Capital Projects

All major infrastructure and information technology projects with a budget of $25 million or more that are currently active (in the design, procurement, or construction phase).

City Government Mayor's Office of Operations (OPS) Dataset n7gv-k5yt 16 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
New Westchester Square
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 1147 • Project Name: New Westchester Square
Date Reported As Of
2022-04-01T00:00:00.000
Pid
1147
Project Name
New Westchester Square
Description
DDC Constructability comments anticipated by 5/31/17. Anticipated Construction Budget shortfall of $600k. Funding required to submit initial Construction CP.
Category
Other Government Facilities
Managing Agency
DDC
Client Agency
Libraries-NYPL
Current Phase
Construction Procurement
Design Start
2013-05-13T00:00:00.000
Budget Forecast
36429630.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2026-02-28T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
471
Bergen Avenue Street Reconstruction
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 170 • Project Name: Bergen Avenue Street Reconstruction
Date Reported As Of
2022-04-01T00:00:00.000
Pid
170
Project Name
Bergen Avenue Street Reconstruction
Description
Reconstruction of Bergen Avenue Area, including Storm Sewers, Water Mains, Street Lighting, Traffic Signal Work, and reconstruction of new outfall at East Mill Basin.
Category
Streets and Roadways
Borough
Brooklyn
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Construction
Design Start
2012-12-03T00:00:00.000
Budget Forecast
79864000.00
Latest Budget Changes
-1638000.00
Total Budget Changes
45837000.00
Forecast Completion
2023-06-24T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
-388
Headworks Improvements at Tallman Island
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 906 • Project Name: Headworks Improvements at Tallman Island
Date Reported As Of
2022-04-01T00:00:00.000
Pid
906
Project Name
Headworks Improvements at Tallman Island
Description
Headworks Improvements
Category
Industrial Development
Managing Agency
DEP
Client Agency
WWC
Current Phase
Design
Design Start
2019-07-07T00:00:00.000
Budget Forecast
52030751.00
Latest Budget Changes
0.00
Total Budget Changes
19975649.96
Forecast Completion
2026-11-05T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
586
SEELY STREET OVER PROSPECT AVENUE BIN: 2244470
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 1119 • Project Name: SEELY STREET OVER PROSPECT AVENUE BIN: 2244470
Date Reported As Of
2022-04-01T00:00:00.000
Pid
1119
Project Name
SEELY STREET OVER PROSPECT AVENUE BIN: 2244470
Description
Rehabilitation of Seeley Street bridge over Prospect Avenue
Category
Bridges
Managing Agency
DOT
Client Agency
n/a
Current Phase
Design
Design Start
2019-11-12T00:00:00.000
Budget Forecast
30709037.00
Latest Budget Changes
-512230.00
Total Budget Changes
0.00
Forecast Completion
2027-10-03T00:00:00.000
Latest Schedule Changes
27
Total Schedule Changes
253
DELANCEY STREET SAFETY IMPROVEMENTS
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 983 • Project Name: DELANCEY STREET SAFETY IMPROVEMENTS
Date Reported As Of
2022-04-01T00:00:00.000
Pid
983
Project Name
DELANCEY STREET SAFETY IMPROVEMENTS
Description
DELANCEY STREET SAFETY IMPROVEMENTS
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2017-07-19T00:00:00.000
Budget Forecast
56381000.00
Latest Budget Changes
0.00
Total Budget Changes
20937000.00
Forecast Completion
2026-10-23T00:00:00.000
Latest Schedule Changes
123
Total Schedule Changes
1217
New 116Th Pct
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 762 • Project Name: New 116Th Pct
Date Reported As Of
2022-04-01T00:00:00.000
Pid
762
Project Name
New 116Th Pct
Description
Construction of a new precinct station house facility and associated site work for the new 116th Precinct.
