Capital Projects

All major infrastructure and information technology projects with a budget of $25 million or more that are currently active (in the design, procurement, or construction phase).

City Government Mayor's Office of Operations (OPS) Dataset n7gv-k5yt 16 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
Water Main Replacement In 222 Street, Queens
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 768 • Project Name: Water Main Replacement In 222 Street, Queens
Date Reported As Of
2022-09-01T00:00:00.000
Pid
768
Project Name
Water Main Replacement In 222 Street, Queens
Description
WATER MAIN REPLACEMENT IN 222 STREET
Category
Water Supply
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Design
Design Start
2017-01-05T00:00:00.000
Budget Forecast
41671000.00
Latest Budget Changes
199000.00
Total Budget Changes
7195000.00
Forecast Completion
2028-03-03T00:00:00.000
Latest Schedule Changes
806
Total Schedule Changes
2236
Lexington Avenue Pedestrian Safety Improvements
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 1239 • Project Name: Lexington Avenue Pedestrian Safety Improvements
Date Reported As Of
2022-09-01T00:00:00.000
Pid
1239
Project Name
Lexington Avenue Pedestrian Safety Improvements
Description
Lexington Avenue Pedestrian Safety Improvements
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Budget Forecast
29819000.00
Latest Budget Changes
17000.00
Total Budget Changes
17000.00
Staten Island 1 & 3 Garage Construction & Rehab
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 769 • Project Name: Staten Island 1 & 3 Garage Construction & Rehab
Date Reported As Of
2022-09-01T00:00:00.000
Pid
769
Project Name
Staten Island 1 & 3 Garage Construction & Rehab
Description
The Department of Sanitation of the City of New York (DSNY) is planning to develop a Staten Island Districts 1 and 3 campus that will include a new garage serving both districts and renovation of the existing Borough Repair Shop. The site is to be reconfigured with new grading and drainage, new covered salt storage, new outdoor fueling, new household special waste collection, outdoor DSNY truck parking and a new force main sanitary line to connect to the NYC DEP sewer.
Category
Sanitation
Borough
Staten Island
Managing Agency
DDC
Client Agency
Sanitation
Current Phase
Construction
Design Start
2017-07-14T00:00:00.000
Budget Forecast
202104000.00
Latest Budget Changes
1014000.00
Total Budget Changes
68555000.00
Forecast Completion
2024-03-25T00:00:00.000
Latest Schedule Changes
62
Total Schedule Changes
406
Ped Safety Upgrades on Atlantic Avenue, Phase 2
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 519 • Project Name: Ped Safety Upgrades on Atlantic Avenue, Phase 2
Date Reported As Of
2022-09-01T00:00:00.000
Pid
519
Project Name
Ped Safety Upgrades on Atlantic Avenue, Phase 2
Description
PED. SAFETY UPGRADES ON ATLANTIC AVE - PH 2, BROOKLYN
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Construction
Design Start
2016-08-04T00:00:00.000
Budget Forecast
40012000.00
Latest Budget Changes
-1000.00
Total Budget Changes
10136496.00
Forecast Completion
2024-05-30T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1400
Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 193 • Project Name: Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation
Date Reported As Of
2022-09-01T00:00:00.000
Pid
193
Project Name
Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation
Description
Reconstruction DUMBO/Vinegar Hill Area including Trunk and Distribution water main replacement; Installation of HLSS and Combined Sewer replacement; Restoration of Belgian block in Water Street; Street lighting and Traffic Signal work.
Category
Streets and Roadways
Borough
Brooklyn
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Construction
Design Start
2012-06-07T00:00:00.000
Budget Forecast
131339000.00
Latest Budget Changes
929000.00
Total Budget Changes
96724000.00
Forecast Completion
2024-06-04T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
3253
Manhattan Greenway: East Midtown
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 859 • Project Name: Manhattan Greenway: East Midtown
Date Reported As Of
2022-09-01T00:00:00.000
Pid
859
Project Name
Manhattan Greenway: East Midtown
Description
The East Midtown Waterfront Greenway project involves the creation of a waterfront esplanade between East 53rd and East 59th Streets.
