Pursuant to Local Law 175 of 2016, the City is responsible for publishing a list of capital and programmatic commitments associated with neighborhood-scale rezonings, and an annual progress report detailing the status of each initiative. These rezoning commitments are the product of comprehensive and community-driven planning processes in each neighborhood (East New York; Greater East Midtown; Downtown Far Rockaway; East Harlem; Jerome Avenue; and Inwood) and have been organized by policy domain (Housing; Open Space; Community Resources; Transportation; and Economic and Workforce Development).

City Government Mayor's Office of Operations (OPS) Dataset fd95-5ihz 10 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
2024
Year: 2024 • Rezoning Area: Far Rockaway • Commitment Title: Quarterly meetings with steering committee
Year
2024
Rezoning Area
Far Rockaway
Commitment Title
Quarterly meetings with steering committee
Rezoning Policy Domain
Community Resources
Lead Agency
ECONOMIC DEVELOPMENT CORPORATION (EDC)
Commitment Stage
Completed
Statement From Source Document Poa
EDC will commit to quarterly steering committee meetings, whose members will be selected by the Council Member, after the conclusion of ULURP. These meetings will be used to provide project updates and serve as a forum for the City to receive feedback from community stakeholders.
Original Schedule
2017-2021
Narrative
The Downtown Far Rockaway Working Group met quarterly throughout the fulfillment of POA commitments. As of 2024 with the deployment of the $91 million Capital Reserve, the commitments have been completed.
2024
Year: 2024 • Rezoning Area: Far Rockaway • Rezoning Policy Domain: Economic Development
Year
2024
Rezoning Area
Far Rockaway
Commitment Title
Reserve $91 million in Capital Funding for implementation of the Downtown Far Rockaway Redevelopment Project
Rezoning Policy Domain
Economic Development
Lead Agency
ECONOMIC DEVELOPMENT CORPORATION (EDC)
Commitment Stage
Completed
Statement From Source Document Poa
As a demonstration of the Administration's commitment to realizing the goals of the Downtown Far Rockaway Roadmap for Action and the Downtown Far Rockaway Redevelopment Project, the City has pledged $91million in Capital Funding for implementation. These funds are reserved to facilitate activation of key underutilized properties within the rezoning area. The City will provide annual updates to Council Member on the utilization of these pledged funds. If, through the course of implementation of the project or by June 2021, there is a surplus of funds remaining AND it is clear that such funds will not be needed and can be repurposed, the City will work in consultation with the Council Member to reprogram funds for other related projects in the area.
Original Schedule
2017-2021
Narrative
EDC, in coordination with other City agencies, deployed the total $91 million Capital Reserve funding to advance the goals of the Downtown Far Rockaway Roadmap for Action. In 2018, $12 million was allocated to streetscape improvements in Downtown Far Rockaway. In 2021, $30 million was allocated for a new health center in Rockaway Village. Recently, $25 million was allocated towards a proposed trauma hospital for the Rockaway peninsula. The remaining $24 million will be allocated towards a new, public aquatic facility in the Arvene East Development
2024
Year: 2024 • Rezoning Area: Far Rockaway • Commitment Title: ADA access ramp project at the 101 Police Precinct
Year
2024
Rezoning Area
Far Rockaway
Commitment Title
ADA access ramp project at the 101 Police Precinct
Rezoning Policy Domain
Community Resources
Lead Agency
POLICE DEPARTMENT (NYPD)
Commitment Stage
In Progress
Statement From Source Document Poa
The City will perform upgrades for the 101st Precinct including an ADA access ramp project, estimated at $300,000. Construction is anticipated start in the fall of 2018.
Original Schedule
2018-2019
Narrative
Funding has been identified for the shortfal; the project is expected to commence in March, 2025.
2024
Year: 2024 • Rezoning Area: Far Rockaway • Rezoning Policy Domain: Economic Development
Year
2024
Rezoning Area
Far Rockaway
Commitment Title
Explore potential business incubation space in Far Rockaway to support area businesses
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
Completed
Statement From Source Document Poa
Working through SBS and/or NYCEDC, the City will assess the current business landscape and identify the space and programming that would be most appropriate and relevant to area businesses. In spring 2018, the City will report back to the Council Member on a suggested course of action, which could include additional resources for existing programs, the release an RFEI seeking proposals from operators, or other strategies.
Original Schedule
2018
Narrative
SBS will continue to partner with local stakeholders to determine and subsequently meet the needs of small business owners in Downtown Far Rockaway.
2024
Year: 2024 • Rezoning Area: Far Rockaway • Commitment Title: Promote local hiring and job opportunities for area residents
Year
2024
Rezoning Area
Far Rockaway
Commitment Title
Promote local hiring and job opportunities for area residents
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
Completed
Statement From Source Document Poa
SBS will host monthly meetings at the Rockaway Workforce1 Center with community partners, including Rockaway Development & Revitalization Corporation (RDRC) and Ocean Bay Community Development Corporation, to connect Far Rockaway residents with workforce opportunities. Building on existing services, SBS will enhance outreach to the local community including quarterly recruiting events with various community partners such as faith based organization, the Queens Public Library, and other groups.
Original Schedule
2017-TBD**
Narrative
The Far Rockaway Workforce 1 Career Center continues to provide local residents with a suite of services to connect them with job opportunities in Downtown Far Rockaway. SBS connects local residents with professionals who can provide one-on-one help to access free workforce training, prepare for interviews, and identify jobs that match experience and skills. The Far Rockaway Workforce1 Career Center is located at: 57-17 Rockaway Beach Blvd, Arverne, NY 11692.
2024
Year: 2024 • Rezoning Area: Gowanus • Rezoning Policy Domain: Transportation & Infrastructure
Year
2024
Rezoning Area
Gowanus
Commitment Title
Accelerate implementation of Free/Low-Cost Broadband in Gowanus Houses and Wyckoff Gardens.
Rezoning Policy Domain
Transportation & Infrastructure
Lead Agency
CHIEF TECHNOLOGY OFFICER (CTO)
Commitment Stage
Completed
Statement From Source Document Poa
As one of the developments included in the City’s Request for Expressions of Interest (RFEI) under the Internet Master Plan for Universal Broadband, implementation of high-speed, low-cost internet access at Wyckoff Gardens is underway.
Original Schedule
2021-2022
Narrative
Big Apple Connect, a program that offers free basic cable and high-speed broadband to NYCHA households, is available in Gowanus Houses through Charter/Spectrum. Additionally, low-cost, in-unit broadband is currently being offered at Wycoff Gardens through ISP Starry.
2024
Year: 2024 • Rezoning Area: Far Rockaway • Commitment Title: Provide services for new businesses in Far Rockaway
Year
2024
Rezoning Area
Far Rockaway
Commitment Title
Provide services for new businesses in Far Rockaway
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
Completed
Statement From Source Document Poa
SBS will work with the Council Member's Office to encourage local business owners and aspiring entrepreneurs to apply and participate in the full suite of FastTrac NewVenture and FastTrac Growth Venture business incubation workshops in Downtown Far Rockaway in collaboration with local community organizations such as the Queens Public Library.
Original Schedule
2017-2018
Narrative
SBS worked collabroatively with former Council Member Richards' office to directly engage with local business owners to determine their needs and tailor services following the rezoning.



Although the POA has expired, SBS continues to provide resources for new businesses, including an entrepreneurship bootcamp called FastTrac to upskill new and existing entrpreneurs, free online webinar business courses, and one-on-one government navigation services through our NYC Business Express Services Team (NYC BEST).



Anyone interested in these services can call our Hotline (888-SBS-4NYC).
2024
Year: 2024 • Rezoning Area: Far Rockaway • Commitment Title: Support area M/WBEs
Year
2024
Rezoning Area
Far Rockaway
Commitment Title
Support area M/WBEs
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
Completed
Statement From Source Document Poa
SBS will work with the Council Member to host M/WBE certification events in the district. In addition, it will provide a number of capacity building services to M/WBE business owners in Downtown Far Rockaway. These include certifying firms with contract financing assistance, business courses, one-on-one technical assistance, networking and educational events, assistance with obtaining bonds, and access to City and private sector contracting opportunities. Residents of Far Rockaway can access these opportunities by calling the Certification Helpline or visiting any one of the seven NYC Business Solutions Centers, including the NYC Small Business Support Center located in Jamaica.
Original Schedule
2017-TBD**
Narrative
SBS conducted several outreach events in Far Rockaway to provide services, which included M/WBE certification assistance and capacity-building resources. All SBS NYC Business Solutions Centers offer both remote and in-person services, and operates Monday to Friday, 9-5. The nearby Business Solution Center is located at 90-27 Sutphin Boulevard, 4th Floor, Jamaica, NY 11435.



Although the POA has expired, SBS remains committed to connecting any interested business owner with M/WBE certification and capacity-building resources.
2024
Year: 2024 • Rezoning Area: Far Rockaway • Rezoning Policy Domain: Economic Development
Year
2024
Rezoning Area
Far Rockaway
Commitment Title
Support existing businesses through free legal services and other business outreach efforts
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
Completed
Statement From Source Document Poa
In Downtown Far Rockaway, SBS will conduct door-to-door engagement with business owners and provide services in Far Rockaway to meet business needs through Chamber-on-the-Go. SBS will roll out additional entrepreneurship education programs for immigrant and women-owned businesses, including Women Entrepreneurs NYC (WENYC) workshops on credit, funding, and leadership, in addition to one-on-one financial counseling and mentorship sessions. SBS will continue to monitor needs and provide appropriate entrepreneurship resources in coordination with community partners such as the Queens Public Library.



