fields citywide.
Current Phase
Construction
Current Phase Start
2023-03-15T00:00:00.000
Forecast Current Phase End
2025-03-13T00:00:00.000
Forecast Completion
2025-03-13T00:00:00.000
Actual Design Start
2018-11-26T00:00:00.000
Actual Design End
2020-12-23T00:00:00.000
Actual Construction
2020-12-23T00:00:00.000
Actual Construction 1
2022-12-23T00:00:00.000
Actual Construction Start
2023-03-15T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-1018, P-D018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2833
Fms Id
P-501CRPL
Total Budget
4100000.00
Spend To Date
812922.36
Spend To Date 1
0.1982
Fms Project Name
CPL. Thompson Park
Agency Project Name
Citywide Synthetic Turf Field Reconstruction (CNYG-1119MA)
Agency Project Description
This project will reconstruct synthetic turf fields citywide.
Current Phase
Construction
Current Phase Start
2023-03-15T00:00:00.000
Forecast Current Phase End
2025-03-13T00:00:00.000
Forecast Completion
2025-03-13T00:00:00.000
Actual Design Start
2018-11-26T00:00:00.000
Actual Design End
2020-12-23T00:00:00.000
Actual Construction
2020-12-23T00:00:00.000
Actual Construction 1
2022-12-23T00:00:00.000
Actual Construction Start
2023-03-15T00:00:00.000
Borough
Staten Island
Community Board
Staten Island, Staten Island 01
Budget Line
P-D020, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2834
Fms Id
SANDY1-11
Total Budget
10999883.32
Spend To Date
801261.44
Spend To Date 1
0.0728
Fms Project Name
Pelham Bay Landfill
Agency Project Name
Pelham Bay Park Seawall Reconstruction (Hurricane Sandy)
Agency Project Description
This project will reconstruct the waterfront Parks infrastructure damaged by Hurricane Sandy at Pelham Bay Park.
Current Phase
Design
Current Phase Start
2020-01-06T00:00:00.000
Forecast Current Phase End
2024-11-06T00:00:00.000
Forecast Completion
2028-06-23T00:00:00.000
Actual Design Start
2020-01-06T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-1018, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2835
Fms Id
P-308ERP3
Total Budget
49683373.00
Spend To Date
395738.34
Spend To Date 1
0.0079
Fms Project Name
EAST RIVER ESPLANADE PHASE 3+
Agency Project Name
East River Esplanade Stabilization and Reconstruction Phase 3
Agency Project Description
This project will stabilize and reconstruct portions of the East River Esplanade.
Current Phase
Construction Procurement
Current Phase Start
2022-06-29T00:00:00.000
Forecast Current Phase End
2024-03-31T00:00:00.000
Forecast Completion
2026-10-27T00:00:00.000
Actual Design Start
2019-02-01T00:00:00.000
Actual Design End
2022-06-29T00:00:00.000
Actual Construction
2022-06-29T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-0501, P-1018, P-1245, P-D018, P-I001, PU-0200
Ten Year Plan Category
MISCELLANEOUS ENERGY EFFICIENCY AND SUSTAINABILITY
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2836
Fms Id
P-2SNSTRW
Total Budget
3984618.00
Spend To Date
2755790.62
Spend To Date 1
0.6916
Fms Project Name
Commodore Barry Park C.S
Agency Project Name
Commodore Barry Park Public Restroom Building Reconstruction
Agency Project Description
This project will reconstruct the public restroom building in Commodore Barry Park.
Current Phase
Construction
Current Phase Start
2022-05-09T00:00:00.000
Forecast Current Phase End
2023-10-30T00:00:00.000
Forecast Completion
2023-10-30T00:00:00.000
Actual Design Start
2019-04-24T00:00:00.000
Actual Design End
2020-05-29T00:00:00.000
Actual Construction
2020-05-29T00:00:00.000
Actual Construction 1
2022-01-10T00:00:00.000
Actual Construction Start
2022-05-09T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-0505, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2837
Fms Id
P-1WDLNCS
Total Budget
1831000.00
Spend To Date
273345.28
Spend To Date 1
0.1492
Fms Project Name
Woodlawn Playground C.S X092-119M
Agency Project Name
Woodlawn Playground Public Restroom Building Reconstruction
Agency Project Description
This project will reconstruct the public restroom building in Woodlawn Playground in Van Cortlandt Park.