Category
Parks
Managing Agency
EDC
Client Agency
EDC
Current Phase
Construction
Design Start
2017-10-01T00:00:00.000
Budget Forecast
154840000.00
Latest Budget Changes
0.00
Total Budget Changes
24840000.00
Forecast Completion
2023-12-31T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
487
Queens Public School 472 New Construction
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 1099 • Project Name: Queens Public School 472 New Construction
Date Reported As Of
2022-09-01T00:00:00.000
Pid
1099
Project Name
Queens Public School 472 New Construction
Description
NEW SCHOOL
Category
Schools
Managing Agency
SCA
Client Agency
DOE
Current Phase
Construction
Design Start
2019-01-07T00:00:00.000
Budget Forecast
251284250.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2025-09-03T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
0
Henry Hudson Parkway over Amtrak (Northbound)
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 592 • Project Name: Henry Hudson Parkway over Amtrak (Northbound)
Date Reported As Of
2022-09-01T00:00:00.000
Pid
592
Project Name
Henry Hudson Parkway over Amtrak (Northbound)
Description
Replace the Ramp to northbound Henry Hudson Parkway over Amtrak in Manhattan.
Category
Bridges
Borough
Manhattan
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2020-01-02T00:00:00.000
Budget Forecast
53551625.00
Latest Budget Changes
0.00
Total Budget Changes
500625.00
Forecast Completion
2029-07-01T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1693
Pelham Bay Equestrian Park over Amtrak
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 703 • Project Name: Pelham Bay Equestrian Park over Amtrak
Date Reported As Of
2022-09-01T00:00:00.000
Pid
703
Project Name
Pelham Bay Equestrian Park over Amtrak
Description
Replace/Rehab the Pelham Bay Equestrian Park bridge over Amtrak, the Bronx
Category
Bridges
Borough
Bronx
Managing Agency
DOT
Client Agency
DPR
Current Phase
Design
Design Start
2019-01-30T00:00:00.000
Budget Forecast
0.00
Latest Budget Changes
-40966997.00
Total Budget Changes
137997.00
Forecast Completion
2027-06-04T00:00:00.000
Latest Schedule Changes
321
Total Schedule Changes
1029
SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 2
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 847 • Project Name: SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 2
Date Reported As Of
2022-09-01T00:00:00.000
Pid
847
Project Name
SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 2
Description
SOUTHEAST QUEENS PRIORITY GRIDS - GROUP 2
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2018-10-09T00:00:00.000
Budget Forecast
32981000.00
Latest Budget Changes
0.00
Total Budget Changes
14480000.00
Forecast Completion
2028-02-29T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1630
Queens IS at 47-10 Barnett Avenue Addition
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 967 • Project Name: Queens IS at 47-10 Barnett Avenue Addition
Date Reported As Of
2022-09-01T00:00:00.000
Pid
967
Project Name
Queens IS at 47-10 Barnett Avenue Addition
Description
NEW SCHOOL
Category
Schools
Managing Agency
SCA
Client Agency
DOE
Current Phase
Construction
Design Start
2018-07-02T00:00:00.000
Budget Forecast
95408495.00
Latest Budget Changes
0.00
Total Budget Changes
3206657.00
Forecast Completion
2023-09-03T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
365
Bronx Public School 87 Addition
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 1103 • Project Name: Bronx Public School 87 Addition
Date Reported As Of
2022-09-01T00:00:00.000
Pid
1103
Project Name
Bronx Public School 87 Addition
Description
ADDITION / EXISTING SCHOOL RENOVATION WORK
Category
Schools
Managing Agency
SCA
Client Agency
DOE
Current Phase
Construction
Design Start
2019-09-23T00:00:00.000
Budget Forecast
70834393.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2024-09-03T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
0
West 35th Street over Amtrak
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 696 • Project Name: West 35th Street over Amtrak
Date Reported As Of
2022-09-01T00:00:00.000
Pid
696
Project Name
West 35th Street over Amtrak
Description
Repair the West 35th Street bridge over Amtrak, Manhattan
Category
Bridges
Borough
Manhattan
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2018-11-21T00:00:00.000
Budget Forecast
32671034.00
Latest Budget Changes
0.00
Total Budget Changes
-621966.00
Forecast Completion
2032-03-05T00:00:00.000
Latest Schedule Changes
451
Total Schedule Changes
2846
Installation of Dechlorination System at Hunts Point WRRF
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 1094 • Project Name: Installation of Dechlorination System at Hunts Point WRRF
Date Reported As Of
2022-09-01T00:00:00.000
Pid
1094
Project Name
Installation of Dechlorination System at Hunts Point WRRF
Description
Install a Dechlorination System, replace the existing chlorination system including chemical storage tanks, metering pumps, electrical distribution equipment and upgrade the HVAC within the existing Chlorination Building.
