NYC Rezoning Tracker

Pursuant to Local Law 175 of 2016, the City is responsible for publishing a list of capital and programmatic commitments associated with neighborhood-scale rezonings, and an annual progress report detailing the status of each initiative. These rezoning commitments are the product of comprehensive and community-driven planning processes in each neighborhood (East New York; Greater East Midtown; Downtown Far Rockaway; East Harlem; Jerome Avenue; and Inwood) and have been organized by policy domain (Housing; Open Space; Community Resources; Transportation; and Economic and Workforce Development).

City Government Mayor's Office of Operations (OPS) Dataset fd95-5ihz 10 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
2019
Year: 2019 • Rezoning Area: Jerome • Map Order: 32
Year
2019
Rezoning Area
Jerome
Commitment Title
Commit to fund current Capital Plan Identified Need in Community School Districts 9 and 10 in the next Capital Plan
Map Order
32
Rezoning Policy Domain
Community Resources
Lead Agency
SCHOOL CONSTRUCTION AUTHORITY (SCA)
Commitment Stage
Done with Ongoing Work
Statement From Source Document Poa
According to the November 2017 Amendment of the 2015-2019 SCA Capital Plan, CSD 9, Subdistrict 1 has an unfunded Identified Need of 572 seats. CSD 10, Subdistrict 4 has an unfunded Identified Need of 892 seats. The Administration commits to funding all currently unfunded Identified Needs in Districts 9 and 10 in the next Capital Plan.
Original Schedule
2020-2024
Narrative
SCA has identified funding in the proposed Fiscal 2020-2024 Capital Plan for Community School District 9, Subdistrict 1 and Community School District 10, Subdistrict 4.
2021
Year: 2021 • Rezoning Area: Jerome • Map Order: 32
Year
2021
Rezoning Area
Jerome
Commitment Title
Commit to fund current Capital Plan Identified Need in Community School Districts 9 and 10 in the next Capital Plan
Map Order
32
Rezoning Policy Domain
Community Resources
Lead Agency
SCHOOL CONSTRUCTION AUTHORITY (SCA)
Commitment Stage
Done with Ongoing Work
Statement From Source Document Poa
According to the November 2017 Amendment of the 2015-2019 SCA Capital Plan, CSD 9, Subdistrict 1 has an unfunded Identified Need of 572 seats. CSD 10, Subdistrict 4 has an unfunded Identified Need of 892 seats. The Administration commits to funding all currently unfunded Identified Needs in Districts 9 and 10 in the next Capital Plan.
Original Schedule
2020-2024
Narrative
SCA has identified funding in the proposed Fiscal Years 2020-2024 Capital Plan for Community School District 9, Subdistrict 1 and Community School District 10, Subdistrict 4. SCA has fully funded the seat need in these districts. Both projects within these districts are underway.
2022
Year: 2022 • Rezoning Area: Jerome • Map Order: 32
Year
2022
Rezoning Area
Jerome
Commitment Title
Commit to fund current Capital Plan Identified Need in Community School Districts 9 and 10 in the next Capital Plan
Map Order
32
Rezoning Policy Domain
Community Resources
Lead Agency
SCHOOL CONSTRUCTION AUTHORITY (SCA)
Commitment Stage
Done with Ongoing Work
Statement From Source Document Poa
According to the November 2017 Amendment of the 2015-2019 SCA Capital Plan, CSD 9, Subdistrict 1 has an unfunded Identified Need of 572 seats. CSD 10, Subdistrict 4 has an unfunded Identified Need of 892 seats. The Administration commits to funding all currently unfunded Identified Needs in Districts 9 and 10 in the next Capital Plan.
Original Schedule
2020-2024
Narrative
SCA has identified funding in the proposed Fiscal Years 2020-2024 Capital Plan for Community School District 9, Subdistrict 1 and Community School District 10, Subdistrict 4. SCA has fully funded the seat need in these districts. Both projects within these districts are underway.
2021
Year: 2021 • Rezoning Area: Bay Street • Commitment Title: Commitment to good jobs in the rezoning area
Year
2021
Rezoning Area
Bay Street
Commitment Title
Commitment to good jobs in the rezoning area
Map Order
64
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
In Progress
Statement From Source Document Poa
As part of the Administration's commitment to responsible development and good jobs, the City
has developed a set of standards that will apply within the geographic boundaries of Cityinitiated
rezoning areas in New York City neighborhoods that are rezoned after January 1, 2016.
These standards require that prevailing wages will be required for all building service workers
employed in new and existing buildings containing at least 30 units where the owner has
received or will receive one million dollars or more in public financial assistance, or new
buildings containing at least 30 units on City-owned property that is sold, leased or developed
pursuant to an RFP.
Original Schedule
Ongoing
Narrative
Leading up to March 2020, recruitment was ongoing for positions at the Empire Outlets through the Workforce 1 Career Center at 120 Stuyvesant Place. Due to the COVID19 pandemic, the Staten Island Workforce 1 Career Center is now operating virtually. Through the virtual Workforce 1 Career Center system, SBS is able to connect with local residents via web or phone to provide consultation and one-on-one help from professionals who can help identify jobs that match experience and skills, prepare for interviews, and offer access to free trainings.
2022
Year: 2022 • Rezoning Area: Bay Street • Commitment Title: Commitment to good jobs in the rezoning area
Year
2022
Rezoning Area
Bay Street
Commitment Title
Commitment to good jobs in the rezoning area
Map Order
64
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
In Progress
Statement From Source Document Poa
As part of the Administration's commitment to responsible development and good jobs, the City
has developed a set of standards that will apply within the geographic boundaries of Cityinitiated
rezoning areas in New York City neighborhoods that are rezoned after January 1, 2016.
These standards require that prevailing wages will be required for all building service workers
employed in new and existing buildings containing at least 30 units where the owner has
received or will receive one million dollars or more in public financial assistance, or new
buildings containing at least 30 units on City-owned property that is sold, leased or developed
pursuant to an RFP.
Original Schedule
Ongoing
Narrative
Leading up to March 2020, recruitment was ongoing for positions at the Empire Outlets through the Workforce 1 Career Center at 120 Stuyvesant Place. Due to the COVID19 pandemic, the Staten Island Workforce 1 Career Center is now operating virtually. Through the virtual Workforce 1 Career Center system, SBS is able to connect with local residents via web or phone to provide consultation and one-on-one help from professionals who can help identify jobs that match experience and skills, prepare for interviews, and offer access to free trainings.
2018
Year: 2018 • Rezoning Area: Far Rockaway • Commitment Title: Complete Commercial District Needs Assessment, including BID feasibility study
Year
2018
Rezoning Area
Far Rockaway
Commitment Title
Complete Commercial District Needs Assessment, including BID feasibility study
Map Order
45
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
Done
Statement From Source Document Poa
SBS will conduct a Commercial District Needs Assessment (CDNA) to look at the existing storefront business landscape in the neighborhood, including the retail vacancy rate, retail mix, retail leakage, physical conditions, and unique character of the commercial corridors and local businesses.
Original Schedule
2017-2018
Narrative
A Commercial District Needs Assessment (CDNA) is a tool aimed at helping SBS and our local partners gain an in-depth and comprehensive understanding of the current strengths, needs, challenges, and opportunities of neighborhood commercial corridors. SBS will conduct a CDNA of Downtown Far Rockaway in partnership with local organizations and the Councilmember's Office. SBS anticipates that the CDNA will begin in Summer 2018. The CDNA will highlight the neighborhood's business landscape, consumer characteristics, physical environment, and demographic data. Examples of completed CDNAs can be found at www.nyc.gov/neighborhood360.
2019
Year: 2019 • Rezoning Area: Far Rockaway • Commitment Title: Complete Commercial District Needs Assessment, including BID feasibility study
Year
2019
Rezoning Area
Far Rockaway
Commitment Title
Complete Commercial District Needs Assessment, including BID feasibility study
Map Order
45
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
Done
Statement From Source Document Poa
SBS will conduct a Commercial District Needs Assessment (CDNA) to look at the existing storefront business landscape in the neighborhood, including the retail vacancy rate, retail mix, retail leakage, physical conditions, and unique character of the commercial corridors and local businesses.