Category
Public Safety and Criminal Justice
Managing Agency
DDC
Client Agency
Police
Current Phase
Construction
Design Start
2017-09-14T00:00:00.000
Budget Forecast
110640000.00
Latest Budget Changes
0.00
Total Budget Changes
33852900.86
Forecast Completion
2023-12-30T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
727
Beverly Road over Brighton Subway Line
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 709 • Project Name: Beverly Road over Brighton Subway Line
Date Reported As Of
2022-04-01T00:00:00.000
Pid
709
Project Name
Beverly Road over Brighton Subway Line
Description
Repair the Beverly Road bridge over BMT Subway Brighton, Brooklyn
Category
Bridges
Borough
Brooklyn
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2020-01-06T00:00:00.000
Budget Forecast
47981235.00
Latest Budget Changes
-500000.00
Total Budget Changes
1279646.00
Forecast Completion
2030-02-28T00:00:00.000
Latest Schedule Changes
90
Total Schedule Changes
1864
Water Main Replacement In 222 Street, Queens
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 768 • Project Name: Water Main Replacement In 222 Street, Queens
Date Reported As Of
2022-04-01T00:00:00.000
Pid
768
Project Name
Water Main Replacement In 222 Street, Queens
Description
WATER MAIN REPLACEMENT IN 222 STREET
Category
Water Supply
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Design
Design Start
2017-01-05T00:00:00.000
Budget Forecast
41472000.00
Latest Budget Changes
0.00
Total Budget Changes
7195000.00
Forecast Completion
2025-12-18T00:00:00.000
Latest Schedule Changes
153
Total Schedule Changes
2236
West 59th Street Marine Transfer Station Construction, Phase 2
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 347 • Project Name: West 59th Street Marine Transfer Station Construction, Phase 2
Date Reported As Of
2022-04-01T00:00:00.000
Pid
347
Project Name
West 59th Street Marine Transfer Station Construction, Phase 2
Description
Project 2 Scope: Refurbishment of the existing pier building including: repair of existing pier structure including pile caps and fendering; construction of new emergency generator, electrical, mechanical, fire pump and fire valve rooms; new exit passageway construction and existing exit passageway refurbishment; re-arrangement and refurbishment of the Operations Building interiors; replacement of fire suppression system throughout the entire pier structure; mechanical, electrical and plumbing system upgrades; refurbishment and painting the existing pier interior steel framing and wall/roof surfaces; recoating the structure's exterior cladding systems including metal wall and roof panel system and translucent panel wall cladding system.
Category
Sanitation
Borough
Manhattan
Managing Agency
DDC
Client Agency
Sanitation
Current Phase
Construction
Design Start
2012-01-17T00:00:00.000
Budget Forecast
187830576.46
Latest Budget Changes
93915288.23
Total Budget Changes
126753576.46
Forecast Completion
2022-08-16T00:00:00.000
Latest Schedule Changes
169
Total Schedule Changes
1949
The Reconstruction of The Lower Catskill Aqueduct
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 667 • Project Name: The Reconstruction of The Lower Catskill Aqueduct
Date Reported As Of
2022-04-01T00:00:00.000
Pid
667
Project Name
The Reconstruction of The Lower Catskill Aqueduct
Description
Reconstruction of Aqueduct structures; Replacement of mechanical equipment; cleaning the aqueduct interior & rehabilitation & repair of cracks & leaks. All relevent assessments, investigations, piloting, plans and reports.
Category
Water Supply
Borough
Citywide
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2019-04-15T00:00:00.000
Budget Forecast
249460845.00
Latest Budget Changes
5000000.00
Total Budget Changes
-65760729.00
Forecast Completion
2027-11-27T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1421
Reconstruction of the Ashokan Headworks
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 834 • Project Name: Reconstruction of the Ashokan Headworks
Date Reported As Of
2022-04-01T00:00:00.000
Pid
834
Project Name
Reconstruction of the Ashokan Headworks
Description
CAT-213
Category
Water Supply
Borough
Upstate
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2020-08-07T00:00:00.000
Budget Forecast
333066831.75
Latest Budget Changes
13832112.00
Total Budget Changes
41950858.00
Forecast Completion
2027-11-04T00:00:00.000
Latest Schedule Changes
11
Total Schedule Changes
-67
UNION TURNPIKE CENTER MEDIAN REPLACEMENT
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 986 • Project Name: UNION TURNPIKE CENTER MEDIAN REPLACEMENT
Date Reported As Of
2022-04-01T00:00:00.000
Pid
986
Project Name
UNION TURNPIKE CENTER MEDIAN REPLACEMENT
Description
Union Turnpike Center Median Replacement from Hollis Court Blvd to 226th Street, Borough of Queens
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Construction Procurement
Design Start
2019-05-23T00:00:00.000
Budget Forecast
50000000.00
Latest Budget Changes
20231000.00
Total Budget Changes
23766000.00
Forecast Completion
2024-09-10T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
341
WOODHAVEN BLVD QUEENS BLVD BIN# 2248159
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 1128 • Project Name: WOODHAVEN BLVD QUEENS BLVD BIN# 2248159
Date Reported As Of
2022-04-01T00:00:00.000
Pid
1128
Project Name
WOODHAVEN BLVD QUEENS BLVD BIN# 2248159
Description
This bridge is a two span concrete encased structure, 153.3 feet wide, 75 feet long and carries a total of 9 lanes of traffic. The bridge itself is an integral part of the Woodhaven Blvd. subway station structure owned and operated by the MTA. The superstructure consists of concrete encased steel stringers framing into concrete encased steel columns which are also used to serve as the retaining wall holding up Queens Blvd. service road.
