Capital Projects Dashboard - Citywide Budget and Schedule

All major capital infrastructure projects with a committed budget. Financial information and agency schedule details for each project are joined via FMS ID. Only projects in the design phase or later have project schedules displayed. This dataset is part of the Capital Projects Dashboard.

Note: Each row is uniquely identified by its Financial Management Service (FMS) ID. FMS ID is the unique ID that OMB uses for the FMS (Financial Information System). This ID can be universally joined with any OMB dataset that has the same field. The Capital Projects Dashboard is the result of joining OMB’s fiscal data with the agency’s schedule data. FMS IDs and agency projects don't always have a one-to-one relationship (i.e., one project schedule may correlate to multiple FMS IDs, and one FMS may correct to multiple projects with different schedules).

City Government Mayor's Office of Operations (OPS) Dataset fb86-vt7u 27 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3076
Fms Id
P-2CPISAP
Total Budget
8661000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
CPI - St. Andrew's Playground B225-123M
Agency Project Name
St. Andrew's Playground Reconstruction
Agency Project Description
This project will reconstruct St. Andrew's Playground.
Current Phase
Design
Current Phase Start
2023-03-22T00:00:00.000
Forecast Current Phase End
2024-09-27T00:00:00.000
Forecast Completion
2027-05-25T00:00:00.000
Actual Design Start
2023-03-22T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-1018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3077
Fms Id
P-2CPIPHP
Total Budget
5000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
CPI - Pena Herrera Playground B210J-123M
Agency Project Name
Pena Hererra Playground Reconstruction
Agency Project Description
This project will reconstruct Pena Herrera Playground.
Current Phase
Design
Current Phase Start
2023-02-16T00:00:00.000
Forecast Current Phase End
2024-05-31T00:00:00.000
Forecast Completion
2027-01-26T00:00:00.000
Actual Design Start
2023-02-16T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-1018, P-D017, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3078
Fms Id
P-6CWSTF2
Total Budget
9950000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Citywide Synthetic Turf Limited Scope Reconstruction
Agency Project Name
Citywide Synthetic Turf Reconstruction
Agency Project Description
This project will reconstruct synthetic turf fields at various locations citywide.
Current Phase
Construction Procurement
Current Phase Start
2022-09-13T00:00:00.000
Forecast Current Phase End
2024-03-30T00:00:00.000
Forecast Completion
2027-10-26T00:00:00.000
Actual Design Start
2022-07-01T00:00:00.000
Actual Design End
2022-09-13T00:00:00.000
Actual Construction
2022-09-13T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
P-0510
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3079
Fms Id
P-2BKSTF1
Total Budget
9950000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Brooklyn Synthetic Turf Limited Scope Reconstruction
Agency Project Name
Brooklyn Synthetic Turf Reconstruction
Agency Project Description
This project will reconstruct synthetic turf fields at various locations in Brooklyn.
Current Phase
Construction Procurement
Current Phase Start
2022-09-13T00:00:00.000
Forecast Current Phase End
2024-03-30T00:00:00.000
Forecast Completion
2027-10-26T00:00:00.000
Actual Design Start
2022-07-01T00:00:00.000
Actual Design End
2022-09-13T00:00:00.000
Actual Construction
2022-09-13T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-0510
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3080
Fms Id
P-216OSBO
Total Budget
772000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Osborn Playground Phase 2 - Adult Fitness Area B343-123M
Agency Project Name
Osborn Playground Adult Fitness Construction
Agency Project Description
This project will construct an adult fitness area at Osborn Playground.
Current Phase
Design
Current Phase Start
2022-11-21T00:00:00.000
Forecast Current Phase End
2023-11-30T00:00:00.000
Forecast Completion
2026-07-27T00:00:00.000
Actual Design Start
2022-11-21T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-D017, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3081
Fms Id
P-215MEL2
Total Budget
1500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Mellet Playground Phase 2 - Construct Basketball Courts
Agency Project Name
Mellett Playground Basketball Courts Construction
Agency Project Description
This project will construct basketball courts at Mellett Playground.
Current Phase
Design
Current Phase Start
2022-12-12T00:00:00.000
Forecast Current Phase End
2023-12-12T00:00:00.000
Forecast Completion
2026-08-08T00:00:00.000
Actual Design Start
2022-12-12T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-D017, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3082
Fms Id
P-207GWHB
Total Budget
1000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Greenwood Playground - Handball Courts RC B130-123M
Agency Project Name
Greenwood Playground Handball Courts Reconstruction
Agency Project Description
This project will reconstruct the handball courts at Greenwood Playground.
