Capital Projects Dashboard - Citywide Budget and Schedule

All major capital infrastructure projects with a committed budget. Financial information and agency schedule details for each project are joined via FMS ID. Only projects in the design phase or later have project schedules displayed. This dataset is part of the Capital Projects Dashboard.

Note: Each row is uniquely identified by its Financial Management Service (FMS) ID. FMS ID is the unique ID that OMB uses for the FMS (Financial Information System). This ID can be universally joined with any OMB dataset that has the same field. The Capital Projects Dashboard is the result of joining OMB’s fiscal data with the agency’s schedule data. FMS IDs and agency projects don't always have a one-to-one relationship (i.e., one project schedule may correlate to multiple FMS IDs, and one FMS may correct to multiple projects with different schedules).

City Government Mayor's Office of Operations (OPS) Dataset fb86-vt7u 27 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2881
Fms Id
P-412DOP3
Total Budget
4764534.55
Spend To Date
490770.65
Spend To Date 1
0.103
Fms Project Name
Daniel M. O'Connell Playground Renovation Q106-120M
Agency Project Name
Daniel O'Connell Playground Reconstruction
Agency Project Description
This project will reconstruct Daniel O'Connell Playground.
Current Phase
Design
Current Phase Start
2020-10-20T00:00:00.000
Forecast Current Phase End
2023-09-29T00:00:00.000
Forecast Completion
2026-05-26T00:00:00.000
Actual Design Start
2020-10-20T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-0245Q, P-D019, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2882
Fms Id
P-210JJCP
Total Budget
5714000.00
Spend To Date
393256.24
Spend To Date 1
0.0688
Fms Project Name
JJ Carty Park - Renovation of Playground
Agency Project Name
John J. Carty Park Playground Reconstruction
Agency Project Description
This project will reconstruct the playground at John J. Carty Park.
Current Phase
Construction
Current Phase Start
2023-05-01T00:00:00.000
Forecast Current Phase End
2024-04-29T00:00:00.000
Forecast Completion
2024-04-29T00:00:00.000
Actual Design Start
2020-10-08T00:00:00.000
Actual Design End
2021-11-05T00:00:00.000
Actual Construction
2021-11-05T00:00:00.000
Actual Construction 1
2023-04-20T00:00:00.000
Actual Construction Start
2023-05-01T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 10
Budget Line
P-D017, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2883
Fms Id
P-218MPOV
Total Budget
11105900.00
Spend To Date
515909.41
Spend To Date 1
0.0464
Fms Project Name
Marine Park Oval Reconstruction B057-120M
Agency Project Name
Marine Park Oval Path Reconstruction
Agency Project Description
This project will reconstruct the inner and outer walking paths of the oval as well as several connecting paths at Marine Park, including new asphalt pavement, bottle fillers and benches.
Current Phase
Construction
Current Phase Start
2023-06-12T00:00:00.000
Forecast Current Phase End
2024-09-08T00:00:00.000
Forecast Completion
2024-09-08T00:00:00.000
Actual Design Start
2019-11-18T00:00:00.000
Actual Design End
2021-12-16T00:00:00.000
Actual Construction
2021-12-16T00:00:00.000
Actual Construction 1
2023-04-24T00:00:00.000
Actual Construction Start
2023-06-12T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 15, Brooklyn 18
Budget Line
P-0077, P-D017, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2884
Fms Id
P-2PPESIT
Total Budget
1049000.00
Spend To Date
321976.09
Spend To Date 1
0.3069
Fms Project Name
Ocean Parkway Sitting Areas Reconstruction BG-121M
Agency Project Name
Ocean Parkway Sitting Areas Reconstruction
Agency Project Description
This project will reconstruct two sitting areas along Ocean Parkway at East 8th Street and at Sherman Street with new pavement, benches and plantings.
Current Phase
Construction
Current Phase Start
2023-04-24T00:00:00.000
Forecast Current Phase End
2024-04-22T00:00:00.000
Forecast Completion
2024-04-22T00:00:00.000
Actual Design Start
2020-02-24T00:00:00.000
Actual Design End
2021-03-23T00:00:00.000
Actual Construction
2021-03-23T00:00:00.000
Actual Construction 1
2023-01-10T00:00:00.000
Actual Construction Start
2023-04-24T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-1018, P-D017, P-I001, P-K001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2885
Fms Id
P-210VINP
Total Budget
3863800.00
Spend To Date
462184.26
Spend To Date 1
0.1196
Fms Project Name
Shore Park & Parkway Vinland Playground Recon. B082-320M
Agency Project Name
Shore Park and Parkway Vinland Playground Reconstruction
Agency Project Description
This project will reconstruct Vinland Playground at Shore Park and Parkway.