Finally, SBS will work with business owners in Downtown Far Rockaway to coordinate consultation visits from our Compliance Advisors, who educate business owners on how to avoid the most commonly issued City violations.
Original Schedule
2017-TBD**
Narrative
Through the data collected through the Commercial District Needs Assessment, SBS connected several business owners to a suite of various services. In addition, SBS helped businesses prepare for a street improvement project in the area.



SBS continues to connect interested small business owners in Far Rockaway with legal services.
2024
Year: 2024 • Rezoning Area: Far Rockaway • Commitment Title: Hold a site within the Urban Renewal Area for a potential elementary school
Year
2024
Rezoning Area
Far Rockaway
Commitment Title
Hold a site within the Urban Renewal Area for a potential elementary school
Rezoning Policy Domain
Community Resources
Lead Agency
SCHOOL CONSTRUCTION AUTHORITY (SCA)
Commitment Stage
Completed
Statement From Source Document Poa
While the Downtown Far Rockaway Rezoning would result in new development and demand for public schools, as demonstrated in the FEIS there is capacity in Sub-district 1 of CSD 27 to accommodate existing students as well as new enrollment projected to result from the rezoning. However, the City recognizes the Council Member's concerns about public school capacity, specifically elementary schools. We anticipate that the rezoning will increase the population of the neighborhood over time, and SCA and DOE will continue to monitor school enrollment and capacity in the future as development occurs and will address capacity issues as they arise. To this end, the City will reserve a site in the urban renewal area for a period of 10 years in order to be able to accommodate a new elementary school, to be utilized if SCA and DOE determines a need for one during that 10 year period.
Original Schedule
FY 2025-FY2029
Narrative
Based on an assessment of the local area's needs, SCA is exploring the use of 1 Beach 39th Street for a potential school.
2024
Year: 2024 • Rezoning Area: Far Rockaway • Commitment Title: Invest in upgrades to existing schools
Year
2024
Rezoning Area
Far Rockaway
Commitment Title
Invest in upgrades to existing schools
Rezoning Policy Domain
Community Resources
Lead Agency
SCHOOL CONSTRUCTION AUTHORITY (SCA)
Commitment Stage
Completed
Statement From Source Document Poa
The DOE/SCA is happy to work with the community as part of the Downtown Far Rockaway rezoning effort. DOE/SCA is currently advancing over $130million in capital work to provide necessary improvements to the schools within the Council Member's district. In addition, DOE/SCA is accelerating projects currently in design so that students may benefit from the work on an accelerated timeline. DOE/SCA will continue working closely with the community and use the feedback received to ensure that future upgrades meet the needs of the schools and improve the state of facilities within the district. Additionally, the Administration will fund up to $10million in other SCA School Improvements, to be selected in consultation with Council Member Richards prior to June 1, 2018.
Original Schedule
2018-2022
Narrative
Complete
2024
Year: 2024 • Rezoning Area: Gowanus • Commitment Title: Renovate the Pacific Street Library
Year
2024
Rezoning Area
Gowanus
Commitment Title
Renovate the Pacific Street Library
Rezoning Policy Domain
Community Resources
Lead Agency
BROOKLYN PUBLIC LIBRARY - RESEARCH (BPL)
Commitment Stage
In Progress
Statement From Source Document Poa
One of the Brooklyn’s historic Carnegie libraries, Pacific Street Library serves as a cultural touchpoint and community center for the Gowanus neighborhood as well as the surrounding area. Improvements to the Pacific Street Library are critical to providing access, programming, and resources to all library patrons.

Brooklyn Public Library (BPL) will make significant state of good repair investments at Pacific Street Library including the installation of an elevator to all three building floors and upgrades to the building's structural, mechanical, plumbing, and electrical systems, and localized upgrades to the building interior and exterior.
Original Schedule
2023 Start
Narrative
Brooklyn Public Library and the Pacific Library community have secured $34M to renovate Pacific Library, BPL’s oldest branch and a Carnegie Library built in 1903. In addition to our care for the library’s historic significance, this funding enables a once in a generation opportunity to ensure our collective vision for the future of Pacific Library. This project will make Pacific Library fully accessible with an elevator, improved bathrooms, and a new ramp. This project will also update the building's infrastructure and improve the library's interior. The architect was selected in June and the design process is anticipated to begin by the end of 2024.
2024
Year: 2024 • Rezoning Area: Gowanus • Rezoning Policy Domain: Community Resources
Year
2024
Rezoning Area
Gowanus
Commitment Title
Continue engagement with local stakeholders on the Gowanus IBZ Vision Plan’s framework and workforce and infrastructure recommendations.
Rezoning Policy Domain
Community Resources
Lead Agency
DEPARTMENT OF CITY PLANNING (DCP)
Commitment Stage
In Progress
Statement From Source Document Poa
DCP and agency partners commit to continue engaging with local stakeholders on strategies and recommendations in the Gowanus IBZ Vision Plan, including around land use and zoning as part of any broader efforts to revise and update industrial zoning. In connection with the Gowanus Neighborhood Plan, DCP led a public engagement effort with businesses, property owners, and other stakeholders to develop a vision for the southern part of Gowanus within the Southwest Brooklyn Industrial Business Zone (IBZ), other portions of blocks zoned as manufacturing districts, and the Third Avenue corridor. In May 2021, DCP released the Gowanus IBZ Vision Plan, which put forth a land use framework and key infrastructure and workforce recommendations, many of which are listed above. DCP will continue to work with property owners interested in pursuing private applications that comport with the land use framework. DCP will also consider the Gowanus IBZ as part of any broader initiative to revise and update industrial zoning that may take place in coming years and will work closely with CB6 and local elected officials on any such initiative.
Original Schedule
TBD
Narrative
DCP is continuing to engage local stakeholders on the Gowanus IBZ Vision Plan and other related efforts to strengthen job hubs across the City. City of Yes for Economic Opportunity (ZEO), which passed in June 2024, modernized zoning regulations to support small businesses, including by creating new job-intensive zoning districts which were informed by the Gowanus IBZ study and continued outreach to industrial stakeholders in Gowanus and beyond. Further outreach with Gowanus IBZ stakeholders is underway as part of the NYC Industrial Plan outlined in Local Law 172-2023.
2024
Year: 2024 • Rezoning Area: Gowanus • Commitment Title: Create a promenade connecting the Gowanus Esplanade to 9th Street.
Year
2024
Rezoning Area
Gowanus
Commitment Title
Create a promenade connecting the Gowanus Esplanade to 9th Street.
Rezoning Policy Domain
Transportation & Infrastructure
Lead Agency
DEPARTMENT OF CITY PLANNING (DCP)
Commitment Stage
In Progress
Statement From Source Document Poa
The City will request the MTA release or license the parcel to design and construct a new waterfront pathway and public space north of 9th Street between 9th Street and the proposed Waterfront Public Access Areas to the north. This crucial connection would provide much needed access, expanding the planned waterfront esplanades and parks along the western bank of the canal down to 9th Street, the 9th Street bridge and the Smith 9th Street subway station areas in order to increase connections for residents, businesses, and public infrastructure
Original Schedule
2023 Start
Narrative
In March 2024, NYC Parks executed the Surrender Agreement with MTA, an important step toward transferring the property from MTA to the City's jurisdiction. Once the transaction is complete, Parks will begin the pre-design phase and a set a schedule for community engagement. Additionally, DCP has worked closely with DPR to help facilitate Gowanus Canal Conservancy’s interim use of this space as a plant nursery.
2024
Year: 2024 • Rezoning Area: Gowanus • Rezoning Policy Domain: Community Resources
Year
2024
Rezoning Area
Gowanus
Commitment Title
Support the Council, Community Board 6, and other stakeholders to form a Community Oversight Task Force.
Rezoning Policy Domain
Community Resources
Lead Agency
DEPARTMENT OF CITY PLANNING (DCP)
Commitment Stage
In Progress
Statement From Source Document Poa
• In the first quarter of 2022, City Hall and DCP will support the Council, Community Board 6 (CB 6), and other stakeholders including NYCHA residents and Tenant Association leadership to develop a detailed plan for a Community Oversight Task Force dedicated to commitments related to the Gowanus Neighborhood Plan. The framework of this plan will include:

• Quarterly meetings will be open to the public with relevant updates on implementation of major plan components and POA commitments, including capital project progress updates by the relevant agency.

• City agencies will participate in and support a process managed by an independent facilitator to support the Task Force. The City and City Council are assisting in identifying independent resources for this facilitator, to be further refined by City Council and CB6 before the end of 2021.

• Staff from DCP and City Hall will work with and assist CB 6 to facilitate and organize meetings, help liaise between city agencies and other Task Force members.

• Representation from CB6, City agencies (including but not limited to senior staff from DCP, DOT, Parks, DEP, NYCHA, and HPD), City Council offices, NYCHA residents and Tenant Association leadership, and core community organizations and stakeholders as determined by CB6 and City Council leadership.

• City agencies will dedicate staffing resources through the end of 2037 to prepare for and attend regular update meetings, including a designated liaison for rezoning-related issues at City Hall.

