Capital Projects Dashboard - Citywide Budget and Schedule

All major capital infrastructure projects with a committed budget. Financial information and agency schedule details for each project are joined via FMS ID. Only projects in the design phase or later have project schedules displayed. This dataset is part of the Capital Projects Dashboard.

Note: Each row is uniquely identified by its Financial Management Service (FMS) ID. FMS ID is the unique ID that OMB uses for the FMS (Financial Information System). This ID can be universally joined with any OMB dataset that has the same field. The Capital Projects Dashboard is the result of joining OMB’s fiscal data with the agency’s schedule data. FMS IDs and agency projects don't always have a one-to-one relationship (i.e., one project schedule may correlate to multiple FMS IDs, and one FMS may correct to multiple projects with different schedules).

City Government Mayor's Office of Operations (OPS) Dataset fb86-vt7u 27 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2956
Fms Id
P-4MARFAJ
Total Budget
6105251.38
Spend To Date
623824.97
Spend To Date 1
0.1021
Fms Project Name
MARIO FAJARDO PLAYGROUND Q300-121M
Agency Project Name
Captain Mario Fajardo Park Playground and Sports Courts Reconstruction
Agency Project Description
This project will reconstruct the playground, basketball courts, and handball courts in Captain Mario Fajardo Park.
Current Phase
Construction Procurement
Current Phase Start
2022-08-26T00:00:00.000
Forecast Current Phase End
2024-04-30T00:00:00.000
Forecast Completion
2025-11-26T00:00:00.000
Actual Design Start
2021-02-16T00:00:00.000
Actual Design End
2022-08-26T00:00:00.000
Actual Construction
2022-08-26T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-D019, P-I001, P-Q245
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2957
Fms Id
P-412JAMP
Total Budget
5135367.79
Spend To Date
500313.51
Spend To Date 1
0.0974
Fms Project Name
Jamaica Playground -- Renovate MPPA Q301-121M
Agency Project Name
Jamaica Playground Multipurpose Play Area Reconstruction
Agency Project Description
This project will reconstruct the multipurpose play area in Jamaica Playground.
Current Phase
Construction Procurement
Current Phase Start
2022-06-29T00:00:00.000
Forecast Current Phase End
2024-03-31T00:00:00.000
Forecast Completion
2025-10-27T00:00:00.000
Actual Design Start
2021-03-11T00:00:00.000
Actual Design End
2022-06-29T00:00:00.000
Actual Construction
2022-06-29T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-D019, P-I001, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2958
Fms Id
P-412SRPC
Total Budget
5870444.74
Spend To Date
399241.35
Spend To Date 1
0.068
Fms Project Name
SOUTH ROCHDALE PLGD- RENO OF PLGD & CS
Agency Project Name
South Rochdale Playground Reconstruction
Agency Project Description
This project will reconstruct the basketball courts, multipurpose play area, and children's play area at South Rochdale Playground.
Current Phase
Design
Current Phase Start
2022-06-02T00:00:00.000
Forecast Current Phase End
2024-01-30T00:00:00.000
Forecast Completion
2026-09-26T00:00:00.000
Actual Design Start
2022-06-02T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-D019, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2959
Fms Id
NDF-SOAQK
Total Budget
10299896.86
Spend To Date
357544.84
Spend To Date 1
0.0347
Fms Project Name
NDF-Aqueduct Walk X001A-121M
Agency Project Name
Aqueduct Walk Reconstruction at West Burnside Avenue
Agency Project Description
This project will construct an ADA-accessible entrance, pathways, a plaza, stairs, retaining walls, park security lighting and landscaping at Aqueduct Walk.
Current Phase
Design
Current Phase Start
2021-06-29T00:00:00.000
Forecast Current Phase End
2024-12-31T00:00:00.000
Forecast Completion
2028-08-27T00:00:00.000
Actual Design Start
2021-06-29T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
ED-0384, P-I001
Ten Year Plan Category
NEIGHBORHOOD REVITALIZATION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2960
Fms Id
P-303HMFS
Total Budget
4044000.00
Spend To Date
548517.65
Spend To Date 1
0.1356
Fms Project Name
Hamilton Fish Park-Full renovation , Manhattan
Agency Project Name
Hamilton Fish Park Playground Reconstruction
Agency Project Description
This project will reconstruct the playground at Hamilton Fish Park.