Current Phase
Construction
Current Phase Start
2023-08-15T00:00:00.000
Forecast Current Phase End
2024-08-13T00:00:00.000
Forecast Completion
2024-08-13T00:00:00.000
Actual Design Start
2020-10-08T00:00:00.000
Actual Design End
2022-01-31T00:00:00.000
Actual Construction
2022-01-31T00:00:00.000
Actual Construction 1
2023-05-31T00:00:00.000
Actual Construction Start
2023-08-15T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 10
Budget Line
P-D017, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2886
Fms Id
P-309JSST
Total Budget
1787682.00
Spend To Date
833082.76
Spend To Date 1
0.466
Fms Project Name
Jacob Schiff Park- Recons of Seating area, Manhattan
Agency Project Name
Jacob Schiff Playground Sitting Area Reconstruction
Current Phase
Construction
Current Phase Start
2022-06-30T00:00:00.000
Forecast Current Phase End
2023-06-29T00:00:00.000
Forecast Completion
2023-06-29T00:00:00.000
Actual Design Start
2019-11-27T00:00:00.000
Actual Design End
2020-11-24T00:00:00.000
Actual Construction
2020-11-24T00:00:00.000
Actual Construction 1
2022-05-25T00:00:00.000
Actual Construction Start
2022-06-30T00:00:00.000
Borough
Manhattan
Community Board
Manhattan, Manhattan 09
Budget Line
P-1018, P-D018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2887
Fms Id
P-205LIN1
Total Budget
4615000.00
Spend To Date
485420.52
Spend To Date 1
0.1051
Fms Project Name
Linden Park:Phase 4-Playground,Spray Shower & Basketball crt
Agency Project Name
Linden Park Playground Reconstruction
Agency Project Description
This project will reconstruct the playground at Linden Park.
Current Phase
Construction
Current Phase Start
2023-05-08T00:00:00.000
Forecast Current Phase End
2024-05-06T00:00:00.000
Forecast Completion
2024-05-06T00:00:00.000
Actual Design Start
2020-10-07T00:00:00.000
Actual Design End
2021-11-05T00:00:00.000
Actual Construction
2021-11-05T00:00:00.000
Actual Construction 1
2023-06-08T00:00:00.000
Actual Construction Start
2023-05-08T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-D017, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2888
Fms Id
P-3COLPCS
Total Budget
11350000.00
Spend To Date
206570.08
Spend To Date 1
0.0182
Fms Project Name
COLUMBUS PARK -RENOVATE COMFORT STATION ON WORTH STREET
Agency Project Name
Columbus Park Public Restroom Building and Pavilion Reconstruction
Agency Project Description
This project will reconstruct the public restroom building and pavilion in Columbus Park.
Current Phase
Design
Current Phase Start
2022-04-05T00:00:00.000
Forecast Current Phase End
2024-04-30T00:00:00.000
Forecast Completion
2027-12-26T00:00:00.000
Actual Design Start
2022-04-05T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-0245M, P-D018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2889
Fms Id
P-3BENNSF
Total Budget
1430000.00
Spend To Date
330000.00
Spend To Date 1
0.2307
Fms Project Name
BENNETT PARK SYNTHETIC FIELD
Agency Project Name
Bennett Park Synthetic Turf Field Construction
Agency Project Description
This project will construct a synthetic turf field in Bennett Park.
Current Phase
Construction Procurement
Current Phase Start
2023-05-09T00:00:00.000
Forecast Current Phase End
2024-05-08T00:00:00.000
Forecast Completion
2025-12-04T00:00:00.000
Actual Design Start
2020-10-29T00:00:00.000
Actual Design End
2023-05-09T00:00:00.000
Actual Construction
2023-05-09T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-D018, P-I001, P-M245
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2890
Fms Id
P-108WDLN
Total Budget
5481180.00
Spend To Date
573404.38
Spend To Date 1
0.1046
Fms Project Name
WOODLAWN PARK RENOVATIONS X092-121M
Agency Project Name
Woodlawn Playground Reconstruction
Agency Project Description
This project will reconstruct Woodlawn Playground in Van Cortlandt Park, including new steel play equipment, swings, safety surfacing, fencing, landscaping, benches, and park security lighting.
Current Phase
Design
Current Phase Start
2021-01-28T00:00:00.000
Forecast Current Phase End
2023-08-31T00:00:00.000
Forecast Completion
2026-04-27T00:00:00.000
Actual Design Start
2021-01-28T00:00:00.000
Borough
Bronx
Community Board
Bronx, Bronx 08
Budget Line
P-D018, P-D021, P-I001, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2891
Fms Id
P-3W185BC
Total Budget
1190000.00
Spend To Date
160000.00
Spend To Date 1
0.1344
Fms Project Name
WEST 186TH ST BASKEBALL COURTS, Manhattan
Agency Project Name
West 186th Street Basketball Court Reconstruction
Agency Project Description
This project will reconstruct West 186th Street Basketball Court.
Current Phase
Design
Current Phase Start
2022-03-07T00:00:00.000
Forecast Current Phase End
2023-07-31T00:00:00.000
Forecast Completion
2026-03-27T00:00:00.000
Actual Design Start
2022-03-07T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-D018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2892
Fms Id
LIC-CTSQP
Total Budget
4433490.00
Spend To Date
572492.74
Spend To Date 1
0.1291
Fms Project Name
LIC- Court Square Park - Q267-120M
Agency Project Name
Court Square Park Reconstruction
Agency Project Description
This project will reconstruct Court Square Park.