Category
Bridges
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2018-10-10T00:00:00.000
Budget Forecast
65231241.00
Latest Budget Changes
115000.00
Total Budget Changes
2052000.00
Forecast Completion
2027-05-03T00:00:00.000
Latest Schedule Changes
26
Total Schedule Changes
932
Concourse Village Avenue over Metro North
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 587 • Project Name: Concourse Village Avenue over Metro North
Date Reported As Of
2022-04-01T00:00:00.000
Pid
587
Project Name
Concourse Village Avenue over Metro North
Description
Replace the Concourse Village Avenue bridge over Metro North, Bronx
Category
Bridges
Borough
Bronx
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2019-01-25T00:00:00.000
Budget Forecast
49809580.00
Latest Budget Changes
-759610.00
Total Budget Changes
-186092.37
Forecast Completion
2029-08-22T00:00:00.000
Latest Schedule Changes
121
Total Schedule Changes
1865
Bronx Public School 108 Addition
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 1109 • Project Name: Bronx Public School 108 Addition
Date Reported As Of
2022-04-01T00:00:00.000
Pid
1109
Project Name
Bronx Public School 108 Addition
Description
ADDITION
Category
Schools
Managing Agency
SCA
Client Agency
DOE
Current Phase
Construction
Design Start
2020-01-17T00:00:00.000
Budget Forecast
86927350.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2024-09-03T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
0
Brooklyn Public School 253 Addition
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 1110 • Project Name: Brooklyn Public School 253 Addition
Date Reported As Of
2022-04-01T00:00:00.000
Pid
1110
Project Name
Brooklyn Public School 253 Addition
Description
ADDITION
Category
Schools
Managing Agency
SCA
Client Agency
DOE
Current Phase
Construction
Design Start
2020-03-09T00:00:00.000
Budget Forecast
75767435.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2024-09-03T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
0
RECONSTRUCTION OF QUEENS BLVD - PHASE 2
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 619 • Project Name: RECONSTRUCTION OF QUEENS BLVD - PHASE 2
Date Reported As Of
2022-04-01T00:00:00.000
Pid
619
Project Name
RECONSTRUCTION OF QUEENS BLVD - PHASE 2
Description
Vision Zero - Queens Boulevard - Segment 2: 73rd Street to Eliot Avenue. Variety of safety and streetscape improvements including partial street reconstruction and resurfacing to address roadway conditions
Category
Industrial Development
Borough
Queens
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2016-10-26T00:00:00.000
Budget Forecast
85043000.00
Latest Budget Changes
800000.00
Total Budget Changes
14201000.00
Forecast Completion
2029-08-13T00:00:00.000
Latest Schedule Changes
-31
Total Schedule Changes
2315
Sunset Park Infrastructure
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 574 • Project Name: Sunset Park Infrastructure
Date Reported As Of
2022-04-01T00:00:00.000
Pid
574
Project Name
Sunset Park Infrastructure
Description
This project is construction of infrastructure and streetscape improvements in Sunset Park from 37th to 43rd Streets, between the Gowanus Expressway and the waterfront - to activate the waterfront and promote future development.