Current Phase
Construction Procurement
Current Phase Start
2022-11-07T00:00:00.000
Forecast Current Phase End
2024-02-28T00:00:00.000
Forecast Completion
2025-09-25T00:00:00.000
Actual Design Start
2021-06-24T00:00:00.000
Actual Design End
2022-11-07T00:00:00.000
Actual Construction
2022-11-07T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-D018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2961
Fms Id
P-309AHAM
Total Budget
1593000.00
Spend To Date
468889.87
Spend To Date 1
0.2943
Fms Project Name
Alexander Hamilton Plg Basketball Renovation M041-121M
Agency Project Name
Alexander Hamilton Playground Basketball Courts Reconstruction
Agency Project Description
This project will reconstruct the basketball court at Alexander Hamilton Playground.
Current Phase
Construction Procurement
Current Phase Start
2023-02-03T00:00:00.000
Forecast Current Phase End
2024-02-03T00:00:00.000
Forecast Completion
2025-08-31T00:00:00.000
Actual Design Start
2021-02-24T00:00:00.000
Actual Design End
2023-02-03T00:00:00.000
Actual Construction
2023-02-03T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-D018, P-M245
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2962
Fms Id
P-307SOLB
Total Budget
811000.00
Spend To Date
211000.00
Spend To Date 1
0.2601
Fms Project Name
Sol Bloom Playground Improvements, Manhattan
Agency Project Name
Sol Bloom Playground Basketball Court Reconstruction
Agency Project Description
This project will reconstruct the basketball court in Sol Bloom Playground.
Current Phase
Construction Procurement
Current Phase Start
2022-01-05T00:00:00.000
Forecast Current Phase End
2023-09-30T00:00:00.000
Forecast Completion
2025-04-27T00:00:00.000
Actual Design Start
2021-01-08T00:00:00.000
Actual Design End
2022-01-05T00:00:00.000
Actual Construction
2022-01-05T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-D018, TF-0502
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2963
Fms Id
P-4UDALNP
Total Budget
402000.00
Spend To Date
52000.00
Spend To Date 1
0.1293
Fms Project Name
Udalls Cove Park & Nature Preserve
Agency Project Name
Udall's Park Preserve Forest Restoration
Agency Project Description
This project will restore native species habitat within forested natural areas in Udall's Park Preserve.
Current Phase
Design
Current Phase Start
2021-01-07T00:00:00.000
Forecast Current Phase End
2024-01-06T00:00:00.000
Forecast Completion
2028-09-01T00:00:00.000
Actual Design Start
2021-01-07T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-D019, P-I001
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2964
Fms Id
P-3MORNHR
Total Budget
650000.00
Spend To Date
115000.00
Spend To Date 1
0.1769
Fms Project Name
MORNINGSIDE PARK HANDRAILS
Agency Project Name
Morningside Park 113th Street Steps Handrails Construction
Agency Project Description
This project will construct handrails at the 113th Street steps in Morningside Park.
Current Phase
Construction Procurement
Current Phase Start
2022-01-27T00:00:00.000
Forecast Current Phase End
2023-09-30T00:00:00.000
Forecast Completion
2025-04-27T00:00:00.000
Actual Design Start
2021-02-08T00:00:00.000
Actual Design End
2022-01-27T00:00:00.000
Actual Construction
2022-01-27T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-D018, P-M245
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2965
Fms Id
P-1ARAELV
Total Budget
500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Bronx Aramark building for elevator - X360-119M
Agency Project Name
Citywide Services Shops Elevator Reconstruction
Agency Project Description
This project will reconstruct the elevator at the Citywide Services Shops.
Current Phase
Design
Current Phase Start
2021-01-29T00:00:00.000
Forecast Current Phase End
2024-04-30T00:00:00.000
Forecast Completion
2026-12-26T00:00:00.000
Actual Design Start
2021-01-29T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2966
Fms Id
P-6VHXHST
Total Budget
488000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Vehicle Exhaust (M104-221M)
Agency Project Name
Randall's Island Park Citywide Services Complex Fleet Shop Exhaust System Reconstruction
Agency Project Description
This project will reconstruct the exhaust system for the Fleet Shop within the Citywide Services Complex and Garage at Randall's Island Park.
Current Phase
Construction
Current Phase Start
2023-05-30T00:00:00.000
Forecast Current Phase End
2024-02-23T00:00:00.000
Forecast Completion
2024-02-23T00:00:00.000
Actual Design Start
2021-02-16T00:00:00.000
Actual Design End
2021-04-20T00:00:00.000
Actual Construction
2021-04-20T00:00:00.000
Actual Construction 1
2022-12-02T00:00:00.000
Actual Construction Start
2023-05-30T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2967
Fms Id
P-1CRTORF
Total Budget
3534000.00
Spend To Date
148907.13
Spend To Date 1
0.0421
Fms Project Name
Crotona Park Pool Roof Reconstruction X010-121M
Agency Project Name
Crotona Park Bathhouse Roof Reconstruction
Agency Project Description
This project will reconstruct a portion of the roof at Crotona Park Bathhouse.