Original Schedule
2017-2018
Narrative
The Commercial District Needs Assessment was conducted between November 2018 and May 2019. Merchant and consumer surveys were conducted through the end of March. Data collection was completed on April 15. A merchant and consumer workshop was held on April 25 hosted by community partners where SBS presented on the preliminary findings of the Commercial District Needs Assessment. Merchants and consumers were engaged to participate in a strategy generation exercise to address issues in Downtown Far Rockaway. SBS, along with other city agencies, presented to Councilmember Richards' Communiity Working Group on April 30 and presented to Community Board 14 on May 14. SBS hosted a second merchant and consumer workshop on May 30. The final report is scheduled to be released in the summer 2019. The final report and Downtown Far Rockaway N360° Grant is scheduled to be released in the summer of 2019.
2021
Year: 2021 • Rezoning Area: Far Rockaway • Commitment Title: Complete Commercial District Needs Assessment, including BID feasibility study
Year
2021
Rezoning Area
Far Rockaway
Commitment Title
Complete Commercial District Needs Assessment, including BID feasibility study
Map Order
45
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
Done
Statement From Source Document Poa
SBS will conduct a Commercial District Needs Assessment (CDNA) to look at the existing storefront business landscape in the neighborhood, including the retail vacancy rate, retail mix, retail leakage, physical conditions, and unique character of the commercial corridors and local businesses.
Original Schedule
2017-2018
Narrative
The Commercial District Needs Assessment was conducted between November 2018 and May 2019. The final report was released in the summer of 2019. You can view the report here. https://www1.nyc.gov/assets/sbs/downloads/pdf/neighborhoods/n360-cdna-downtownfarrockaway.pdf
2022
Year: 2022 • Rezoning Area: Far Rockaway • Commitment Title: Complete Commercial District Needs Assessment, including BID feasibility study
Year
2022
Rezoning Area
Far Rockaway
Commitment Title
Complete Commercial District Needs Assessment, including BID feasibility study
Map Order
45
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
Done
Statement From Source Document Poa
SBS will conduct a Commercial District Needs Assessment (CDNA) to look at the existing storefront business landscape in the neighborhood, including the retail vacancy rate, retail mix, retail leakage, physical conditions, and unique character of the commercial corridors and local businesses.
Original Schedule
2017-2018
Narrative
The Commercial District Needs Assessment was conducted between November 2018 and May 2019. The final report was released in the summer of 2019. You can view the report here. https://www1.nyc.gov/assets/sbs/downloads/pdf/neighborhoods/n360-cdna-downtownfarrockaway.pdf
2019
Year: 2019 • Rezoning Area: Jerome • Commitment Title: Complete PS 33 Annex
Year
2019
Rezoning Area
Jerome
Commitment Title
Complete PS 33 Annex
Map Order
30
Rezoning Policy Domain
Community Resources
Lead Agency
SCHOOL CONSTRUCTION AUTHORITY (SCA)
Commitment Stage
Done
Statement From Source Document Poa
The PS 33 annex will add 388 much-needed elementary school seats to District 10. This new annex is anticipated to be completed by September 2021.
Original Schedule
2019 - Fall 2021
Narrative
SCA has named a General Contractor for the PS 33 Annex, which will add 388 much-needed elementary seats to District 10. The new annex is anticipated to be completed by September 2021.
2021
Year: 2021 • Rezoning Area: Jerome • Commitment Title: Complete PS 33 Annex
Year
2021
Rezoning Area
Jerome
Commitment Title
Complete PS 33 Annex
Map Order
30
Rezoning Policy Domain
Community Resources
Lead Agency
SCHOOL CONSTRUCTION AUTHORITY (SCA)
Commitment Stage
Done
Statement From Source Document Poa
The PS 33 annex will add 388 much-needed elementary school seats to District 10. This new annex is anticipated to be completed by September 2021.
Original Schedule
2019 - Fall 2021
Narrative
The PS 33 Annex will add 388 much-needed elementary seats to District 10. Occupancy is expected by September 2021.
2022
Year: 2022 • Rezoning Area: Jerome • Commitment Title: Complete PS 33 Annex
Year
2022
Rezoning Area
Jerome
Commitment Title
Complete PS 33 Annex
Map Order
30
Rezoning Policy Domain
Community Resources
Lead Agency
SCHOOL CONSTRUCTION AUTHORITY (SCA)
Commitment Stage
Done
Statement From Source Document Poa
The PS 33 annex will add 388 much-needed elementary school seats to District 10. This new annex is anticipated to be completed by September 2021.
Original Schedule
2019 - Fall 2021
Narrative
This project is complete.
2017
Year: 2017 • Rezoning Area: East New York • Commitment Title: Complete streetscape enhancement projects along commercial corridors
Year
2017
Rezoning Area
East New York
Commitment Title
Complete streetscape enhancement projects along commercial corridors
Map Order
41
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
Done with Ongoing Work
Statement From Source Document Poa
Statement from Source: Capital funding will be made available for streetscape enhancement projects that could include additional street lighting, benches, bike racks, street trees and planters, improved sanitation and corner garbage bins, wayfinding, identity banners and other placemaking initiatives developed by local stakeholders. Capital Funding: $500k
Original Schedule
2016-ongoing
Narrative
A portion of Neighborhood 360° grant funding to the Cypress Hills LDC and the LDC of East New York will cover streetscape enhancements that create a cleaner, more inviting environment for local businesses and the people they serve. These upgrades, which will be completed between 2017 and 2020, will include improved sanitation, new sidewalk planters and garbage bins, and banners and neighborhood events that promote small businesses. SBS will use the East New York CDNA and input from Neighborhood 360° grantees to guide additional streetscape improvements for neighborhood commercial corridors.
2018
Year: 2018 • Rezoning Area: East New York • Commitment Title: Complete streetscape enhancement projects along commercial corridors
Year
2018
Rezoning Area
East New York
Commitment Title
Complete streetscape enhancement projects along commercial corridors
Map Order
41
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
Done with Ongoing Work
Statement From Source Document Poa
Statement from Source: Capital funding will be made available for streetscape enhancement projects that could include additional street lighting, benches, bike racks, street trees and planters, improved sanitation and corner garbage bins, wayfinding, identity banners and other placemaking initiatives developed by local stakeholders. Capital Funding: $500k
Original Schedule
2016-ongoing
Narrative
To create a cleaner, more inviting environment for local businesses and the people they serve, a portion of SBS's Neighborhood 360 grant funding in East New York will focus on streetscape enhancements. These upgrades, which will be completed between 2018 and 2020, will include supplemental sanitation services, new sidewalk planters, garbage bins, district banners, and neighborhood events that promote local small businesses. So far, 62 upgraded garbage bins have been placed on various corners along Fulton Street and Liberty Avenue to help keep the corridor clean.
2019
Year: 2019 • Rezoning Area: East New York • Commitment Title: Complete streetscape enhancement projects along commercial corridors
Year
2019
Rezoning Area
East New York
Commitment Title
Complete streetscape enhancement projects along commercial corridors
Map Order
41
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
Done with Ongoing Work
Statement From Source Document Poa
Statement from Source: Capital funding will be made available for streetscape enhancement projects that could include additional street lighting, benches, bike racks, street trees and planters, improved sanitation and corner garbage bins, wayfinding, identity banners and other placemaking initiatives developed by local stakeholders. Capital Funding: $500k
Original Schedule
2016-ongoing
Narrative
To create a more inviting environment for local businesses and the people they serve, a portion of SBS's Neighborhood 360 grant funding in East New York focuses on streetscape enhancements. Streetscape improvements will include new sidewalk planters and signage that will be installed in tree pits on Liberty Avenue by the end of Fiscal Year 2019, district-wide banners will begin installation in Fiscal Year 2019, and 62 upgraded garbage bins have been placed on various corners along Fulton Street and Liberty Avenue to help keep the corridor clean.