Current Phase
Design
Current Phase Start
2022-11-16T00:00:00.000
Forecast Current Phase End
2023-11-16T00:00:00.000
Forecast Completion
2026-07-13T00:00:00.000
Actual Design Start
2022-11-16T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-D017, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3083
Fms Id
P-5TREP23
Total Budget
2975000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
FY23 Street Trees SI CB's 1-3
Agency Project Name
Staten Island Street Tree Planting FY23 - Community Board 1-3
Agency Project Description
This project will plant new and replacement trees in Community Boards 1-3 in Staten Island.
Current Phase
Construction
Current Phase Start
2023-04-18T00:00:00.000
Forecast Current Phase End
2024-04-16T00:00:00.000
Forecast Completion
2024-04-16T00:00:00.000
Actual Design Start
2022-06-06T00:00:00.000
Actual Design End
2022-09-08T00:00:00.000
Actual Construction
2022-09-08T00:00:00.000
Actual Construction 1
2023-05-05T00:00:00.000
Actual Construction Start
2023-04-18T00:00:00.000
Borough
Staten Island
Community Board
Staten Island, Staten Island 01, Staten Island 02, Staten Island 03
Budget Line
P-0822, P-I001, SE-0200R, WM-0006
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3084
Fms Id
P-2TREP23
Total Budget
500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
FY23 Street Trees BK CB's 3 & 4
Agency Project Name
Brooklyn Street Tree Planting FY23 - Community Boards 3 & 4
Agency Project Description
This project will plant new and replacement trees in Community Boards 3 and 4 in Brooklyn.
Current Phase
Construction Procurement
Current Phase Start
2023-01-12T00:00:00.000
Forecast Current Phase End
2024-01-12T00:00:00.000
Forecast Completion
2025-08-09T00:00:00.000
Actual Design Start
2022-08-01T00:00:00.000
Actual Design End
2023-01-12T00:00:00.000
Actual Construction
2023-01-12T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn, Brooklyn 03, Brooklyn 04
Budget Line
P-0822, P-D822, P-I001
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3085
Fms Id
P-4TRE23A
Total Budget
900000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Queens Street Tree Planting FY 23 - CB 7
Agency Project Name
Queens Street Tree Planting FY23 - Community Board 7 (QG-1019MR)
Current Phase
Construction
Current Phase Start
2022-10-10T00:00:00.000
Forecast Current Phase End
2023-07-31T00:00:00.000
Forecast Completion
2023-07-31T00:00:00.000
Actual Design Start
2022-06-06T00:00:00.000
Actual Design End
2022-09-08T00:00:00.000
Actual Construction
2022-09-08T00:00:00.000
Actual Construction 1
2023-04-19T00:00:00.000
Actual Construction Start
2022-10-10T00:00:00.000
Borough
Queens
Community Board
Queens, Queens 07
Budget Line
P-0822, P-1018, P-I001
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3086
Fms Id
P-2TRE23B
Total Budget
2959000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
FY23 Street Trees BK CB's 12 & 14
Agency Project Name
Brooklyn Street Tree Planting FY23 - Community Boards 12 &14 (BG-1619MR)
Agency Project Description
This project will plant new and replacement trees in Community Board 12 and 14 in Brooklyn.
Current Phase
Construction
Current Phase Start
2022-10-13T00:00:00.000
Forecast Current Phase End
2023-10-12T00:00:00.000
Forecast Completion
2023-10-12T00:00:00.000
Actual Design Start
2022-06-06T00:00:00.000
Actual Design End
2022-09-08T00:00:00.000
Actual Construction
2022-09-08T00:00:00.000
Actual Construction 1
2023-04-20T00:00:00.000
Actual Construction Start
2022-10-13T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn, Brooklyn 12, Brooklyn 14
Budget Line
P-0822, P-1018, P-I001
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3087
Fms Id
P-4TREP23
Total Budget
3983000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
FY23 Street Trees QN CB's 1-6
Agency Project Name
Queens Street Tree Planting FY23 - Community Boards 1-6
Agency Project Description
This project will plant new trees in Community Boards 1-6 in Queens.