Current Phase
Construction Procurement
Current Phase Start
2022-03-21T00:00:00.000
Forecast Current Phase End
2023-10-31T00:00:00.000
Forecast Completion
2026-05-28T00:00:00.000
Actual Design Start
2021-01-11T00:00:00.000
Actual Design End
2022-03-21T00:00:00.000
Actual Construction
2022-03-21T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-1249, P-I001, PU-0025
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2968
Fms Id
P-6CWR22D
Total Budget
2223000.00
Spend To Date
170345.36
Spend To Date 1
0.0766
Fms Project Name
Citywide HVAC R22 Reconstruction CNYG-1721M
Agency Project Name
Citywide HVAC R22 Reconstruction
Agency Project Description
This project will reconstruct HVAC equipment to replace R22 coolant based components Citywide.
Current Phase
(Pending)
Forecast Current Phase End
2023-06-10T00:00:00.000
Forecast Completion
2025-01-05T00:00:00.000
Actual Design Start
2021-03-30T00:00:00.000
Actual Design End
2021-12-03T00:00:00.000
Actual Construction
2021-12-03T00:00:00.000
Actual Construction 1
2023-06-10T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
P-1250, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2969
Fms Id
P-4GRST21
Total Budget
1801000.00
Spend To Date
205000.00
Spend To Date 1
0.1138
Fms Project Name
Greenstreets - Queens
Agency Project Name
Queens Medians Planting and Reconstruction
Agency Project Description
This project will reconstruct and replant Bell Malls, Merrick Boulevard Mall and Elmjack Mall.
Current Phase
Construction Procurement
Current Phase Start
2022-07-14T00:00:00.000
Forecast Current Phase End
2024-01-31T00:00:00.000
Forecast Completion
2026-02-19T00:00:00.000
Actual Design Start
2015-09-29T00:00:00.000
Actual Design End
2022-07-14T00:00:00.000
Actual Construction
2022-07-14T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
ED-Q384, P-0822, P-D171, P-I001, P-Q245, P-Q822
Ten Year Plan Category
MISCELLANEOUS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2970
Fms Id
P-3GRST01
Total Budget
100000.00
Spend To Date
10000.00
Spend To Date 1
0.10
Fms Project Name
Greenstreets - Manhattan Greenstreets Planting
Agency Project Name
East 66th Street Greenstreets Reconstruction
Agency Project Description
This project will reconstruct two Greenstreets on East 66th Street with new plantings.
Current Phase
Construction Procurement
Current Phase Start
2022-03-31T00:00:00.000
Forecast Current Phase End
2023-08-30T00:00:00.000
Forecast Completion
2025-03-27T00:00:00.000
Actual Design Start
2015-09-29T00:00:00.000
Actual Design End
2022-03-31T00:00:00.000
Actual Construction
2022-03-31T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-0822, P-I001
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2971
Fms Id
P-2GRST01
Total Budget
610000.00
Spend To Date
68743.10
Spend To Date 1
0.1126
Fms Project Name
Greenstreets - Brooklyn Tree Planting & Greenstreets
Agency Project Name
Brooklyn Tree Planting and Greenstreets Construction
Agency Project Description
This project will plant street trees and construct Greenstreets on Union Street.
Current Phase
Construction Procurement
Current Phase Start
2022-06-21T00:00:00.000
Forecast Current Phase End
2023-12-31T00:00:00.000
Forecast Completion
2025-07-28T00:00:00.000
Actual Design Start
2015-09-29T00:00:00.000
Actual Design End
2022-06-21T00:00:00.000
Actual Construction
2022-06-21T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-0822, P-D822, P-I001
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2972
Fms Id
P-302BLEE
Total Budget
2374000.00
Spend To Date
304699.38
Spend To Date 1
0.1283
Fms Project Name
Bleecker Street Playground,Manhattan
Agency Project Name
Bleecker Playground Reconstruction
Agency Project Description
This project will reconstruct Bleecker Playground.
Current Phase
Construction Procurement
Current Phase Start
2023-05-15T00:00:00.000
Forecast Current Phase End
2024-05-14T00:00:00.000
Forecast Completion
2025-12-10T00:00:00.000
Actual Design Start
2022-05-19T00:00:00.000
Actual Design End
2023-05-15T00:00:00.000
Actual Construction
2023-05-15T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-D018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2973
Fms Id
P-310MCCY
Total Budget
5175000.00
Spend To Date
464136.93
Spend To Date 1
0.0896
Fms Project Name
McCray Playground , Manhattan
Agency Project Name
William McCray Playground Reconstruction
Agency Project Description
This project will reconstruct William McCray Playground.