2021
Year: 2021 • Rezoning Area: East New York • Commitment Title: Complete streetscape enhancement projects along commercial corridors
Year
2021
Rezoning Area
East New York
Commitment Title
Complete streetscape enhancement projects along commercial corridors
Map Order
41
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
Done with Ongoing Work
Statement From Source Document Poa
Statement from Source: Capital funding will be made available for streetscape enhancement projects that could include additional street lighting, benches, bike racks, street trees and planters, improved sanitation and corner garbage bins, wayfinding, identity banners and other placemaking initiatives developed by local stakeholders. Capital Funding: $500k
Original Schedule
2016-ongoing
Narrative
To create a more inviting environment for local businesses and the people they serve, a portion of SBS's Neighborhood 360 grant funding in East New York focuses on streetscape enhancements. Streetscape improvements included new sidewalk planters and signage that were installed in tree pits on Liberty Avenue in Fiscal Year 2019, district-wide banners began installation in Fiscal Year 2019, and 62 upgraded garbage bins have been placed on various corners along Fulton Street and Liberty Avenue to help keep the corridor clean.
2022
Year: 2022 • Rezoning Area: East New York • Commitment Title: Complete streetscape enhancement projects along commercial corridors
Year
2022
Rezoning Area
East New York
Commitment Title
Complete streetscape enhancement projects along commercial corridors
Map Order
41
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
Done with Ongoing Work
Statement From Source Document Poa
Statement from Source: Capital funding will be made available for streetscape enhancement projects that could include additional street lighting, benches, bike racks, street trees and planters, improved sanitation and corner garbage bins, wayfinding, identity banners and other placemaking initiatives developed by local stakeholders. Capital Funding: $500k
Original Schedule
2016-ongoing
Narrative
To create a more inviting environment for local businesses and the people they serve, a portion of SBS's Neighborhood 360 grant funding in East New York focuses on streetscape enhancements. Streetscape improvements included new sidewalk planters and signage that were installed in tree pits on Liberty Avenue in Fiscal Year 2019, district-wide banners began installation in Fiscal Year 2019, and 62 upgraded garbage bins have been placed on various corners along Fulton Street and Liberty Avenue to help keep the corridor clean.
2019
Year: 2019 • Rezoning Area: Inwood • Commitment Title: Complete the Broadway Bridge Rehabilitation
Year
2019
Rezoning Area
Inwood
Commitment Title
Complete the Broadway Bridge Rehabilitation
Map Order
66
Rezoning Policy Domain
Transportation & Infrastructure
Lead Agency
DEPARTMENT OF TRANSPORTATION (DOT)
Commitment Stage
In Progress
Statement From Source Document Poa
The current Broadway Bridge opened to traffic in 1962. In addition to the roadway and sidewalks, it also carries the #1 train. Capital plans for major rehabilitation work include repairing deteriorated steel members, replacing the roadway deck, and adding a solid-surface bike lane. Mechanical and electrical work will be done on the bridge's lift system including: replacing the current underwater control cables with droop cables hung between the towers. Each tower will get new electric service as well as auxiliary generators.
Original Schedule
Winter 2019 Construction
Narrative
DOT awarded the contract to perform bridge improvements and issued the formal Notice to Proceed to the contractor in September 2018. DOT also assigned a Community Liaison for the project who has begun public outreach in both Manhattan and the Bronx. Preparations for construction are underway with work scheduled to begin later in 2019.
2021
Year: 2021 • Rezoning Area: Inwood • Commitment Title: Complete the Broadway Bridge Rehabilitation
Year
2021
Rezoning Area
Inwood
Commitment Title
Complete the Broadway Bridge Rehabilitation
Map Order
66
Rezoning Policy Domain
Transportation & Infrastructure
Lead Agency
DEPARTMENT OF TRANSPORTATION (DOT)
Commitment Stage
In Progress
Statement From Source Document Poa
The current Broadway Bridge opened to traffic in 1962. In addition to the roadway and sidewalks, it also carries the #1 train. Capital plans for major rehabilitation work include repairing deteriorated steel members, replacing the roadway deck, and adding a solid-surface bike lane. Mechanical and electrical work will be done on the bridge's lift system including: replacing the current underwater control cables with droop cables hung between the towers. Each tower will get new electric service as well as auxiliary generators.
Original Schedule
Winter 2019 Construction
Narrative
The current Broadway Bridge opened to traffic in 1962. In addition to the roadway and sidewalks, it also carries the 1 train. Capital plans for major rehabilitation work include repairing deteriorated steel members, replacing the roadway deck, and adding a solid-surface bike lane. DOT awarded the contract to perform bridge improvements and issued the formal Notice to Proceed to the contractor in September 2018. DOT also assigned a Community Liaison for the project who has begun public outreach in both Manhattan and the Bronx. The first phase of construction began this winter. DOT is coordinating with the community regarding traffic and outreach for project information.
2022
Year: 2022 • Rezoning Area: Inwood • Commitment Title: Complete the Broadway Bridge Rehabilitation
Year
2022
Rezoning Area
Inwood
Commitment Title
Complete the Broadway Bridge Rehabilitation
Map Order
66
Rezoning Policy Domain
Transportation & Infrastructure
Lead Agency
DEPARTMENT OF TRANSPORTATION (DOT)
Commitment Stage
In Progress
Statement From Source Document Poa
The current Broadway Bridge opened to traffic in 1962. In addition to the roadway and sidewalks, it also carries the #1 train. Capital plans for major rehabilitation work include repairing deteriorated steel members, replacing the roadway deck, and adding a solid-surface bike lane. Mechanical and electrical work will be done on the bridge's lift system including: replacing the current underwater control cables with droop cables hung between the towers. Each tower will get new electric service as well as auxiliary generators.
Original Schedule
Winter 2019 Construction
Narrative
The current Broadway Bridge opened to traffic in 1962. In addition to the roadway and sidewalks, it also carries the 1 train. Capital plans for major rehabilitation work include repairing deteriorated steel members, replacing the roadway deck, and adding a solid-surface bike lane. DOT awarded the contract to perform bridge improvements and issued the formal Notice to Proceed to the contractor in September 2018. DOT also assigned a Community Liaison for the project who has begun public outreach in both Manhattan and the Bronx. The first phase of construction began this winter. DOT is coordinating with the community regarding traffic and outreach for project information.
2025
Year: 2025 • Rezoning Area: Gowanus • Commitment Title: Enhance the Old Stone House by upgrading facilities and improving accessibility.
Year
2025
Rezoning Area
Gowanus
Commitment Title
Enhance the Old Stone House by upgrading facilities and improving accessibility.
Map Order
24
Rezoning Policy Domain
Community Resources
Lead Agency
DEPARTMENT OF PARKS AND RECREATION (DPR)
Commitment Stage
In Progress
Statement From Source Document Poa
• Parks will improve ADA access to the Old Stone House, a historic cultural and civic hub located in Washington Park, and expand access to programming and ancillary spaces by constructing an elevator, a new staircase, and public restrooms within an extension on the north side of the building.
Original Schedule
2023 Start
Narrative
Design completion expected in Fall 2025.
2021
Year: 2021 • Rezoning Area: Bay Street • Commitment Title: Complete the Tompkinsville Esplanade
Year
2021
Rezoning Area
Bay Street
Commitment Title
Complete the Tompkinsville Esplanade
Map Order
28
Rezoning Policy Domain
Open Space
Lead Agency
ECONOMIC DEVELOPMENT CORPORATION (EDC)
Commitment Stage
In Progress
Statement From Source Document Poa
EDC will complete design and construction of a new esplanade along the Tompkinsville portion
of the waterfront, closing the half mile gap that exists between the new waterfront open space
16
at New Stapleton Waterfront and Lighthouse Point. Work will also include resiliency measures,
including shoreline stabilization and repair, as well as debris removal. The work will be
coordinated with the esplanade constructed in the northern phase of New Stapleton
Waterfront.
