Contractor / Sub Contractor Change Order Report

The Contractor / Sub Contractor Change Order Report is a monthly Multi-Project SCA Change Management Report that lists who is currently responsible for Change Management Issues and the last stage/document of the Change Process.

Housing & Development School Construction Authority (SCA) Dataset gzvm-na49 14 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015268 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015268
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS254K07
Change Management Number
00086
Change Order Document Date
2021-09-13
Change Order Project Ball In Court Code
TECHNICO
Change Order Project Title
PS254K New 4 Story Add w/Gymatorium
Change Order Document Type
FRE
Change Order Project Stage Date
2021-10-02
Change Order Number
00086
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015268 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015268
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS254K07
Change Management Number
00086
Change Order Document Date
2021-09-13
Change Order Project Ball In Court Code
TECHNICO
Change Order Project Title
PS254K New 4 Story Add w/Gymatorium
Change Order Document Type
EST
Change Order Project Stage Date
2021-09-13
Change Order Number
00086
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015268 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015268
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS254K07
Change Management Number
00088
Change Order Document Date
2021-09-27
Change Order Project Ball In Court Code
TECHNICO
Change Order Project Title
PS254K New 4 Story Add w/Gymatorium
Change Order Document Type
EST
Change Order Project Stage Date
2021-09-27
Change Order Number
00088
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015268 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015268
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS254K07
Change Management Number
00081
Change Order Document Date
2021-08-16
Change Order Project Ball In Court Code
TECHNICO
Change Order Project Title
PS254K New 4 Story Add w/Gymatorium
Change Order Document Type
EST
Change Order Project Stage Date
2021-08-16
Change Order Number
00081
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015268 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015268
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS254K07
Change Management Number
00069
Change Order Document Date
2021-05-11
Change Order Project Ball In Court Code
TECHNICO
Change Order Project Title
PS254K New 4 Story Add w/Gymatorium
Change Order Document Type
EST
Change Order Project Stage Date
2021-05-11
Change Order Number
00069
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015268 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015268
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS254K07
Change Management Number
00084
Change Order Document Date
2021-09-08
Change Order Project Ball In Court Code
TECHNICO
Change Order Project Title
PS254K New 4 Story Add w/Gymatorium
Change Order Document Type
PCO
Change Order Project Stage Date
2021-10-21
Change Order Number
00084
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015268 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015268
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS254K07
Change Management Number
00084
Change Order Document Date
2021-09-08
Change Order Project Ball In Court Code
TECHNICO
Change Order Project Title
PS254K New 4 Story Add w/Gymatorium
Change Order Document Type
FRE
Change Order Project Stage Date
2021-10-21
Change Order Number
00084
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015268 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015268
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS254K07
Change Management Number
00084
Change Order Document Date
2021-09-08
Change Order Project Ball In Court Code
TECHNICO
Change Order Project Title
PS254K New 4 Story Add w/Gymatorium
Change Order Document Type
EST
Change Order Project Stage Date
2021-09-08
Change Order Number
00084
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015268 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015268
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS254K07
Change Management Number
00080
Change Order Document Date
2021-08-13
Change Order Project Ball In Court Code
TECHNICO
Change Order Project Title
PS254K New 4 Story Add w/Gymatorium
Change Order Document Type
EST
Change Order Project Stage Date
2021-08-13
Change Order Number
00080
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015268 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015268
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS254K07
Change Management Number
00045
Change Order Document Date
2020-12-23
Change Order Project Ball In Court Code
TECHNICO
Change Order Project Title
PS254K New 4 Story Add w/Gymatorium
Change Order Document Type
EST
Change Order Project Stage Date
2020-12-23
Change Order Number
00045
Change Order Project To Status Name
OPN
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015268 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015268
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS254K07
Change Management Number
00016
Change Order Document Date
2020-01-02
Change Order Project Ball In Court Code
TECHNICO
Change Order Project Title
PS254K New 4 Story Add w/Gymatorium
Change Order Document Type
PCO
Change Order Project Stage Date
2020-02-07
Change Order Number
00016
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015268 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015268
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS254K07
Change Management Number
00016
Change Order Document Date
2020-01-02
Change Order Project Ball In Court Code
TECHNICO
Change Order Project Title
PS254K New 4 Story Add w/Gymatorium
Change Order Document Type
FRE
Change Order Project Stage Date
2020-02-07
Change Order Number
00016
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015268 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015268
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS254K07