Current Phase
Construction Procurement
Current Phase Start
2023-01-27T00:00:00.000
Forecast Current Phase End
2024-03-30T00:00:00.000
Forecast Completion
2025-10-26T00:00:00.000
Actual Design Start
2022-01-27T00:00:00.000
Actual Design End
2023-01-27T00:00:00.000
Actual Construction
2023-01-27T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-1018, P-D018, P-I001, P-M245
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2974
Fms Id
P-503GCPG
Total Budget
8550000.00
Spend To Date
542354.74
Spend To Date 1
0.0634
Fms Project Name
Greencroft Playgroud R089-122M
Agency Project Name
Greencroft Playground Reconstruction
Agency Project Description
This project will reconstruct the playground area at Greencroft Playground.
Current Phase
Design
Current Phase Start
2021-11-17T00:00:00.000
Forecast Current Phase End
2023-10-27T00:00:00.000
Forecast Completion
2026-06-23T00:00:00.000
Actual Design Start
2021-11-17T00:00:00.000
Borough
Staten Island
Community Board
Staten Island 03
Budget Line
P-0245R, P-D020, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2975
Fms Id
P-4FTTOTP
Total Budget
1084000.00
Spend To Date
98053.86
Spend To Date 1
0.0904
Fms Project Name
FT. TOTTEN PK PORCHES
Agency Project Name
Fort Totten Park Commander's House Porches Reconstruction
Agency Project Description
This project will reconstruct the porches at the Commander's House in Fort Totten Park.
Current Phase
Construction Procurement
Current Phase Start
2022-03-31T00:00:00.000
Forecast Current Phase End
2023-10-31T00:00:00.000
Forecast Completion
2025-11-27T00:00:00.000
Actual Design Start
2021-05-11T00:00:00.000
Actual Design End
2022-03-31T00:00:00.000
Actual Construction
2022-03-31T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-1018, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2976
Fms Id
P-203LFGP
Total Budget
3800000.00
Spend To Date
425639.75
Spend To Date 1
0.112
Fms Project Name
Lafayette Gardens Playground Reconstruction
Agency Project Name
Lafayette Gardens Playground Reconstruction
Agency Project Description
This project will reconstruct the playground at Lafayette Gardens.
Current Phase
Construction Procurement
Current Phase Start
2023-03-10T00:00:00.000
Forecast Current Phase End
2024-04-30T00:00:00.000
Forecast Completion
2025-11-26T00:00:00.000
Actual Design Start
2021-06-24T00:00:00.000
Actual Design End
2023-03-10T00:00:00.000
Actual Construction
2023-03-10T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 03
Budget Line
P-D017, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2977
Fms Id
P-1SPC21A
Total Budget
3269000.00
Spend To Date
165000.00
Spend To Date 1
0.0504
Fms Project Name
Pelham Bay Park Forest Tree Replacement
Agency Project Name
Pelham Bay Park Forest Tree Replacement
Agency Project Description
This project will plant replacement trees and restore native species habitat within forested natural areas in Pelham Bay Park.
Current Phase
Construction Procurement
Current Phase Start
2021-12-30T00:00:00.000
Forecast Current Phase End
2023-10-31T00:00:00.000
Forecast Completion
2027-05-28T00:00:00.000
Actual Design Start
2021-02-22T00:00:00.000
Actual Design End
2021-12-30T00:00:00.000
Actual Construction
2021-12-30T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-0822, P-I001, WM-0001
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2978
Fms Id
P-2SPC21A
Total Budget
1198000.00
Spend To Date
91694.61
Spend To Date 1
0.0765
Fms Project Name
Marine Park Forest Restoration
Agency Project Name
Marine Park Forest Restoration
Agency Project Description
This project will restore native species habitat within forested natural areas in Marine Park.
Current Phase
Construction Procurement
Current Phase Start
2021-10-05T00:00:00.000
Forecast Current Phase End
2023-06-30T00:00:00.000
Forecast Completion
2027-01-25T00:00:00.000
Actual Design Start
2021-01-07T00:00:00.000
Actual Design End
2021-10-05T00:00:00.000
Actual Construction
2021-10-05T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-0822
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2979
Fms Id
P-2PWBFTG
Total Budget
25726340.98
Spend To Date
1699798.07
Spend To Date 1
0.066
Fms Project Name
PWOB- Fort Greene (B032-117M)
Agency Project Name
Fort Greene Park Entrances, Paths, Plaza and Drainage Infrastructure Reconstruction
Agency Project Description
This project will reconstruct the entrances, paths, plaza and drainage infrastructure at Fort Greene Park.