EDC will engage with the community during the design process to understand priorities and
gather feedback on the proposed project and amenities. As part of that process, NYCEDC will
explore design of a fish cleaning station.
Original Schedule
2020-2023
Narrative
EDC started design work of the new esplanade along the Tompkinsville portion of the waterfront in fall 2019. This project will close the half-mile gap that exists between the new waterfront open space at New Stapleton Waterfront and Lighthouse Point. Work also includes resiliency measures, including shoreline stabilization and repair, as well as debris removal. The work will be coordinated with the esplanade constructed in the northern phase of New Stapleton Waterfront.The design and construction of the infrastructure were put on hold until January 2021. Design work resumed in February 2021.
2022
Year: 2022 • Rezoning Area: Bay Street • Commitment Title: Complete the Tompkinsville Esplanade
Year
2022
Rezoning Area
Bay Street
Commitment Title
Complete the Tompkinsville Esplanade
Map Order
28
Rezoning Policy Domain
Open Space
Lead Agency
ECONOMIC DEVELOPMENT CORPORATION (EDC)
Commitment Stage
In Progress
Statement From Source Document Poa
EDC will complete design and construction of a new esplanade along the Tompkinsville portion
of the waterfront, closing the half mile gap that exists between the new waterfront open space
16
at New Stapleton Waterfront and Lighthouse Point. Work will also include resiliency measures,
including shoreline stabilization and repair, as well as debris removal. The work will be
coordinated with the esplanade constructed in the northern phase of New Stapleton
Waterfront.
EDC will engage with the community during the design process to understand priorities and
gather feedback on the proposed project and amenities. As part of that process, NYCEDC will
explore design of a fish cleaning station.
Original Schedule
2020-2023
Narrative
EDC started design work of the new esplanade along the Tompkinsville portion of the waterfront in fall 2019. This project will close the half-mile gap that exists between the new waterfront open space at New Stapleton Waterfront and Lighthouse Point. Work also includes resiliency measures, including shoreline stabilization and repair, as well as debris removal. The work will be coordinated with the esplanade constructed in the northern phase of New Stapleton Waterfront.The design and construction of the infrastructure were put on hold until January 2021. Design work resumed in February 2021. Project is in final design, and schedule is to certify into ULURP in the first quarter of 2023.
2022
Year: 2022 • Rezoning Area: Gowanus • Map Order: 41
Year
2022
Rezoning Area
Gowanus
Commitment Title
Comply with EPA’s timeline for constructing CSO retention tanks as mandated in Gowanus Superfund ROD.
Map Order
41
Rezoning Policy Domain
Transportation & Infrastructure
Lead Agency
DEPARTMENT OF ENVIRONMENTAL PROTECTION (DEP)
Commitment Stage
Not Started
Statement From Source Document Poa
• The City has been complying with the Order by performing the CSO design and CSO remedial action work required by the Order, as well as the removal action for design and construction of a bulkhead at property owned by the City where the OH-007 CSO tank will be constructed. The City continues to advance the design, removal and remedial action work required by the Order. While the City will comply with the Order, it must ensure that the specific milestones are feasible and will continue to discuss those issues with the EPA.
Original Schedule
TBD
Narrative
The City has been complying with the Order by performing the CSO design and CSO remedial action work required by the Order, as well as the removal action for design and construction of a bulkhead at property owned by the City where the OH-007 CSO tank will be constructed. The City continues to advance the design, removal and remedial action work required by the Order. While the City will comply with the Order, it must ensure that the specific milestones are feasible and will continue to discuss those issues with the EPA.
2017
Year: 2017 • Rezoning Area: East New York • Commitment Title: Conduct a commercial district needs assessment of ENY retail corridors
Year
2017
Rezoning Area
East New York
Commitment Title
Conduct a commercial district needs assessment of ENY retail corridors
Map Order
40
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
Done
Statement From Source Document Poa
SBS is currently working in partnership with the Cypress Hills Local Development Corporation, the Local Development Corporation of East New York, and Highland Park Community Development Corporation to conduct a Commercial District Needs Assessment (CDNA) of the Fulton, Atlantic, Liberty, and Pitkin Avenue commercial corridors. CDNA includes analysis of community capacity, physical environment, business environment, and market and demographic data to help SBS and its partners better understand the needs of local commercial corridors and develop ground-up recommendations to foster a healthy local retail mix. The results of this assessment will be published later this year in the form of an East New York commercial district profile coproduced by East New York partner organizations. Following results from the commercial district needs assessment, SBS will develop a work plan with local stakeholders to align SBS, City, and community resources with the needs of the East New York's commercial corridors.
(....)
Timeline: CDNA completion and competitive funding to local groups in Summer 2016

Please see notes for full details
Original Schedule
2016
Narrative
The NYC Department of Small Business Services (SBS) worked in partnership with the Cypress Hills LDC, the LDC of East New York, and the Highland Park CDC to conduct a Neighborhood 360° Commercial District Needs Assessment (CDNA) of the Fulton Street, Atlantic Avenue, Liberty Avenue, and Pitkin Avenue commercial corridors. The CDNA, conducted between December 2015 and May 2016, highlights East New York's business landscape and consumer characteristics to help SBS and its partners better understand the needs of local commercial corridors. In October 2016, SBS published the results of the assessment, which can be found at nyc.gov/neighborhood360. The results, based on 239 surveys and various stakeholder meetings with neighborhood merchants, shoppers, workers, property owners, and residents, provide insight into existing conditions, business data, and opportunities for improvement. The CDNA will help SBS determine how it prioritizes local investments and serve as an informational and marketing resource for the neighborhood. Its findings informed how SBS awarded competitive Neighborhood 360° grant funding to nonprofits for commerical revitalization services in East New York.
2018
Year: 2018 • Rezoning Area: East New York • Commitment Title: Conduct a commercial district needs assessment of ENY retail corridors
Year
2018
Rezoning Area
East New York
Commitment Title
Conduct a commercial district needs assessment of ENY retail corridors
Map Order
40
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
Done
Statement From Source Document Poa
SBS is currently working in partnership with the Cypress Hills Local Development Corporation, the Local Development Corporation of East New York, and Highland Park Community Development Corporation to conduct a Commercial District Needs Assessment (CDNA) of the Fulton, Atlantic, Liberty, and Pitkin Avenue commercial corridors. CDNA includes analysis of community capacity, physical environment, business environment, and market and demographic data to help SBS and its partners better understand the needs of local commercial corridors and develop ground-up recommendations to foster a healthy local retail mix. The results of this assessment will be published later this year in the form of an East New York commercial district profile coproduced by East New York partner organizations. Following results from the commercial district needs assessment, SBS will develop a work plan with local stakeholders to align SBS, City, and community resources with the needs of the East New York's commercial corridors.
(....)
Timeline: CDNA completion and competitive funding to local groups in Summer 2016

Please see notes for full details
Original Schedule
2016
Narrative
SBS worked in partnership with the Cypress Hills LDC, the LDC of East New York, and the Highland Park CDC to conduct a Commercial District Needs Assessment (CDNA) of the Fulton, Atlantic, Liberty, and Pitkin Avenue corridors. A CDNA is a tool aimed at helping SBS and our local partners gain an in-depth and comprehensive understanding of the current strengths, needs, challenges, and opportunities of neighborhood commercial corridors.

The East New York CDNA, published in October 2016, highlights the neighborhood's business landscape, consumer characteristics, physical environment, and demographic data. The information identified in the CDNA informed how SBS awarded the competitive Neighborhood 360 grant funding for East New York non-profits to develop customized commercial revitalization initiatives.

The full report can be found at www.nyc.gov/neighborhood360.