Current Phase
Construction Procurement
Current Phase Start
2022-09-01T00:00:00.000
Forecast Current Phase End
2024-01-31T00:00:00.000
Forecast Completion
2025-08-28T00:00:00.000
Actual Design Start
2019-11-14T00:00:00.000
Actual Design End
2022-09-01T00:00:00.000
Actual Construction
2022-09-01T00:00:00.000
Borough
Queens
Community Board
Queens, Queens 02
Budget Line
ED-0075, P-I001
Ten Year Plan Category
NEIGHBORHOOD REVITALIZATION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2893
Fms Id
LIC-QNBBP
Total Budget
11300000.00
Spend To Date
425822.56
Spend To Date 1
0.0376
Fms Project Name
LIC-Queensbridge Baby Park Q104
Agency Project Name
Queensbridge Baby Park Reconstruction
Agency Project Description
This project will reconstruct Queensbridge Baby Park.
Current Phase
Design
Current Phase Start
2022-02-01T00:00:00.000
Forecast Current Phase End
2023-09-29T00:00:00.000
Forecast Completion
2026-05-26T00:00:00.000
Actual Design Start
2022-02-01T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
ED-0075, P-I001
Ten Year Plan Category
NEIGHBORHOOD REVITALIZATION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2894
Fms Id
P-111FFBB
Total Budget
5867500.00
Spend To Date
570150.05
Spend To Date 1
0.0971
Fms Project Name
FRISCH FIELD IN BRONX PK- RENO OF BBALL FIELD
Agency Project Name
Frisch Field Reconstruction
Agency Project Description
This project will reconstruct the natural turf baseball field at Frisch Field, including grading, drainage, benches, fencing, dugouts, sidewalks, pathways, drinking fountains and bottle fillers.
Current Phase
Design
Current Phase Start
2021-02-17T00:00:00.000
Forecast Current Phase End
2023-08-31T00:00:00.000
Forecast Completion
2026-04-27T00:00:00.000
Actual Design Start
2021-02-17T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-D021, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2895
Fms Id
P-411OKPT
Total Budget
536500.00
Spend To Date
121468.64
Spend To Date 1
0.2264
Fms Project Name
Oakland Lake Pathways Reconstruction Q001-120M
Agency Project Name
Oakland Lake Pathways Reconstruction
Agency Project Description
This project will reconstruct pathways at Oakland Lake in Alley Pond Park.
Current Phase
Construction Procurement
Current Phase Start
2022-03-29T00:00:00.000
Forecast Current Phase End
2023-12-31T00:00:00.000
Forecast Completion
2025-07-28T00:00:00.000
Actual Design Start
2020-06-05T00:00:00.000
Actual Design End
2022-03-29T00:00:00.000
Actual Construction
2022-03-29T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-1018, P-D019, P-Q245
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2896
Fms Id
P-4PHIPPS
Total Budget
5338000.00
Spend To Date
583041.41
Spend To Date 1
0.1092
Fms Project Name
Lt. Michael R. Davidson Playground Construction Q516-120M
Agency Project Name
Lt. Michael R. Davidson Playground Construction
Agency Project Description
This project will construct Lt. Michael R. Davidson Playground.
Current Phase
Construction Procurement
Current Phase Start
2022-08-31T00:00:00.000
Forecast Current Phase End
2024-03-31T00:00:00.000
Forecast Completion
2025-10-27T00:00:00.000
Actual Design Start
2020-12-16T00:00:00.000
Actual Design End
2022-08-31T00:00:00.000
Actual Construction
2022-08-31T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-D019, P-D056, P-I001, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2897
Fms Id
P-4ANCH05
Total Budget
5553000.00
Spend To Date
122719.25
Spend To Date 1
0.022
Fms Project Name
Anchor Park - Astoria Park Phase 3
Agency Project Name
Astoria Park Great Lawn Pathways Reconstruction
Agency Project Description
This project will reconstruct the landscape in Astoria Park north of the pool.
Current Phase
Construction Procurement
Current Phase Start
2022-09-30T00:00:00.000
Forecast Current Phase End
2024-03-31T00:00:00.000
Forecast Completion
2026-01-25T00:00:00.000
Actual Design Start
2021-06-17T00:00:00.000
Actual Design End
2022-09-30T00:00:00.000
Actual Construction
2022-09-30T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-0848, P-1018, P-D019, P-I001, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2898
Fms Id
P-216CHES
Total Budget
8321685.00
Spend To Date
497353.33
Spend To Date 1
0.0597
Fms Project Name
Chester Park - Playground Renovation Phase 1 B362-120M
Agency Project Name
Chester Playground Reconstruction
Agency Project Description
This project will reconstruct Chester Playground.
Current Phase
Construction Procurement
Current Phase Start
2022-08-31T00:00:00.000
Forecast Current Phase End
2024-03-31T00:00:00.000
Forecast Completion
2025-10-27T00:00:00.000
Actual Design Start
2020-10-06T00:00:00.000
Actual Design End
2022-08-31T00:00:00.000
Actual Construction
2022-08-31T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 16
Budget Line
P-0245K, P-D017, P-I001, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2899
Fms Id
P-210DOG
Total Budget
1219930.00
Spend To Date
835091.07
Spend To Date 1
0.6845
Fms Project Name
Shore Park and Parkway Dog Run Construction B082-120M
Agency Project Name
Shore Park and Parkway Dog Run Construction
Agency Project Description
This project will construct a dog run in Shore Park and Parkway.
