Capital Projects Dashboard - Citywide Budget and Schedule

All major capital infrastructure projects with a committed budget. Financial information and agency schedule details for each project are joined via FMS ID. Only projects in the design phase or later have project schedules displayed. This dataset is part of the Capital Projects Dashboard.

Note: Each row is uniquely identified by its Financial Management Service (FMS) ID. FMS ID is the unique ID that OMB uses for the FMS (Financial Information System). This ID can be universally joined with any OMB dataset that has the same field. The Capital Projects Dashboard is the result of joining OMB’s fiscal data with the agency’s schedule data. FMS IDs and agency projects don't always have a one-to-one relationship (i.e., one project schedule may correlate to multiple FMS IDs, and one FMS may correct to multiple projects with different schedules).

City Government Mayor's Office of Operations (OPS) Dataset fb86-vt7u 27 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: OFFSHRWND
Reporting Period
202305
Managing Agency
EDC
Fms Id
OFFSHRWND
Total Budget
110000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Offshore Wind - Development and Manufacturing
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
ED-0075
Ten Year Plan Category
MISCELLANEOUS
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: P-2BUSHDE
Reporting Period
202305
Managing Agency
EDC
Fms Id
P-2BUSHDE
Total Budget
18000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Bushwick Inlet Park CitiStorage Demo
Current Phase
(Pending)
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
P-1018
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: P-2GPWB07
Reporting Period
202305
Managing Agency
EDC
Fms Id
P-2GPWB07
Total Budget
4310831.00
Spend To Date
3341784.33
Spend To Date 1
0.7752
Fms Project Name
GPWB - Box Street and Newtown Barge Parks
Current Phase
(Pre-Design)
Borough
Brooklyn
Community Board
Brooklyn 01
Budget Line
P-0839, WP-0283
Ten Year Plan Category
PLANT UPGRADING AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: P-2GPWB08
Reporting Period
202305
Managing Agency
EDC
Fms Id
P-2GPWB08
Total Budget
10431056.31
Spend To Date
9921378.30
Spend To Date 1
0.9511
Fms Project Name
GPWB - 65 Commercial St Soccer Pk-MTA Reloc. & Park Develop.
Current Phase
(Completed)
Borough
Brooklyn
Community Board
Brooklyn 01
Budget Line
ED-0384, P-0839
Ten Year Plan Category
NEIGHBORHOOD REVITALIZATION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: P-2GPWNB
Reporting Period
202305
Managing Agency
EDC
Fms Id
P-2GPWNB
Total Budget
21627375.99
Spend To Date
19443694.09
Spend To Date 1
0.899
Fms Project Name
GPWB - Newtown Barge Park
Current Phase
(Completed)
Borough
Brooklyn
Community Board
Brooklyn 01
Budget Line
P-0839, P-1018, WP-0283
Ten Year Plan Category
PLANT UPGRADING AND RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: P-301BATW
Reporting Period
202305
Managing Agency
EDC
Fms Id
P-301BATW
Total Budget
5480651.45
Spend To Date
5096563.45
Spend To Date 1
0.9299
Fms Project Name
Battery Park - Wharf
Current Phase
(Completed)
Borough
Manhattan
Community Board
Manhattan
Budget Line
ED-0409, PU-0200, RE-0025
Ten Year Plan Category
WATERFRONT DEVELOPMENT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: P-311RAND
Reporting Period
202305
Managing Agency
EDC
Fms Id
P-311RAND
Total Budget
32407162.98
Spend To Date
32392162.98
Spend To Date 1
0.9995
Fms Project Name
Randall's Island New Track and Field Center
Current Phase
(Completed)
Borough
Manhattan
Community Board
Manhattan 11
Budget Line
ED-0075
Ten Year Plan Category
COMMUNITY DEVELOPMENT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: P-3HILIN3
Reporting Period
202305
Managing Agency
EDC
Fms Id
P-3HILIN3
Total Budget
10832373.47
Spend To Date
9545406.33
Spend To Date 1
0.8811
Fms Project Name
Highline Phase 3
Current Phase
(Completed)
Borough
Manhattan
Community Board
Manhattan 04
Budget Line
P-1018, P-1326
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: P-3RETWAL
Reporting Period