Current Phase
Construction Procurement
Current Phase Start
2022-09-08T00:00:00.000
Forecast Current Phase End
2023-09-08T00:00:00.000
Forecast Completion
2025-04-05T00:00:00.000
Actual Design Start
2022-06-06T00:00:00.000
Actual Design End
2022-09-08T00:00:00.000
Actual Construction
2022-09-08T00:00:00.000
Borough
Queens
Community Board
Queens, Queens 01, Queens 02, Queens 03, Queens 04, Queens 05, Queens 06
Budget Line
P-0822, P-1018, P-D822, SE-0002Q
Ten Year Plan Category
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3088
Fms Id
P-0PRC23B
Total Budget
4000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Citywide Grow Bag, Field Grown Tree Proc. Region 1 FY23
Agency Project Name
Citywide Grow Bag and Field Grown Tree Procurement from Region 1 FY23
Agency Project Description
This project will furnish and deliver grow bag and field grown trees in Region 1 for tree planting programs.
Current Phase
Design
Current Phase Start
2023-03-24T00:00:00.000
Forecast Current Phase End
2024-04-01T00:00:00.000
Forecast Completion
2029-11-26T00:00:00.000
Actual Design Start
2023-03-24T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
P-0822
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3089
Fms Id
P-0PRC23A
Total Budget
2500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Citywide Grow Bag, Field Grown Tree Proc. Region 2 FY23
Agency Project Name
Citywide Grow Bag and Field Grown Tree Procurement from Region 2 FY23
Agency Project Description
This project will furnish and deliver grow bag and field grown trees in Region 2 for tree planting programs.
Current Phase
Design
Current Phase Start
2023-03-24T00:00:00.000
Forecast Current Phase End
2024-04-01T00:00:00.000
Forecast Completion
2029-11-26T00:00:00.000
Actual Design Start
2023-03-24T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
P-0822
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3090
Fms Id
P-2TRE23C
Total Budget
500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Brooklyn CB 3 & 4 Street Tree Planting FY24
Agency Project Name
Brooklyn Street Tree Planting FY24 - Community Boards 3 & 4
Agency Project Description
This project will plant new and replacement trees in Community Boards 3 & 4 in Brooklyn.
Current Phase
Construction Procurement
Current Phase Start
2023-01-12T00:00:00.000
Forecast Current Phase End
2024-01-12T00:00:00.000
Forecast Completion
2025-08-09T00:00:00.000
Actual Design Start
2022-08-01T00:00:00.000
Actual Design End
2023-01-12T00:00:00.000
Actual Construction
2023-01-12T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn, Brooklyn 03, Brooklyn 04
Budget Line
P-0822
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3091
Fms Id
P-2TRE23D
Total Budget
500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Brooklyn CB 7 & 10 Street Tree Planting FY23
Agency Project Name
Brooklyn Street Tree Planting FY23 - Community Boards 7 & 10
Agency Project Description
This project will plant new and replacement trees in Community Boards 7 & 10 in Brooklyn.
Current Phase
Construction Procurement
Current Phase Start
2023-01-12T00:00:00.000
Forecast Current Phase End
2024-01-12T00:00:00.000
Forecast Completion
2025-08-09T00:00:00.000
Actual Design Start
2022-08-01T00:00:00.000
Actual Design End
2023-01-12T00:00:00.000
Actual Construction
2023-01-12T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn, Brooklyn 07, Brooklyn 10
Budget Line
P-0822
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3092
Fms Id
P-2PKTR23
Total Budget
990000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Brooklyn Park Tree Planting FY23
Agency Project Name
Brooklyn Park Tree Planting FY23
Agency Project Description
This project will plant new and replacement park trees in Brooklyn.
Current Phase
Construction Procurement
Current Phase Start
2023-03-01T00:00:00.000
Forecast Current Phase End
2024-02-29T00:00:00.000
Forecast Completion
2025-09-26T00:00:00.000
Actual Design Start
2022-08-01T00:00:00.000
Actual Design End
2023-03-01T00:00:00.000
Actual Construction
2023-03-01T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-0822, P-1018
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3093
Fms Id
P-4PKTR23
Total Budget
990000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Queens Park Tree Planting FY23
Agency Project Name
Queens Park Tree Planting FY23
Agency Project Description
This project will plant new and replacement park trees in Queens.
Current Phase
Construction Procurement
Current Phase Start
2023-03-01T00:00:00.000
Forecast Current Phase End
2024-02-29T00:00:00.000
Forecast Completion
2025-09-26T00:00:00.000
Actual Design Start
2022-08-01T00:00:00.000
Actual Design End
2023-03-01T00:00:00.000
Actual Construction
2023-03-01T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-0822, P-1018
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3094
Fms Id
P-6PKTR23
Total Budget
1787000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Bronx & Manhattan Park Tree Planting FY23
Agency Project Name
Bronx & Manhattan Park Tree Planting FY23
Agency Project Description
This project will plant new and replacement trees in parks.