Current Phase
Design
Current Phase Start
2021-02-22T00:00:00.000
Forecast Current Phase End
2023-08-31T00:00:00.000
Forecast Completion
2026-07-27T00:00:00.000
Actual Design Start
2021-02-22T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-0935, P-1018, P-D017, P-I001, P-K011, TF-0502
Ten Year Plan Category
TRAFFIC WORK IN CONJUNCTION WITH HIGHWAY RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2980
Fms Id
P-1FACDCR
Total Budget
767000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Crotona Park Pool Facade Reconstruction
Agency Project Name
Citywide Facade Reconstruction
Agency Project Description
This project will reconstruct facades Citywide
Current Phase
Construction Procurement
Current Phase Start
2021-06-03T00:00:00.000
Forecast Current Phase End
2023-12-31T00:00:00.000
Forecast Completion
2027-07-28T00:00:00.000
Actual Design Start
2021-02-03T00:00:00.000
Actual Design End
2021-06-03T00:00:00.000
Actual Construction
2021-06-03T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-1018, P-1249, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2980
Fms Id
P-6FACD21
Total Budget
1914000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Citywide Facade Reconstruction CNYG-1421M
Agency Project Name
Citywide Facade Reconstruction
Agency Project Description
This project will reconstruct facades Citywide
Current Phase
Construction Procurement
Current Phase Start
2021-06-03T00:00:00.000
Forecast Current Phase End
2023-12-31T00:00:00.000
Forecast Completion
2027-07-28T00:00:00.000
Actual Design Start
2021-02-03T00:00:00.000
Actual Design End
2021-06-03T00:00:00.000
Actual Construction
2021-06-03T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
P-0505, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2981
Fms Id
SAND4TREE
Total Budget
4180000.00
Spend To Date
183537.71
Spend To Date 1
0.0439
Fms Project Name
ESCR -Stormwater Greenstreets Construction- MG-421M
Agency Project Name
Manhattan East Side Coastal Resiliency Stormwater Greenstreets Construction
Agency Project Description
This project will construct greenstreets to capture stormwater in Community Boards 3 and 6 in Manhattan.
Current Phase
Design
Current Phase Start
2021-10-04T00:00:00.000
Forecast Current Phase End
2023-09-05T00:00:00.000
Forecast Completion
2026-11-01T00:00:00.000
Actual Design Start
2021-10-04T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-I001, PU-0100
Ten Year Plan Category
MISCELLANEOUS ENERGY EFFICIENCY AND SUSTAINABILITY
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2982
Fms Id
P-1BOLTPK
Total Budget
8474000.00
Spend To Date
125000.00
Spend To Date 1
0.0147
Fms Project Name
Bolton Park Wetland Restore. & PK Con.
Agency Project Name
Soundview Park Bolton Point Coastal Habitat Restoration and Park Construction
Agency Project Description
This project will restore the coastal wetland and upland maritime area, and construct a park entry, pedestrian pathway, and plaza area at Bolton Point in Soundview Park.
Current Phase
Design
Current Phase Start
2018-11-14T00:00:00.000
Forecast Current Phase End
2023-10-02T00:00:00.000
Forecast Completion
2027-05-29T00:00:00.000
Actual Design Start
2018-11-14T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-1018, P-1245, P-D021, P-I001
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2983
Fms Id
P-4OLMSRF
Total Budget
9126000.00
Spend To Date
299737.69
Spend To Date 1
0.0328
Fms Project Name
RC of the roof at Olmsted Center
Agency Project Name
Olmsted Center Roof Reconstruction
Agency Project Description
This project will reconstruct the roof at the Olmsted Center.
Current Phase
Construction Procurement
Current Phase Start
2023-03-17T00:00:00.000
Forecast Current Phase End
2024-04-30T00:00:00.000
Forecast Completion
2025-11-26T00:00:00.000
Actual Design Start
2021-08-17T00:00:00.000
Actual Design End
2023-03-17T00:00:00.000
Actual Construction
2023-03-17T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-1018, P-1250, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2984
Fms Id
GXBXGI-02
Total Budget
850000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Bronx Green Inrastructure
Agency Project Name
Bronx Green Infrastructure Construction
Agency Project Description
This project will construct green infrastructure to capture storm water at Magenta Playground and Watson Gleason Playground.