Category
Industrial Development
Borough
Brooklyn
Managing Agency
EDC
Client Agency
Mayor's Office
Current Phase
Construction
Design Start
2016-06-08T00:00:00.000
Budget Forecast
37500000.00
Latest Budget Changes
0.00
Total Budget Changes
31633941.69
Forecast Completion
2024-04-30T00:00:00.000
Latest Schedule Changes
181
Total Schedule Changes
1290
WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 981 • Project Name: WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS
Date Reported As Of
2022-04-01T00:00:00.000
Pid
981
Project Name
WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS
Description
PRELIMINARY AND FINAL DESIGN SERVICES FOR RECONSTRUCTION OF WESTBOURNE NORTON DRIVE. BOROUGH OF QUEENS
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2016-12-15T00:00:00.000
Budget Forecast
60672000.00
Latest Budget Changes
-651000.00
Total Budget Changes
47223000.00
Forecast Completion
2029-09-26T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1840
GI - GRAVESEND BAY CSO - PHASE II
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 1198 • Project Name: GI - GRAVESEND BAY CSO - PHASE II
Date Reported As Of
2022-04-01T00:00:00.000
Pid
1198
Project Name
GI - GRAVESEND BAY CSO - PHASE II
Description
GREEN INFRASTRUCTURE IN OH-015 GRAVESEND BAY CSO PH 2
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Design
Design Start
2017-10-30T00:00:00.000
Budget Forecast
42088000.00
Latest Budget Changes
690000.00
Total Budget Changes
13699000.00
Forecast Completion
2024-11-10T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
29
FUEL TANK & SUMP REPLACEMENTS - BRONX
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 901 • Project Name: FUEL TANK & SUMP REPLACEMENTS - BRONX
Date Reported As Of
2022-04-01T00:00:00.000
Pid
901
Project Name
FUEL TANK & SUMP REPLACEMENTS - BRONX
Description
CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS
Category
Industrial Development
Managing Agency
DDC
Client Agency
DCAS
Current Phase
Construction
Design Start
2019-08-20T00:00:00.000
Budget Forecast
25516000.00
Latest Budget Changes
200000.00
Total Budget Changes
-1834000.00
Forecast Completion
2025-01-22T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
663
Park Avenue Tunnel (Murray Hill)
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 536 • Project Name: Park Avenue Tunnel (Murray Hill)
Date Reported As Of
2022-04-01T00:00:00.000
Pid
536
Project Name
Park Avenue Tunnel (Murray Hill)
Description
Repair Park Avenue tunnel, located in Midtown, Manhattan.
Category
Bridges
Managing Agency
DOT
Client Agency
DOT
Current Phase
Construction
Design Start
2006-08-01T00:00:00.000
Budget Forecast
46396271.00
Latest Budget Changes
-6440696.00
Total Budget Changes
-17773389.61
Forecast Completion
2022-08-03T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1568
Battery Park Underpass Emergency Relief Betterments
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 540 • Project Name: Battery Park Underpass Emergency Relief Betterments
Date Reported As Of
2022-04-01T00:00:00.000
Pid
540
Project Name
Battery Park Underpass Emergency Relief Betterments
Description
Resiliency betterments for Battery Park and West Street underpasses.
Category
Bridges
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2018-04-01T00:00:00.000
Budget Forecast
56984167.00
Latest Budget Changes
1940638.00
Total Budget Changes
47923308.00
Forecast Completion
2024-11-27T00:00:00.000
Latest Schedule Changes
30
Total Schedule Changes
1197
Coney Island Area, Phase 3A
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 516 • Project Name: Coney Island Area, Phase 3A
Date Reported As Of
2022-04-01T00:00:00.000
Pid
516
Project Name
Coney Island Area, Phase 3A
Description
Reconstruction of Storm and Sanitary sewer, Trunk and distribution water main in Coney Island area - Phase 3A, Borough of Brooklyn
Category
Industrial Development
Borough
Brooklyn
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Construction
Design Start
2014-03-17T00:00:00.000
Budget Forecast
63020000.00
Latest Budget Changes
0.00
Total Budget Changes
25273000.00
Forecast Completion
2023-11-27T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1215
BROWNSVILLE LIBRARY MAJOR RENOVATIONS
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 977 • Project Name: BROWNSVILLE LIBRARY MAJOR RENOVATIONS
Date Reported As Of
2022-04-01T00:00:00.000
Pid
977
Project Name
BROWNSVILLE LIBRARY MAJOR RENOVATIONS
Description
The Brownsville Library is a comprehensive interior/exterior renovation and addition which includes new fire alarm/BMS, new interior layout, new HVAC, new accessible restrooms, exterior rehabilitation and landscape.