Current Phase
Construction Procurement
Current Phase Start
2023-03-07T00:00:00.000
Forecast Current Phase End
2024-03-06T00:00:00.000
Forecast Completion
2025-10-02T00:00:00.000
Actual Design Start
2022-08-01T00:00:00.000
Actual Design End
2023-03-07T00:00:00.000
Actual Construction
2023-03-07T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
ED-0075, ED-0409, P-0822
Ten Year Plan Category
WATERFRONT DEVELOPMENT
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3095
Fms Id
P-4TRE23B
Total Budget
980000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Queens CB 7 Street Tree Planting FY23
Agency Project Name
Queens Street Tree Planting FY23 - Community Board 7
Agency Project Description
This project will plant new and replacement trees in Community Board 7 in Queens.
Current Phase
Construction Procurement
Current Phase Start
2023-01-12T00:00:00.000
Forecast Current Phase End
2024-01-12T00:00:00.000
Forecast Completion
2025-08-09T00:00:00.000
Actual Design Start
2022-08-01T00:00:00.000
Actual Design End
2023-01-12T00:00:00.000
Actual Construction
2023-01-12T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-0822
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3096
Fms Id
P-2TRE23E
Total Budget
2967000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Brooklyn CB 1, 2, 6 Street Tree Planting FY23
Agency Project Name
Brooklyn Street Tree Planting FY23 - Community Boards 1, 2 & 6
Agency Project Description
This project will plant new and replacement trees in Community Boards 1, 2 and 6 in Brooklyn.
Current Phase
Construction Procurement
Current Phase Start
2023-01-12T00:00:00.000
Forecast Current Phase End
2024-02-28T00:00:00.000
Forecast Completion
2025-09-25T00:00:00.000
Actual Design Start
2022-08-01T00:00:00.000
Actual Design End
2023-01-12T00:00:00.000
Actual Construction
2023-01-12T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn, Brooklyn 01, Brooklyn 02, Brooklyn 06
Budget Line
P-0822, P-1018
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3097
Fms Id
P-2TRE23A
Total Budget
985000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
FY23 Street Trees BK CB's 5 & 16
Agency Project Name
Brooklyn Street Tree Planting FY23 - Community Boards 5 & 16
Agency Project Description
This project will plant new and replacement trees in Community Boards 5 & 16 in Brooklyn.
Current Phase
Construction Procurement
Current Phase Start
2023-01-12T00:00:00.000
Forecast Current Phase End
2024-01-12T00:00:00.000
Forecast Completion
2025-08-09T00:00:00.000
Actual Design Start
2022-08-01T00:00:00.000
Actual Design End
2023-01-12T00:00:00.000
Actual Construction
2023-01-12T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn, Brooklyn 05, Brooklyn 16
Budget Line
P-0822, P-D822, P-I001
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3098
Fms Id
P-2TRE23F
Total Budget
2600000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Brooklyn CB 12 & 14 Street Tree Planting FY23
Agency Project Name
Brooklyn Street Tree Planting FY23 - Community Boards 12 & 14
Agency Project Description
This project will plant new and replacement trees in Community Boards 12 & 14 in Brooklyn.
Current Phase
Construction Procurement
Current Phase Start
2023-01-12T00:00:00.000
Forecast Current Phase End
2024-02-28T00:00:00.000
Forecast Completion
2025-09-25T00:00:00.000
Actual Design Start
2022-08-01T00:00:00.000
Actual Design End
2023-01-12T00:00:00.000
Actual Construction
2023-01-12T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn, Brooklyn 12, Brooklyn 14
Budget Line
P-0822, P-1018
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3099
Fms Id
P-2TRE23G
Total Budget
2970000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Brooklyn CB 11, 13, 15 Street Tree Planting FY23
Agency Project Name
Brooklyn Street Tree Planting FY23 - Community Boards 11, 13 & 15
Agency Project Description
This project will plant new and replacement trees in Community Boards 11, 13 & 15 in Brooklyn.
Current Phase
Construction Procurement
Current Phase Start
2023-01-12T00:00:00.000
Forecast Current Phase End
2024-02-28T00:00:00.000
Forecast Completion
2025-09-25T00:00:00.000
Actual Design Start
2022-08-01T00:00:00.000
Actual Design End
2023-01-12T00:00:00.000
Actual Construction
2023-01-12T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn, Brooklyn 11, Brooklyn 13, Brooklyn 15
Budget Line
P-0822, P-1018
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3100
Fms Id
P-1TRE23A
Total Budget
2779000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Bronx CB 1-4 Street Tree Planting FY23
Agency Project Name
Bronx Street Tree Planting FY23 - Community Boards 1-4
Agency Project Description
This project will plant new and replacement trees in Community Boards 1-4 in The Bronx.