202305
Managing Agency
EDC
Fms Id
P-3RETWAL
Total Budget
4576072.31
Spend To Date
4055349.85
Spend To Date 1
0.8862
Fms Project Name
Seawall and Henry Hudson Parkway
Current Phase
(Completed)
Borough
Manhattan
Community Board
Manhattan
Budget Line
P-1018, P-1515
Ten Year Plan Category
LARGE, MAJOR AND REGIONAL PARK RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: P-4QNSWAY
Reporting Period
202305
Managing Agency
EDC
Fms Id
P-4QNSWAY
Total Budget
34991000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Queensway - LIRR Rockaway Branch Line Into A Park
Current Phase
(Pre-Design)
Borough
Queens
Community Board
Queens
Budget Line
P-0245Q, P-D019
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: P-6NEWYN2
Reporting Period
202305
Managing Agency
EDC
Fms Id
P-6NEWYN2
Total Budget
11071319.30
Spend To Date
10718952.12
Spend To Date 1
0.9681
Fms Project Name
New Yankee Stadium - Associated Soft Costs
Current Phase
(Completed)
Borough
Bronx
Community Board
Bronx 04
Budget Line
P-1515
Ten Year Plan Category
MAJOR RECREATIONAL FACILITIES AND FACILITY RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: P79MBR
Reporting Period
202305
Managing Agency
EDC
Fms Id
P79MBR
Total Budget
670000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Pier 79 South to Middle Barge Rehabilitation
Current Phase
(Pre-Design)
Borough
Manhattan
Community Board
Manhattan
Budget Line
FA-0027
Ten Year Plan Category
RECONSTRUCTION OF FERRY TERMINAL FACILITIES
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: PARACHUT2
Reporting Period
202305
Managing Agency
EDC
Fms Id
PARACHUT2
Total Budget
2501251.28
Spend To Date
2468698.39
Spend To Date 1
0.9869
Fms Project Name
Coney Island - Parachute Jump Lighting 2
Current Phase
(Completed)
Borough
Brooklyn
Community Board
Brooklyn 13
Budget Line
P-D017
Ten Year Plan Category
VEHICLES AND EQUIPMENT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: PASSSHIP
Reporting Period
202305
Managing Agency
EDC
Fms Id
PASSSHIP
Total Budget
89498702.06
Spend To Date
89056020.49
Spend To Date 1
0.995
Fms Project Name
Passenger Ship Terminal
Current Phase
(Completed)
Borough
Manhattan
Community Board
Manhattan 04
Budget Line
ED-0075
Ten Year Plan Category
WATERFRONT DEVELOPMENT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: PASSSHIP4
Reporting Period
202305
Managing Agency
EDC
Fms Id
PASSSHIP4
Total Budget
5998264.55
Spend To Date
5328200.72
Spend To Date 1
0.8882
Fms Project Name
Manhattan Cruise Terminal - Viaduct Concrete Rehabilitation
Current Phase
(Completed)
Borough
Manhattan
Community Board
Manhattan 04
Budget Line
ED-0075, ED-0075
Ten Year Plan Category
WATERFRONT DEVELOPMENT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: PIER12PH2
Reporting Period
202305
Managing Agency
EDC
Fms Id
PIER12PH2
Total Budget
14000000.00
Spend To Date
713926.67
Spend To Date 1
0.0509
Fms Project Name
Brooklyn Cruise Terminal Pier 12 Substructure Rehab phase2
Current Phase
(Pre-Design)
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
ED-0409
Ten Year Plan Category
MISCELLANEOUS
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: PIER6PILE
Reporting Period
202305
Managing Agency
EDC
Fms Id
PIER6PILE
Total Budget
1754995.79
Spend To Date
1747893.12
Spend To Date 1
0.9959
Fms Project Name
Pier 6 Pile Rehabilitation
Current Phase
(Completed)
Borough
Manhattan
Community Board
Manhattan
Budget Line
ED-0409, ED-0409
Ten Year Plan Category
WATERFRONT DEVELOPMENT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: PIER79REH
Reporting Period
202305
Managing Agency
EDC
Fms Id
PIER79REH
Total Budget
665000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Pier 79 Float to Barge Rehabilitation
Current Phase
(Pre-Design)
Borough
Manhattan
Community Board
Manhattan
Budget Line
FA-0027
Ten Year Plan Category
RECONSTRUCTION OF FERRY TERMINAL FACILITIES
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: PIER94ENC
Reporting Period
202305
Managing Agency
EDC
Fms Id
PIER94ENC
Total Budget
28000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