Category
Libraries
Managing Agency
DDC
Client Agency
Libraries-BPL
Current Phase
Design
Design Start
2018-07-27T00:00:00.000
Budget Forecast
32074000.00
Latest Budget Changes
175000.00
Total Budget Changes
6752000.00
Forecast Completion
2026-12-19T00:00:00.000
Latest Schedule Changes
170
Total Schedule Changes
916
Catskill Aqueduct Repair and Rehabilitation
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 478 • Project Name: Catskill Aqueduct Repair and Rehabilitation
Date Reported As Of
2022-04-01T00:00:00.000
Pid
478
Project Name
Catskill Aqueduct Repair and Rehabilitation
Description
Project to ensure the reliability of the 74 mile upper Catskill Aqueduct, including replacement of mechanical components, leak mitigation, and biofilm removal/condition assessment.
Category
Water Supply
Borough
Citywide
Managing Agency
DEP
Client Agency
DEP
Current Phase
Construction
Design Start
2015-06-19T00:00:00.000
Budget Forecast
244269503.18
Latest Budget Changes
-22942519.82
Total Budget Changes
9642889.68
Forecast Completion
2022-08-01T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1517
Grand Concourse Reconstruction, Phase 4 (Great Streets)
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 476 • Project Name: Grand Concourse Reconstruction, Phase 4 (Great Streets)
Date Reported As Of
2022-04-01T00:00:00.000
Pid
476
Project Name
Grand Concourse Reconstruction, Phase 4 (Great Streets)
Description
RECONSTRUCTION OF GRAND CONCOURSE FROM E 175 ST TO EAST FORDHAM RD- PHASE 4, BX
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Construction
Design Start
2016-07-19T00:00:00.000
Budget Forecast
97382000.00
Latest Budget Changes
9398000.00
Total Budget Changes
57634000.00
Forecast Completion
2023-06-13T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1448
FUEL TANK & SUMP REPLACEMENTS - MANHATTAN/S.I.
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 900 • Project Name: FUEL TANK & SUMP REPLACEMENTS - MANHATTAN/S.I.
Date Reported As Of
2022-04-01T00:00:00.000
Pid
900
Project Name
FUEL TANK & SUMP REPLACEMENTS - MANHATTAN/S.I.
Description
CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS
Category
Industrial Development
Managing Agency
DDC
Client Agency
DCAS
Current Phase
Design
Design Start
2019-07-17T00:00:00.000
Budget Forecast
25546000.00
Latest Budget Changes
300000.00
Total Budget Changes
-1754000.00
Forecast Completion
2025-06-29T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
663
Queens Public School 489 Annex
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 1107 • Project Name: Queens Public School 489 Annex
Date Reported As Of
2022-04-01T00:00:00.000
Pid
1107
Project Name
Queens Public School 489 Annex
Description
NEW SCHOOL
Category
Schools
Managing Agency
SCA
Client Agency
DOE
Current Phase
Construction
Design Start
2019-12-16T00:00:00.000
Budget Forecast
79171750.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2024-09-03T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
0
Henry Hudson Parkway over Amtrak (Northbound)
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 592 • Project Name: Henry Hudson Parkway over Amtrak (Northbound)
Date Reported As Of
2022-04-01T00:00:00.000
Pid
592
Project Name
Henry Hudson Parkway over Amtrak (Northbound)
Description
Replace the Ramp to northbound Henry Hudson Parkway over Amtrak in Manhattan.