Current Phase
Construction
Current Phase Start
2022-07-05T00:00:00.000
Forecast Current Phase End
2023-07-04T00:00:00.000
Forecast Completion
2023-07-04T00:00:00.000
Actual Design Start
2019-11-12T00:00:00.000
Actual Design End
2020-11-13T00:00:00.000
Actual Construction
2020-11-13T00:00:00.000
Actual Construction 1
2022-06-16T00:00:00.000
Actual Construction Start
2022-07-05T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 10
Budget Line
P-D017, P-I001
Ten Year Plan Category
MAJOR RECREATIONAL FACILITIES AND FACILITY RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2900
Fms Id
P-215MBTC
Total Budget
4144287.00
Spend To Date
403038.63
Spend To Date 1
0.0972
Fms Project Name
Manhattan Beach Park Tennis Courts Reconstruction B251-120M
Agency Project Name
Manhattan Beach Park Tennis Courts Reconstruction
Agency Project Description
This project will reconstruct the tennis courts at Manhattan Beach Park.
Current Phase
Construction Procurement
Current Phase Start
2022-07-07T00:00:00.000
Forecast Current Phase End
2024-01-31T00:00:00.000
Forecast Completion
2025-08-28T00:00:00.000
Actual Design Start
2020-09-09T00:00:00.000
Actual Design End
2022-07-07T00:00:00.000
Actual Construction
2022-07-07T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 15
Budget Line
P-D017, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2901
Fms Id
P-5GBRCTF
Total Budget
5750480.10
Spend To Date
435415.76
Spend To Date 1
0.0757
Fms Project Name
Greenbelt Rec.Cntr-Constr. of turf field
Agency Project Name
Greenbelt Recreation Center Synthetic Turf Field Reconstruction
Agency Project Description
This project will reconstruct the synthetic turf field, rain garden and will install new field lighting at Greenbelt Recreation Center.
Current Phase
Construction Procurement
Current Phase Start
2021-05-04T00:00:00.000
Forecast Current Phase End
2023-06-30T00:00:00.000
Forecast Completion
2025-01-25T00:00:00.000
Actual Design Start
2019-10-09T00:00:00.000
Actual Design End
2021-05-04T00:00:00.000
Actual Construction
2021-05-04T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
P-D020, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2902
Fms Id
P-1CROALG
Total Budget
575000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
CROTONA PARK INDIAN LAKE ALGAE REDUCTION
Agency Project Name
Crotona Park Indian Lake Shoreline Restoration
Agency Project Description
This project will remove invasive species and plant new and replacement trees to restore the shoreline of Indian Lake in Crotona Park.
Current Phase
Construction
Current Phase Start
2023-03-06T00:00:00.000
Forecast Current Phase End
2025-08-31T00:00:00.000
Forecast Completion
2025-08-31T00:00:00.000
Actual Design Start
2019-08-29T00:00:00.000
Actual Design End
2020-12-24T00:00:00.000
Actual Construction
2020-12-24T00:00:00.000
Actual Construction 1
2022-12-22T00:00:00.000
Actual Construction Start
2023-03-06T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-0822, P-I001, P-X245
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2903
Fms Id
SANDY2-37
Total Budget
2188000.00
Spend To Date
259629.51
Spend To Date 1
0.1186
Fms Project Name
SANDY-John Malone Community Center
Agency Project Name
John Malone Community Center Mechanical Systems Reconstruction (Hurricane Sandy)
Agency Project Description
This project will reconstruct the Hurricane Sandy-damaged HVAC and mechanical systems at John Malone Community Center at McGuire Fields.
Current Phase
Design
Current Phase Start
2021-06-16T00:00:00.000
Forecast Current Phase End
2023-07-31T00:00:00.000
Forecast Completion
2026-03-27T00:00:00.000
Actual Design Start
2021-06-16T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-1018, P-I001
Ten Year Plan Category
MAJOR RECREATIONAL FACILITIES AND FACILITY RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2904
Fms Id
P-205LIN2
Total Budget
5161000.00
Spend To Date
563099.89
Spend To Date 1
0.1091
Fms Project Name
Linden Park: Phase 5 Area Renovation
Agency Project Name
Linden Park Multipurpose Play Area Reconstruction
Agency Project Description
This project will reconstruct the multipurpose play area at Linden Park.
Current Phase
Construction Procurement
Current Phase Start
2021-11-05T00:00:00.000
Forecast Current Phase End
2024-05-31T00:00:00.000
Forecast Completion
2025-12-27T00:00:00.000
Actual Design Start
2020-10-07T00:00:00.000
Actual Design End
2021-11-05T00:00:00.000
Actual Construction
2021-11-05T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 05
Budget Line
P-D017, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2905
Fms Id
P-412DKWP
Total Budget
830000.00
Spend To Date
567484.83
Spend To Date 1
0.6837
Fms Project Name
Detective Keith L Williams Park (Liberty) Basketball Cts
Agency Project Name
Detective Keith L. Williams Park Basketball Courts Reconstruction
Agency Project Description
This project will reconstruct the basketball courts at Detective Keith L. Williams Park (Liberty Park).