2022
Year: 2022 • Rezoning Area: Inwood • Commitment Title: Water main and sanitary sewer replacement in northwestern Inwood
Year
2022
Rezoning Area
Inwood
Commitment Title
Water main and sanitary sewer replacement in northwestern Inwood
Map Order
69
Rezoning Policy Domain
Transportation & Infrastructure
Lead Agency
DEPARTMENT OF ENVIRONMENTAL PROTECTION (DEP)
Commitment Stage
In Progress
Statement From Source Document Poa
DDC will continue to implement the project to replace sanitary sewer and water mains in the northwestern portion of Inwood. The project includes distribution water main and sanitary sewer replacements in the area generally bounded by Park Terrace East and West and West 214th and 218th Streets.
Original Schedule
2017-2020 (Construction)
Narrative
A project to replace sanitary sewers and water mains (SEN002157) is in construction with a projected completion of June 2022.
2019
Year: 2019 • Rezoning Area: East New York • Commitment Title: Conduct a commercial district needs assessment of ENY retail corridors
Year
2019
Rezoning Area
East New York
Commitment Title
Conduct a commercial district needs assessment of ENY retail corridors
Map Order
40
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
Done
Statement From Source Document Poa
SBS is currently working in partnership with the Cypress Hills Local Development Corporation, the Local Development Corporation of East New York, and Highland Park Community Development Corporation to conduct a Commercial District Needs Assessment (CDNA) of the Fulton, Atlantic, Liberty, and Pitkin Avenue commercial corridors. CDNA includes analysis of community capacity, physical environment, business environment, and market and demographic data to help SBS and its partners better understand the needs of local commercial corridors and develop ground-up recommendations to foster a healthy local retail mix. The results of this assessment will be published later this year in the form of an East New York commercial district profile coproduced by East New York partner organizations. Following results from the commercial district needs assessment, SBS will develop a work plan with local stakeholders to align SBS, City, and community resources with the needs of the East New York's commercial corridors.
(....)
Timeline: CDNA completion and competitive funding to local groups in Summer 2016

Please see notes for full details
Original Schedule
2016
Narrative
SBS worked in partnership with the Cypress Hills LCD, the LDC of East New York, and the Highland Park CDC to conduct a Commercial District Needs Assessment (CDNA) of the Fulton, Atlantic, Liberty, and Pitkin Avenue corridors. A CDNA is a tool aimed at helping community organizations gain an in-depth and comprehensive understanding of the current strengths, needs, challenges, and opportunities of neighborhood commercial corridors. The East New York CDNA was published in October 2016 and highlights the neighborhood's business landscape, consumer characteristics, physical environment, and demographic data, and informed the subsequent Neighborhood 360 programming.
The full report can be found at www.nyc.gov/neighborhood360.
2021
Year: 2021 • Rezoning Area: East New York • Commitment Title: Conduct a commercial district needs assessment of ENY retail corridors
Year
2021
Rezoning Area
East New York
Commitment Title
Conduct a commercial district needs assessment of ENY retail corridors
Map Order
40
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
Done
Statement From Source Document Poa
SBS is currently working in partnership with the Cypress Hills Local Development Corporation, the Local Development Corporation of East New York, and Highland Park Community Development Corporation to conduct a Commercial District Needs Assessment (CDNA) of the Fulton, Atlantic, Liberty, and Pitkin Avenue commercial corridors. CDNA includes analysis of community capacity, physical environment, business environment, and market and demographic data to help SBS and its partners better understand the needs of local commercial corridors and develop ground-up recommendations to foster a healthy local retail mix. The results of this assessment will be published later this year in the form of an East New York commercial district profile coproduced by East New York partner organizations. Following results from the commercial district needs assessment, SBS will develop a work plan with local stakeholders to align SBS, City, and community resources with the needs of the East New York's commercial corridors.
(....)
Timeline: CDNA completion and competitive funding to local groups in Summer 2016

Please see notes for full details
Original Schedule
2016
Narrative
SBS worked in partnership with the Cypress Hills LCD, the LDC of East New York, and the Highland Park CDC to conduct a Commercial District Needs Assessment (CDNA) of the Fulton, Atlantic, Liberty, and Pitkin Avenue corridors. A CDNA is a tool aimed at helping community organizations gain an in-depth and comprehensive understanding of the current strengths, needs, challenges, and opportunities of neighborhood commercial corridors. The East New York CDNA was published in October 2016 and highlights the neighborhood's business landscape, consumer characteristics, physical environment, and demographic data, and informed the subsequent Neighborhood 360 programming. The full report can be found at www.nyc.gov/neighborhood360.
2022
Year: 2022 • Rezoning Area: East New York • Commitment Title: Conduct a commercial district needs assessment of ENY retail corridors
Year
2022
Rezoning Area
East New York
Commitment Title
Conduct a commercial district needs assessment of ENY retail corridors
Map Order
40
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
Done
Statement From Source Document Poa
SBS is currently working in partnership with the Cypress Hills Local Development Corporation, the Local Development Corporation of East New York, and Highland Park Community Development Corporation to conduct a Commercial District Needs Assessment (CDNA) of the Fulton, Atlantic, Liberty, and Pitkin Avenue commercial corridors. CDNA includes analysis of community capacity, physical environment, business environment, and market and demographic data to help SBS and its partners better understand the needs of local commercial corridors and develop ground-up recommendations to foster a healthy local retail mix. The results of this assessment will be published later this year in the form of an East New York commercial district profile coproduced by East New York partner organizations. Following results from the commercial district needs assessment, SBS will develop a work plan with local stakeholders to align SBS, City, and community resources with the needs of the East New York's commercial corridors.
(....)
Timeline: CDNA completion and competitive funding to local groups in Summer 2016

Please see notes for full details
Original Schedule
2016
Narrative
SBS worked in partnership with the Cypress Hills LCD, the LDC of East New York, and the Highland Park CDC to conduct a Commercial District Needs Assessment (CDNA) of the Fulton, Atlantic, Liberty, and Pitkin Avenue corridors. A CDNA is a tool aimed at helping community organizations gain an in-depth and comprehensive understanding of the current strengths, needs, challenges, and opportunities of neighborhood commercial corridors. The East New York CDNA was published in October 2016 and highlights the neighborhood's business landscape, consumer characteristics, physical environment, and demographic data, and informed the subsequent Neighborhood 360 programming. The full report can be found at www.nyc.gov/neighborhood360.
2022
Year: 2022 • Rezoning Area: Gowanus • Map Order: 32
Year
2022
Rezoning Area
Gowanus
Commitment Title
Conduct a study of traffic circulation in IBZ/3rd Avenue and additional improvements.
Map Order
32
Rezoning Policy Domain
Transportation & Infrastructure
Lead Agency
DEPARTMENT OF TRANSPORTATION (DOT)
Commitment Stage
Not Started
Statement From Source Document Poa
DOT commits to a study of 3rd Avenue from 9th St to Hamilton Avenue/16th Street near the entrance to the Gowanus Expressway. The study will also evaluate the broader IBZ to improve loading zones for local industrial businesses, and improvements to the Gowanus Underpass crossing of Hamilton Ave. DOT will work to implement appropriate treatments that the study identifies. The listening session early in the planning process will include institutional, industry, and community stakeholders.
Original Schedule
2022 Start
Narrative
Scope of work for traffic analysis under development.
2017
Year: 2017 • Rezoning Area: East New York • Map Order: 51
Year
2017
Rezoning Area
East New York
Commitment Title
Conduct a study to identify opportunities to bring regional-scale uses to Broadway Junction. Conduct a land use study of the IBZ to identify opportunities to densify industrial uses along key corridors.
Map Order
51
Rezoning Policy Domain
Economic Development
Lead Agency
ECONOMIC DEVELOPMENT CORPORATION (EDC)
Commitment Stage
Done
Statement From Source Document Poa
DCP, together with NYCEDC, will conduct a follow-up study of Broadway Junction. To support this study, NYCEDC is prepared to commit resources to fund a real estate/planning consultant. Acknowledging the significant role of the MTA in this area, the scope of the study will be informed by further coordination with the MTA. In order to successfully start the Broadway Junction work, DCP requires the final recommendations of the North Brooklyn study and complete public review of the IBZ hotel and self-storage zoning text proposal. These elements inform the commitment to begin this study in the second quarter of 2017.