Category
Wastewater Treatment
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2021-05-25T00:00:00.000
Budget Forecast
27900000.00
Latest Budget Changes
337490.00
Total Budget Changes
-6856021.00
Forecast Completion
2027-06-21T00:00:00.000
Latest Schedule Changes
86
Total Schedule Changes
-9
New 116Th Pct
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 762 • Project Name: New 116Th Pct
Date Reported As Of
2022-09-01T00:00:00.000
Pid
762
Project Name
New 116Th Pct
Description
Construction of a new precinct station house facility and associated site work for the new 116th Precinct.
Category
Public Safety and Criminal Justice
Managing Agency
DDC
Client Agency
Police
Current Phase
Construction
Design Start
2017-09-14T00:00:00.000
Budget Forecast
110670000.00
Latest Budget Changes
30000.00
Total Budget Changes
33852900.86
Forecast Completion
2024-01-21T00:00:00.000
Latest Schedule Changes
22
Total Schedule Changes
727
RECONST. OF COLUMBIA ST., PH II/BED-768B/SEK002321
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 845 • Project Name: RECONST. OF COLUMBIA ST., PH II/BED-768B/SEK002321
Date Reported As Of
2022-09-01T00:00:00.000
Pid
845
Project Name
RECONST. OF COLUMBIA ST., PH II/BED-768B/SEK002321
Description
Roadway reconstruction including new sewers, water main, street lighting and traffic signals: Columbia Street south of Hamilton Avenue.
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2019-07-01T00:00:00.000
Budget Forecast
120604000.00
Latest Budget Changes
0.00
Total Budget Changes
6730000.00
Forecast Completion
2026-09-08T00:00:00.000
Latest Schedule Changes
421
Total Schedule Changes
972
150th Street Spine: Phase II - DOT Van Wyck Expressway - Trunk Combined Sewer
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 1202 • Project Name: 150th Street Spine: Phase II - DOT Van Wyck Expressway - Trunk Combined Sewer
Date Reported As Of
2022-09-01T00:00:00.000
Pid
1202
Project Name
150th Street Spine: Phase II - DOT Van Wyck Expressway - Trunk Combined Sewer
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Construction
Design Start
2020-03-02T00:00:00.000
Budget Forecast
138692000.00
Latest Budget Changes
-676000.00
Total Budget Changes
-676000.00
Forecast Completion
2025-04-14T00:00:00.000
Latest Schedule Changes
-382
Total Schedule Changes
-194
Cross River and Croton Falls Dam Refacing
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 1092 • Project Name: Cross River and Croton Falls Dam Refacing
Date Reported As Of
2022-09-01T00:00:00.000
Pid
1092
Project Name
Cross River and Croton Falls Dam Refacing
Description
Provide design and design services during construction for the dam refacing, and drainage work at Cross River and Croton Falls Dams, including but not limited to resurface fascia, address seepage from the dams face.
Category
Water Supply
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2021-03-23T00:00:00.000
Budget Forecast
69145800.00
Latest Budget Changes
23950000.00
Total Budget Changes
23950000.00
Forecast Completion
2027-03-31T00:00:00.000
Latest Schedule Changes
124
Total Schedule Changes
298
Brooklyn Public School 710 Pre-K
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 1097 • Project Name: Brooklyn Public School 710 Pre-K
Date Reported As Of
2022-09-01T00:00:00.000
Pid
1097
Project Name
Brooklyn Public School 710 Pre-K
Description
NEW SCHOOL
Category
Schools
Managing Agency
SCA
Client Agency
DOE
Current Phase
Construction
Design Start
2019-06-17T00:00:00.000
Budget Forecast
38697915.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2023-09-03T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
0
Rehab Of Queens District 11/13 Sanitation Garage
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 770 • Project Name: Rehab Of Queens District 11/13 Sanitation Garage
Date Reported As Of
2022-09-01T00:00:00.000
Pid
770
Project Name
Rehab Of Queens District 11/13 Sanitation Garage
Description
The Department of Sanitation of the City of New York (DSNY) is planning to rehabilitate Queens Districts 11 and 13 garage. The renovation serving both districts is to extend the useful life of the facility through rehabilitation of the building structure and systems. The renovation includes: Extensive structural work that includes the replacement of reinforced concrete slabs and stiffening of the existing steel frame, select replacement of building MEP systems, including BMS systems, architectural renovation of the entire building, study and implementation of deep energy conservation measures (DECMs), and site work which includes new landscape work and replacement of sidewalks and driveways. Rehabilitation is required to meet LEED Silver requirements.