Current Phase
Construction Procurement
Current Phase Start
2023-01-12T00:00:00.000
Forecast Current Phase End
2024-02-28T00:00:00.000
Forecast Completion
2025-09-25T00:00:00.000
Actual Design Start
2022-08-01T00:00:00.000
Actual Design End
2023-01-12T00:00:00.000
Actual Construction
2023-01-12T00:00:00.000
Borough
Bronx
Community Board
Bronx, Bronx 01, Bronx 02, Bronx 03, Bronx 04
Budget Line
P-0822, P-1018, P-X822
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3101
Fms Id
P-1TRE23B
Total Budget
3470000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Bronx CB 9-10 Street Tree Planting FY23
Agency Project Name
Bronx Street Tree Planting FY23 - Community Boards 9-10
Agency Project Description
This project will plant new and replacement trees in Community Boards 9-10 in the Bronx.
Current Phase
Construction Procurement
Current Phase Start
2023-01-12T00:00:00.000
Forecast Current Phase End
2024-02-28T00:00:00.000
Forecast Completion
2025-09-25T00:00:00.000
Actual Design Start
2022-08-01T00:00:00.000
Actual Design End
2023-01-12T00:00:00.000
Actual Construction
2023-01-12T00:00:00.000
Borough
Bronx
Community Board
Bronx, Bronx 09, Bronx 10
Budget Line
P-0822, P-1018, P-D822, P-I001, WM-0011
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3102
Fms Id
P-4TRE23C
Total Budget
7120000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Queens CB 1-5 Street Tree Planting FY23
Agency Project Name
Queens Street Tree Planting FY23 - Community Boards 1-5
Agency Project Description
This project will plant new and replacement trees in Community Boards 1-5 in Queens.
Current Phase
Construction Procurement
Current Phase Start
2023-01-12T00:00:00.000
Forecast Current Phase End
2024-02-28T00:00:00.000
Forecast Completion
2026-09-25T00:00:00.000
Actual Design Start
2022-08-01T00:00:00.000
Actual Design End
2023-01-12T00:00:00.000
Actual Construction
2023-01-12T00:00:00.000
Borough
Queens
Community Board
Queens, Queens 01, Queens 02, Queens 03, Queens 04, Queens 05
Budget Line
P-0822, P-1018, WM-0006
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3103
Fms Id
P-4PNYT32
Total Budget
2760000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Queens PLANYC CB 6, 9, 10 Street Tree Planting FY23
Agency Project Name
Queens PLANYC Street Tree Planting FY23 - Community Boards 6, 9 & 10
Agency Project Description
This project will plant new and replacement trees in Community Boards 6, 9 & 10 in Queens.
Current Phase
Construction Procurement
Current Phase Start
2023-01-12T00:00:00.000
Forecast Current Phase End
2024-02-28T00:00:00.000
Forecast Completion
2025-09-25T00:00:00.000
Actual Design Start
2022-08-01T00:00:00.000
Actual Design End
2023-01-12T00:00:00.000
Actual Construction
2023-01-12T00:00:00.000
Borough
Queens
Community Board
Queens, Queens 06, Queens 09, Queens 10
Budget Line
P-0822
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3104
Fms Id
P-5TRE23A
Total Budget
2450000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Staten Island Street Tree Planting FY23
Agency Project Name
Staten Island Street Tree Planting FY23
Agency Project Description
This project will plant new and replacement trees in Staten Island.
Current Phase
Construction Procurement
Current Phase Start
2023-01-12T00:00:00.000
Forecast Current Phase End
2024-02-28T00:00:00.000
Forecast Completion
2025-09-25T00:00:00.000
Actual Design Start
2022-08-01T00:00:00.000
Actual Design End
2023-01-12T00:00:00.000
Actual Construction
2023-01-12T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
P-0822, P-1018
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3105
Fms Id
P-503ANNA
Total Budget
2500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Annadale Green Reconstruction
Agency Project Name
Annadale Green Reconstruction
Agency Project Description
This project will reconstruct the passive park and sidewalks at Annadale Green.