Change Management Number
00016
Change Order Document Date
2020-01-02
Change Order Project Ball In Court Code
TECHNICO
Change Order Project Title
PS254K New 4 Story Add w/Gymatorium
Change Order Document Type
EST
Change Order Project Stage Date
2020-01-02
Change Order Number
00016
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015268 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015268
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS254K07
Change Management Number
00016
Change Order Document Date
2020-01-02
Change Order Project Ball In Court Code
TECHNICO
Change Order Project Title
PS254K New 4 Story Add w/Gymatorium
Change Order Document Type
CO
Change Order Project Stage Date
2020-03-12
Change Order Number
00016U
Change Order Project To Status Name
APP
Change Order Project To Vendor
TECHNICO
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015268 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015268
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS254K07
Change Management Number
00073
Change Order Document Date
2021-07-07
Change Order Project Ball In Court Code
TECHNICO
Change Order Project Title
PS254K New 4 Story Add w/Gymatorium
Change Order Document Type
EST
Change Order Project Stage Date
2021-07-07
Change Order Number
00073
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015268 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015268
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS254K07
Change Management Number
00067
Change Order Document Date
2021-05-04
Change Order Project Ball In Court Code
TECHNICO
Change Order Project Title
PS254K New 4 Story Add w/Gymatorium
Change Order Document Type
EST
Change Order Project Stage Date
2021-05-04
Change Order Number
00067
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015268 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015268
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS254K07
Change Management Number
00054
Change Order Document Date
2021-02-03
Change Order Project Ball In Court Code
TECHNICO
Change Order Project Title
PS254K New 4 Story Add w/Gymatorium
Change Order Document Type
EST
Change Order Project Stage Date
2021-02-03
Change Order Number
00054
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015268 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015268
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS254K07
Change Management Number
00028
Change Order Document Date
2020-06-02
Change Order Project Ball In Court Code
TECHNICO
Change Order Project Title
PS254K New 4 Story Add w/Gymatorium
Change Order Document Type
PCO
Change Order Project Stage Date
2020-08-18
Change Order Number
00028
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015268 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015268
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS254K07
Change Management Number
00028
Change Order Document Date
2020-06-02
Change Order Project Ball In Court Code
TECHNICO
Change Order Project Title
PS254K New 4 Story Add w/Gymatorium
Change Order Document Type
FRE
Change Order Project Stage Date
2020-09-16
Change Order Number
00028
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000013815 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000013815
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS254K04
Change Management Number
00028
Change Order Document Date
2018-08-20
Change Order Project Ball In Court Code
LOSARDO
Change Order Project Title
PS254K Sandy-Heating Plnt,Flood Elim
Change Order Document Type
PCO
Change Order Project Stage Date
2019-02-14
Change Order Number
00028
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000013815 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000013815
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS254K04
Change Management Number
00029
Change Order Document Date
2018-11-21
Change Order Project Ball In Court Code
LOSARDO
Change Order Project Title
PS254K Sandy-Heating Plnt,Flood Elim
Change Order Document Type
EST
Change Order Project Stage Date
2018-11-21
Change Order Number
00029
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000013815 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000013815
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS254K04
Change Management Number
00032
Change Order Document Date
2020-09-14
Change Order Project Ball In Court Code
LOSARDO
Change Order Project Title
PS254K Sandy-Heating Plnt,Flood Elim
Change Order Document Type
PCO
Change Order Project Stage Date
2020-11-02
Change Order Number
00032
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000013815 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000013815
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS254K04
Change Management Number
00032
Change Order Document Date
2020-09-14
Change Order Project Ball In Court Code
LOSARDO
Change Order Project Title
PS254K Sandy-Heating Plnt,Flood Elim
Change Order Document Type
FRE
Change Order Project Stage Date
2021-05-21
Change Order Number
00032
Change Order Project To Status Name
CLO
Change Order Project To Vendor
LOSARDO
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000013815 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000013815
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS254K04
Change Management Number
00032
Change Order Document Date
2020-09-14
Change Order Project Ball In Court Code
LOSARDO
Change Order Project Title
PS254K Sandy-Heating Plnt,Flood Elim
Change Order Document Type
EST
Change Order Project Stage Date
2020-09-14
Change Order Number
00032
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000013815 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000013815
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS254K04
Change Management Number
00032
Change Order Document Date
2020-09-14
Change Order Project Ball In Court Code
LOSARDO
Change Order Project Title
PS254K Sandy-Heating Plnt,Flood Elim
Change Order Document Type
CO
Change Order Project Stage Date
2021-06-01
Change Order Number
00032
Change Order Project To Status Name
NEW
Change Order Project To Vendor
LOSARDO