• Every five years – 2027, 2032, 2037 – DCP will prepare a community update report on plan implementation, housing and economic development, and population and demographic data in the rezoning area.
Original Schedule
2022 start
Narrative
Beginning in 2022, the City has supported the formation and operations of the Gowanus Oversite Taskforce (GOTF), primarily led by Councilmembers Hanif and Restler and the independent facilitator they selected, JLP+D. DCP has continued being involved and providing assistance as needed, while ensuring that the Taskforce is driven by the local community, facilitator, and other key stakeholders. Senior staff from DCP and all relevant agencies have engaged continuously with the GOTF, including attending and providing updates at quarterly public meetings. More information can be found at https://www.gowanustaskforce.net/. In addition to these frequent touchpoints, DCP looks forward to preparing the first of three five-year update reports on the Gowanus Neighborhood Plan in 2027.
2024
Year: 2024 • Rezoning Area: Gowanus • Commitment Title: Work to create a Construction Committee
Year
2024
Rezoning Area
Gowanus
Commitment Title
Work to create a Construction Committee
Rezoning Policy Domain
Community Resources
Lead Agency
DEPARTMENT OF CITY PLANNING (DCP)
Commitment Stage
Not Started
Statement From Source Document Poa
• Work to create a construction and quality of life committee at CB6 that can address these issues more frequently as requested by the CB and/or issues arise.
Original Schedule
TBD
Narrative
Brooklyn Community Board 6 has not created a construction and quality of life committee due to the large number of parallel forums addressing these concerns on an as-needed and topic-specific basis, including the Gowanus Oversight Taskforce, the Gowanus Superfund Community Advisory Group, the Gowanus Business Improvement District formation effort, and NYS DEC Brownfield Cleanup outreach and monitoring.
2024
Year: 2024 • Rezoning Area: Gowanus • Rezoning Policy Domain: Transportation & Infrastructure
Year
2024
Rezoning Area
Gowanus
Commitment Title
Work to identify suitable and feasible locations for in-water recreational access and share design concepts with Gowanus Community prior to Waterfront Certification.
Rezoning Policy Domain
Transportation & Infrastructure
Lead Agency
DEPARTMENT OF CITY PLANNING (DCP)
Commitment Stage
In Progress
Statement From Source Document Poa
• The Gowanus Plan’s Waterfront Access Plan (WAP) provides incentives for developers to include boat or kayak launches and tidal wetlands within waterfront public access areas. Lightstone, an existing mixed-use residential building on the Canal, provides an example of how a private development can provide both a boat launch and a boathouse in the building’s ground floor for the Gowanus Dredgers Canoe Club, a volunteer organization dedicated to providing waterfront access and education to the public.

The City will explore potential in-water access at two City-controlled locations: Gowanus Green and the 2nd Ave street end by the Salt Lot. At Gowanus Green, in-water access at the future park will determined through a robust community engagement process as well as work to determine the engineering feasibility. At the Salt Lot, DEP will evaluate water access during design of the Owls Head site. DEP has heard the request from local stakeholders, including the Gowanus Dredgers, and look forward to studying the feasibility of including it in the project.

The City will also work with waterfront owners, developers, and community stakeholders to identify suitable locations in segments of the canal that do not currently (or in the future) have in-water access such as boat launches and docks, including sharing design concepts with the Gowanus community prior to Certification by Chair of the City Planning Commission.
Original Schedule
TBD
Narrative
The DCP Brooklyn Office has continued to direct applicant and design teams to consider in-water access feasibility and to engage with the community. City Agencies have met regularly with the Gowanus Oversight Taskforce on this topic. There is a new boat launch planned at the DEP Owls Head facility. To date, of nine sites that have received Waterfront Public Access Area Certifications, none have taken advantage of zoning incentives for providing boat launches, but two sites have approved designs that include gates in the guardrail that may allow for installation of boat launches in the future. There are nine remaining privately-owned parcels in the Gowanus Waterfront Access Plan area that will need to seek Waterfront Certifications to facilitate redevelopment, expansion, or changes of use, and DCP will continue strongly urging property owners to provide in-water recreational access amenities during application review.
2024
Year: 2024 • Rezoning Area: Gowanus • Commitment Title: Improve design, permitting and construction coordination at street ends.
Year
2024
Rezoning Area
Gowanus
Commitment Title
Improve design, permitting and construction coordination at street ends.
Rezoning Policy Domain
Transportation & Infrastructure
Lead Agency
DEPARTMENT OF CITY PLANNING (DCP)
Commitment Stage
In Progress
Statement From Source Document Poa
DCP, DOT, DEP, Parks, and FDNY commit to working together, with private developers, and with state and federal agencies to coordinate overlapping priorities for street ends, including access to the esplanade and the water, amenities for public space users, emergency vehicle access, stormwater management, and esplanade continuity.
Original Schedule
TBD
Narrative
DCP continues to work with DOT, DEP, Parks, and FDNY, along with private developers, the State, and Federal agencies to coordinate overlapping priorities for street ends, as part of the Waterfront Public Access Area Certification review process. Action items include enhancing access to the esplanade and waterfront, public space activations, emergency vehicle access, and stormwater management. DCP provided a detailed presentation on this topic at a meeting in September 2023. A few months later, in December 2023, DCP engaged in discussions regarding FDNY’s emergency access needs for properties along the canal.
2024
Year: 2024 • Rezoning Area: Gowanus • Rezoning Policy Domain: Transportation & Infrastructure
Year
2024
Rezoning Area
Gowanus
Commitment Title
Assist in continued provision of composting and temporary relocation of nursery site during Salt Lot CSO construction.
Rezoning Policy Domain
Transportation & Infrastructure
Lead Agency
DEPARTMENT OF ENVIRONMENTAL PROTECTION (DEP)
Commitment Stage
In Progress
Statement From Source Document Poa
DEP anticipates that the composting operations can remain on site in a temporary location during construction. GCC’s nursery operations will be impacted in early 2022 by the reconstruction of the bulkhead on the City-owned site. This work is separate from the Owls Head Facility contract, but part of the Superfund efforts required by the EPA. GCC has identified an MTA property that may be viable, and DEP will support the organization in that relocation. DEP is also working to identify additional locations if needed and will provide funding for a comparable amount of temporary space should it be necessary, as already documented with impacted stakeholders.
Original Schedule
TBD
Narrative
DEP supported GCC's move to a temporary site at 25 9th Street in 2022. It will remain operating at this site for the duration of the construction of the Combined Sewer Overflow (CSO) tank, and will be moved back to the Salt Lot site following the construction of the CSO Facility. As of 2024, GCC will remain at the 9th Street site for another 2 years.
2024
Year: 2024 • Rezoning Area: Gowanus • Rezoning Policy Domain: Transportation & Infrastructure
Year
2024
Rezoning Area
Gowanus
Commitment Title
Comply with EPA’s timeline for constructing CSO retention tanks as mandated in Gowanus Superfund ROD.
Rezoning Policy Domain
Transportation & Infrastructure
Lead Agency
DEPARTMENT OF ENVIRONMENTAL PROTECTION (DEP)
Commitment Stage
In Progress
Statement From Source Document Poa
• The City has been complying with the Order by performing the CSO design and CSO remedial action work required by the Order, as well as the removal action for design and construction of a bulkhead at property owned by the City where the OH-007 CSO tank will be constructed. The City continues to advance the design, removal and remedial action work required by the Order. While the City will comply with the Order, it must ensure that the specific milestones are feasible and will continue to discuss those issues with the EPA.
Original Schedule
TBD
Narrative
The City broke ground on the first CSO tank in March 2023 and Construction is underway. Both tanks are expected to be completed by the end of 2027.
2024
Year: 2024 • Rezoning Area: Gowanus • Commitment Title: Construct open space at the future Head-End CSO site.
Year
2024
Rezoning Area
Gowanus
Commitment Title
Construct open space at the future Head-End CSO site.
Rezoning Policy Domain
Transportation & Infrastructure
Lead Agency
DEPARTMENT OF ENVIRONMENTAL PROTECTION (DEP)
Commitment Stage
In Progress
Statement From Source Document Poa
• DEP confirms that the open space at the Head End site will be completed in late-2030.The design was informed by community outreach and recommendations and was approved by PDC in November 2018. The headhouse will be activated with interpretive graphics about the function of the CSO facility and the history of Gowanus. Additionally, in line with community feedback, DEP is seeking to host temporary art programming, outdoor movie nights, and accommodate outdoor performance space in collaboration with Parks.
Original Schedule
TBD
Narrative
The second phase of work at the Head End site CSO facility began in March 2023, and in September 2023 crews began building the concrete support walls that will enable the deep excavation required the build the tank. This work remains ongoing. DEP is working hard to reduce any impacts on the surrounding neighborhood, including by installing sound barriers to minimize noise and spraying water and foam on soil to reduce dust and odors. DEP performs regular perimeter checks for errant odors and operates a 24/7 community air monitoring program (CAMP) with real-time alerts. The CAMP monitors emissions and protects residents and DEP employees while we undertake this important project. The monitoring program includes eight automatic monitoring stations around the perimeter of the construction site that operate continuously and monitor air quality for particulate matter and chemicals, including petroleum. An EPA inspector is on site daily. If you have any questions or concerns, please reach out to the Community Construction Liaison: Valentina Mascaro at GowanusCCL@johnson-asberry.com or 934-216-0209.
2024
Year: 2024 • Rezoning Area: Gowanus • Commitment Title: Continue to provide updates on sewer and draining infrastructure work.
Year
2024
Rezoning Area
Gowanus
Commitment Title
Continue to provide updates on sewer and draining infrastructure work.
Rezoning Policy Domain
Transportation & Infrastructure
Lead Agency
DEPARTMENT OF ENVIRONMENTAL PROTECTION (DEP)
Commitment Stage
In Progress
Statement From Source Document Poa
• DEP will continue to provide investment and schedule updates – with ample notice before construction begins - on sewer and drainage infrastructure work (9th Street, 7th Street, 3rd Ave, and Hamilton Ave) to affected business and property owners and Study the need for additional water and sewer improvements on 10th Street.
Original Schedule
TBD
Narrative
Sewer work on 7th Street is slated to be completed by the end of 2024, now that unforeseen conditions with adjacent building have been resolved. This work will increase sewer capacity by 78 percent. DEP has also completed construction on green infrastructure in Carroll Park and Boerum Park to reduce flooding and improve the health of the Gowanus Canal.
2024
Year: 2024 • Rezoning Area: Gowanus • Commitment Title: Include Gowanus, Red Hook, and Gowanus IBZ in upcoming Cloudburst studies.
Year
2024
Rezoning Area
Gowanus
Commitment Title
Include Gowanus, Red Hook, and Gowanus IBZ in upcoming Cloudburst studies.
Rezoning Policy Domain
Transportation & Infrastructure
Lead Agency
DEPARTMENT OF ENVIRONMENTAL PROTECTION (DEP)
Commitment Stage
Completed
Statement From Source Document Poa
• DEP has committed to advancing innovative cloudburst solutions in the Mayor’s “New Normal: Combatting Storm-Related Extreme Weather in New York City” report. These projects are designed for heavy downpours and transform open space and streetscapes to absorb water where possible. They store excess water safely until the event passes to take pressure off the sewer system. The City has committed to identifying ten cloudburst neighborhoods, four of which will begin work next year, while pursuing State and Federal funding to implement another six. To further define future locations, DEP will be conducting physical and social vulnerability assessments utilizing multiple factors like 10 and 100-year rain events, 311 structural damage complaints, sewer back-up data, historic wetland locations, impervious surfaces and social factors (i.e., social vulnerability index, critical infrastructure like schools and hospitals). This initial assessment will yield priority sub-catchment areas for cloudburst opportunities. This will require further engineering feasibility review and engagement with internal and external stakeholders and partners to better understand local conditions. DEP commits to including the rezoning area, Gowanus IBZ and Red Hook neighborhood for both the physical and social vulnerability assessment and feasibility analysis for cloudburst.
Original Schedule
2022 Start
Narrative
DEP included both Gowanus IBZ and Red Hook for both the physical and social vulnerability assessment and feasibility analysis for Cloudbursts.