Category
Sanitation
Borough
Queens
Managing Agency
DDC
Client Agency
Sanitation
Current Phase
Design
Design Start
2017-03-06T00:00:00.000
Budget Forecast
73391000.00
Latest Budget Changes
230000.00
Total Budget Changes
36221000.00
Forecast Completion
2026-06-12T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1521
Bainbridge Avenue Trunk Water Main
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 454 • Project Name: Bainbridge Avenue Trunk Water Main
Date Reported As Of
2022-09-01T00:00:00.000
Pid
454
Project Name
Bainbridge Avenue Trunk Water Main
Description
Replacement of Trunk Water Main in Bainbridge Avenue Between Gunhill Road and Holly Lane and in Jerome Avenue Between Holly Lane and E233th Street, etc. Also, New 36" WM in West Burnside Avenue & Phelan Place
Category
Water Supply
Borough
Bronx
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Construction
Design Start
2014-03-17T00:00:00.000
Budget Forecast
71949000.00
Latest Budget Changes
2239000.00
Total Budget Changes
25547000.00
Forecast Completion
2023-06-30T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1687
Coler Specialty Hospital Priority Mitigation Projects
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 544 • Project Name: Coler Specialty Hospital Priority Mitigation Projects
Date Reported As Of
2022-09-01T00:00:00.000
Pid
544
Project Name
Coler Specialty Hospital Priority Mitigation Projects
Description
The priority mitigation projects at Coler include key critical mitigation projects to improve the resiliency of the campus.
Category
Health and Hospitals
Borough
Manhattan
Managing Agency
EDC
Client Agency
H+H
Current Phase
Construction
Design Start
2014-09-01T00:00:00.000
Budget Forecast
26776342.00
Latest Budget Changes
2669225.00
Total Budget Changes
0.00
Forecast Completion
2023-07-31T00:00:00.000
Latest Schedule Changes
61
Total Schedule Changes
2085
New 40th Precinct
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 634 • Project Name: New 40th Precinct
Date Reported As Of
2022-09-01T00:00:00.000
Pid
634
Project Name
New 40th Precinct
Description
Design and build a new Police Precinct with full basement totaling 43,000 sq. ft. on an existing City owned property in the Bronx.
Category
Public Safety and Criminal Justice
Borough
Bronx
Managing Agency
DDC
Client Agency
Police
Design Start
2014-09-30T00:00:00.000
Budget Forecast
98816000.00
Latest Budget Changes
7542000.00
Total Budget Changes
26020000.00
Forecast Completion
2023-06-06T00:00:00.000
Latest Schedule Changes
209
Total Schedule Changes
711
New Stapleton Waterfront: Phases 2 and 3
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 962 • Project Name: New Stapleton Waterfront: Phases 2 and 3
Date Reported As Of
2022-09-01T00:00:00.000
Pid
962
Project Name
New Stapleton Waterfront: Phases 2 and 3
Description
Mixed-use residential community on Staten Island's North Shore.
Category
Industrial Development
Managing Agency
EDC
Client Agency
EDC
Current Phase
Design
Design Start
2015-09-30T00:00:00.000
Budget Forecast
199141423.00
Latest Budget Changes
-923.00
Total Budget Changes
100733778.00
Forecast Completion
2027-05-03T00:00:00.000
Latest Schedule Changes
152
Total Schedule Changes
913
SOUTH BROOKLYN CROSSTOWN SBS
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 843 • Project Name: SOUTH BROOKLYN CROSSTOWN SBS
Date Reported As Of
2022-09-01T00:00:00.000
Pid
843
Project Name
SOUTH BROOKLYN CROSSTOWN SBS
Description
The construction of Southern Brooklyn Crosstown Select Bus Service (SBS)
Category
Industrial Development
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2018-07-17T00:00:00.000
Budget Forecast
91085000.00
Latest Budget Changes
4871000.00
Total Budget Changes
29789000.00
Forecast Completion
2026-09-17T00:00:00.000
Latest Schedule Changes
30
Total Schedule Changes
819
Tompkinsville Esplanade
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 963 • Project Name: Tompkinsville Esplanade
Date Reported As Of
2022-09-01T00:00:00.000
Pid
963
Project Name
Tompkinsville Esplanade
Description
Esplanade from Stapleton to the Lighthouse Museum and Pier for DOT Dockbuilders.