Current Phase
Design
Current Phase Start
2023-01-10T00:00:00.000
Forecast Current Phase End
2024-01-31T00:00:00.000
Forecast Completion
2026-09-27T00:00:00.000
Actual Design Start
2023-01-10T00:00:00.000
Borough
Staten Island
Community Board
Staten Island
Budget Line
P-D020, P-I001, P-R245
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3106
Fms Id
P-306ASGP
Total Budget
3940000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Augustus Saint Gaudens Playground Renovation ( M226-123M)
Agency Project Name
Augustus Saint Gaudens Playground Reconstruction
Agency Project Description
This project will reconstruct Augustus Saint Gaudens Playground.
Current Phase
Design
Current Phase Start
2023-02-15T00:00:00.000
Forecast Current Phase End
2024-02-15T00:00:00.000
Forecast Completion
2026-10-12T00:00:00.000
Actual Design Start
2023-02-15T00:00:00.000
Borough
Manhattan
Community Board
Manhattan, Manhattan 06
Budget Line
P-D018, P-I001
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3107
Fms Id
P-312LBPG
Total Budget
5008000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Fort Washington - Lily Brown Playground Renovation
Agency Project Name
Fort Washington Park Lily Brown Playground Reconstruction
Agency Project Description
This project will reconstruct Lily Brown Playground in Fort Washington Park .
Current Phase
Design
Current Phase Start
2023-01-19T00:00:00.000
Forecast Current Phase End
2024-01-18T00:00:00.000
Forecast Completion
2026-09-14T00:00:00.000
Actual Design Start
2023-01-19T00:00:00.000
Borough
Manhattan
Community Board
Manhattan, Manhattan 12
Budget Line
P-D018, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3108
Fms Id
P-6SEAWAL
Total Budget
9663000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Citywide Seawall Reconstruction
Agency Project Name
Citywide Seawall Reconstruction
Agency Project Description
This project will reconstruct seawalls in various locations, citywide.
Current Phase
Design
Current Phase Start
2019-10-21T00:00:00.000
Forecast Current Phase End
2023-12-31T00:00:00.000
Forecast Completion
2027-02-25T00:00:00.000
Actual Design Start
2019-10-21T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
P-0501, P-1130, P-D017, P-I001, P-K011, PU-0200
Ten Year Plan Category
MISCELLANEOUS ENERGY EFFICIENCY AND SUSTAINABILITY
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3109
Fms Id
P-110FPPP
Total Budget
3122000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Ferry Point Playground Reconstruction X126
Agency Project Name
Ferry Point Playground Reconstruction
Agency Project Description
This project will reconstruct the playground in Ferry Point Park.
Current Phase
Design
Current Phase Start
2022-10-24T00:00:00.000
Forecast Current Phase End
2023-10-30T00:00:00.000
Forecast Completion
2026-06-26T00:00:00.000
Actual Design Start
2022-10-24T00:00:00.000
Borough
Bronx
Community Board
Bronx
Budget Line
P-D021, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3110
Fms Id
P-302TDAP
Total Budget
20000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Tony Dapolito Recreation Center Emergency
Agency Project Name
Tony Dapolito Recreation Center Emergency Reconstruction
Agency Project Description
This project is an emergency reconstruction of Tony Dapolito Recreation Center.
Current Phase
Construction Procurement
Current Phase Start
2023-03-27T00:00:00.000
Forecast Current Phase End
2024-03-26T00:00:00.000
Forecast Completion
2026-04-23T00:00:00.000
Actual Design Start
2022-09-07T00:00:00.000
Actual Design End
2023-03-27T00:00:00.000
Actual Construction
2023-03-27T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-0506
Ten Year Plan Category
MAJOR RECREATIONAL FACILITIES AND FACILITY RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3111
Fms Id
P-6PREFAB
Total Budget
3180000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Compact Prefabricated Comfort Stations for BX,QN,MN
Agency Project Name
Joyce Kilmer Park, Hoyt Playground, and Thomas Jefferson Park Compact Prefabricated Public Restroom Buildings Construction
Agency Project Description
This project will construct compact prefabricated public restroom buildings at Joyce Kilmer Park, Hoyt Playground, and Thomas Jefferson Park.
Current Phase
Design
Current Phase Start
2023-01-06T00:00:00.000
Forecast Current Phase End
2023-09-29T00:00:00.000
Forecast Completion
2026-11-25T00:00:00.000
Actual Design Start
2023-01-06T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
P-1018, P-I001
Ten Year Plan Category
MAJOR RECREATIONAL FACILITIES AND FACILITY RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3112
Fms Id
P-308CSPP
Total Budget
300000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Carl Schurz Park -- Pathway Repavings
Agency Project Name
Carl Schurz Park Pathway Reconstruction
Agency Project Description
This project will reconstruct bluestone paths in Carl Schurz Park.