DEP is currently piloting Cloudburst projects in three communities: South Jamaica, Queens; St. Albans, Queens; and East Harlem, Manhattan. Additional projects in five communities were announced earlier this year, including Corona, Queens; Kissena Park, Queens; Parkchester, Bronx; East New York, Brooklyn; and Brownsville, Brooklyn. These communities met the physical, social, and technical feasibility criteria to ensure that a Cloudburst project would have a substantive impact of community flooding. As previously explained, through the technical feasibility evaluation, Gowanus was not found to be a good candidate for this type of intervention, due to the low-lying nature of the neighborhood and the broad areas zoned for commercial and manufacturing uses. DEP will continue to pursue alternative methods to address inland flooding in Gowanus.
2024
Year: 2024 • Rezoning Area: Gowanus • Rezoning Policy Domain: Transportation & Infrastructure
Year
2024
Rezoning Area
Gowanus
Commitment Title
Monitor changes in sanitary and storm water loading within the Gowanus Sewershed.
Rezoning Policy Domain
Transportation & Infrastructure
Lead Agency
DEPARTMENT OF ENVIRONMENTAL PROTECTION (DEP)
Commitment Stage
In Progress
Statement From Source Document Poa
• On October 31st, the City submitted a monitoring plan to the EPA. The monitoring requirements include the following:

1. Monitoring beginning on June 1, 2022, to establish a baseline for CSO solids loading and solids contaminant levels;

2. Periodic in-Canal monitoring beginning one year after capping is completed in RTA 1.

To meet the above requirements, the monitoring plan will quantify the levels of contaminants of potential concern (COPCs) on solids discharging from CSO outfalls RH-034 and OH-007 along with the levels of total suspended solids (TSS), suspended solids organic carbon, and suspended solids grain size distribution. Samples will be collected from sewer pipes feeding these two outfalls quarterly for a period of two years starting from June 1, 2022. This sampling will provide a baseline for the characteristic of the CSO solids that enter the Canal. To quantify the solids loading to the Canal, the City will use data from this monitoring program along with the Owls Head and Red Hook WWTP Collection System. The flow estimated from a model and the measured TSS concentrations will be used by the City to estimate the annual CSO solids load to the Canal.

The monitoring plan described above, as well as DEP’s regular harbor water quality monitoring program are the best methods for understanding the water quality impacts of combined sewer overflows on the Gowanus Canal. The annual report is available at DEP’s website and will contain information about major indicators of environmental changes including dissolved oxygen, bacteria, secchi transparency, chlorophyll ‘a’ and nitrogen levels.
Original Schedule
TBD
Narrative
Since January 26, 2023, DEP has been tracking storms and analyzing the concentrations of pollutants flowing into the Gowanus Canal due to Combined Sewer Overflows (CSOs) during these storms. CSOs discharge raw sewage directly into local waterways during periods of heavy rainfall that overwhelm the City’s sewer system; this mechanism prevents sewage from backing up in residences and businesses. Through this work, DEP aims to establish baseline standards for the permissible quantities of toxins that CSOs release into the environment.



In 2024, EPA directed DEP to reduce the requirements for the mobilization protocol from a 48-hour to a 24-hour dry antecedent period, which allows for the inclusion of a higher percentage of storms. DEP submitted validated data to EPA from weather events that occurred between March and May 2023, along with additional validated data in January 2024. EPA also instructed DEP to align the compiled monitoring report with the Annual Green Infrastructure Report.
2024
Year: 2024 • Rezoning Area: Gowanus • Rezoning Policy Domain: Open Space
Year
2024
Rezoning Area
Gowanus
Commitment Title
Provide open space and ecosystem restoration at the Salt Lot site following community engagement.
Rezoning Policy Domain
Open Space
Lead Agency
DEPARTMENT OF ENVIRONMENTAL PROTECTION (DEP)
Commitment Stage
In Progress
Statement From Source Document Poa
• DEP will provide open space at the Salt Lot CSO tank site following community engagement. DEP has outlined an aggressive schedule, per EPA, and committed to a robust public engagement process beginning early in the design phase to allow for community input to inform the design. In coordination with Council Member Lander’s office, DEP will schedule its first meeting in late 2021. For the Head End site, DEP included a community liaison as a part of the construction management team and will do the same for the Salt Lot site. DEP has been coordinating with DSNY, Big Reuse, and GCC to relocate their operations during construction and commits to reestablish permanent facilities for each operation on site in the final design, and during construction to the greatest extent feasible. DEP will incorporate feedback from DSNY, Big Reuse, and GCC on the design of their facilities. DEP looks forward to hearing from the community through our engagement process to better inform what additional programming and ecosystem restoration is suggested and feasible for the property.
Original Schedule
2021 start
Narrative
The bulkhead reconstruction was completed on November 20, 2023, and the first phase of work for the CSO facility is underway. The hazmat sampling and remediation planning were completed in acquired properties on 5th Street. Currently, asbestos abatement is being performed on these properties before they are demolished. DEP’s designated Community Construction Liaison for the first phase of work at the Owls Head site is Lisa Blake of Michael Baker International; she will be the direct point of contact for the community during the construction process.
2024
Year: 2024 • Rezoning Area: Gowanus • Commitment Title: Report on compliance with the Unified Stormwater Rule.
Year
2024
Rezoning Area
Gowanus
Commitment Title
Report on compliance with the Unified Stormwater Rule.
Rezoning Policy Domain
Transportation & Infrastructure
Lead Agency
DEPARTMENT OF ENVIRONMENTAL PROTECTION (DEP)
Commitment Stage
Completed
Statement From Source Document Poa
as part of the permitted site connection process the City will prepare an annual report on applicable project approvals and completions for the preceding calendar year within the Gowanus Canal Sewershed. This information will include the anticipated sanitary discharge, development site storm flow, allowable flow from the site and/or the stormwater release rate from the site submitted. Data will be made publicly available and easy to access for individual sites and summarized for the Gowanus Canal Sewershed. DEP will provide twice annual updates on compliance with USWR through the green infrastructure program.
Original Schedule
TBD
Narrative
The Unified Stormwater Rule, promulgated on February 15, 2022, updates the City’s requirements for how stormwater is managed on all new and redeveloped sites that discharge to the City's sewer network in both combined and separately sewered areas. In combined sewer areas, like Gowanus, the Rule works to free up capacity in the combined sewer and reduce combined sewer overflows (CSOs) by limiting or slowing the volume of stormwater entering the sewer. DEP enforces this Rule through the site/house connections permitting process.



DEP provided an overview presentation of the Unified Stormwater Rule with a Gowanus case study at the quarterly Task Force Meeting in Fall 2023.



DEP publishes the Green Infrastructure Annual Report by April 30 every year and includes Gowanus Sewershed sites connections.

https://www.nyc.gov/assets/dep/downloads/pdf/water/stormwater/green-infrastructure/gi-annual-report-2023.pdf
2024
Year: 2024 • Rezoning Area: Gowanus • Commitment Title: Upgrade sewer infrastructure to alleviate flooding conditions.
Year
2024
Rezoning Area
Gowanus
Commitment Title
Upgrade sewer infrastructure to alleviate flooding conditions.
Rezoning Policy Domain
Transportation & Infrastructure
Lead Agency
DEPARTMENT OF ENVIRONMENTAL PROTECTION (DEP)
Commitment Stage
in progress
Statement From Source Document Poa
• DEP will upgrade sewer infrastructure to alleviate flooding conditions in the vicinity of 4th Avenue and Carroll Street. The project would include an upgraded sewer and an upgraded pumping station in the location of the existing 19th Street Pump Station at the intersection of 19th Street and 3rd Avenue.