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000013815 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000013815
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS254K04
Change Management Number
00028
Change Order Document Date
2018-08-20
Change Order Project Ball In Court Code
LOSARDO
Change Order Project Title
PS254K Sandy-Heating Plnt,Flood Elim
Change Order Document Type
EST
Change Order Project Stage Date
2018-08-20
Change Order Number
00028
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000013815 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000013815
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS254K04
Change Management Number
00028
Change Order Document Date
2018-08-20
Change Order Project Ball In Court Code
LOSARDO
Change Order Project Title
PS254K Sandy-Heating Plnt,Flood Elim
Change Order Document Type
FRE
Change Order Project Stage Date
2019-02-26
Change Order Number
00028
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000013815 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000013815
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS254K04
Change Management Number
00028
Change Order Document Date
2018-08-20
Change Order Project Ball In Court Code
LOSARDO
Change Order Project Title
PS254K Sandy-Heating Plnt,Flood Elim
Change Order Document Type
CO
Change Order Project Stage Date
2019-03-22
Change Order Number
00028U
Change Order Project To Status Name
APP
Change Order Project To Vendor
LOSARDO
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015396 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015396
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS255K02
Change Management Number
00001
Change Order Document Date
2019-08-29
Change Order Project Ball In Court Code
WCC
Change Order Project Title
PS255K Wndws, Ext Mas, Roofs, Prpts
Change Order Document Type
EST
Change Order Project Stage Date
2019-08-29
Change Order Number
00001
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015396 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015396
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS255K02
Change Management Number
00007
Change Order Document Date
2021-06-03
Change Order Project Ball In Court Code
WCC
Change Order Project Title
PS255K Wndws, Ext Mas, Roofs, Prpts
Change Order Document Type
EST
Change Order Project Stage Date
2021-06-03
Change Order Number
00007
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015396 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015396
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS255K02
Change Management Number
00003
Change Order Document Date
2019-10-01
Change Order Project Ball In Court Code
WCC
Change Order Project Title
PS255K Wndws, Ext Mas, Roofs, Prpts
Change Order Document Type
EST
Change Order Project Stage Date
2019-10-01
Change Order Number
00003
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015396 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015396
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS255K02
Change Management Number
00002
Change Order Document Date
2019-09-20
Change Order Project Ball In Court Code
WCC
Change Order Project Title
PS255K Wndws, Ext Mas, Roofs, Prpts
Change Order Document Type
EST
Change Order Project Stage Date
2019-09-20
Change Order Number
00002
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015396 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015396
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS255K02
Change Management Number
00005
Change Order Document Date
2021-06-02
Change Order Project Ball In Court Code
WCC
Change Order Project Title
PS255K Wndws, Ext Mas, Roofs, Prpts
Change Order Document Type
EST
Change Order Project Stage Date
2021-06-02
Change Order Number
00005
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000013555 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000013555
Change Order Boro Identifier
K
Change Order Project District Identifier
18
Change Order Project Identifier
PS276K03
Change Management Number
00065
Change Order Document Date
2021-09-29
Change Order Project Ball In Court Code
NESCO
Change Order Project Title
PS276 Heat Plnt Upgr,Clim Cntrl,Roof
Change Order Document Type
EST
Change Order Project Stage Date
2021-09-29
Change Order Number
00065
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000013555 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000013555
Change Order Boro Identifier
K
Change Order Project District Identifier
18
Change Order Project Identifier
PS276K03
Change Management Number
00064
Change Order Document Date
2021-09-14
Change Order Project Ball In Court Code
NESCO
Change Order Project Title
PS276 Heat Plnt Upgr,Clim Cntrl,Roof
Change Order Document Type
PCO
Change Order Project Stage Date
2021-09-16
Change Order Number
00064
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000013555 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000013555
Change Order Boro Identifier
K
Change Order Project District Identifier
18
Change Order Project Identifier
PS276K03
Change Management Number
00064
Change Order Document Date
2021-09-14
Change Order Project Ball In Court Code
NESCO
Change Order Project Title
PS276 Heat Plnt Upgr,Clim Cntrl,Roof
Change Order Document Type
EST
Change Order Project Stage Date
2021-09-14
Change Order Number
00064
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000013555 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000013555
Change Order Boro Identifier
K
Change Order Project District Identifier
18
Change Order Project Identifier
PS276K03
Change Management Number
00058
Change Order Document Date
2020-04-10
Change Order Project Ball In Court Code
NESCO
Change Order Project Title
PS276 Heat Plnt Upgr,Clim Cntrl,Roof
Change Order Document Type
EST
Change Order Project Stage Date
2020-04-10
Change Order Number
00058
Change Order Project To Status Name
PRO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015130 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015130
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS277K05
Change Management Number
00019
Change Order Document Date
2021-09-02
Change Order Project Ball In Court Code