Current Phase
Construction
Current Phase Start
2023-09-04T00:00:00.000
Forecast Current Phase End
2024-09-02T00:00:00.000
Forecast Completion
2024-09-02T00:00:00.000
Actual Design Start
2021-05-11T00:00:00.000
Actual Design End
2021-08-20T00:00:00.000
Actual Construction
2021-08-20T00:00:00.000
Actual Construction 1
2023-06-06T00:00:00.000
Actual Construction Start
2023-09-04T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
WP-0169, WP-0170
Ten Year Plan Category
GREEN INFRASTRUCTURE PROGRAM
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2985
Fms Id
EDMFPM
Total Budget
22264606.33
Spend To Date
508651.44
Spend To Date 1
0.0228
Fms Project Name
FERRY PIER AT DYCKMAN MARINA
Agency Project Name
Fort Washington Park Dyckman Marina Reconstruction
Agency Project Description
This project will reconstruct the Inwood Canoe Pier, Dyckman Fishing Pier, Dyckman Marina docks and adjacent shorelines at Fort Washington Park.
Current Phase
Design
Current Phase Start
2022-06-23T00:00:00.000
Forecast Current Phase End
2023-12-23T00:00:00.000
Forecast Completion
2027-08-19T00:00:00.000
Actual Design Start
2022-06-23T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
ED-D401, P-0245M, P-0501, P-D018, P-I001, PU-0200
Ten Year Plan Category
WATERFRONT DEVELOPMENT
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2986
Fms Id
SAND5TREE
Total Budget
5175000.00
Spend To Date
165814.00
Spend To Date 1
0.032
Fms Project Name
ESCR- Right of Way Bioswale Construction
Agency Project Name
Manhattan East Side Coastal Resiliency Sidewalk Bioswales Construction
Agency Project Description
This project will construct sidewalk bioswales and green infrastructure to capture storm water in Community Boards 3 and 6 in Manhattan.
Current Phase
Construction Procurement
Current Phase Start
2022-06-30T00:00:00.000
Forecast Current Phase End
2024-01-31T00:00:00.000
Forecast Completion
2027-08-28T00:00:00.000
Actual Design Start
2021-11-01T00:00:00.000
Actual Design End
2022-06-30T00:00:00.000
Actual Construction
2022-06-30T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-I001, PU-0100
Ten Year Plan Category
MISCELLANEOUS ENERGY EFFICIENCY AND SUSTAINABILITY
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2987
Fms Id
GXBXGI-03
Total Budget
2179000.00
Spend To Date
243094.09
Spend To Date 1
0.1115
Fms Project Name
GI- Van Cortlandt Park
Agency Project Name
Van Cortlandt Park Green Infrastructure Construction
Agency Project Description
This project will install multiple green infrastructure elements throughout Van Cortlandt Park.
Current Phase
Design
Current Phase Start
2022-04-14T00:00:00.000
Forecast Current Phase End
2023-12-08T00:00:00.000
Forecast Completion
2026-08-04T00:00:00.000
Actual Design Start
2022-04-14T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-I001, WP-0170
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2988
Fms Id
P-1MBRKCS
Total Budget
1191000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Millbrook Playground Comfort Station Reconstruction
Agency Project Name
Citywide Building Facility Reconstruction (CNYG-522M)
Agency Project Description
This project will reconstruct various parks facilities.
Current Phase
Construction Procurement
Current Phase Start
2021-11-29T00:00:00.000
Forecast Current Phase End
2023-12-31T00:00:00.000
Forecast Completion
2027-07-28T00:00:00.000
Actual Design Start
2021-07-19T00:00:00.000
Actual Design End
2021-11-29T00:00:00.000
Actual Construction
2021-11-29T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-0505, P-1018, P-1250, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2988
Fms Id
P-3LFLWER
Total Budget
1553000.00
Spend To Date
59703.81
Spend To Date 1
0.0384
Fms Project Name
Little Flower Playground Comfort Station Reconstruction
Agency Project Name
Citywide Building Facility Reconstruction (CNYG-522M)
Agency Project Description
This project will reconstruct various parks facilities.
Current Phase
Construction Procurement
Current Phase Start
2021-11-29T00:00:00.000
Forecast Current Phase End
2023-12-31T00:00:00.000
Forecast Completion
2027-07-28T00:00:00.000
Actual Design Start
2021-07-19T00:00:00.000
Actual Design End
2021-11-29T00:00:00.000
Actual Construction
2021-11-29T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2988
Fms Id
P-3P155CS
Total Budget
1430000.00
Spend To Date
55424.01
Spend To Date 1
0.0387
Fms Project Name
PS 155 Plgd-Comfort Station Recon.-ADA Acessible
Agency Project Name
Citywide Building Facility Reconstruction (CNYG-522M)
Agency Project Description
This project will reconstruct various parks facilities.