Category
Parks
Managing Agency
EDC
Client Agency
EDC
Current Phase
Design
Design Start
2019-07-01T00:00:00.000
Budget Forecast
162154665.00
Latest Budget Changes
582596.00
Total Budget Changes
10582596.00
Forecast Completion
2025-12-29T00:00:00.000
Latest Schedule Changes
60
Total Schedule Changes
944
DBCD South Site Cultural Fit-Out
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 484 • Project Name: DBCD South Site Cultural Fit-Out
Date Reported As Of
2022-09-01T00:00:00.000
Pid
484
Project Name
DBCD South Site Cultural Fit-Out
Description
Interior fit-out of the south site cultural unit.
Category
Arts and Culture
Borough
Brooklyn
Managing Agency
EDC
Client Agency
DCLA
Current Phase
Construction
Design Start
2014-12-01T00:00:00.000
Budget Forecast
70516949.86
Latest Budget Changes
19446949.86
Total Budget Changes
36789601.16
Forecast Completion
2023-09-02T00:00:00.000
Latest Schedule Changes
245
Total Schedule Changes
1706
Gilboa Dam Reconstruction, Phase IV
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 406 • Project Name: Gilboa Dam Reconstruction, Phase IV
Date Reported As Of
2022-09-01T00:00:00.000
Pid
406
Project Name
Gilboa Dam Reconstruction, Phase IV
Description
This project will rehabilitate the mechanics and the architecture of the Shandaken Tunnel Intake Chamber, which includes the replacement of gates and general site improvements.
Category
Water Supply
Borough
Upstate
Managing Agency
DEP
Client Agency
DEP
Current Phase
Construction
Design Start
2008-12-01T00:00:00.000
Budget Forecast
71046192.20
Latest Budget Changes
-1914297.65
Total Budget Changes
33535991.20
Forecast Completion
2022-11-27T00:00:00.000
Latest Schedule Changes
90
Total Schedule Changes
1684
Shore Road Bridge over Hutchinson River
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 541 • Project Name: Shore Road Bridge over Hutchinson River
Date Reported As Of
2022-09-01T00:00:00.000
Pid
541
Project Name
Shore Road Bridge over Hutchinson River
Description
Replace the Shore Road Bridge over the Hutchinson River with a new bridge.
Category
Bridges, Streets and Roadways
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2017-06-30T00:00:00.000
Budget Forecast
340732843.00
Latest Budget Changes
3266615.00
Total Budget Changes
-19049921.84
Forecast Completion
2029-07-24T00:00:00.000
Latest Schedule Changes
115
Total Schedule Changes
1477
Douglaston New Facility
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 960 • Project Name: Douglaston New Facility
Date Reported As Of
2022-09-01T00:00:00.000
Pid
960
Project Name
Douglaston New Facility
Description
New library facility for the Douglaston/Little Neck community.
Category
Libraries
Managing Agency
DDC
Client Agency
Libraries-QBPL
Current Phase
Design
Design Start
2019-11-20T00:00:00.000
Budget Forecast
30706000.00
Latest Budget Changes
307000.00
Total Budget Changes
5348000.00
Forecast Completion
2027-02-15T00:00:00.000
Latest Schedule Changes
189
Total Schedule Changes
244
Construction Of Sanitary Sewers, Storm Sewers (Bm
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 760 • Project Name: Construction Of Sanitary Sewers, Storm Sewers (Bm
Date Reported As Of
2022-09-01T00:00:00.000
Pid
760
Project Name
Construction Of Sanitary Sewers, Storm Sewers (Bm
Description
Construction of storm sewers, sanitary sewers, water mains and Best Management Practice (BMP) NC-16 in Mason Avenue area, Borough of Staten Island.
Category
Sewers
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Construction
Design Start
2016-08-29T00:00:00.000
Budget Forecast
70400000.00
Latest Budget Changes
845000.00
Total Budget Changes
37691000.00
Forecast Completion
2023-06-26T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
595
Bronx Public School @ 639 ST ANN'S AVENUE
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 1089 • Project Name: Bronx Public School @ 639 ST ANN'S AVENUE
Date Reported As Of
2022-09-01T00:00:00.000
Pid
1089
Project Name
Bronx Public School @ 639 ST ANN'S AVENUE
Description
NEW SCHOOL
Category
Schools
Managing Agency
SCA
Client Agency
DOE
Current Phase
Construction
Design Start
2019-08-29T00:00:00.000
Budget Forecast
93838545.00
Latest Budget Changes
0.00
Total Budget Changes
-1926038.00
Forecast Completion
2024-09-03T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
0
Queensboro Bridge Roadway Replacement over East River
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 594 • Project Name: Queensboro Bridge Roadway Replacement over East River
Date Reported As Of
2022-09-01T00:00:00.000
Pid
594
Project Name
Queensboro Bridge Roadway Replacement over East River
Description
This project includes the replacement of the upper roadway's deck on the main bridge along with steel repairs, fire standpipes, and lighting upgrades.