PIER 94 -- RECONSTRUCTION AND ENCAPSULATION
Current Phase
(Pre-Design)
Borough
Manhattan
Community Board
Manhattan
Budget Line
ED-0409
Ten Year Plan Category
MISCELLANEOUS
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: PIER94RH
Reporting Period
202305
Managing Agency
EDC
Fms Id
PIER94RH
Total Budget
1102784.50
Spend To Date
1097654.91
Spend To Date 1
0.9953
Fms Project Name
Pier 94 Rehabilitation
Current Phase
(Completed)
Borough
Manhattan
Community Board
Manhattan 04
Budget Line
ED-0409
Ten Year Plan Category
WATERFRONT DEVELOPMENT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: PIERS8890
Reporting Period
202305
Managing Agency
EDC
Fms Id
PIERS8890
Total Budget
20499886.72
Spend To Date
19200308.62
Spend To Date 1
0.9366
Fms Project Name
Piers 88 & 90 Cluster Encapsulation Project
Current Phase
(Completed)
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
ED-0409, ED-0409
Ten Year Plan Category
WATERFRONT DEVELOPMENT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: PROGDOMIN
Reporting Period
202305
Managing Agency
EDC
Fms Id
PROGDOMIN
Total Budget
761155.00
Spend To Date
707680.97
Spend To Date 1
0.9297
Fms Project Name
COMMUNITY ASSOCIATION OF PROGRESSIVE DOMINICANS
Current Phase
(Completed)
Borough
Manhattan
Community Board
Manhattan
Budget Line
ED-D075, ED-M075
Ten Year Plan Category
MISCELLANEOUS
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: P-SWEDISH
Reporting Period
202305
Managing Agency
EDC
Fms Id
P-SWEDISH
Total Budget
575000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
CPF- Swedish Cottage Marionette Theatre RC
Current Phase
(Pre-Design)
Borough
Manhattan
Community Board
Manhattan, Manhattan 10, Manhattan 11
Budget Line
P-D018, P-I001
Ten Year Plan Category
MAJOR RECREATIONAL FACILITIES AND FACILITY RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: PV034GRUV
Reporting Period
202305
Managing Agency
EDC
Fms Id
PV034GRUV
Total Budget
14218000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
AMNH - Gilder Center Green Bldg.
Current Phase
(Funding Agreement)
Borough
Manhattan
Community Board
Manhattan
Budget Line
PV-0034, PV-D034, PV-M034
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: PV230-ACF
Reporting Period
202305
Managing Agency
EDC
Fms Id
PV230-ACF
Total Budget
10333000.00
Spend To Date
8848064.33
Spend To Date 1
0.8562
Fms Project Name
FA - WCS NEW YORK AQUARIUM - Animal Care Facility
Current Phase
(Funding Agreement)
Borough
Brooklyn
Community Board
Brooklyn 13
Budget Line
PV-0230
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: PV230-SHA
Reporting Period
202305
Managing Agency
EDC
Fms Id
PV230-SHA
Total Budget
119169845.82
Spend To Date
114930975.60
Spend To Date 1
0.9644
Fms Project Name
FA - WCS - New York Aquarium
Current Phase
(Funding Agreement)
Borough
Brooklyn
Community Board
Brooklyn 13
Budget Line
PV-0230, PV-K230
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: PV467ELMB
Reporting Period
202305
Managing Agency
EDC
Fms Id
PV467ELMB
Total Budget
4725206.99
Spend To Date
4109294.37
Spend To Date 1
0.8696
Fms Project Name
ELM- El Museo - Gallery Environmental Stabilzation Project
Current Phase
(Completed)
Borough
Manhattan
Community Board
Manhattan 11
Budget Line
PV-0103, PV-0467, PV-D018, PV-D467
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: PV467-POL
Reporting Period
202305
Managing Agency
EDC
Fms Id
PV467-POL
Total Budget
4000000.00
Spend To Date
4000000.00
Spend To Date 1
1.00
Current Phase
(Pending)
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: PV503SDWK
Reporting Period
202305
Managing Agency
EDC
Fms Id
PV503SDWK
Total Budget
1500000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
CH - Carnegie Sidewalk Restoration
Current Phase
(Pre-Design)
Borough
Manhattan
Community Board
Manhattan
Budget Line
PV-0467, PV-0503, PV-D503, PV-M503
Ten Year Plan Category
ESSENTIAL RECONSTRUCTION OF FACILITIES
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: PWD5CFTH
Reporting Period
202305
Managing Agency
EDC
Fms Id
PWD5CFTH
Total Budget
478292.43
Spend To Date
473292.43
Spend To Date 1