Current Phase
Construction Procurement
Current Phase Start
2021-11-29T00:00:00.000
Forecast Current Phase End
2023-12-31T00:00:00.000
Forecast Completion
2027-07-28T00:00:00.000
Actual Design Start
2021-07-19T00:00:00.000
Actual Design End
2021-11-29T00:00:00.000
Actual Construction
2021-11-29T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-D018, P-I001, P-M245
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2988
Fms Id
P-4HOLSCS
Total Budget
1473000.00
Spend To Date
24520.78
Spend To Date 1
0.0166
Fms Project Name
Hollis Playground Public Restroom Bldg Recon CNYG-522M
Agency Project Name
Citywide Building Facility Reconstruction (CNYG-522M)
Agency Project Description
This project will reconstruct various parks facilities.
Current Phase
Construction Procurement
Current Phase Start
2021-11-29T00:00:00.000
Forecast Current Phase End
2023-12-31T00:00:00.000
Forecast Completion
2027-07-28T00:00:00.000
Actual Design Start
2021-07-19T00:00:00.000
Actual Design End
2021-11-29T00:00:00.000
Actual Construction
2021-11-29T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-0505, P-1008, P-D019, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2989
Fms Id
P-102WWGT
Total Budget
480000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
NYC GreenThumb -Wishing Well Community Garden Water System -
Agency Project Name
Citywide Utility Reconstruction
Agency Project Description
This project will reconstruct utilities citywide.
Current Phase
Construction Procurement
Current Phase Start
2022-01-06T00:00:00.000
Forecast Current Phase End
2023-10-31T00:00:00.000
Forecast Completion
2026-05-28T00:00:00.000
Actual Design Start
2021-11-17T00:00:00.000
Actual Design End
2022-01-06T00:00:00.000
Actual Construction
2022-01-06T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-D021, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2989
Fms Id
P-105MHGT
Total Budget
350000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
MABEL HAMPTON Garden accessibilIty & garden bed renovations
Agency Project Name
Citywide Utility Reconstruction
Agency Project Description
This project will reconstruct utilities citywide.
Current Phase
Construction Procurement
Current Phase Start
2022-01-06T00:00:00.000
Forecast Current Phase End
2023-10-31T00:00:00.000
Forecast Completion
2026-05-28T00:00:00.000
Actual Design Start
2021-11-17T00:00:00.000
Actual Design End
2022-01-06T00:00:00.000
Actual Construction
2022-01-06T00:00:00.000
Borough
Bronx
Community Board
Bronx, Bronx 04
Budget Line
P-D021, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2989
Fms Id
P-209MSGT
Total Budget
350000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
GreenThumb Comm Garden Maple Street Garden -- Water line
Agency Project Name
Citywide Utility Reconstruction
Agency Project Description
This project will reconstruct utilities citywide.
Current Phase
Construction Procurement
Current Phase Start
2022-01-06T00:00:00.000
Forecast Current Phase End
2023-10-31T00:00:00.000
Forecast Completion
2026-05-28T00:00:00.000
Actual Design Start
2021-11-17T00:00:00.000
Actual Design End
2022-01-06T00:00:00.000
Actual Construction
2022-01-06T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-D017, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2989
Fms Id
P-2GRNTHB
Total Budget
2795000.00
Spend To Date
91652.82
Spend To Date 1
0.0327
Fms Project Name
Green Thumb Irrigation systems (Brooklyn)
Agency Project Name
Citywide Utility Reconstruction
Agency Project Description
This project will reconstruct utilities citywide.
Current Phase
Construction Procurement
Current Phase Start
2022-01-06T00:00:00.000
Forecast Current Phase End
2023-10-31T00:00:00.000
Forecast Completion
2026-05-28T00:00:00.000
Actual Design Start
2021-11-17T00:00:00.000
Actual Design End
2022-01-06T00:00:00.000
Actual Construction
2022-01-06T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-1018, P-D017, P-I001, P-K011
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2989
Fms Id
P-312FTDR
Total Budget
300000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Ft. Tryon Dog Run -- Install Water Service at Sir William's
Agency Project Name
Citywide Utility Reconstruction
Agency Project Description
This project will reconstruct utilities citywide.
Current Phase
Construction Procurement
Current Phase Start
2022-01-06T00:00:00.000
Forecast Current Phase End
2023-10-31T00:00:00.000
Forecast Completion
2026-05-28T00:00:00.000
Actual Design Start
2021-11-17T00:00:00.000
Actual Design End
2022-01-06T00:00:00.000
Actual Construction
2022-01-06T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-D018, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2989
Fms Id
P-406PEGT
Total Budget
350000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Project Eden- Greenthumb Community Gardens--Internal Water I
Agency Project Name
Citywide Utility Reconstruction
Agency Project Description
This project will reconstruct utilities citywide.