Timeline: DCP and NYCEDC would commence stakeholder engagement in support of this planning effort in the second quarter of 2017.
Original Schedule
2017-2020
Narrative
The City is currently exploring new models for innovation districts to support 21st century businesses and jobs, with opportunities for a mix of light industrial, commercial, and residential uses. DCP is also developing new tools to support economic development within the City's IBZs and areas zoned for manufacturing use, including new special permits for self-storage facilities and hotels. These proposed regulations will be entering public review over the next year and could be adopted in 2018. Once these new policies are in place, DCP and NYCEDC will begin a land use study to drive industrial and commercial business and job growth in the IBZ. This study will help to identify strategies to transform the area around the Broadway Junction transit hub into a center of economic activity. DCP and NYCEDC will engage local business owners, community leaders, elected officials and other stakeholders throughout the course of the study. Preliminary stakeholder outreach is anticipated to begin by the end of 2017.
2021
Year: 2021 • Rezoning Area: East New York • Map Order: 37
Year
2021
Rezoning Area
East New York
Commitment Title
Increase bidding opportunities for local IBZ businesses in upcoming local real estate projects
Map Order
37
Rezoning Policy Domain
Economic Development
Lead Agency
ECONOMIC DEVELOPMENT CORPORATION (EDC)
Commitment Stage
Done
Statement From Source Document Poa
With existing companies in the IBZ specializing in construction trades and materials, there is potential for synergy between the ENY IBZ and anticipated construction activity. NYCEDC will work with local organizations and developers to support "Meet the Developer" events to facilitate awareness of the services and skills available in the IBZ
Timeline: Commencing by the end of 2016
Original Schedule
2016-ongoing
Narrative
As part of a marketing campaign created for the East Brooklyn Business Improvement District, EDC developed unique material to promote the "Meet the Developer" events.
2018
Year: 2018 • Rezoning Area: East New York • Map Order: 51
Year
2018
Rezoning Area
East New York
Commitment Title
Conduct a study to identify opportunities to bring regional-scale uses to Broadway Junction. Conduct a land use study of the IBZ to identify opportunities to densify industrial uses along key corridors.
Map Order
51
Rezoning Policy Domain
Economic Development
Lead Agency
ECONOMIC DEVELOPMENT CORPORATION (EDC)
Commitment Stage
Done
Statement From Source Document Poa
DCP, together with NYCEDC, will conduct a follow-up study of Broadway Junction. To support this study, NYCEDC is prepared to commit resources to fund a real estate/planning consultant. Acknowledging the significant role of the MTA in this area, the scope of the study will be informed by further coordination with the MTA. In order to successfully start the Broadway Junction work, DCP requires the final recommendations of the North Brooklyn study and complete public review of the IBZ hotel and self-storage zoning text proposal. These elements inform the commitment to begin this study in the second quarter of 2017.
Timeline: DCP and NYCEDC would commence stakeholder engagement in support of this planning effort in the second quarter of 2017.
Original Schedule
2017-2020
Narrative
NYCEDC formally launched Broadway Junction planning study and working group in November 2017. There have been 5 working group meetings thus far, and additional meetings will be scheduled this summer. There will be a public event to discuss working group progress in June 2018. The study is expected to continue through late-Summer 2018.
2019
Year: 2019 • Rezoning Area: East New York • Map Order: 51
Year
2019
Rezoning Area
East New York
Commitment Title
Conduct a study to identify opportunities to bring regional-scale uses to Broadway Junction. Conduct a land use study of the IBZ to identify opportunities to densify industrial uses along key corridors.
Map Order
51
Rezoning Policy Domain
Economic Development
Lead Agency
ECONOMIC DEVELOPMENT CORPORATION (EDC)
Commitment Stage
Done
Statement From Source Document Poa
DCP, together with NYCEDC, will conduct a follow-up study of Broadway Junction. To support this study, NYCEDC is prepared to commit resources to fund a real estate/planning consultant. Acknowledging the significant role of the MTA in this area, the scope of the study will be informed by further coordination with the MTA. In order to successfully start the Broadway Junction work, DCP requires the final recommendations of the North Brooklyn study and complete public review of the IBZ hotel and self-storage zoning text proposal. These elements inform the commitment to begin this study in the second quarter of 2017.
Timeline: DCP and NYCEDC would commence stakeholder engagement in support of this planning effort in the second quarter of 2017.
Original Schedule
2017-2020
Narrative
EDC led an interagency planning study and community engagement process on the area in and around Broadway Junction, including the ENY IBZ. Public outreach included seven meetings with the Broadway Junction Working Group (co-chaired by Council Member Rafael Espinal and Borough President Adams), a public open house with over 100 community members in attendance, and an online and in-person survey with over 600 responses from 2018-2019. This work has culminated in the Broadway Junction Vision Document which will be released in Summer 2019
2021
Year: 2021 • Rezoning Area: East New York • Map Order: 51
Year
2021
Rezoning Area
East New York
Commitment Title
Conduct a study to identify opportunities to bring regional-scale uses to Broadway Junction. Conduct a land use study of the IBZ to identify opportunities to densify industrial uses along key corridors.
Map Order
51
Rezoning Policy Domain
Economic Development
Lead Agency
ECONOMIC DEVELOPMENT CORPORATION (EDC)
Commitment Stage
Done
Statement From Source Document Poa
DCP, together with NYCEDC, will conduct a follow-up study of Broadway Junction. To support this study, NYCEDC is prepared to commit resources to fund a real estate/planning consultant. Acknowledging the significant role of the MTA in this area, the scope of the study will be informed by further coordination with the MTA. In order to successfully start the Broadway Junction work, DCP requires the final recommendations of the North Brooklyn study and complete public review of the IBZ hotel and self-storage zoning text proposal. These elements inform the commitment to begin this study in the second quarter of 2017.
Timeline: DCP and NYCEDC would commence stakeholder engagement in support of this planning effort in the second quarter of 2017.
Original Schedule
2017-2020
Narrative
The Broadway Junction Vision Plan was released in August 2019 after a year and a half-long interagency planning effort with a community-led working group to plan for the future of the major transit hub. The Plan lays out a vision to improve the area in and around Broadway Junction, focusing on the key areas of: Transit access and equity; Inclusive growth; Economic and workforce development; Active places and neighborhood amenities; Public realm and open space. EDC and the City continue to identify opportunities to advance this vision and seek feedback from the local community to help shape Broadway Junction's future.
2022
Year: 2022 • Rezoning Area: East New York • Map Order: 51
Year
2022
Rezoning Area
East New York
Commitment Title
Conduct a study to identify opportunities to bring regional-scale uses to Broadway Junction. Conduct a land use study of the IBZ to identify opportunities to densify industrial uses along key corridors.
Map Order
51
Rezoning Policy Domain
Economic Development
Lead Agency
ECONOMIC DEVELOPMENT CORPORATION (EDC)
Commitment Stage
Done
Statement From Source Document Poa
DCP, together with NYCEDC, will conduct a follow-up study of Broadway Junction. To support this study, NYCEDC is prepared to commit resources to fund a real estate/planning consultant. Acknowledging the significant role of the MTA in this area, the scope of the study will be informed by further coordination with the MTA. In order to successfully start the Broadway Junction work, DCP requires the final recommendations of the North Brooklyn study and complete public review of the IBZ hotel and self-storage zoning text proposal. These elements inform the commitment to begin this study in the second quarter of 2017.
Timeline: DCP and NYCEDC would commence stakeholder engagement in support of this planning effort in the second quarter of 2017.
Original Schedule
2017-2020
Narrative
The Broadway Junction Vision Plan was released in August 2019 after a year and a half-long interagency planning effort with a community-led working group to plan for the future of the major transit hub. The Plan lays out a vision to improve the area in and around Broadway Junction, focusing on the key areas of: Transit access and equity; Inclusive growth; Economic and workforce development; Active places and neighborhood amenities; Public realm and open space. EDC and the City continue to identify opportunities to advance this vision and seek feedback from the local community to help shape Broadway Junction's future.