Category
Bridges, Streets and Roadways
Managing Agency
DOT
Client Agency
DOT
Current Phase
Construction
Design Start
2015-04-09T00:00:00.000
Budget Forecast
358195118.00
Latest Budget Changes
-6340651.00
Total Budget Changes
8567339.67
Forecast Completion
2014-01-31T00:00:00.000
Latest Schedule Changes
-3694
Total Schedule Changes
1970
Park Avenue Tunnel (Murray Hill)
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 536 • Project Name: Park Avenue Tunnel (Murray Hill)
Date Reported As Of
2022-09-01T00:00:00.000
Pid
536
Project Name
Park Avenue Tunnel (Murray Hill)
Description
Repair Park Avenue tunnel, located in Midtown, Manhattan.
Category
Bridges
Managing Agency
DOT
Client Agency
DOT
Current Phase
Construction
Design Start
2006-08-01T00:00:00.000
Budget Forecast
43024414.00
Latest Budget Changes
-3371857.00
Total Budget Changes
-17773389.61
Forecast Completion
2023-05-02T00:00:00.000
Latest Schedule Changes
272
Total Schedule Changes
1568
Bush Terminal Development Site Preparation
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 1086 • Project Name: Bush Terminal Development Site Preparation
Date Reported As Of
2022-09-01T00:00:00.000
Pid
1086
Project Name
Bush Terminal Development Site Preparation
Description
Sitework (including but not limited to: excavation, utility, and bulkhead work) at Bush Terminal in preparation of the Steiner Studio campus.
Category
Industrial Development
Managing Agency
EDC
Client Agency
EDC
Current Phase
Construction Procurement
Design Start
2021-03-01T00:00:00.000
Budget Forecast
29000000.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2025-05-31T00:00:00.000
Latest Schedule Changes
121
Total Schedule Changes
517
Grand Concourse Reconstruction, Phase 4 (Great Streets)
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 476 • Project Name: Grand Concourse Reconstruction, Phase 4 (Great Streets)
Date Reported As Of
2022-09-01T00:00:00.000
Pid
476
Project Name
Grand Concourse Reconstruction, Phase 4 (Great Streets)
Description
RECONSTRUCTION OF GRAND CONCOURSE FROM E 175 ST TO EAST FORDHAM RD- PHASE 4, BX
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Construction
Design Start
2016-07-19T00:00:00.000
Budget Forecast
96108000.00
Latest Budget Changes
-1274000.00
Total Budget Changes
57634000.00
Forecast Completion
2023-06-13T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1448
Harlem River Drive Ramp Reconstruction (George Washington Bridge)
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 708 • Project Name: Harlem River Drive Ramp Reconstruction (George Washington Bridge)
Date Reported As Of
2022-09-01T00:00:00.000
Pid
708
Project Name
Harlem River Drive Ramp Reconstruction (George Washington Bridge)
Description
Repair the Harlem River Drive Ramp to George Washington Bridge over Harlem River Drive Southbound (Trans-Manhattan Expressway), Manhattan
Category
Bridges, Streets and Roadways
Borough
Manhattan
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2019-02-07T00:00:00.000
Budget Forecast
427587546.00
Latest Budget Changes
-2205000.00
Total Budget Changes
-3711870.00
Forecast Completion
2035-04-15T00:00:00.000
Latest Schedule Changes
255
Total Schedule Changes
2697
Orchard Beach Pavilion
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 858 • Project Name: Orchard Beach Pavilion
Date Reported As Of
2022-09-01T00:00:00.000
Pid
858
Project Name
Orchard Beach Pavilion
Description
The restoration of the existing landmarked Orchard Beach Pavilion (located in Bronx, NY) which includes the construction of an ADA ramp at the main entrance of the Pavilion to improve accessibility to the beach passageway.