Specifically, DEP will upgrade 3,000 linear feet of double barrel box sewers and an additional 1,000 linear feet of single box sewers. To complement the sewer upgrades and provide additional pumping capacity during wet weather, DEP will also rehabilitate and expand the capacity of the 19th Street Pumping Station. In addition, DEP will replace 4,000 linear feet of older water mains, which will provide enhanced reliability to residents and alleviate low pressure issues.

The project would alleviate street flooding during a 5-year storm and would substantially reduce CSO flowing to the new Owls Head tank since the project would be redirecting flow from the watershed to new outfall, closer Gowanus Bay.

By addressing street flooding the project would improve the usability of major local roadways including 3rd and 4th Avenues in a neighborhood with a current population of approximately 50 thousand people and a major business corridor for the new population to be introduced with the rezoning.
Original Schedule
2021 Start
Narrative
DEP has identified an alternative solution that increases sewer capacity, lessens the reliance on pumping, and includes synergies with planned capital sewer work in order to resolve the flooding conditions in the vicinity of 4th Avenue and Carroll Street. This phased plan is funded, and the first phase is already underway. The 19th Street pumping station will no longer require upsizing, but it will be renovated to meet updated safety and operation standards and resiliency guidelines to ensure reliable service.



Phase 1: 7th Street between 3rd and 4th Avenues; in construction; anticipated completion FY25; $2.7 million

Phase 2: 4th Avenue between Degraw and 7th Streets; in design; anticipated construction FY28-33; $132.8 million

Phase 3: 3rd Avenue between 7th and 22nd Streets; in development; anticipated construction FY28-33; $123.6 million



Separately, a similar design approach will be taken to increase sewer capacity at the Bond-Lorraine sewer west of the Gowanus Canal. DEP is developing a phased strategy to increase capacity and efficiency of the sewers on the west side of the Gowanus Canal, including the Bond-Lorraine sewer line.
2024
Year: 2024 • Rezoning Area: Gowanus • Commitment Title: Upgrade sewer infrastructure to alleviate flooding conditions.
Year
2024
Rezoning Area
Gowanus
Commitment Title
Upgrade sewer infrastructure to alleviate flooding conditions.
Rezoning Policy Domain
Transportation & Infrastructure
Lead Agency
DEPARTMENT OF ENVIRONMENTAL PROTECTION (DEP)
Commitment Stage
In Progress
Statement From Source Document Poa
• DEP will upgrade sewer infrastructure to alleviate flooding conditions in the vicinity of 4th Avenue and Carroll Street. The project would include an upgraded sewer and an upgraded pumping station in the location of the existing 19th Street Pump Station at the intersection of 19th Street and 3rd Avenue.

Specifically, DEP will upgrade 3,000 linear feet of double barrel box sewers and an additional 1,000 linear feet of single box sewers. To complement the sewer upgrades and provide additional pumping capacity during wet weather, DEP will also rehabilitate and expand the capacity of the 19th Street Pumping Station. In addition, DEP will replace 4,000 linear feet of older water mains, which will provide enhanced reliability to residents and alleviate low pressure issues.

The project would alleviate street flooding during a 5-year storm and would substantially reduce CSO flowing to the new Owls Head tank since the project would be redirecting flow from the watershed to new outfall, closer Gowanus Bay.

By addressing street flooding the project would improve the usability of major local roadways including 3rd and 4th Avenues in a neighborhood with a current population of approximately 50 thousand people and a major business corridor for the new population to be introduced with the rezoning.
Original Schedule
2021 Start
Narrative
This is a repeat of Row 47



DEP has identified an alternative solution that increases sewer capacity, lessens the reliance on pumping, and includes synergies with planned capital sewer work in order to resolve the flooding conditions in the vicinity of 4th Avenue and Carroll Street. This phased plan is funded, and the first phase is already underway. The 19th Street pumping station will no longer require upsizing, but it will be renovated to meet updated safety and operation standards and resiliency guidelines to ensure reliable service.



Phase 1: 7th Street between 3rd and 4th Avenues; in construction; anticipated completion FY25; $2.7 million

Phase 2: 4th Avenue between Degraw and 7th Streets; in design; anticipated construction FY28-33; $132.8 million

Phase 3: 3rd Avenue between 7th and 22nd Streets; in development; anticipated construction FY28-33; $123.6 million



Separately, a similar design approach will be taken to increase sewer capacity at the Bond-Lorraine sewer west of the Gowanus Canal. DEP is developing a phased strategy to increase capacity and efficiency of the sewers on the west side of the Gowanus Canal, including the Bond-Lorraine sewer line.
2024
Year: 2024 • Rezoning Area: Gowanus • Commitment Title: Study potential pedestrian bridges at key crossing points.
Year
2024
Rezoning Area
Gowanus
Commitment Title
Study potential pedestrian bridges at key crossing points.
Rezoning Policy Domain
Transportation & Infrastructure
Lead Agency
DEPARTMENT OF TRANSPORTATION (DOT)
Commitment Stage
Not Started
Statement From Source Document Poa
• With the long-term goal of continuous access around the canal, consistent with the Waterfront Access Plan (WAP), upon completion of the Superfund work, DOT will conduct a maritime navigation study toward the end of exploring fixed pedestrian or other bridges across the Canal. This requires reaching out to all stakeholders (canal users and property owners abutting the canal). This study would take approximately six months. Ultimate creation of fixed structures would require the approval of the US Coast Guard along with the US Army Corps of Engineers and EPA. DOT will work with relevant entities to participate in an informational briefing for interested stakeholders regarding the process for studying the feasibility of a pedestrian bridge.
Original Schedule
2022 Start
Narrative
With the long-term goal of continuous access around the canal, consistent with the Waterfront Access Plan (WAP), upon completion of the Superfund work, DOT will conduct a maritime navigation study toward the end of exploring fixed pedestrian or other bridges across the Canal. This requires reaching out to all stakeholders (canal users and property owners abutting the canal). This study would take approximately six months. Ultimate creation of fixed structures would require the approval of the US Coast Guard along with the US Army Corps of Engineers and EPA. DOT will work with relevant entities to participate in an informational briefing for interested stakeholders regarding the process for studying the feasibility of a pedestrian bridge.
2024
Year: 2024 • Rezoning Area: Gowanus • Rezoning Policy Domain: Open Space
Year
2024
Rezoning Area
Gowanus
Commitment Title
Advance planning to remediate and renovate Thomas Greene Playground while maintaining public access to comparable facilities.
Rezoning Policy Domain
Open Space
Lead Agency
DEPARTMENT OF PARKS AND RECREATION (DPR)
Commitment Stage
In Progress
Statement From Source Document Poa
• The EPA has directed National Grid to remediate Thomas Greene Park, a former manufactured gas plant site, and ensure that the public has access to comparable facilities while Park remediation is underway. National Grid will remediate and reconstruct Thomas Greene Park in accordance with the schedule to be established by the EPA. It is anticipated that work on this site will begin after canal dredging and bulkhead work is complete.

The City commits to assisting National Grid by providing site access before, during, and after the remediation and to working with National Grid as they design and construct temporary facilities and as they design remediate and reconstruct Thomas Greene Park. The City also commits to working with National Grid to ensure that the public has access to comparable facilities, including a public pool, and to operating those temporary facilities while Thomas Greene Park undergoes remediation. National Grid will be required to replace the park as described in the Gowanus Superfund Record of Decision. The City commits to a public engagement process, in partnership with the Friends of Thomas Greene Park and local stakeholders as part of final park design to ensure it meets community needs.