Current Phase
Construction
Current Phase Start
2023-03-20T00:00:00.000
Forecast Current Phase End
2024-03-18T00:00:00.000
Forecast Completion
2024-03-18T00:00:00.000
Actual Design Start
2020-10-26T00:00:00.000
Actual Design End
2021-10-20T00:00:00.000
Actual Construction
2021-10-20T00:00:00.000
Actual Construction 1
2023-02-22T00:00:00.000
Actual Construction Start
2023-03-20T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-0245Q, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2906
Fms Id
P-111BPWF
Total Budget
402000.00
Spend To Date
96942.09
Spend To Date 1
0.2411
Fms Project Name
Bronx PK- Installation of a water fountain X002-320M
Agency Project Name
Bronx Park Skate Park Drinking Fountain Construction
Agency Project Description
This project will construct water service and a drinking fountain at the skate park in Bronx Park.
Current Phase
Construction
Current Phase Start
2023-05-08T00:00:00.000
Forecast Current Phase End
2023-11-10T00:00:00.000
Forecast Completion
2023-11-10T00:00:00.000
Actual Design Start
2020-01-06T00:00:00.000
Actual Design End
2021-02-01T00:00:00.000
Actual Construction
2021-02-01T00:00:00.000
Actual Construction 1
2023-03-10T00:00:00.000
Actual Construction Start
2023-05-08T00:00:00.000
Borough
Bronx
Community Board
Bronx, Bronx 06, Bronx 11
Budget Line
P-1018, P-D021, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2907
Fms Id
P-3BOTWAT
Total Budget
145000.00
Spend To Date
22026.93
Spend To Date 1
0.1519
Fms Project Name
6BC Botanical Garden:Garden Water Source
Agency Project Name
6BC Botanical Garden Water Service Installation
Agency Project Description
This project will install water service at 6BC Botanical Garden.
Current Phase
Construction Procurement
Current Phase Start
2022-06-23T00:00:00.000
Forecast Current Phase End
2023-12-31T00:00:00.000
Forecast Completion
2025-07-28T00:00:00.000
Actual Design Start
2021-06-02T00:00:00.000
Actual Design End
2022-06-23T00:00:00.000
Actual Construction
2022-06-23T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-D018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2908
Fms Id
P-4CPSLIT
Total Budget
2580000.00
Spend To Date
197347.66
Spend To Date 1
0.0764
Fms Project Name
College Point Sports Park - New Lighting
Agency Project Name
College Point Fields Sports and Security Lighting Construction
Agency Project Description
This project will construct sports and security lighting at College Point Fields.
Current Phase
Construction
Current Phase Start
2023-06-05T00:00:00.000
Forecast Current Phase End
2024-06-03T00:00:00.000
Forecast Completion
2024-06-03T00:00:00.000
Actual Design Start
2020-11-23T00:00:00.000
Actual Design End
2021-12-10T00:00:00.000
Actual Construction
2021-12-10T00:00:00.000
Actual Construction 1
2023-04-20T00:00:00.000
Actual Construction Start
2023-06-05T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-D019, P-I001, P-Q245
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2909
Fms Id
NDF-VHALL
Total Budget
5850000.00
Spend To Date
154308.70
Spend To Date 1
0.0263
Fms Project Name
NDF-Village Hall Roof R028-120M
Agency Project Name
Tappen Park Village Hall Roof Reconstruction
Agency Project Description
This project will reconstruct the roof at the Village Hall located in Tappen Park. The work will include replacing or resetting slate roof tiles and chimney bricks; new gutters, skylights, flashing, and an access hatch; and repairing the dormer windows.
Current Phase
Construction Procurement
Current Phase Start
2020-12-02T00:00:00.000
Forecast Current Phase End
2023-06-30T00:00:00.000
Forecast Completion
2025-07-19T00:00:00.000
Actual Design Start
2019-10-31T00:00:00.000
Actual Design End
2020-12-02T00:00:00.000
Actual Construction
2020-12-02T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
ED-0384, P-I001
Ten Year Plan Category
NEIGHBORHOOD REVITALIZATION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2910
Fms Id
P-409FPAP
Total Budget
4175000.00
Spend To Date
26183.36
Spend To Date 1
0.0062
Fms Project Name
Forest Park Asphalt Pathways Improvements
Agency Project Name
Citywide Pavement Reconstruction (CNYG-1820M)
Agency Project Description
This contract will reconstruct pavement, Citywide
Current Phase
Construction
Current Phase Start
2023-07-10T00:00:00.000
Forecast Current Phase End
2026-07-08T00:00:00.000
Forecast Completion
2026-07-08T00:00:00.000
Actual Design Start
2020-02-10T00:00:00.000
Actual Design End
2020-08-28T00:00:00.000
Actual Construction
2020-08-28T00:00:00.000
Actual Construction 1
2023-02-15T00:00:00.000
Actual Construction Start
2023-07-10T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-1018, P-D019, P-I001, P-Q771
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2910
Fms Id
P-4ALYPND
Total Budget
900000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Alley Pond Park adventure course path reconstruction
Agency Project Name
Citywide Pavement Reconstruction (CNYG-1820M)
Agency Project Description
This contract will reconstruct pavement, Citywide
Current Phase
Construction
Current Phase Start
2023-07-10T00:00:00.000
Forecast Current Phase End
2026-07-08T00:00:00.000
Forecast Completion
2026-07-08T00:00:00.000
Actual Design Start
2020-02-10T00:00:00.000
Actual Design End
2020-08-28T00:00:00.000
Actual Construction