Current Phase
Construction Procurement
Current Phase Start
2020-05-29T00:00:00.000
Forecast Current Phase End
2023-09-30T00:00:00.000
Forecast Completion
2025-10-19T00:00:00.000
Actual Design Start
2019-01-08T00:00:00.000
Actual Design End
2020-05-29T00:00:00.000
Actual Construction
2020-05-29T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-0505, P-D021, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2838
Fms Id
P-3SHARCS
Total Budget
2069344.00
Spend To Date
693589.13
Spend To Date 1
0.3351
Fms Project Name
Sheltering Arms Playgound Comfort Station M190-119M
Agency Project Name
Sheltering Arms Playground Public Restroom Building Reconstruction
Agency Project Description
This project will reconstruct the public restroom building in Sheltering Arms Playground.
Current Phase
Construction
Current Phase Start
2022-03-28T00:00:00.000
Forecast Current Phase End
2023-09-26T00:00:00.000
Forecast Completion
2023-09-26T00:00:00.000
Actual Design Start
2019-02-19T00:00:00.000
Actual Design End
2020-03-20T00:00:00.000
Actual Construction
2020-03-20T00:00:00.000
Actual Construction 1
2022-01-11T00:00:00.000
Actual Construction Start
2022-03-28T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-0505, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2839
Fms Id
NDF-MKECS
Total Budget
4762560.00
Spend To Date
281735.11
Spend To Date 1
0.0591
Fms Project Name
NDF-Monsignor Kett Playground Comfort Station RC M199-119M
Agency Project Name
Monsignor Kett Playground Public Restroom Building Construction
Agency Project Description
This project will construct a public restroom building in Monsignor Kett Playground.
Current Phase
(Pending)
Forecast Current Phase End
2023-06-09T00:00:00.000
Forecast Completion
2025-06-28T00:00:00.000
Actual Design Start
2019-01-29T00:00:00.000
Actual Design End
2020-08-13T00:00:00.000
Actual Construction
2020-08-13T00:00:00.000
Actual Construction 1
2023-06-09T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
ED-0384, P-I001
Ten Year Plan Category
NEIGHBORHOOD REVITALIZATION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2840
Fms Id
P-5ANCH02
Total Budget
27230000.00
Spend To Date
327782.29
Spend To Date 1
0.012
Fms Project Name
Anchor Park Site - South Pk Construction /Fresh kills
Agency Project Name
Freshkills South Park Synthetic Turf Fields and Landscape Construction
Agency Project Description
This project will construct synthetic turf athletic fields, roadways, a parking lot with associated landscaping and stormwater management, multi-use and pedestrian paths, benches, signage, fencing, and lighting, and restore woodlands and wetlands at Freshkills South Park.
Current Phase
Design
Current Phase Start
2016-11-30T00:00:00.000
Forecast Current Phase End
2023-11-30T00:00:00.000
Forecast Completion
2027-07-27T00:00:00.000
Actual Design Start
2016-11-30T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
P-1321, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2841
Fms Id
P-5ANCH03
Total Budget
5290000.00
Spend To Date
109470.67
Spend To Date 1
0.0206
Fms Project Name
Anchor Park Site - South Pk CS /Fresh kills
Agency Project Name
Freshkills South Park Public Restroom Building Construction
Agency Project Description
This project will construct a public restroom building at Freshkills South Park.
Current Phase
Design
Current Phase Start
2016-11-30T00:00:00.000
Forecast Current Phase End
2023-11-30T00:00:00.000
Forecast Completion
2027-01-18T00:00:00.000
Actual Design Start
2016-11-30T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
P-1018, P-1321
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2842
Fms Id
P-3PL14A6
Total Budget
9154000.00
Spend To Date
260000.00
Spend To Date 1
0.0284
Fms Project Name
Ruppert Park Reconstruction
Agency Project Name
Ruppert Park Reconstruction
Agency Project Description
This project will reconstruct a portion of Ruppert Park.