Category
Parks
Managing Agency
EDC
Client Agency
DPR
Current Phase
Construction Procurement
Design Start
2018-11-30T00:00:00.000
Budget Forecast
87652588.00
Latest Budget Changes
0.00
Total Budget Changes
35628847.00
Forecast Completion
2025-02-28T00:00:00.000
Latest Schedule Changes
-31
Total Schedule Changes
942
Flushing Meadows Corona Park Electrical Vault Reconstruction (Hurricane Sandy)
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 1083 • Project Name: Flushing Meadows Corona Park Electrical Vault Reconstruction (Hurricane Sandy)
Date Reported As Of
2022-09-01T00:00:00.000
Pid
1083
Project Name
Flushing Meadows Corona Park Electrical Vault Reconstruction (Hurricane Sandy)
Description
This project will reconstruct the electrical vaults in Flushing Meadows Corona Park that were damaged by Hurricane Sandy.
Category
Parks
Managing Agency
DPR
Client Agency
DPR
Current Phase
Design
Design Start
2019-08-21T00:00:00.000
Budget Forecast
56237000.00
Latest Budget Changes
-3590909.00
Total Budget Changes
-3555909.00
East River Esplanade Stabilization and Reconstruction Phase 2
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 1082 • Project Name: East River Esplanade Stabilization and Reconstruction Phase 2
Date Reported As Of
2022-09-01T00:00:00.000
Pid
1082
Project Name
East River Esplanade Stabilization and Reconstruction Phase 2
Description
This project will stabilize and reconstruct portions of the East River Esplanade.
Category
Parks
Managing Agency
DPR
Client Agency
DPR
Current Phase
Construction Procurement
Design Start
2019-02-01T00:00:00.000
Budget Forecast
29475000.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2024-11-16T00:00:00.000
Latest Schedule Changes
-7
Total Schedule Changes
156
Bronx Sanitation Garage Rehabilitation: Community District 12
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 956 • Project Name: Bronx Sanitation Garage Rehabilitation: Community District 12
Date Reported As Of
2022-09-01T00:00:00.000
Pid
956
Project Name
Bronx Sanitation Garage Rehabilitation: Community District 12
Description
Rehabilitation of garage that serves Bronx Community District 12 located at 1635 East 233rd Street, Bronx.
Category
Sanitation
Managing Agency
DSNY
Client Agency
DSNY
Current Phase
Design
Design Start
2017-11-01T00:00:00.000
Budget Forecast
57376185.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2027-12-31T00:00:00.000
Latest Schedule Changes
365
Total Schedule Changes
1064
Lower Concourse: Park
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 961 • Project Name: Lower Concourse: Park
Date Reported As Of
2022-09-01T00:00:00.000
Pid
961
Project Name
Lower Concourse: Park
Description
Four-acre waterfront park in Lower Concourse, Bronx.
Category
Parks
Managing Agency
EDC
Client Agency
DPR
Current Phase
Construction Procurement
Design Start
2019-09-30T00:00:00.000
Budget Forecast
35407359.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2025-03-31T00:00:00.000
Latest Schedule Changes
152
Total Schedule Changes
456
NEW UTRECH LIBRARY MAJOR RENOVATIONS
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 841 • Project Name: NEW UTRECH LIBRARY MAJOR RENOVATIONS
Date Reported As Of
2022-09-01T00:00:00.000
Pid
841
Project Name
NEW UTRECH LIBRARY MAJOR RENOVATIONS
Description
New Utrech branch library is a comprehensive interior and exterior renovation which includes new fire alarm/ BMS, new interior layout, new HVAC, new roof, exterior rehabilitation and landscape.
Category
Libraries
Managing Agency
DDC
Client Agency
Libraries-BPL
Current Phase
Design
Design Start
2018-06-27T00:00:00.000
Budget Forecast
26658000.00
Latest Budget Changes
0.00
Total Budget Changes
290000.00
Forecast Completion
2027-12-02T00:00:00.000
Latest Schedule Changes
370
Total Schedule Changes
1188
Pier 42 and East River Park Connector Program
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 1085 • Project Name: Pier 42 and East River Park Connector Program
Date Reported As Of
2022-09-01T00:00:00.000
Pid
1085
Project Name
Pier 42 and East River Park Connector Program
Description
Abatement, demolition, and replacement of shed with an upland park on Pier 42 in Manhattan.