0.9895
Fms Project Name
FA - Coalition for the Homeless
Current Phase
(Funding Agreement)
Borough
Manhattan
Community Board
Manhattan 01
Budget Line
PW-D005
Ten Year Plan Category
MISCELLANEOUS CONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: PWDSIBPCT
Reporting Period
202305
Managing Agency
EDC
Fms Id
PWDSIBPCT
Total Budget
50000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Van for the Staten Island Borough President's Clean Team --
Current Phase
(Completed)
Borough
Staten Island
Community Board
Staten Island
Budget Line
PW-D308
Ten Year Plan Category
MISCELLANEOUS CONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: RANDBXSHO
Reporting Period
202305
Managing Agency
EDC
Fms Id
RANDBXSHO
Total Budget
10049371.51
Spend To Date
10042371.51
Spend To Date 1
0.9993
Fms Project Name
Randall's Island - Bronx Shore Fields
Current Phase
(Completed)
Borough
Manhattan
Community Board
Manhattan, Manhattan 11
Budget Line
P-0705, P-0944
Ten Year Plan Category
NEIGHBORHOOD PARKS AND PLAYGROUNDS
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: RE25-004
Reporting Period
202305
Managing Agency
EDC
Fms Id
RE25-004
Total Budget
2750989.95
Spend To Date
2726989.95
Spend To Date 1
0.9912
Fms Project Name
FA - Courts & Sports at Pier 36
Current Phase
(Completed)
Borough
Manhattan
Community Board
Manhattan 03
Budget Line
RE-0025
Ten Year Plan Category
REHABILITATION OF WATERFRONT PROPERTIES
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: ROCKBLVD
Reporting Period
202305
Managing Agency
EDC
Fms Id
ROCKBLVD
Total Budget
1000000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
FA - Rockaway BLVD
Current Phase
(Pre-Design)
Borough
Queens
Community Board
Queens, Queens 10, Queens 12, Queens 13
Budget Line
ED-0075, ED-D384
Ten Year Plan Category
NEIGHBORHOOD REVITALIZATION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: ROOSEDOCK
Reporting Period
202305
Managing Agency
EDC
Fms Id
ROOSEDOCK
Total Budget
698000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Roosevelt Island Dock
Current Phase
(Completed)
Borough
Manhattan
Community Board
Manhattan 08
Budget Line
ED-D401
Ten Year Plan Category
WATERFRONT DEVELOPMENT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: ROOSEOPER
Reporting Period
202305
Managing Agency
EDC
Fms Id
ROOSEOPER
Total Budget
144000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
Roosevelt Island Operating Corp - Blackwell House
Current Phase
(Funding Agreement)
Borough
Manhattan
Community Board
Manhattan 08
Budget Line
ED-D075
Ten Year Plan Category
NEIGHBORHOOD REVITALIZATION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: ROOSISLTH
Reporting Period
202305
Managing Agency
EDC
Fms Id
ROOSISLTH
Total Budget
700000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
ROOSEVELT ISLAND LIGHTHOUSE
Current Phase
(Completed)
Borough
Manhattan
Community Board
Manhattan
Budget Line
ED-D075
Ten Year Plan Category
MISCELLANEOUS
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: SAND1102
Reporting Period
202305
Managing Agency
EDC
Fms Id
SAND1102
Total Budget
3148538.86
Spend To Date
3106702.71
Spend To Date 1
0.9867
Fms Project Name
HHC FEMA PMP BELLEVUE: MEDICAL GAS SYSTEM MITIGATION A5
Current Phase
(Completed)
Borough
Manhattan
Community Board
Manhattan
Budget Line
HO-0214
Ten Year Plan Category
ROUTINE RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: SAND1112
Reporting Period
202305
Managing Agency
EDC
Fms Id
SAND1112
Total Budget
2087997.88
Spend To Date
2036874.48
Spend To Date 1
0.9755
Fms Project Name
HHC FEMA BELLEVUE BASEMENT GENERAL CONSTRUCTION
Current Phase
(Completed)
Borough
Manhattan
Community Board
Manhattan
Budget Line
HO-0214
Ten Year Plan Category
ROUTINE RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: SAND1113
Reporting Period
202305
Managing Agency
EDC
Fms Id
SAND1113
Total Budget
20000620.96
Spend To Date
13626879.42
Spend To Date 1
0.6813
Fms Project Name
HHC FEMA PMP BELLEVUE EXISTING VERTICAL TRANSPORTATION
Current Phase
(Completed)
Borough
Manhattan
Community Board
Manhattan
Budget Line
HO-0214