Current Phase
Design
Current Phase Start
2021-10-19T00:00:00.000
Forecast Current Phase End
2023-06-30T00:00:00.000
Forecast Completion
2026-02-24T00:00:00.000
Actual Design Start
2021-10-19T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-D018, P-I001, P-M245
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2843
Fms Id
P-1RNQARF
Total Budget
4500044.00
Spend To Date
3453273.85
Spend To Date 1
0.7673
Fms Project Name
Ranaqua Roof Reconstruction
Agency Project Name
Ranaqua Roof Reconstruction
Agency Project Description
This project will reconstruct the roof at Ranaqua in Bronx Park.
Current Phase
Construction
Current Phase Start
2022-08-22T00:00:00.000
Forecast Current Phase End
2024-02-21T00:00:00.000
Forecast Completion
2024-02-21T00:00:00.000
Actual Design Start
2019-10-04T00:00:00.000
Actual Design End
2020-11-02T00:00:00.000
Actual Construction
2020-11-02T00:00:00.000
Actual Construction 1
2022-06-15T00:00:00.000
Actual Construction Start
2022-08-22T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-1018, P-1249, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2844
Fms Id
P-2PEPWIN
Total Budget
1014795.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Prospect Park Parade Ground PEP HQ window replace CNYG-2819M
Agency Project Name
Citywide Building Envelope Reconstruction (CNYG-2819M)
Agency Project Description
This project will reconstruct building envelopes at various parks facilities citywide.
Current Phase
Construction
Current Phase Start
2022-10-15T00:00:00.000
Forecast Current Phase End
2025-10-13T00:00:00.000
Forecast Completion
2025-10-13T00:00:00.000
Actual Design Start
2019-09-16T00:00:00.000
Actual Design End
2019-12-10T00:00:00.000
Actual Construction
2019-12-10T00:00:00.000
Actual Construction 1
2022-05-20T00:00:00.000
Actual Construction Start
2022-10-15T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2844
Fms Id
P-3SRAWIN
Total Budget
1001990.00
Spend To Date
1182.37
Spend To Date 1
0.0011
Fms Project Name
BRC Senior Ctr Sara D., Park (MN) window replace CNYG-2819M
Agency Project Name
Citywide Building Envelope Reconstruction (CNYG-2819M)
Agency Project Description
This project will reconstruct building envelopes at various parks facilities citywide.
Current Phase
Construction
Current Phase Start
2022-10-15T00:00:00.000
Forecast Current Phase End
2025-10-13T00:00:00.000
Forecast Completion
2025-10-13T00:00:00.000
Actual Design Start
2019-09-16T00:00:00.000
Actual Design End
2019-12-10T00:00:00.000
Actual Construction
2019-12-10T00:00:00.000
Actual Construction 1
2022-05-20T00:00:00.000
Actual Construction Start
2022-10-15T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2844
Fms Id
P-3TJRCUP
Total Budget
300000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Thomas Jefferson Recreational Center-Upgrades
Agency Project Name
Citywide Building Envelope Reconstruction (CNYG-2819M)
Agency Project Description
This project will reconstruct building envelopes at various parks facilities citywide.
Current Phase
Construction
Current Phase Start
2022-10-15T00:00:00.000
Forecast Current Phase End
2025-10-13T00:00:00.000
Forecast Completion
2025-10-13T00:00:00.000
Actual Design Start
2019-09-16T00:00:00.000
Actual Design End
2019-12-10T00:00:00.000
Actual Construction
2019-12-10T00:00:00.000
Actual Construction 1
2022-05-20T00:00:00.000
Actual Construction Start
2022-10-15T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-D018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2845
Fms Id
P-108TBTF
Total Budget
425000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Tibbett's Tail - Fence
Agency Project Name
Citywide Fencing Systems Reconstruction
Agency Project Description
This project will reconstruct fencing systems at various parks citywide.
Current Phase
Construction Procurement
Current Phase Start
2022-05-02T00:00:00.000
Forecast Current Phase End
2023-12-31T00:00:00.000
Forecast Completion
2027-07-28T00:00:00.000
Actual Design Start
2019-09-04T00:00:00.000
Actual Design End
2022-05-02T00:00:00.000
Actual Construction
2022-05-02T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-D021, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000