2018
Year: 2018 • Rezoning Area: East Harlem • Commitment Title: Conduct outreach and identify new OOPP providers in East Harlem
Year
2018
Rezoning Area
East Harlem
Commitment Title
Conduct outreach and identify new OOPP providers in East Harlem
Map Order
35
Rezoning Policy Domain
Community Resources
Lead Agency
DEPARTMENT OF HEALTH AND MENTAL HYGIENE (DOHMH)
Commitment Stage
Done with Ongoing Work
Statement From Source Document Poa
In response to requests for more Opioid Overdose Prevention Providers (OOPP's) to train East Harlem residents to administer naloxone, DOHMH has alerted community leaders to the 21 OOPP's currently working in East Harlem. Community members who would like to go to these sites to get a kit should call in advance to ensure availability. DOHMH is committed to helping additional interested organizations become OOPPs.
Original Schedule
2017
Narrative
In response to requests for more Opioid Overdose Prevention Providers (OOPP's) to train East Harlem residents to administer naloxone, DOHMH has alerted community leaders to the 21 OOPP's currently working in East Harlem. Community members who would like to obtain a kit from one of these sites should call in advance to ensure availability. DOHMH is committed to helping additional interested organizations become OOPPs, and four additional OOPPs with sites in the area have recently registered, bringing the total number of East Harlem sites where community members can receive overdose prevention training and naloxone to 25.
2021
Year: 2021 • Rezoning Area: East Harlem • Commitment Title: Conduct outreach and identify new OOPP providers in East Harlem
Year
2021
Rezoning Area
East Harlem
Commitment Title
Conduct outreach and identify new OOPP providers in East Harlem
Map Order
35
Rezoning Policy Domain
Community Resources
Lead Agency
DEPARTMENT OF HEALTH AND MENTAL HYGIENE (DOHMH)
Commitment Stage
Done with Ongoing Work
Statement From Source Document Poa
In response to requests for more Opioid Overdose Prevention Providers (OOPP's) to train East Harlem residents to administer naloxone, DOHMH has alerted community leaders to the 21 OOPP's currently working in East Harlem. Community members who would like to go to these sites to get a kit should call in advance to ensure availability. DOHMH is committed to helping additional interested organizations become OOPPs.
Original Schedule
2017
Narrative
There are 22 Opioid Overdose Prevention Providers (OOPPs) and a total of 46 registered sites in zipcodes 10029 and 10034, where community members can receive overdose prevention training and naloxone. Community members who would like to go to these sites to get a kit should call in advance to ensure availability. DOHMH is committed to helping additional interested organizations become OOPPs.
2022
Year: 2022 • Rezoning Area: East Harlem • Commitment Title: Conduct outreach and identify new OOPP providers in East Harlem
Year
2022
Rezoning Area
East Harlem
Commitment Title
Conduct outreach and identify new OOPP providers in East Harlem
Map Order
35
Rezoning Policy Domain
Community Resources
Lead Agency
DEPARTMENT OF HEALTH AND MENTAL HYGIENE (DOHMH)
Commitment Stage
Done with Ongoing Work
Statement From Source Document Poa
In response to requests for more Opioid Overdose Prevention Providers (OOPP's) to train East Harlem residents to administer naloxone, DOHMH has alerted community leaders to the 21 OOPP's currently working in East Harlem. Community members who would like to go to these sites to get a kit should call in advance to ensure availability. DOHMH is committed to helping additional interested organizations become OOPPs.
Original Schedule
2017
Narrative
There are 22 Opioid Overdose Prevention Providers (OOPPs) and a total of 46 registered sites in zipcodes 10029 and 10034, where community members can receive overdose prevention training and naloxone. Community members who would like to go to these sites to get a kit should call in advance to ensure availability. DOHMH is committed to helping additional interested organizations become OOPPs.
2019
Year: 2019 • Rezoning Area: Inwood • Commitment Title: Conduct outreach to Inwood tenants for the NYC Rent Freeze Program
Year
2019
Rezoning Area
Inwood
Commitment Title
Conduct outreach to Inwood tenants for the NYC Rent Freeze Program
Map Order
18
Rezoning Policy Domain
Housing
Lead Agency
PUBLIC ENGAGEMENT UNIT (PEU)
Commitment Stage
Done with Ongoing Work
Statement From Source Document Poa
PEU's Rent Freeze Team will conduct proactive outreach to all likely eligible tenants for or already enrolled in NYC Rent Freeze programs. The Rent Freeze team will aim to enroll or renew 4,100 New Yorkers in NYC Rent Freeze programs. Outreach shall include door knocking, live and robo-calls, mailings, and co-hosting various events in the area in partnership with Council Member Rodríguez. The team will assist all eligible tenants identified through this outreach in enrolling in the Rent Freeze programs.
Original Schedule
2018-2019
Narrative
PEU's Rent Freeze Team has conducted proactive outreach to all likely eligible tenants for or already enrolled in NYC Rent Freeze programs, assisting all eligible tenants identified through this outreach in enrolling in the Rent Freeze programs. Between August 2018-April 2019, 2,331 New Yorkers in CD10 were successfully enrolled or renewed in Rent Freeze programs.
2021
Year: 2021 • Rezoning Area: Inwood • Commitment Title: Conduct outreach to Inwood tenants for the NYC Rent Freeze Program
Year
2021
Rezoning Area
Inwood
Commitment Title
Conduct outreach to Inwood tenants for the NYC Rent Freeze Program
Map Order
18
Rezoning Policy Domain
Housing
Lead Agency
PUBLIC ENGAGEMENT UNIT (PEU)
Commitment Stage
Done with Ongoing Work
Statement From Source Document Poa
PEU's Rent Freeze Team will conduct proactive outreach to all likely eligible tenants for or already enrolled in NYC Rent Freeze programs. The Rent Freeze team will aim to enroll or renew 4,100 New Yorkers in NYC Rent Freeze programs. Outreach shall include door knocking, live and robo-calls, mailings, and co-hosting various events in the area in partnership with Council Member Rodríguez. The team will assist all eligible tenants identified through this outreach in enrolling in the Rent Freeze programs.
Original Schedule
2018-2019
Narrative
PEU's Rent Freeze Team has conducted proactive outreach to all likely eligible tenants for or already enrolled in NYC Rent Freeze programs, assisting all eligible tenants identified through this outreach in enrolling in the Rent Freeze programs. Since August 2018, 2,924 New Yorkers in CD10 were successfully enrolled or renewed in Rent Freeze programs. Additionally, the Rent Freeze Team continues to help tenants with SCRIE/DRIE & SCHE/DHE applications city-wide through phone outreach.
2022
Year: 2022 • Rezoning Area: Inwood • Commitment Title: Conduct outreach to Inwood tenants for the NYC Rent Freeze Program
Year
2022
Rezoning Area
Inwood
Commitment Title
Conduct outreach to Inwood tenants for the NYC Rent Freeze Program
Map Order
18
Rezoning Policy Domain
Housing
Lead Agency
PUBLIC ENGAGEMENT UNIT (PEU)
Commitment Stage
Done with Ongoing Work
Statement From Source Document Poa
PEU's Rent Freeze Team will conduct proactive outreach to all likely eligible tenants for or already enrolled in NYC Rent Freeze programs. The Rent Freeze team will aim to enroll or renew 4,100 New Yorkers in NYC Rent Freeze programs. Outreach shall include door knocking, live and robo-calls, mailings, and co-hosting various events in the area in partnership with Council Member Rodríguez. The team will assist all eligible tenants identified through this outreach in enrolling in the Rent Freeze programs.
Original Schedule
2018-2019
Narrative
PEU’s Rent Freeze team is currently running an outreach campaign to reach over 7,000 tenants who failed to renew their SCRIE/DRIE applications (data provided by DOF) since March 2020 and assist those who are still eligible with submitting applications.