The City will support and adhere to the site's Citizen Participation Plan (CPP). Established by National Grid and the NYSDEC, the CPP provides citizens and all stakeholders a forum for input and comment on project-specific information such as major program milestones including the temporary pool's schedule and the reconstruction of Thomas Greene Park, post-remediation.
Original Schedule
TBD
Narrative
National Grid is responsible for remediation of the Fulton Former Manufactured Gas Plant (MGP) Site, which includes Thomas Greene Park and three waterfront parcels between Bulter St and Sackett St, where DEP will construct the Head of the Canal CSO Facility. Currently, National Grid continues remediation activites at the canalside parcels. Once that work is completed (within roughly 2-3 years), National Grid will start work on the upland parcels, including Thomas Greene Park.
2024
Year: 2024 • Rezoning Area: Gowanus • Commitment Title: Create a new city-owned waterfront park adjacent to Gowanus Green.
Year
2024
Rezoning Area
Gowanus
Commitment Title
Create a new city-owned waterfront park adjacent to Gowanus Green.
Rezoning Policy Domain
Open Space
Lead Agency
DEPARTMENT OF PARKS AND RECREATION (DPR)
Commitment Stage
Not Started
Statement From Source Document Poa
The City will provide capital funding to the Gowanus Green Partners for the construction of a new 1.5-acre waterfront park adjacent to the proposed mixed-use development. The new park will be city-owned. The City will provide for ongoing maintenance either through its funding of the overall Gowanus Green mixed-use development or through participation in a future BID or BID-like entity, which is currently being explored by the community with support from City agencies. The future park will provide a mix of active and passive uses to be determined through a robust community engagement process and serve as the largest public increase of open space through the rezoning process and an anchor for old and new residents alike. The design will also explore the feasibility of providing a publicly accessible bathroom in the park or within a nearby development, if appropriate, that would also be covered by capital funding, as well as water access for recreational uses. Timing of construction is dependent on the site's availability. US EPA is contemplating use of the Gowanus Green and park sites for Canal Clean up staging, which would defer the final phase of remediation and subsequent construction. As stated above, City agencies continue to work with the EPA, National Grid and their contractors, and property owners in the area in an effort to identify locations for staging that would allow the remediation and development of Gowanus Green to move forward as expeditiously as possible.
Original Schedule
2025 targeted start
Narrative
Design is expected to start in 2025, provided that the plans for the Hoyt Street extension, which will border the park parcel, are completed by then.
2024
Year: 2024 • Rezoning Area: Gowanus • Commitment Title: Create new open space at the Bond Street street end.
Year
2024
Rezoning Area
Gowanus
Commitment Title
Create new open space at the Bond Street street end.
Rezoning Policy Domain
Open Space
Lead Agency
DEPARTMENT OF PARKS AND RECREATION (DPR)
Commitment Stage
Not Started
Statement From Source Document Poa
In an effort to create new open space where possible within the Gowanus rezoning area and increase connectivity to a future contiguous waterfront esplanade, Parks in consultation with DOT will create a new passive waterfront open space with landscaping and potential green infrastructure to address local flooding. The open space design process will include a robust community participation component, including coordination with the adjacent properties and a public visioning meeting
Original Schedule
2025 targeted start
Narrative
Design is expected to start in 2025, provided that the plans for the Hoyt Street extension, which will border the park parcel, are completed by then.
2024
Year: 2024 • Rezoning Area: Gowanus • Commitment Title: Enhance the Old Stone House by upgrading facilities and improving accessibility.
Year
2024
Rezoning Area
Gowanus
Commitment Title
Enhance the Old Stone House by upgrading facilities and improving accessibility.
Rezoning Policy Domain
Community Resources
Lead Agency
DEPARTMENT OF PARKS AND RECREATION (DPR)
Commitment Stage
In Progress
Statement From Source Document Poa
• Parks will improve ADA access to the Old Stone House, a historic cultural and civic hub located in Washington Park, and expand access to programming and ancillary spaces by constructing an elevator, a new staircase, and public restrooms within an extension on the north side of the building.
Original Schedule
2023 Start
Narrative
Design is underway and anticipated to be completed by the end of 2024.
2024
Year: 2024 • Rezoning Area: Gowanus • Commitment Title: Increase opportunities for public art and historic interpretation.
Year
2024
Rezoning Area
Gowanus
Commitment Title
Increase opportunities for public art and historic interpretation.
Rezoning Policy Domain
Open Space
Lead Agency
DEPARTMENT OF PARKS AND RECREATION (DPR)
Commitment Stage
Completed
Statement From Source Document Poa
The City commits to exploring opportunities for incorporating public art and historic interpretation elements at key new open spaces being created at Gowanus Green and other open spaces. Specifically, the Head End CSO site’s headhouse’s facade will be activated with interpretive graphics about the function of the CSO facility and the history of Gowanus.
Original Schedule
TBD
Narrative
NYC Parks worked with developers to provide public art within the newly created waterfront public access areas, and will contemplate ways to incorporate public art in Gowanus Green Park once Design begins in 2025.
2024
Year: 2024 • Rezoning Area: Gowanus • Commitment Title: Fulfill commitment to renovate and reopen the Gowanus Community Center and
Year
2024
Rezoning Area
Gowanus
Commitment Title
Fulfill commitment to renovate and reopen the Gowanus Community Center and
Rezoning Policy Domain
Community Resources
Lead Agency
DEPARTMENT OF YOUTH & COMMUNITY DEVELOPMENT (DYCD)
Commitment Stage
In Progress
Statement From Source Document Poa
DYCD will fund a non-profit provider to operate a Cornerstone Program at the Gowanus Community Center. Cornerstone programs provide a holistic approach to programming for ages 6-adult. Activities operating out of Cornerstones are designed and based on the needs of each community they are located in. Cornerstones operate from 2-10pm during the school year and from 8am-11pm weekdays and 3pm-11pm on the weekends during the summer months.
Original Schedule
2022 Start
Narrative
The opening of the Gowanus Community Center is pending; NYCHA must resolve two issues. Cornerstone Community Center services are currently relocated to P.S. 456 at 485 State Street. NYCHA working with Verizon on issues concerning phone lines feeding into the fire alarm panel. Once the issue is corrected, a new FDNY inspection will be requested. This pushes out the overall timeline for the space to be utilized. We are hoping for building access by the end of 2024.
2024
Year: 2024 • Rezoning Area: Gowanus • Commitment Title: Provide MAP services at Gowanus Houses and Wyckoff Gardens
Year
2024
Rezoning Area
Gowanus
Commitment Title
Provide MAP services at Gowanus Houses and Wyckoff Gardens
Rezoning Policy Domain
Community Resources
Lead Agency
DEPARTMENT OF YOUTH & COMMUNITY DEVELOPMENT (DYCD)
Commitment Stage
Completed
Statement From Source Document Poa
• The MAP initiative brings together neighborhood residents and government agencies to reduce crime. Strategies aim to address concentrated disadvantage and physical disorder and promote neighborhood cohesion and strong citywide networks. NeighborhoodStat (Nstat), the driving mechanism behind MAP, mobilizes residents and City agencies to reframe the concept of public safety by addressing the drivers of crime in their neighborhoods through the use of shared knowledge, data and performance metrics to build accountability, safety, legitimacy and trust. The site activation plan for Gowanus Houses and Wyckoff Gardens includes interventions in the broad areas of opportunity, trust, and design. This includes programming in the following areas:

• Opportunity:

• Youth development and employment

• Family Stabilization

• Trust:

• NeighborhoodStat

• Domestic Violence Technical Assistance

• Conflict Mediation

• Design:

• Participatory Design

• Activation through play

• MAP Youth Mentorship and Sports Leagues
Original Schedule
2022 Start
Narrative
As of 2022, Gowanus and Wyckoff became MAP Developments. Both developments received all MAP services. This action fulfilled the commitment.



In FY23, Kings Against Violence Initiative (KAVI) was selected as the MAP NStat implementation provider for Gowanus Houses and Wyckoff Gardens. A community organizer was hired to recruit an intergenerational resident team in each site. In FY24, these teams led a participatory budgeting exercise to determine how to spend $30,000 (each) of public funding provided by ONS.



414 Gowanus Houses residents voted on a project idea implemented in Spring 2024. The project focused on Health and Wellbeing and ran from April through early June. Ten participants between the ages of 15 and 21 learned about music expression, fitness, and nutrition.

281 Wyckoff residents voted on a project idea implemented in Spring 2024. The project focused on youth development, where participants learned boxing and basketball and essential life skills, including communication, teamwork, leadership, and problem-solving abilities.



The next steps were phased out by the DOP in FY24.



HRA continues to lead in-person benefits enrollment events in Gowanus and Wyckoff, as requested by residents and/or Property Management.



When Love Works Dynamically hosts yearly healthy relationships trainings to help Wyckoff and Gowanus residents identify, prevent, and respond to negative relationships, including intimate partner violence.



Each NYCHA development received an ONS grant to paint a mural on site. Paid artists provided art instruction and stipends for residents to design and paint the murals.
2024
Year: 2024 • Rezoning Area: Gowanus • Rezoning Policy Domain: Transportation & Infrastructure
Year
2024
Rezoning Area
Gowanus
Commitment Title
Target EDC Industrial Developer Loan Fund to facilitate potential Gowanus Mix spaces
Rezoning Policy Domain
Transportation & Infrastructure
Lead Agency
ECONOMIC DEVELOPMENT CORPORATION (EDC)
Commitment Stage
Completed
Statement From Source Document Poa
EDC will promote the Industrial Developer Loan Fund to ensure Gowanus businesses are aware of the opportunity.
Original Schedule
TBD
Narrative
This is a city-wide fund (e.g., EDC is open to applications from Gowanus but there has not been a neighborhood-specific marketing plan for this fund). The fund has made two prior loans - one for Peninsula 1A and the other to GMDC - and is open for new applications (https://edc.nyc/program/nyc-industrial-developer-loan-fund). The fund is also being promoted in recent RFPs issued by EDC.
2024
Year: 2024 • Rezoning Area: Gowanus • Rezoning Policy Domain: Transportation & Infrastructure
Year
2024
Rezoning Area
Gowanus
Commitment Title
Help IBZ businesses and property owners meet resiliency and sustainability goals.
Rezoning Policy Domain
Transportation & Infrastructure
Lead Agency
MAYOR'S OFFICE OF CLIMATE AND ENVIRONMENTAL JUSTICE (MOCEJ)
Commitment Stage
Completed
Statement From Source Document Poa
• MOS will work with local service providers to help businesses and property owners in the Gowanus IBZ and rezoning area understand new options for decarbonization, electrification, and resiliency, such as flood-proofing critical equipment, installing solar PV panels, and investing in energy efficiency retrofits with support provided by the NYC Accelerator, and stormwater management retrofits with support provided by the DEP Private Property Retrofit Incentive Program and the recently updated Green Roof Tax Abatement incentive.
Original Schedule
2022 Start
Narrative
In May 2024, NYC MOCEJ and city partners (NYC Accelerator, NYC DEP, SBS, Con Edison, NYSERDA, FloodHelpNY, Bronx and Brooklyn Energy Hub) worked with the Gowanus Sustainability Oversight Taskforce and Council Member Shahana Hanif's office to host a Sustainability and Resiliency Resource Fair/Open House, which provided Gowanus business and property owners with important information on building-level sustainability and resilience programs and incentives. This event connected business and property owners with the NYC Accelerator program to increase community awareness of available resources to reduce the impacts of localized flooding. The NYC Accelerator will continue to provide ongoing support to the owners who have engaged with them following the event.
2024
Year: 2024 • Rezoning Area: Gowanus • Commitment Title: Target outreach around green building infrastructure through NYC Accelerator.
Year
2024
Rezoning Area
Gowanus
Commitment Title
Target outreach around green building infrastructure through NYC Accelerator.
Rezoning Policy Domain
Transportation & Infrastructure
Lead Agency
MAYOR'S OFFICE OF CLIMATE AND ENVIRONMENTAL JUSTICE (MOCEJ)
Commitment Stage
Completed
Statement From Source Document Poa
• NYC Accelerator is a free program that helps New Yorkers save energy and water. A team of experts will meet with local building owners, developers, contractors and community partners to discuss how to improve energy efficiency, reduce carbon emissions, and access project financing & incentives.
Original Schedule
2022 Start
Narrative
In May 2024, NYC MOCEJ and city partners (NYC Accelerator, NYC DEP, SBS, Con Edison, NYSERDA, FloodHelpNY, Bronx and Brooklyn Energy Hub) worked with the Gowanus Sustainability Oversight Taskforce and CM Shahana Hanif's office to host a Sustainability and Resiliency Resource Fair/Open House, to provide Gowanus residents with important information on building-level sustainability and resilience programs and incentives. Leading into LL97, this event helped connect New Yorkers to resources to comply with Local Law 97 and increase community awareness of available resources to reduce the impacts of localized flooding.
2024
Year: 2024 • Rezoning Area: Gowanus • Commitment Title: Ensure tenant engagement and oversight of NYCHA investments
Year
2024
Rezoning Area
Gowanus
Commitment Title
Ensure tenant engagement and oversight of NYCHA investments
Rezoning Policy Domain
Housing
Lead Agency
NEW YORK CITY HOUSING AUTHORITY (NYCHA)
Commitment Stage
Completed
Statement From Source Document Poa
• In consultation with Tenant Association leadership at each development, NYCHA will engage residents during project planning and throughout the procurement and construction phases of the capital projects. NYCHA will hold meetings quarterly, or more frequently if needed. Other engagement methods could include: updates at monthly tenant association meetings, resident surveys, robocalls or live calls, door knocking, a dedicated website, tours of other NYCHA preservation projects, and flyers. Discussions with residents will focus on the scope of work NYCHA’s contractor will deliver inside residential units, renovation budgets and timelines (including relocation timeline), input into design preferences within the constraints of the budget, resident rights and protections, Section 3 job opportunities, and contractor requirements, among other topics.