Ten Year Plan Category
ROUTINE RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: SAND2601C
Reporting Period
202305
Managing Agency
EDC
Fms Id
SAND2601C
Total Budget
7898305.86
Spend To Date
7478047.71
Spend To Date 1
0.9467
Fms Project Name
CIH: RELOCATE OUTPATIENT RADIOLOGIC IMAGING SERVICES
Current Phase
(Completed)
Borough
Brooklyn
Community Board
Brooklyn 13
Budget Line
HO-0214
Ten Year Plan Category
ROUTINE RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: SAND6701
Reporting Period
202305
Managing Agency
EDC
Fms Id
SAND6701
Total Budget
17531047.22
Spend To Date
9319914.83
Spend To Date 1
0.5316
Fms Project Name
COLER : DESIGN & CONSTRUCTION FOR NEW GENERATOR
Current Phase
(Pre-Design)
Borough
Manhattan
Community Board
Manhattan
Budget Line
HO-0214
Ten Year Plan Category
ROUTINE RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: SAND6702
Reporting Period
202305
Managing Agency
EDC
Fms Id
SAND6702
Total Budget
2841516.08
Spend To Date
2841094.91
Spend To Date 1
0.9998
Fms Project Name
COLER : DESIGN & CONSTRUCTION OF NEW LIGHTING
Current Phase
(Completed)
Borough
Manhattan
Community Board
Manhattan
Budget Line
HO-0214
Ten Year Plan Category
ROUTINE RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: SAND6703
Reporting Period
202305
Managing Agency
EDC
Fms Id
SAND6703
Total Budget
1004893.81
Spend To Date
1004757.01
Spend To Date 1
0.9998
Fms Project Name
COLER : DESIGN & CONSTRUCTION OF ELECTRICAL PANELS
Current Phase
(Completed)
Borough
Manhattan
Community Board
Manhattan
Budget Line
HO-0214
Ten Year Plan Category
ROUTINE RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: SAND6706
Reporting Period
202305
Managing Agency
EDC
Fms Id
SAND6706
Total Budget
2274911.89
Spend To Date
2249817.94
Spend To Date 1
0.9889
Fms Project Name
COLER : DESIGN & CONSTRUCTION FOR FIRE PUMP
Current Phase
(Completed)
Borough
Manhattan
Community Board
Manhattan
Budget Line
HO-0214
Ten Year Plan Category
ROUTINE RECONSTRUCTION
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: SANDB3416
Reporting Period
202305
Managing Agency
EDC
Fms Id
SANDB3416
Total Budget
1172560.00
Spend To Date
112560.00
Spend To Date 1
0.0959
Fms Project Name
Sandy - BNYDC - PW 3416 - Berth 6 Concrete Slab
Current Phase
(Partner-managed)
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
ED-0319
Ten Year Plan Category
INDUSTRIAL DEVELOPMENT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: SANDB4123
Reporting Period
202305
Managing Agency
EDC
Fms Id
SANDB4123
Total Budget
8832622.00
Spend To Date
561622.00
Spend To Date 1
0.0635
Fms Project Name
Sandy - BNYDC - PW 4123 Rehabilitation
Current Phase
(Partner-managed)
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
ED-0319
Ten Year Plan Category
INDUSTRIAL DEVELOPMENT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: SANDB4269
Reporting Period
202305
Managing Agency
EDC
Fms Id
SANDB4269
Total Budget
4001000.00
Spend To Date
0.00
Spend To Date 1
0.00
Fms Project Name
BNYDC Sandy - PW 4269 - B270 Boilers
Current Phase
(Partner-managed)
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
ED-0319
Ten Year Plan Category
INDUSTRIAL DEVELOPMENT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: SANDB4270
Reporting Period
202305
Managing Agency
EDC
Fms Id
SANDB4270
Total Budget
1184477.00
Spend To Date
134477.00
Spend To Date 1
0.1135
Fms Project Name
Sandy - BNYDC - PW 4270 - BNYDC SITE-WIDE CONDUIT - PAAP
Current Phase
(Partner-managed)
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
ED-0319
Ten Year Plan Category
INDUSTRIAL DEVELOPMENT
Fms Data Date
2023-05-11T00:00:00.000
202305
Reporting Period: 202305 • Managing Agency: EDC • Fms Id: SANDB4271
Reporting Period
202305
Managing Agency
EDC
Fms Id
SANDB4271
Total Budget
3071065.00
Spend To Date
247065.00
Spend To Date 1
0.0804
Fms Project Name
Sandy - BNYDC - PW 4271 - Substations No. 292 and No. 542
Current Phase
(Partner-managed)
Borough
Brooklyn
Community Board
Brooklyn
Budget Line
ED-0319
Ten Year Plan Category
INDUSTRIAL DEVELOPMENT
Fms Data Date
2023-05-11T00:00:00.000