Category
Bridges
Borough
Manhattan
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2020-01-02T00:00:00.000
Budget Forecast
53551625.00
Latest Budget Changes
-500000.00
Total Budget Changes
500625.00
Forecast Completion
2029-07-01T00:00:00.000
Latest Schedule Changes
45
Total Schedule Changes
1693
Harlem River Drive Ramp Reconstruction (George Washington Bridge)
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 708 • Project Name: Harlem River Drive Ramp Reconstruction (George Washington Bridge)
Date Reported As Of
2022-04-01T00:00:00.000
Pid
708
Project Name
Harlem River Drive Ramp Reconstruction (George Washington Bridge)
Description
Repair the Harlem River Drive Ramp to George Washington Bridge over Harlem River Drive Southbound (Trans-Manhattan Expressway), Manhattan
Category
Bridges, Streets and Roadways
Borough
Manhattan
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2019-02-07T00:00:00.000
Budget Forecast
429792546.00
Latest Budget Changes
-290000.00
Total Budget Changes
-3711870.00
Forecast Completion
2034-08-03T00:00:00.000
Latest Schedule Changes
25
Total Schedule Changes
2697
Dutch Kills and Lower Newtown Creek Enhanced Aeration Work
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 313 • Project Name: Dutch Kills and Lower Newtown Creek Enhanced Aeration Work
Date Reported As Of
2022-04-01T00:00:00.000
Pid
313
Project Name
Dutch Kills and Lower Newtown Creek Enhanced Aeration Work
Description
This project will upgrade the Borden Ave Pump Station. Footprint of the PS will be increased to ~ 2750 square feet. Convert dry well into wet well. Replace existing non-submersible pumps with submersible pumps while maintaining PS capacity of 3.9 MGD. Provide emergency portable diesel driven 4.5 MGD pump. Installation of new electrical, controls (SCADA), mechanical & HVAC systems. Provisions to support a future project to expand capacity of the PS from 3.9 MGD to 26 MGD. Upgrade resiliency per BWT guidelines. Line existing 14" Force Main
Category
Wastewater Treatment
Borough
Queens
Managing Agency
DEP
Client Agency
DEP
Current Phase
Construction Procurement
Design Start
2014-01-01T00:00:00.000
Budget Forecast
33485716.43
Latest Budget Changes
-5145584.00
Total Budget Changes
-4338327.57
Forecast Completion
2025-08-01T00:00:00.000
Latest Schedule Changes
133
Total Schedule Changes
1891
Shore Road Bridge over Hutchinson River
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 541 • Project Name: Shore Road Bridge over Hutchinson River
Date Reported As Of
2022-04-01T00:00:00.000
Pid
541
Project Name
Shore Road Bridge over Hutchinson River
Description
Replace the Shore Road Bridge over the Hutchinson River with a new bridge.
Category
Bridges, Streets and Roadways
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2017-06-30T00:00:00.000
Budget Forecast
337466228.00
Latest Budget Changes
5280376.00
Total Budget Changes
-19049921.84
Forecast Completion
2029-03-31T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1477
Queens Public School 032 Addition
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 1108 • Project Name: Queens Public School 032 Addition
Date Reported As Of
2022-04-01T00:00:00.000
Pid
1108
Project Name
Queens Public School 032 Addition
Description
ADDITION
Category
Schools
Managing Agency
SCA
Client Agency
DOE
Current Phase
Construction
Design Start
2020-02-24T00:00:00.000
Budget Forecast
67965151.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2024-09-03T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
0
GI-OWLS HEAD TRIBUTARY DRAINAGE AREAS, BROOKLYN
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 1200 • Project Name: GI-OWLS HEAD TRIBUTARY DRAINAGE AREAS, BROOKLYN
Date Reported As Of
2022-04-01T00:00:00.000
Pid
1200
Project Name
GI-OWLS HEAD TRIBUTARY DRAINAGE AREAS, BROOKLYN
Description
GREEN INFRASTRUCTURE IN OWLS HEAD TRIBUTARY DRAINAGE AREAS, BROOKLYN
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Design
Design Start
2019-01-02T00:00:00.000
Budget Forecast
59405000.00
Latest Budget Changes
12986000.00
Total Budget Changes
24278000.00
Forecast Completion
2026-11-29T00:00:00.000
Latest Schedule Changes
250
Total Schedule Changes
396
Queens Public School 41 SSBA Addition
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 1105 • Project Name: Queens Public School 41 SSBA Addition