NYCHA will work closely Tenant Association leadership and residents in drafting the Gowanus Houses and Wyckoff Gardens design and construction solicitations and, in a timely manner, share a form of the resident temporary relocation agreement and any related documents for review and comment. NYCHA will work with a third-party facilitator and/or independent technical advisor, selected by residents and contracted by NYCHA, that can offer legal support to residents for the duration of the planning, procurement, and construction phases.
Original Schedule
2021 Start
Narrative
NYCHA has prioritized resident engagement, ensuring that residents are involved in shaping the renovation process through a variety of methods. These efforts have included visioning workshops, the establishment of on-site engagement offices, quarterly resident update meetings, and monthly check-ins with Tenant Association (TA) leadership, Property Management, and local elected officials. Additionally, NYCHA has facilitated participation in community events and coordinated the signing of Charter Agreements to confirm both the agreed-upon work scope and the right of residents to return to their homes following temporary relocations. Each site has a dedicated liaison — some of whom are proud NYCHA residents themselves — serving as the primary point of contact for residents. NYCHA also remains actively involved in the Gowanus Oversight Task Force, a group of community volunteers and stakeholders working with City agencies to advance the commitments of the Gowanus Neighborhood Plan.

Earlier this year (2024), NYCHA launched the pilot Resident Ambassador Program, an initiative that recruits residents from within the developments to help communicate information about the renovations. Currently, there are three ambassadors from each site. By facilitating communication among their neighbors, the ambassadors strengthen community ties and builds trust, ensuring everyone feels informed, included, and heard.



In July 2024, NYCHA announced the selection of the design-build team for Wyckoff Gardens and Gowanus Houses. This selection followed a two-year competitive procurement process that included resident representatives and property management on the selection committee. With a combined 55 years of experience in the construction industry, this design-build team has partnered on numerous affordable housing projects and earned notable accolades, including the 2011 Big Apple Brownfield Award and LEED Gold Certification for the Atlantic Terrace Building. Their experience with NYCHA includes significant work on capital projects such as the Hurricane Sandy recovery efforts and Permanent Affordability Commitment Together (PACT) projects.



The work scope for each site has been uniquely tailored based on feedback from residents, TA leadership, Property Management, and local elected officials. The combined budget for Gowanus and Wyckoff is approximately $223 million.



At Wyckoff Gardens, the scope of work includes kitchen and bathroom renovations, kitchen waste line replacements, electrical upgrades, and hazardous material abatement, including the removal of lead-based paint from all apartments. The scope of work at Gowanus Houses includes kitchen and bathroom renovations, complete lead-based paint removal, and in-unit heating optimization to improve heat delivery throughout the apartments. Additionally, through New York State funding, Gowanus Houses will receive full elevator replacements.
2024
Year: 2024 • Rezoning Area: Gowanus • Commitment Title: Fulfill commitment to renovate and reopen the Wyckoff Community Center.
Year
2024
Rezoning Area
Gowanus
Commitment Title
Fulfill commitment to renovate and reopen the Wyckoff Community Center.
Rezoning Policy Domain
Community Resources
Lead Agency
NEW YORK CITY HOUSING AUTHORITY (NYCHA)
Commitment Stage
In Progress
Statement From Source Document Poa
NYCHA’s previous procurement for the expansion of this center was unsuccessful. NYCHA will release a new public solicitation in December 2021. Bids would be due back in late January with an anticipated award in Q2 of 2022. At that time, a contract construction timeline will be presented, and construction will begin. Construction is expected to last two to three years.
Original Schedule
2021 Start
Narrative
Construction began on the community center at Wyckoff in October 2023, with a budget of $6.2 million. The project is at 10 percent Construction completion and is scheduled to be completed in July 2025.
2024
Year: 2024 • Rezoning Area: Gowanus • Rezoning Policy Domain: Housing
Year
2024
Rezoning Area
Gowanus
Commitment Title
Fund comprehensive in-unit renovations at all apartments at Gowanus Houses and Wyckoff Gardens.
Rezoning Policy Domain
Housing
Lead Agency
NEW YORK CITY HOUSING AUTHORITY (NYCHA)
Commitment Stage
In Progress
Statement From Source Document Poa
• The City will fund comprehensive in-unit renovations at all apartments at Gowanus Houses (1,134 units) and Wyckoff Gardens (528 units). This work will include all interior apartment component replacements as identified during the scoping process, which may include but is not limited to: walls, plumbing (including riser work), fixtures in bathrooms and kitchens, flooring, interior doors, electrical wiring, and lighting fixtures. Completing this work may require a phased temporary relocation of existing residents.

As described in Item 4 below, NYCHA will commit to an engagement schedule and communication plan. NYCHA will also commit to creating an agreement with residents focused on the temporary relocation process, including but not limited to: adequate notice to each tenant ahead of renovation, a guarantee that all residents can return to their development, and NYCHA’s payment for resident temporary relocation costs as needed (e.g., moving costs, meal and transportation stipends, storage if necessary, and other out of pocket expenses). If temporary relocation in the development is not possible, accommodations in the immediate neighborhood will be identified. Consideration will be given to medical conditions, emergency transfers and domestic violence cases, and elementary schools.

To ensure the above work will be completed, the City will allocate approximately $200M in capital.
Original Schedule
2022 start
Narrative
The Gowanus and Wyckoff comprehensive modernization projects are utilizing the design-build delivery method. The Notice to Proceed is anticipated for January 2025. Their combined budget is approximately $223 million.



The work scope for each site has been uniquely tailored based on feedback from residents, TA leadership, Property Management, and local elected officials.



At Wyckoff Gardens, the scope of work includes kitchen and bathroom renovations, kitchen waste line replacements, electrical upgrades, and hazardous material abatement, including the removal of lead-based paint from all apartments. The Gowanus Houses scope of work includes kitchen and bathroom renovations, complete lead-based paint removal, and in-unit heating optimization to improve heat delivery throughout the apartments. Additionally, through New York State funding, Gowanus Houses will receive full elevator replacements.
2024
Year: 2024 • Rezoning Area: Gowanus • Commitment Title: Conduct Workforce Outreach and Virtual / In - Person Recruitment Events.
Year
2024
Rezoning Area
Gowanus
Commitment Title
Conduct Workforce Outreach and Virtual / In - Person Recruitment Events.
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
In Progress
Statement From Source Document Poa
• SBS will conduct outreach in the district, including virtual or in-person recruitment events, at least every other week to connect individuals to the Workforce 1 training and employment services based on demand. Workforce 1 will hold regular virtual or in-person recruitment events in the district where recruiters will be screening candidates to fill open jobs for current employers. Recruiters will screen and assess individuals for skills training in several sectors including healthcare, industrial, construction, food service, and retail.
Original Schedule
2023-2025
Narrative
The SBS Workforce1 Career Center in Brooklyn has conducted outreach in the district through virtual and in-person recruitment events. Virtual recruitment events are held weekly for our broader Brooklyn audience. However, in-person efforts focused on the Gowanus population have included offsite recruitment opportunities through our monthly Mobile Outreach events and other events in partnership with organizations such as Community Housing Innovations and NYCHA REES.
2024
Year: 2024 • Rezoning Area: Gowanus • Rezoning Policy Domain: Economic Development
Year
2024
Rezoning Area
Gowanus
Commitment Title
Connect Gowanus residents to construction and green manufacturing training programs.
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
In Progress
Statement From Source Document Poa
• Through the NYC Green Jobs Corps, SBS will screen Gowanus residents for construction trade pre-apprenticeship training opportunities and free construction trade training. Partners in the Green Jobs Corps include Helmets to Hard Hats, Edward J. Malloy Initiative for Construction Skills and Non-Traditional Employment for Women (NEW) and Building Works, all of whom are recognized as pre-apprenticeship trainers by the Building Construction Trades Council. SBS will explore partnership with other local workforce development groups focused on industrial jobs, green jobs, and construction.