Current Phase
Design
Current Phase Start
2023-01-03T00:00:00.000
Forecast Current Phase End
2023-07-31T00:00:00.000
Forecast Completion
2025-09-23T00:00:00.000
Actual Design Start
2023-01-03T00:00:00.000
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-D018, P-I001
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3113
Fms Id
P-2TRSD23
Total Budget
300000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Brooklyn Tree-Damaged Sidewalk Reconstruction
Agency Project Name
Brooklyn Tree-Damaged Sidewalk Reconstruction FY23 - Community Boards 3, 4, 5, 8, 9, 15, 16, 17, 18
Agency Project Description
This project will reconstruct sidewalks damaged by adjacent city-owned trees in Community Boards 3, 4, 5, 8, 9, 15, 16, 17 and 18 in Brooklyn.
Current Phase
Construction Procurement
Current Phase Start
2023-06-07T00:00:00.000
Forecast Current Phase End
2024-06-06T00:00:00.000
Forecast Completion
2027-01-02T00:00:00.000
Actual Design Start
2023-03-24T00:00:00.000
Actual Design End
2023-06-07T00:00:00.000
Actual Construction
2023-06-07T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-D822
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3114
Fms Id
P-6PREFA1
Total Budget
2120000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Compact Prefabricated Comfort Stations for BK & SI
Agency Project Name
Father Macris Park and Irving Square Park Compact Prefabricated Public Restroom Buildings Construction
Agency Project Description
This project will construct compact prefabricated public restroom buildings at Father Macris Park and Irving Square Park.
Current Phase
Design
Current Phase Start
2023-01-06T00:00:00.000
Forecast Current Phase End
2023-09-29T00:00:00.000
Forecast Completion
2026-11-25T00:00:00.000
Actual Design Start
2023-01-06T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
P-1018, P-I001
Ten Year Plan Category
MAJOR RECREATIONAL FACILITIES AND FACILITY RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3115
Fms Id
P-2TRS23A
Total Budget
450000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Brooklyn Tree-Damaged Sidewalk R/C FY23, CBs 1,2,6,7,10 - 14
Agency Project Name
Brooklyn Tree-Damaged Sidewalk Reconstruction FY23 Community Boards 1, 2, 6, 7, 10-14
Agency Project Description
This project will reconstruct sidewalks damaged by adjacent city-owned trees in Community Boards 1, 2, 6, 7, 10, 11, 12, 13 and 14 in Brooklyn.
Current Phase
Construction Procurement
Current Phase Start
2023-06-01T00:00:00.000
Forecast Current Phase End
2024-05-31T00:00:00.000
Forecast Completion
2026-12-27T00:00:00.000
Actual Design Start
2023-03-24T00:00:00.000
Actual Design End
2023-06-01T00:00:00.000
Actual Construction
2023-06-01T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-D822
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3116
Fms Id
P-4TRS23A
Total Budget
75000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Queens Tree-Damaged Sidewalk Reconstruction FY23, CBs 9 -14
Agency Project Name
Queens Tree-Damaged Sidewalk Reconstruction FY23 Community Boards 9-14
Agency Project Description
This project will reconstruct sidewalks damaged by adjacent city-owned trees in Community Boards 9, 10, 11, 12, 13, 14 in Queens.
Current Phase
Construction Procurement
Current Phase Start
2023-06-07T00:00:00.000
Forecast Current Phase End
2024-06-06T00:00:00.000
Forecast Completion
2027-01-02T00:00:00.000
Actual Design Start
2023-03-24T00:00:00.000
Actual Design End
2023-06-07T00:00:00.000
Actual Construction
2023-06-07T00:00:00.000
Borough
Queens
Community Board
Queens
Budget Line
P-D019
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3117
Fms Id
P-6TRS23A
Total Budget
479000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Bronx & Manhattan Tree-Damaged Sidewalk Reconstruction FY23
Agency Project Name
Bronx and Manhattan Tree-Damaged Sidewalk Reconstruction FY23
Agency Project Description
This project will reconstruct sidewalks damaged by adjacent city-owned trees in Bronx and Manhattan.
Current Phase
Construction Procurement
Current Phase Start
2023-06-07T00:00:00.000
Forecast Current Phase End
2024-06-06T00:00:00.000
Forecast Completion
2027-01-02T00:00:00.000
Actual Design Start
2023-03-24T00:00:00.000
Actual Design End
2023-06-07T00:00:00.000
Actual Construction
2023-06-07T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
P-D822
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3118
Fms Id
P-2GPWB12
Total Budget
600000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
GPWB - Bushwick Inlet Park Site Connection Construction
Agency Project Name
Bushwick Inlet Park Sewer Connection Construction
Agency Project Description
This project will install a sewer connection in Bushwick Inlet Park.