2020-08-28T00:00:00.000
Actual Construction 1
2023-02-15T00:00:00.000
Actual Construction Start
2023-07-10T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2910
Fms Id
P-4CROCHP
Total Budget
1216000.00
Spend To Date
24529.07
Spend To Date 1
0.0201
Fms Project Name
Crocheron Park Path Reconstruction
Agency Project Name
Citywide Pavement Reconstruction (CNYG-1820M)
Agency Project Description
This contract will reconstruct pavement, Citywide
Current Phase
Construction
Current Phase Start
2023-07-10T00:00:00.000
Forecast Current Phase End
2026-07-08T00:00:00.000
Forecast Completion
2026-07-08T00:00:00.000
Actual Design Start
2020-02-10T00:00:00.000
Actual Design End
2020-08-28T00:00:00.000
Actual Construction
2020-08-28T00:00:00.000
Actual Construction 1
2023-02-15T00:00:00.000
Actual Construction Start
2023-07-10T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-1018, P-D019, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2910
Fms Id
P-4FMAGDN
Total Budget
90000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Flushing Meadows Corona Park Installation of Retired Animals
Agency Project Name
Citywide Pavement Reconstruction (CNYG-1820M)
Agency Project Description
This contract will reconstruct pavement, Citywide
Current Phase
Construction
Current Phase Start
2023-07-10T00:00:00.000
Forecast Current Phase End
2026-07-08T00:00:00.000
Forecast Completion
2026-07-08T00:00:00.000
Actual Design Start
2020-02-10T00:00:00.000
Actual Design End
2020-08-28T00:00:00.000
Actual Construction
2020-08-28T00:00:00.000
Actual Construction 1
2023-02-15T00:00:00.000
Actual Construction Start
2023-07-10T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2910
Fms Id
P-4HILNDP
Total Budget
2400000.00
Spend To Date
20286.85
Spend To Date 1
0.0084
Fms Project Name
Highland Park Path Reconstruction
Agency Project Name
Citywide Pavement Reconstruction (CNYG-1820M)
Agency Project Description
This contract will reconstruct pavement, Citywide
Current Phase
Construction
Current Phase Start
2023-07-10T00:00:00.000
Forecast Current Phase End
2026-07-08T00:00:00.000
Forecast Completion
2026-07-08T00:00:00.000
Actual Design Start
2020-02-10T00:00:00.000
Actual Design End
2020-08-28T00:00:00.000
Actual Construction
2020-08-28T00:00:00.000
Actual Construction 1
2023-02-15T00:00:00.000
Actual Construction Start
2023-07-10T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-1018, P-D017, P-D019, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2910
Fms Id
P-4KSNAPK
Total Budget
1100000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Kissena Park Path Reconstruction
Agency Project Name
Citywide Pavement Reconstruction (CNYG-1820M)
Agency Project Description
This contract will reconstruct pavement, Citywide
Current Phase
Construction
Current Phase Start
2023-07-10T00:00:00.000
Forecast Current Phase End
2026-07-08T00:00:00.000
Forecast Completion
2026-07-08T00:00:00.000
Actual Design Start
2020-02-10T00:00:00.000
Actual Design End
2020-08-28T00:00:00.000
Actual Construction
2020-08-28T00:00:00.000
Actual Construction 1
2023-02-15T00:00:00.000
Actual Construction Start
2023-07-10T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2911
Fms Id
P-104CLMT
Total Budget
897000.00
Spend To Date
32163.76
Spend To Date 1
0.0358
Fms Project Name
Claremont Park Improvements
Agency Project Name
Citywide Multipurpose Play Area and Sports Court Pavement Reconstruction (CNYG-1120M)
Agency Project Description
This project will reconstruct pavements at multipurpose play areas and sports courts at various parks citywide.
Current Phase
Construction
Current Phase Start
2023-03-15T00:00:00.000
Forecast Current Phase End
2026-03-13T00:00:00.000
Forecast Completion
2026-03-13T00:00:00.000
Actual Design Start
2019-11-21T00:00:00.000
Actual Design End
2019-12-10T00:00:00.000
Actual Construction
2019-12-10T00:00:00.000
Actual Construction 1
2022-09-30T00:00:00.000
Actual Construction Start
2023-03-15T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-0801, P-1018, P-D021, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2911
Fms Id
P-108WWFF
Total Budget
500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Fort Four Playground
Agency Project Name
Citywide Multipurpose Play Area and Sports Court Pavement Reconstruction (CNYG-1120M)
Agency Project Description
This project will reconstruct pavements at multipurpose play areas and sports courts at various parks citywide.
Current Phase
Construction
Current Phase Start
2023-03-15T00:00:00.000
Forecast Current Phase End
2026-03-13T00:00:00.000
Forecast Completion
2026-03-13T00:00:00.000
Actual Design Start
2019-11-21T00:00:00.000
Actual Design End
2019-12-10T00:00:00.000
Actual Construction
2019-12-10T00:00:00.000
Actual Construction 1
2022-09-30T00:00:00.000
Actual Construction Start
2023-03-15T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-D021, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2911
Fms Id
P-1UNVPTH
Total Budget
220000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
University Hill Path Pavement Reconstruction
Agency Project Name
Citywide Multipurpose Play Area and Sports Court Pavement Reconstruction (CNYG-1120M)
Agency Project Description
This project will reconstruct pavements at multipurpose play areas and sports courts at various parks citywide.