This construction trade training includes pre-apprenticeship training for careers in the green economy, including retrofitting buildings for increased energy efficiency. In coordination with the Council Members, SBS will organize outreach events to screen and assess jobseekers for pre-apprenticeships through the program. Individuals with a high school equivalency are eligible for pre- apprenticeship programs and those who may not be ready are referred to community partners and local institutions who provide additional adult and young adult education services.Additionally, SBS will connect jobseekers to green manufacturing training programs as these programs become available, and screen residents for employment opportunities.
Original Schedule
2023-2027
Narrative
In line with the New York City's Green Economy Action plan, SBS has launched the HVAC Pre-Apprenticeship Training Program. This 12-week program will help New Yorkers learn foundational curricula about Heating, Ventilation and Air Conditioning (HVAC) operations and maintenance. The HVAC program is designed to prepare participants for entry-level occupations as air conditioning, heating, and refrigeration technicians trained in the testing, servicing, and maintenance of commercial, industrial, and residential climate-control equipment. The program will include foundational curriculum, targeted recruitment of CB6 NYCHA residents, job connection support for entry-level careers in HVAC, and MetroCards. The anticipated timeline of the first cohort launch is early Fall 2024.
2024
Year: 2024 • Rezoning Area: Gowanus • Rezoning Policy Domain: Economic Development
Year
2024
Rezoning Area
Gowanus
Commitment Title
Create a “Gowanus Program Manager” position, which will oversee all business and workforce strategies related to the Gowanus rezoning.
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
In Progress
Statement From Source Document Poa
The position, housed at SBS, will provide a central contact point for businesses seeking assistance with compliance, business management, legal services, relocation resources from SBS and partnering organizations, promotion of industrial and arts businesses in the Gowanus IBZ, support for the workforce strategies listed below, and collaboration with the potential Gowanus Waterfront BID.
Original Schedule
2023 - 2027
Narrative
The Rezoning Manager position has been filled and is a part of the Intergovernmental Affairs (IGA) Team in the Executive Office. The Rezoning Manager reports to the Director of IGA and is responsible for facilitating coordination on the points of agreement, working with internal and external stakeholders, supporting outreach, and serves as the main point of contact to SBS for the Gowanus community.
2024
Year: 2024 • Rezoning Area: Gowanus • Commitment Title: Create a Gowanus Business Grant Program
Year
2024
Rezoning Area
Gowanus
Commitment Title
Create a Gowanus Business Grant Program
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
In Progress
Statement From Source Document Poa
• SBS will create a Gowanus Business Grant Program to assist businesses that are directly displaced and need to adapt to changes in the neighborhood. Each business will be eligible to receive grants of up to $50,000 per business. Relocation reimbursement grants will be disbursed on a rolling basis. SBS will coordinate with local community organizations and elected officials to conduct regular door-to-door outreach to notify all businesses along the corridor of these grant and loan programs. Businesses will be eligible to receive grants for approximately ten years from the adoption of the rezoning, and requests will be evaluated with SBS on a case-by-case basis thereafter.

• Gowanus Business Grant Eligibility Criteria:

• Business meets Small Business Administration (SBA) definition of small business.

• Business is operating in the neighborhood at the time of the adoption of the rezoning.

• Business can demonstrate direct business losses as a result of the rezoning (ex: manufacturing, etc.); and

• Business can present evidence of eligible relocation expenses incurred for reimbursement.
Original Schedule
2022 Start
Narrative
The Gowanus Business Relocation Grant will reimburse up to $50,000 in relocation expenses for eligible businesses that were directly displaced by the rezoning. SBS has published draft rules for business eligibility criteria, and anticipates promulgating a final rule in the coming months.



Business owners that suspect their business was directly displaced by the rezoning are encouraged to remain up-to-date on tax filings, maintain evidence of business loss, and keep documentation of relocation cost.
2024
Year: 2024 • Rezoning Area: Gowanus • Commitment Title: Deploy the SBS Mobile Unit to the Gowanus neighborhood monthly.
Year
2024
Rezoning Area
Gowanus
Commitment Title
Deploy the SBS Mobile Unit to the Gowanus neighborhood monthly.
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
In Progress
Statement From Source Document Poa
• The SBS Mobile Unit will provide small business services and workforce development services (such as application screenings and interviews with employers) on a regular basis. The City will coordinate with local Council Members on outreach strategies, deployment schedule, locations, and specific focus areas.
Original Schedule
2023-2025
Narrative
The SBS Mobile Outreach unit continues to provide small business and workforce services to residents through monthly Mobile Outreach Unit events in Gowanus. In FY24, the SBS outreach team reached over 600 jobseekers and entrepreneurs. This includes connecting residents to job training, job placement support, small business compliance, and M/WBE certification. SBS works with other city agencies, community partners, and the offices of Councilmember Restler and Councilmember Hanif to raise awareness of the services available in the neighborhood and provide additinal services.
2024
Year: 2024 • Rezoning Area: Gowanus • Commitment Title: Design and Deliver Workforce Training for Local Residents.
Year
2024
Rezoning Area
Gowanus
Commitment Title
Design and Deliver Workforce Training for Local Residents.
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
In Progress
Statement From Source Document Poa
• SBS commits to working with local partner(s) to design and deliver a comprehensive workforce development program(s) tailored to the need of local Gowanus residents. The program(s) will seek to prepare residents for high-paying, fast-growing fields like tech, healthcare, construction, and advanced manufacturing and will include bridge programming, job training, and placement. The program will also specifically target CB 6 NYCHA residents for participation.
Original Schedule
2023-2027
Narrative
SBS has launched the Apprentice NYC training program, with targeted recrtuiment of Gowanus and Brooklyn CD 6 NYCHA residents. The program will help New Yorkers develop in-demand skills in a high-growth occupation and connect them to apprenticeships such as CNC Machinists, Welders, and Industrial Mechanics. The program model will include introductory bridge programming, job skills training, transferable, and industry-recognized certification Certified Manufacturing Associate (CMfgA), job placement through apprenticeship employer partners, and MetroCards.
2024
Year: 2024 • Rezoning Area: Gowanus • Commitment Title: Support access to industrial sector jobs for Community Board 6 residents.
Year
2024
Rezoning Area
Gowanus
Commitment Title
Support access to industrial sector jobs for Community Board 6 residents.
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
In Progress
Statement From Source Document Poa
• SBS will provide funding to an experienced local provider for programing to support industrial job training for community members ages 18-25, particularly NYCHA residents. Such programming will seek to collaborate with local schools and institutions with vocational education to link with career pathways in growing industrial and sustainability-based sectors.
Original Schedule
2023-2025
Narrative
SBS has procured the recruitment partner, Soulful Synergy, to connect SBS residents to workforce training programs, and they are collaborating with training providers to develop a robust talent pipeline inclusive of Gowanus residents with a focus on Brooklyn Community Board 6, NYCHA residents, and young adults aged 18-25.
2024
Year: 2024 • Rezoning Area: Gowanus • Commitment Title: Support M/WBE businesses through city programming.
Year
2024
Rezoning Area
Gowanus
Commitment Title
Support M/WBE businesses through city programming.
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
Completed
Statement From Source Document Poa
• SBS conducts outreach to identify M/WBE businesses that provide goods and services aligned with the City's needs, assesses their eligibility for certification as an M/WBE, and connects them to business education, capacity building programs, individualized technical and financing assistance to help them compete for city contracts, perform on them successfully, and grow. SBS’s M/WBE business education workshops introduce firms to NYC procurement actors and processes and provide strategies for discovering and competing for City contracts. Additionally, they detail the formal steps of contract management and performance. Technical assistance services support MWBEs in creating and maintaining registrations needed to compete for City, state and federal contracts and ensure that technically responsive and appropriately-priced responses are submitted in response to RFPs and requests for bids. Capacity building programs help M/WBEs network deeply with their peers, provide opportunities for partnership and prepare firms to increase their contract size with high spend agencies through qualifying for bonding and pre-qualified lists.

SBS will work to connect Gowanus businesses to all M/WBE services. Working though the M/WBE Leadership Associations, SBS will conduct targeted outreach in the rezoning area. SBS will work to increase the number of certified firms in Gowanus by 50% by the close of FY23.
Original Schedule
2022 Start
Narrative
Although SBS did not meet the goal of increasing M/WBE certification by 50% by the end of June 2023, SBS continues to support any interested eligible entrepreneur get city-certified. SBS currently has over 200 M/WBE certified firms in the Gowanus zip codes and has businesses in the pipeline to become M/WBE certified.



In 2023, Michael Garner was appointed as the first citywide chief business diversity officer of the Mayor’s Office of M/WBE’s, and his leadership has changed SBS’ recruitment strategy to target industries that are well positioned to gain opportunities to perform City contracts.



Our Mobile Unit “Mobie” promotes M/WBE certification and M/WBE program services monthly in Gowanus. In addition, SBS conducts bi-weekly M/WBE Webinars for potential applicants. Outside of tabling during the Mobile Unit Outreach events, SBS has conducts door-to-door outreach in Gowanus to market and promotes M/WBE business services. SBS always welcomes partnerships with local organizations and businesses to promote M/WBE services.