2022
Year: 2022 • Rezoning Area: Soho/NoHo • Commitment Title: Conduct targeted enforcement before implementation of Commercial Waste Zones
Year
2022
Rezoning Area
Soho/NoHo
Commitment Title
Conduct targeted enforcement before implementation of Commercial Waste Zones
Map Order
15
Rezoning Policy Domain
Community Resources
Lead Agency
DEPARTMENT OF SANITATION (DSNY)
Commitment Stage
In Progress
Statement From Source Document Poa
• In advance of the implementation of the Commercial Waste Zones program in Community Board 2 (the “Manhattan Southwest” zone), DSNY and its partner agencies will conduct targeted enforcement of existing laws and regulations concerning commercial waste operations, including regarding waste storage, setout and collection requirements as well as street and sidewalk cleaning regulations.
Original Schedule
2022 Start
Narrative
DSNY commercial enforcement teams will begin conducting localized enforcement this summer.
2019
Year: 2019 • Rezoning Area: Jerome • Commitment Title: Conduct Workforce Outreach and Recruitment Events
Year
2019
Rezoning Area
Jerome
Commitment Title
Conduct Workforce Outreach and Recruitment Events
Map Order
58
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
Done with Ongoing Work
Statement From Source Document Poa
SBS will conduct outreach in the district, including recruitment events, at least every other week to connect individuals to the Workforce 1 training and employment services based on demand. Workforce 1 will hold regular recruitment events in the district where recruiters will be screening candidates to fill open jobs for current employers. Recruiters will screen and assess individuals for skills training in several sectors including: healthcare, industrial, construction, food service, and retail. Recruitment Events will include: ? Events in the neighborhood with local community partners;
? Events at the Council member's offices; and
? Monthly deployment of the SBS Mobile Outreach Unit.
Original Schedule
2019 - 2023
Narrative
SBS delivers workforce services directly along Jerome avenue corridor through the utilization of the Mobile Outreach Unit. SBS partners with local stakeholders and community based organizations to target and engage with local residents, foreign born, and the out-of-school out-of-work youth population
2022
Year: 2022 • Rezoning Area: Gowanus • Commitment Title: Work to create a Construction Committee
Year
2022
Rezoning Area
Gowanus
Commitment Title
Work to create a Construction Committee
Map Order
18
Rezoning Policy Domain
Community Resources
Lead Agency
DEPARTMENT OF CITY PLANNING (DCP)
Commitment Stage
Not Started
Statement From Source Document Poa
• Work to create a construction and quality of life committee at CB6 that can address these issues more frequently as requested by the CB and/or issues arise.
Original Schedule
TBD
Narrative
• Work to create a construction and quality of life committee at CB6 that can address these issues more frequently as requested by the CB and/or issues arise.
2021
Year: 2021 • Rezoning Area: Jerome • Commitment Title: Conduct Workforce Outreach and Recruitment Events
Year
2021
Rezoning Area
Jerome
Commitment Title
Conduct Workforce Outreach and Recruitment Events
Map Order
58
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
Done with Ongoing Work
Statement From Source Document Poa
SBS will conduct outreach in the district, including recruitment events, at least every other week to connect individuals to the Workforce 1 training and employment services based on demand. Workforce 1 will hold regular recruitment events in the district where recruiters will be screening candidates to fill open jobs for current employers. Recruiters will screen and assess individuals for skills training in several sectors including: healthcare, industrial, construction, food service, and retail. Recruitment Events will include: ? Events in the neighborhood with local community partners;
? Events at the Council member's offices; and
? Monthly deployment of the SBS Mobile Outreach Unit.
Original Schedule
2019 - 2023
Narrative
Leading up to March 2020, SBS delivered workforce services directly along Jerome avenue corridor through the utilization of the Mobile Outreach Unit. SBS continues to partner with local stakeholders and community based organizations to target and engage with local residents, foreign born, and the out-of-school out-of-work youth population. As of March 2020, all Workforce 1 Centers are now delivering services remotely and virtually.
2022
Year: 2022 • Rezoning Area: Jerome • Commitment Title: Conduct Workforce Outreach and Recruitment Events
Year
2022
Rezoning Area
Jerome
Commitment Title
Conduct Workforce Outreach and Recruitment Events
Map Order
58
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
Done with Ongoing Work
Statement From Source Document Poa
SBS will conduct outreach in the district, including recruitment events, at least every other week to connect individuals to the Workforce 1 training and employment services based on demand. Workforce 1 will hold regular recruitment events in the district where recruiters will be screening candidates to fill open jobs for current employers. Recruiters will screen and assess individuals for skills training in several sectors including: healthcare, industrial, construction, food service, and retail. Recruitment Events will include: ? Events in the neighborhood with local community partners;
? Events at the Council member's offices; and
? Monthly deployment of the SBS Mobile Outreach Unit.
Original Schedule
2019 - 2023
Narrative
Leading up to March 2020, SBS delivered workforce services directly along Jerome avenue corridor through the utilization of the Mobile Outreach Unit. SBS continues to partner with local stakeholders and community based organizations to target and engage with local residents, foreign born, and the out-of-school out-of-work youth population. As of March 2020, all Workforce 1 Centers are now delivering services remotely and virtually.
2022
Year: 2022 • Rezoning Area: Gowanus • Commitment Title: Conduct Workforce Outreach and Virtual / In - Person Recruitment Events.
Year
2022
Rezoning Area
Gowanus
Commitment Title
Conduct Workforce Outreach and Virtual / In - Person Recruitment Events.
Map Order
55
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
Not Started
Statement From Source Document Poa
• SBS will conduct outreach in the district, including virtual or in-person recruitment events, at least every other week to connect individuals to the Workforce 1 training and employment services based on demand. Workforce 1 will hold regular virtual or in-person recruitment events in the district where recruiters will be screening candidates to fill open jobs for current employers. Recruiters will screen and assess individuals for skills training in several sectors including healthcare, industrial, construction, food service, and retail.
Original Schedule
2023-2025
Narrative
SBS, through its Brooklyn based Workforce1 Career Centers, will establishing a regular schedule to visit the neighborhood in person for recruitment events in FY23. In addition, we are developing an outreach plan to engage with the Community based organizations in Gowanus which will help Workforce1 efficiently match local residents to jobs and training opportunities.
2022
Year: 2022 • Rezoning Area: Gowanus • Map Order: 54
Year
2022
Rezoning Area
Gowanus
Commitment Title
Connect Gowanus residents to construction and green manufacturing training programs.
Map Order
54
Rezoning Policy Domain
Economic Development
Lead Agency
DEPARTMENT OF SMALL BUSINESS SERVICES (SBS)
Commitment Stage
Not Started
Statement From Source Document Poa
• Through the NYC Green Jobs Corps, SBS will screen Gowanus residents for construction trade pre-apprenticeship training opportunities and free construction trade training. Partners in the Green Jobs Corps include Helmets to Hard Hats, Edward J. Malloy Initiative for Construction Skills and Non-Traditional Employment for Women (NEW) and Building Works, all of whom are recognized as pre-apprenticeship trainers by the Building Construction Trades Council. SBS will explore partnership with other local workforce development groups focused on industrial jobs, green jobs, and construction.
This construction trade training includes pre-apprenticeship training for careers in the green economy, including retrofitting buildings for increased energy efficiency. In coordination with the Council Members, SBS will organize outreach events to screen and assess jobseekers for pre-apprenticeships through the program. Individuals with a high school equivalency are eligible for pre- apprenticeship programs and those who may not be ready are referred to community partners and local institutions who provide additional adult and young adult education services.Additionally, SBS will connect jobseekers to green manufacturing training programs as these programs become available, and screen residents for employment opportunities.
Original Schedule
2023-2027
Narrative
SBS is working with the recognized pre-apprenticeship providers to finalize training schedule for FY23 and will begin outreach to Gowanus based community based organizations and the local NYCHA properties.