CENTRAL
Change Order Project Title
PS277K Boiler Convrsn, Clim Cntrl
Change Order Document Type
CO
Change Order Project Stage Date
2021-09-02
Change Order Number
00019W
Change Order Project To Status Name
NEW
Change Order Project To Vendor
CENTRAL
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015130 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015130
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS277K05
Change Management Number
00019
Change Order Document Date
2021-09-02
Change Order Project Ball In Court Code
CENTRAL
Change Order Project Title
PS277K Boiler Convrsn, Clim Cntrl
Change Order Document Type
EST
Change Order Project Stage Date
2021-09-02
Change Order Number
00019
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015130 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015130
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS277K05
Change Management Number
00018
Change Order Document Date
2021-08-10
Change Order Project Ball In Court Code
CENTRAL
Change Order Project Title
PS277K Boiler Convrsn, Clim Cntrl
Change Order Document Type
EST
Change Order Project Stage Date
2021-08-10
Change Order Number
00018
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015130 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015130
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS277K05
Change Management Number
00009
Change Order Document Date
2020-05-26
Change Order Project Ball In Court Code
CENTRAL
Change Order Project Title
PS277K Boiler Convrsn, Clim Cntrl
Change Order Document Type
EST
Change Order Project Stage Date
2020-05-26
Change Order Number
00009
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015130 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015130
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS277K05
Change Management Number
00009
Change Order Document Date
2020-05-26
Change Order Project Ball In Court Code
CENTRAL
Change Order Project Title
PS277K Boiler Convrsn, Clim Cntrl
Change Order Document Type
FRE
Change Order Project Stage Date
2020-10-14
Change Order Number
00009
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015130 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015130
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS277K05
Change Management Number
00009
Change Order Document Date
2020-05-26
Change Order Project Ball In Court Code
CENTRAL
Change Order Project Title
PS277K Boiler Convrsn, Clim Cntrl
Change Order Document Type
PCO
Change Order Project Stage Date
2020-09-14
Change Order Number
00009
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015130 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015130
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS277K05
Change Management Number
00013
Change Order Document Date
2020-04-09
Change Order Project Ball In Court Code
CENTRAL
Change Order Project Title
PS277K Boiler Convrsn, Clim Cntrl
Change Order Document Type
EST
Change Order Project Stage Date
2020-04-06
Change Order Number
00013
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015130 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015130
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS277K05
Change Management Number
00005
Change Order Document Date
2019-10-29
Change Order Project Ball In Court Code
CENTRAL
Change Order Project Title
PS277K Boiler Convrsn, Clim Cntrl
Change Order Document Type
EST
Change Order Project Stage Date
2019-10-29
Change Order Number
00005
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015130 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015130
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS277K05
Change Management Number
00005
Change Order Document Date
2019-10-29
Change Order Project Ball In Court Code
CENTRAL
Change Order Project Title
PS277K Boiler Convrsn, Clim Cntrl
Change Order Document Type
FRE
Change Order Project Stage Date
2020-03-18
Change Order Number
00005
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015130 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015130
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS277K05
Change Management Number
00005
Change Order Document Date
2019-10-29
Change Order Project Ball In Court Code
CENTRAL
Change Order Project Title
PS277K Boiler Convrsn, Clim Cntrl
Change Order Document Type
PCO
Change Order Project Stage Date
2020-02-04
Change Order Number
00005
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015130 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015130
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS277K05
Change Management Number
00006
Change Order Document Date
2019-12-20
Change Order Project Ball In Court Code
CENTRAL
Change Order Project Title
PS277K Boiler Convrsn, Clim Cntrl
Change Order Document Type
EST
Change Order Project Stage Date
2019-12-20
Change Order Number
00006
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015130 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015130
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS277K05
Change Management Number
00006
Change Order Document Date
2019-12-20
Change Order Project Ball In Court Code
CENTRAL
Change Order Project Title
PS277K Boiler Convrsn, Clim Cntrl
Change Order Document Type
FRE
Change Order Project Stage Date
2020-03-18
Change Order Number
00006
Change Order Project To Status Name
NEW
Change Order Project To Vendor
SCA-PM
2021-11-01T10:30:57.7988774-04
Data As Of Date: 2021-11-01T10:30:57.7988774-04 • Change Order Project Sca Contract Identifier: C000015130 • Change Order Boro Identifier: K
Data As Of Date
2021-11-01T10:30:57.7988774-04
Change Order Project Sca Contract Identifier
C000015130
Change Order Boro Identifier
K
Change Order Project District Identifier
22
Change Order Project Identifier
PS277K05
Change Management Number
00006
Change Order Document Date
2019-12-20
Change Order Project Ball In Court Code
CENTRAL
Change Order Project Title
PS277K Boiler Convrsn, Clim Cntrl
Change Order Document Type
PCO
Change Order Project Stage Date
2020-02-04
Change Order Number
00006
Change Order Project To Status Name
CLO
Change Order Project To Vendor
SCA-PM