Date Reported As Of
2022-04-01T00:00:00.000
Pid
1105
Project Name
Queens Public School 41 SSBA Addition
Description
ADDITION / DEMOLITION
Category
Schools
Managing Agency
SCA
Client Agency
DOE
Current Phase
Construction
Design Start
2019-08-05T00:00:00.000
Budget Forecast
70755417.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2024-09-03T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
0
Bellevue Medical Center Priority Mitigation Projects
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 545 • Project Name: Bellevue Medical Center Priority Mitigation Projects
Date Reported As Of
2022-04-01T00:00:00.000
Pid
545
Project Name
Bellevue Medical Center Priority Mitigation Projects
Description
Priority mitigation projects for the repair/restoration and hazard mitigation for Bellevue Hospital, damaged during Superstorm Sandy
Category
Health and Hospitals
Borough
Manhattan
Managing Agency
EDC
Client Agency
H+H
Current Phase
Construction
Design Start
2014-01-01T00:00:00.000
Budget Forecast
45792288.00
Latest Budget Changes
211063.00
Total Budget Changes
0.00
Forecast Completion
2023-06-30T00:00:00.000
Latest Schedule Changes
381
Total Schedule Changes
1854
Gilboa Dam Reconstruction, Phase V
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 456 • Project Name: Gilboa Dam Reconstruction, Phase V
Date Reported As Of
2022-04-01T00:00:00.000
Pid
456
Project Name
Gilboa Dam Reconstruction, Phase V
Description
This is the final phase of the Gilboa Dam reconstruction project and includes reforestation, final site stabilization and wetlands mitigation measures.
Category
Water Supply
Borough
Upstate
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2020-12-30T00:00:00.000
Budget Forecast
31929026.00
Latest Budget Changes
-6400000.00
Total Budget Changes
-3079490.00
Forecast Completion
2025-07-31T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
503
4Th Ave. Safety Improvements Phase II-Vision Zero
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 833 • Project Name: 4Th Ave. Safety Improvements Phase II-Vision Zero
Date Reported As Of
2022-04-01T00:00:00.000
Pid
833
Project Name
4Th Ave. Safety Improvements Phase II-Vision Zero
Description
4TH AVENUE SAFETY IMPROVEMENTS PHASE II - VISION ZERO GREAT STREETS
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Construction
Design Start
2017-06-01T00:00:00.000
Budget Forecast
62857000.00
Latest Budget Changes
1000000.00
Total Budget Changes
-11525000.00
Forecast Completion
2024-06-17T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1106
SUNSET PARK GOWANUS CONNECTOR, BK
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 979 • Project Name: SUNSET PARK GOWANUS CONNECTOR, BK
Date Reported As Of
2022-04-01T00:00:00.000
Pid
979
Project Name
SUNSET PARK GOWANUS CONNECTOR, BK
Description
Sunset Park Gowanus Connector - Brooklyn Waterfront Greenway.
Category
Parks, Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Construction
Design Start
2017-09-18T00:00:00.000
Budget Forecast
29984000.00
Latest Budget Changes
986000.00
Total Budget Changes
-16441000.00
Forecast Completion
2022-11-27T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
445
150th Street Spine: Phase II - DOT Van Wyck Expressway - Trunk Combined Sewer
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 1202 • Project Name: 150th Street Spine: Phase II - DOT Van Wyck Expressway - Trunk Combined Sewer
Date Reported As Of
2022-04-01T00:00:00.000
Pid
1202
Project Name
150th Street Spine: Phase II - DOT Van Wyck Expressway - Trunk Combined Sewer
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Design
Design Start
2020-03-02T00:00:00.000
Budget Forecast
139368000.00
Latest Budget Changes
0.00
Total Budget Changes
-676000.00
Forecast Completion
2026-05-01T00:00:00.000
Latest Schedule Changes
188
Total Schedule Changes
-194
Red Hook Recreation Area Track 1, Soccer Fields 3-5, and Ballfields 1-4 Reconstruction
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 974 • Category: Parks
Date Reported As Of
2022-04-01T00:00:00.000
Pid
974
Project Name
Red Hook Recreation Area Track 1, Soccer Fields 3-5, and Ballfields 1-4 Reconstruction
Description
This project will reconstruct the track & field and convert three soccer fields and four ballfields from natural turf to synthetic turf at Red Hook Recreation Area.