Current Phase
Construction Procurement
Current Phase Start
2022-01-06T00:00:00.000
Forecast Current Phase End
2023-10-31T00:00:00.000
Forecast Completion
2026-05-28T00:00:00.000
Actual Design Start
2021-11-17T00:00:00.000
Actual Design End
2022-01-06T00:00:00.000
Actual Construction
2022-01-06T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-I001, P-Q245
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2989
Fms Id
P-412GECG
Total Budget
350000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
George Eagle Carr Comm Garden -- Install water infrastructur
Agency Project Name
Citywide Utility Reconstruction
Agency Project Description
This project will reconstruct utilities citywide.
Current Phase
Construction Procurement
Current Phase Start
2022-01-06T00:00:00.000
Forecast Current Phase End
2023-10-31T00:00:00.000
Forecast Completion
2026-05-28T00:00:00.000
Actual Design Start
2021-11-17T00:00:00.000
Actual Design End
2022-01-06T00:00:00.000
Actual Construction
2022-01-06T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-D019, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2989
Fms Id
P-412WATR
Total Budget
1050000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
DPR Greenthumb Paradise & 2 Discovery Gardens -- Water sourc
Agency Project Name
Citywide Utility Reconstruction
Agency Project Description
This project will reconstruct utilities citywide.
Current Phase
Construction Procurement
Current Phase Start
2022-01-06T00:00:00.000
Forecast Current Phase End
2023-10-31T00:00:00.000
Forecast Completion
2026-05-28T00:00:00.000
Actual Design Start
2021-11-17T00:00:00.000
Actual Design End
2022-01-06T00:00:00.000
Actual Construction
2022-01-06T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-D019, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2989
Fms Id
P-6WTRSWR
Total Budget
1400000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Citywide Multisite Water and Sewer Reconstruction
Agency Project Name
Citywide Utility Reconstruction
Agency Project Description
This project will reconstruct utilities citywide.
Current Phase
Construction Procurement
Current Phase Start
2022-01-06T00:00:00.000
Forecast Current Phase End
2023-10-31T00:00:00.000
Forecast Completion
2026-05-28T00:00:00.000
Actual Design Start
2021-11-17T00:00:00.000
Actual Design End
2022-01-06T00:00:00.000
Actual Construction
2022-01-06T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2990
Fms Id
P-4UNION
Total Budget
500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Union Street Beautification
Agency Project Name
Queens Council District 20 Sidewalk Reconstruction
Agency Project Description
This project will reconstruct tree pits and sidewalks in Council District 20 in Queens.
Current Phase
Design
Current Phase Start
2022-02-07T00:00:00.000
Forecast Current Phase End
2023-09-15T00:00:00.000
Forecast Completion
2026-05-12T00:00:00.000
Actual Design Start
2022-02-07T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-D019, P-I001
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2991
Fms Id
P-3RIVRMP
Total Budget
2720000.00
Spend To Date
220579.41
Spend To Date 1
0.081
Fms Project Name
RIVERSIDE PARK: RIVERSIDE PARK 105TH STREET STEP RAMP RECON
Agency Project Name
Riverside Park 105th Street Staircase Reconstruction
Agency Project Description
This project will reconstruct the staircase at West 105th Street in Riverside Park.
Current Phase
Design
Current Phase Start
2022-05-18T00:00:00.000
Forecast Current Phase End
2023-08-18T00:00:00.000
Forecast Completion
2026-04-14T00:00:00.000
Actual Design Start
2022-05-18T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-0380, P-D018, P-I001, P-M245
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2992
Fms Id
P-3FCSADA
Total Budget
3575000.00
Spend To Date
389927.89
Spend To Date 1
0.109
Fms Project Name
Fort Washington Park CS-Renovate CS to Make it ADA Compliant
Agency Project Name
Fort Washington Park Discovery Playground Public Restroom Building Construction
Agency Project Description
This project will construct a public restroom building at Discovery Playground in Fort Washington Park.
Current Phase
Design
Current Phase Start
2022-04-01T00:00:00.000
Forecast Current Phase End
2023-07-28T00:00:00.000
Forecast Completion
2027-03-24T00:00:00.000
Actual Design Start
2022-04-01T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-D018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
2993
Fms Id
P-404ATRI
Total Budget
791000.00
Spend To Date
84000.04
Spend To Date 1
0.1061
Fms Project Name
AMERICAN TRIANGLE RECON
Agency Project Name
American Triangle Reconstruction
Agency Project Description
This project will reconstruct American Triangle.
Current Phase
Construction Procurement
Current Phase Start
2023-05-01T00:00:00.000
Forecast Current Phase End
2024-04-30T00:00:00.000
Forecast Completion
2025-11-26T00:00:00.000
Actual Design Start
2022-04-26T00:00:00.000
Actual Design End
2023-05-01T00:00:00.000
Actual Construction
2023-05-01T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-D019, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000