Category
Parks
Managing Agency
EDC
Client Agency
DPR
Current Phase
Construction
Design Start
2017-06-01T00:00:00.000
Budget Forecast
60215737.00
Latest Budget Changes
100000.00
Total Budget Changes
100000.00
Forecast Completion
2023-08-31T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
214
Hansborough Recreation Center Reconstruction
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 1090 • Project Name: Hansborough Recreation Center Reconstruction
Date Reported As Of
2022-09-01T00:00:00.000
Pid
1090
Project Name
Hansborough Recreation Center Reconstruction
Description
This project will reconstruct the pool, entrance and interior spaces of the Hansborough Recreation Center.
Category
Parks
Managing Agency
DPR
Client Agency
DPR
Current Phase
Construction Procurement
Design Start
2020-03-23T00:00:00.000
Budget Forecast
36668800.00
Latest Budget Changes
0.00
Total Budget Changes
-4700000.00
Forecast Completion
2025-08-27T00:00:00.000
Latest Schedule Changes
186
Total Schedule Changes
186
Brooklyn Public School 748 New Construction
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 1098 • Project Name: Brooklyn Public School 748 New Construction
Date Reported As Of
2022-09-01T00:00:00.000
Pid
1098
Project Name
Brooklyn Public School 748 New Construction
Description
LEASE
Category
Schools
Managing Agency
SCA
Client Agency
DOE
Current Phase
Construction
Design Start
2018-02-23T00:00:00.000
Budget Forecast
31421420.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2023-09-03T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
0
Reconstruction Of Trinity Pl
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 755 • Project Name: Reconstruction Of Trinity Pl
Date Reported As Of
2022-09-01T00:00:00.000
Pid
755
Project Name
Reconstruction Of Trinity Pl
Description
Reconstruction of Trinity Place from Morris Street to Cedar Street, Borough of Manhattan
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Construction Procurement
Design Start
2018-10-01T00:00:00.000
Budget Forecast
54434000.00
Latest Budget Changes
1179000.00
Total Budget Changes
13224000.00
Forecast Completion
2026-06-29T00:00:00.000
Latest Schedule Changes
-132
Total Schedule Changes
730
CONSTRUCTION OF BMPs NC 6 AND 15 - SI
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 631 • Project Name: CONSTRUCTION OF BMPs NC 6 AND 15 - SI
Date Reported As Of
2022-09-01T00:00:00.000
Pid
631
Project Name
CONSTRUCTION OF BMPs NC 6 AND 15 - SI
Description
CONSTRUCTION OF BMP’s NC 6 AND 15, STORM AND SANITARY SEWERS INSTALLATION, SI
Category
Industrial Development
Borough
Staten Island
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Construction
Design Start
2017-08-14T00:00:00.000
Budget Forecast
33450000.00
Latest Budget Changes
1171000.00
Total Budget Changes
1921000.00
Forecast Completion
2024-06-09T00:00:00.000
Latest Schedule Changes
556
Total Schedule Changes
925
5th Avenue Bridge Reconstruction over LIRR and Sea Beach, Brooklyn
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 504 • Project Name: 5th Avenue Bridge Reconstruction over LIRR and Sea Beach, Brooklyn
Date Reported As Of
2022-09-01T00:00:00.000
Pid
504
Project Name
5th Avenue Bridge Reconstruction over LIRR and Sea Beach, Brooklyn
Description
Replace the 5th Avenue Bridge over LIRR & Sea Beach, Brooklyn.
Category
Bridges
Borough
Brooklyn
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2017-11-30T00:00:00.000
Budget Forecast
86511361.00
Latest Budget Changes
1992312.00
Total Budget Changes
36577693.00
Forecast Completion
2027-11-13T00:00:00.000
Latest Schedule Changes
-20
Total Schedule Changes
969
Reconstruct Main Sewage Pump Controls at Port Richmond WWTP
Date Reported As Of: 2022-09-01T00:00:00.000 • Pid: 948 • Project Name: Reconstruct Main Sewage Pump Controls at Port Richmond WWTP
Date Reported As Of
2022-09-01T00:00:00.000
Pid
948
Project Name
Reconstruct Main Sewage Pump Controls at Port Richmond WWTP
Description
Reconstruction of main sewage pumps and ancillary components including suction valves, suction piping, seal water system, pressure gauges, suction header, etc. New MSP's should meet the new design parameter of N+2 redundancy during wet weather flow
Category
Wastewater Treatment
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2019-11-27T00:00:00.000
Budget Forecast
50505064.39
Latest Budget Changes
2231723.00
Total Budget Changes
26923720.62
Forecast Completion
2026-09-27T00:00:00.000
Latest Schedule Changes
123
Total Schedule Changes
516