Current Phase
Construction
Current Phase Start
2023-03-15T00:00:00.000
Forecast Current Phase End
2026-03-13T00:00:00.000
Forecast Completion
2026-03-13T00:00:00.000
Actual Design Start
2019-11-21T00:00:00.000
Actual Design End
2019-12-10T00:00:00.000
Actual Construction
2019-12-10T00:00:00.000
Actual Construction 1
2022-09-30T00:00:00.000
Actual Construction Start
2023-03-15T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2911
Fms Id
P-304HELK
Total Budget
480000.00
Spend To Date
51157.80
Spend To Date 1
0.1065
Fms Project Name
Hell's Kitchen Park -Surface Renovation, Manhattan
Agency Project Name
Citywide Multipurpose Play Area and Sports Court Pavement Reconstruction (CNYG-1120M)
Agency Project Description
This project will reconstruct pavements at multipurpose play areas and sports courts at various parks citywide.
Current Phase
Construction
Current Phase Start
2023-03-15T00:00:00.000
Forecast Current Phase End
2026-03-13T00:00:00.000
Forecast Completion
2026-03-13T00:00:00.000
Actual Design Start
2019-11-21T00:00:00.000
Actual Design End
2019-12-10T00:00:00.000
Actual Construction
2019-12-10T00:00:00.000
Actual Construction 1
2022-09-30T00:00:00.000
Actual Construction Start
2023-03-15T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-D018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2911
Fms Id
P-3PAVTMK
Total Budget
1450000.00
Spend To Date
16178.65
Spend To Date 1
0.0111
Fms Project Name
Tompkins Sq Park Paths & Multi-Purpose Play Area Pave RC
Agency Project Name
Citywide Multipurpose Play Area and Sports Court Pavement Reconstruction (CNYG-1120M)
Agency Project Description
This project will reconstruct pavements at multipurpose play areas and sports courts at various parks citywide.
Current Phase
Construction
Current Phase Start
2023-03-15T00:00:00.000
Forecast Current Phase End
2026-03-13T00:00:00.000
Forecast Completion
2026-03-13T00:00:00.000
Actual Design Start
2019-11-21T00:00:00.000
Actual Design End
2019-12-10T00:00:00.000
Actual Construction
2019-12-10T00:00:00.000
Actual Construction 1
2022-09-30T00:00:00.000
Actual Construction Start
2023-03-15T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2911
Fms Id
P-408HMSC
Total Budget
700000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Hoover - Manton Plgd -- Resurface basketball & Handball ct
Agency Project Name
Citywide Multipurpose Play Area and Sports Court Pavement Reconstruction (CNYG-1120M)
Agency Project Description
This project will reconstruct pavements at multipurpose play areas and sports courts at various parks citywide.
Current Phase
Construction
Current Phase Start
2023-03-15T00:00:00.000
Forecast Current Phase End
2026-03-13T00:00:00.000
Forecast Completion
2026-03-13T00:00:00.000
Actual Design Start
2019-11-21T00:00:00.000
Actual Design End
2019-12-10T00:00:00.000
Actual Construction
2019-12-10T00:00:00.000
Actual Construction 1
2022-09-30T00:00:00.000
Actual Construction Start
2023-03-15T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-D019, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2911
Fms Id
P-4SPRNGF
Total Budget
1150000.00
Spend To Date
3767.28
Spend To Date 1
0.0032
Fms Project Name
Alley Pond Park Springfield Plgd Parking Lot Recon
Agency Project Name
Citywide Multipurpose Play Area and Sports Court Pavement Reconstruction (CNYG-1120M)
Agency Project Description
This project will reconstruct pavements at multipurpose play areas and sports courts at various parks citywide.
Current Phase
Construction
Current Phase Start
2023-03-15T00:00:00.000
Forecast Current Phase End
2026-03-13T00:00:00.000
Forecast Completion
2026-03-13T00:00:00.000
Actual Design Start
2019-11-21T00:00:00.000
Actual Design End
2019-12-10T00:00:00.000
Actual Construction
2019-12-10T00:00:00.000
Actual Construction 1
2022-09-30T00:00:00.000
Actual Construction Start
2023-03-15T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2912
Fms Id
P-205PPMT
Total Budget
1297000.00
Spend To Date
41567.16
Spend To Date 1
0.032
Fms Project Name
Public Place - Monument Reconstruction
Agency Project Name
Public Place Monument Reconstruction
Agency Project Description
This project will reconstruct the World War II Memorial at Public Place, including installing a replica of the original, missing eagle statue, reconstructing the base of the monument, restoring the honor roll plaque, and replanting the flower bed around the memorial.
Current Phase
Construction Procurement
Current Phase Start
2022-03-07T00:00:00.000
Forecast Current Phase End
2023-10-31T00:00:00.000
Forecast Completion
2025-07-27T00:00:00.000
Actual Design Start
2020-01-22T00:00:00.000
Actual Design End
2022-03-07T00:00:00.000
Actual Construction
2022-03-07T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 05
Budget Line
P-D017, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2913
Fms Id
P-414BAY9
Total Budget
888000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Michaelis-Bayswater Park Reconstruction
Agency Project Name
Michaelis-Bayswater Park Reconstruction
Agency Project Description
This project will reconstruct Michaelis-Bayswater Park.