Current Phase
Design
Current Phase Start
2023-02-08T00:00:00.000
Forecast Current Phase End
2024-02-08T00:00:00.000
Forecast Completion
2026-04-05T00:00:00.000
Actual Design Start
2023-02-08T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn 01
Budget Line
P-0829
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3119
Fms Id
P-0PRC23C
Total Budget
3300000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Citywide Field Grown Tree Procurement from Region 1 FY23
Agency Project Name
Citywide Field Grown Tree procurement from Region 1 FY24
Agency Project Description
This project will furnish and deliver field grown trees in Region 1 for tree planting programs.
Current Phase
Design
Current Phase Start
2023-03-24T00:00:00.000
Forecast Current Phase End
2024-04-01T00:00:00.000
Forecast Completion
2029-11-26T00:00:00.000
Actual Design Start
2023-03-24T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
P-0822
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3120
Fms Id
P-0PRC23D
Total Budget
9900000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Citywide Field Grown Tree Procurement from Region FY23
Agency Project Name
Citywide Field Grown Tree procurement from Region 2 FY24
Agency Project Description
This project will furnish and deliver field grown trees in Region 2 for tree planting programs.
Current Phase
Design
Current Phase Start
2023-03-24T00:00:00.000
Forecast Current Phase End
2024-04-01T00:00:00.000
Forecast Completion
2029-11-26T00:00:00.000
Actual Design Start
2023-03-24T00:00:00.000
Borough
Citywide
Community Board
Citywide
Budget Line
P-0822
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DPR • Sponsor Agency: DPR
Reporting Period
202305
Managing Agency
DPR
Sponsor Agency
DPR
Pid
3121
Fms Id
P-2FULTON
Total Budget
8000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Fulton Mall Streetscape Improvements
Agency Project Name
Fulton Mall Streetscape Reconstruction
Agency Project Description
This project will reconstruct the streetscape of Fulton Mall
Current Phase
Design
Current Phase Start
2023-05-03T00:00:00.000
Forecast Current Phase End
2023-11-30T00:00:00.000
Forecast Completion
2026-07-27T00:00:00.000
Actual Design Start
2023-05-03T00:00:00.000
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-0245K
Ten Year Plan Category
LAND ACQUISITION AND TREE PLANTING
Agency Data Date
2023-06-21T00:00:00.000
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DSNY • Fms Id: APIDSBK11
Reporting Period
202305
Managing Agency
DSNY
Fms Id
APIDSBK11
Total Budget
43748000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
DSNY ROADMAP ENERGY EFF
Current Phase
(Pre-Design)
Borough
Brooklyn
Community Board
Brooklyn 11
Budget Line
PU-0025
Ten Year Plan Category
MISCELLANEOUS ENERGY EFFICIENCY AND SUSTAINABILITY
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DSNY • Fms Id: APIDSMN12
Reporting Period
202305
Managing Agency
DSNY
Fms Id
APIDSMN12
Total Budget
24464000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
DSNY ROADMAP ENERGY EFF
Current Phase
(Pre-Design)
Borough
Manhattan
Community Board
Manhattan 12
Budget Line
PU-0025
Ten Year Plan Category
MISCELLANEOUS ENERGY EFFICIENCY AND SUSTAINABILITY
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DSNY • Fms Id: APIDSSI02
Reporting Period
202305
Managing Agency
DSNY
Fms Id
APIDSSI02
Total Budget
18420000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
DSNY ROADMAP ENERGY EFF
Current Phase
(Pre-Design)
Borough
Staten Island
Community Board
Staten Island 02
Budget Line
PU-0025
Ten Year Plan Category
MISCELLANEOUS ENERGY EFFICIENCY AND SUSTAINABILITY
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: DSNY • Fms Id: S111-395D
Reporting Period
202305
Managing Agency
DSNY
Fms Id
S111-395D
Total Budget
499000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
DSNY STATEN ISLAND TRANSFER STATION Scales
Current Phase
(Pre-Design)
Borough
Staten Island
Community Board
Staten Island 01, Staten Island 02, Staten Island 03
Budget Line
S-0111
Ten Year Plan Category
SOLID WASTE MANAGEMENT
Fms Data Date
2023-05-11T00:00:00.000