Current Phase
Construction Procurement
Current Phase Start
2022-10-20T00:00:00.000
Forecast Current Phase End
2024-03-31T00:00:00.000
Forecast Completion
2026-10-27T00:00:00.000
Actual Design Start
2018-10-29T00:00:00.000
Actual Design End
2022-10-20T00:00:00.000
Actual Construction
2022-10-20T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-D019
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2913
Fms Id
SANDY4-48
Total Budget
40798000.00
Spend To Date
961700.52
Spend To Date 1
0.0235
Fms Project Name
Bayswater Park Reconstruction-FEMA
Agency Project Name
Michaelis-Bayswater Park Reconstruction
Agency Project Description
This project will reconstruct Michaelis-Bayswater Park.
Current Phase
Construction Procurement
Current Phase Start
2022-10-20T00:00:00.000
Forecast Current Phase End
2024-03-31T00:00:00.000
Forecast Completion
2026-10-27T00:00:00.000
Actual Design Start
2018-10-29T00:00:00.000
Actual Design End
2022-10-20T00:00:00.000
Actual Construction
2022-10-20T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-1018, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2914
Fms Id
SANDY4-49
Total Budget
6468208.00
Spend To Date
113185.02
Spend To Date 1
0.0174
Fms Project Name
Bayswater Park Recons of Maint. & Operations-FEMA
Agency Project Name
Michaelis-Bayswater Park Maintenance and Operations Building Construction
Agency Project Description
This project will construct a maintenance and operations building in Michaelis-Bayswater Park.
Current Phase
Construction Procurement
Current Phase Start
2022-03-31T00:00:00.000
Forecast Current Phase End
2024-01-31T00:00:00.000
Forecast Completion
2026-02-09T00:00:00.000
Actual Design Start
2018-10-29T00:00:00.000
Actual Design End
2022-03-31T00:00:00.000
Actual Construction
2022-03-31T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-1018, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2915
Fms Id
P-1SERTRF
Total Budget
750000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
PO Serrano Synthetic Turf Limited Scope Reconstruction
Agency Project Name
Citywide Synthetic Turf Field Reconstruction (CNYG-1220M)
Agency Project Description
This project will reconstruct synthetic turf fields at various locations citywide.
Current Phase
Construction
Current Phase Start
2022-05-16T00:00:00.000
Forecast Current Phase End
2025-05-14T00:00:00.000
Forecast Completion
2025-05-14T00:00:00.000
Actual Design Start
2019-12-04T00:00:00.000
Actual Design End
2020-01-24T00:00:00.000
Actual Construction
2020-01-24T00:00:00.000
Actual Construction 1
2022-04-07T00:00:00.000
Actual Construction Start
2022-05-16T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-0510, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2915
Fms Id
P-1STFPEL
Total Budget
3350000.00
Spend To Date
19051.73
Spend To Date 1
0.0056
Fms Project Name
Synthetic Turf Field Reconstruction at Pelham Bay
Agency Project Name
Citywide Synthetic Turf Field Reconstruction (CNYG-1220M)
Agency Project Description
This project will reconstruct synthetic turf fields at various locations citywide.
Current Phase
Construction
Current Phase Start
2022-05-16T00:00:00.000
Forecast Current Phase End
2025-05-14T00:00:00.000
Forecast Completion
2025-05-14T00:00:00.000
Actual Design Start
2019-12-04T00:00:00.000
Actual Design End
2020-01-24T00:00:00.000
Actual Construction
2020-01-24T00:00:00.000
Actual Construction 1
2022-04-07T00:00:00.000
Actual Construction Start
2022-05-16T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-0245M, P-0245Q, P-0510, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2915
Fms Id
P-202CPST
Total Budget
725000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Cadman Plaza Turf -- To replace the turf at Cadman Plaza.
Agency Project Name
Citywide Synthetic Turf Field Reconstruction (CNYG-1220M)
Agency Project Description
This project will reconstruct synthetic turf fields at various locations citywide.
Current Phase
Construction
Current Phase Start
2022-05-16T00:00:00.000
Forecast Current Phase End
2025-05-14T00:00:00.000
Forecast Completion
2025-05-14T00:00:00.000
Actual Design Start
2019-12-04T00:00:00.000
Actual Design End
2020-01-24T00:00:00.000
Actual Construction
2020-01-24T00:00:00.000
Actual Construction 1
2022-04-07T00:00:00.000
Actual Construction Start
2022-05-16T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn, Brooklyn
Budget Line
P-D017, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2915
Fms Id
P-205SBST
Total Budget
800000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Sperandeo Brothers Playground Turf Renovations
Agency Project Name
Citywide Synthetic Turf Field Reconstruction (CNYG-1220M)
Agency Project Description
This project will reconstruct synthetic turf fields at various locations citywide.
Current Phase
Construction
Current Phase Start
2022-05-16T00:00:00.000
Forecast Current Phase End
2025-05-14T00:00:00.000
Forecast Completion
2025-05-14T00:00:00.000
Actual Design Start
2019-12-04T00:00:00.000
Actual Design End
2020-01-24T00:00:00.000
Actual Construction
2020-01-24T00:00:00.000
Actual Construction 1
2022-04-07T00:00:00.000
Actual Construction Start
2022-05-16T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-D017, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000