Category
Parks
Managing Agency
DPR
Client Agency
DPR
Current Phase
Construction
Design Start
2017-11-01T00:00:00.000
Budget Forecast
68712000.00
Latest Budget Changes
0.00
Total Budget Changes
-10555000.00
Forecast Completion
2023-01-03T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1082
Bronx Public School 468 New Construction
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 1106 • Project Name: Bronx Public School 468 New Construction
Date Reported As Of
2022-04-01T00:00:00.000
Pid
1106
Project Name
Bronx Public School 468 New Construction
Description
NEW SCHOOL
Category
Schools
Managing Agency
SCA
Client Agency
DOE
Current Phase
Construction
Design Start
2020-01-16T00:00:00.000
Budget Forecast
80833865.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2024-09-03T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
0
Queens Public School 343 New Construction
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 1111 • Project Name: Queens Public School 343 New Construction
Date Reported As Of
2022-04-01T00:00:00.000
Pid
1111
Project Name
Queens Public School 343 New Construction
Description
NEW SCHOOL
Category
Schools
Managing Agency
SCA
Client Agency
DOE
Current Phase
Construction
Design Start
2020-03-03T00:00:00.000
Budget Forecast
70167105.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2023-09-03T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
0
Bainbridge Avenue Trunk Water Main
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 454 • Project Name: Bainbridge Avenue Trunk Water Main
Date Reported As Of
2022-04-01T00:00:00.000
Pid
454
Project Name
Bainbridge Avenue Trunk Water Main
Description
Replacement of Trunk Water Main in Bainbridge Avenue Between Gunhill Road and Holly Lane and in Jerome Avenue Between Holly Lane and E233th Street, etc. Also, New 36" WM in West Burnside Avenue & Phelan Place
Category
Water Supply
Borough
Bronx
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Construction
Design Start
2014-03-17T00:00:00.000
Budget Forecast
69710000.00
Latest Budget Changes
625000.00
Total Budget Changes
25547000.00
Forecast Completion
2023-06-30T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1687
FUEL TANK & SUMP REPLACEMENTS - QUEENS
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 898 • Project Name: FUEL TANK & SUMP REPLACEMENTS - QUEENS
Date Reported As Of
2022-04-01T00:00:00.000
Pid
898
Project Name
FUEL TANK & SUMP REPLACEMENTS - QUEENS
Description
CITYWIDE FUEL TANK REPLACEMENT PROGRAM FOR NEW 2015 EPA PETROLEUM BULK STORAGE REGULATIONS
Category
Industrial Development
Managing Agency
DDC
Client Agency
DCAS
Current Phase
Design
Design Start
2019-07-16T00:00:00.000
Budget Forecast
25350000.00
Latest Budget Changes
0.00
Total Budget Changes
-1850000.00
Forecast Completion
2025-06-29T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
663
49th Avenue Bridge Replacement
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 131 • Project Name: 49th Avenue Bridge Replacement
Date Reported As Of
2022-04-01T00:00:00.000
Pid
131
Project Name
49th Avenue Bridge Replacement
Description
Replace the 49th Avenue bridge over Long Island Railroad and Amtrak in Hunters Point, Queens.
Category
Bridges, Streets and Roadways
Borough
Queens
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2017-08-15T00:00:00.000
Budget Forecast
113934419.00
Latest Budget Changes
-104713600.00
Total Budget Changes
32902419.00
Forecast Completion
2027-04-05T00:00:00.000
Latest Schedule Changes
21
Total Schedule Changes
1449
Brooklyn Civil Court move to 210 Joralemon St
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 509 • Project Name: Brooklyn Civil Court move to 210 Joralemon St
Date Reported As Of
2022-04-01T00:00:00.000
Pid
509
Project Name
Brooklyn Civil Court move to 210 Joralemon St
Category
Public Safety and Criminal Justice
Borough
Brooklyn
Managing Agency
DCAS
Client Agency
DCAS
Total Budget Changes
200931011.96
Total Schedule Changes
1977
Bronx Public School 87 Addition
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 1103 • Project Name: Bronx Public School 87 Addition
Date Reported As Of
2022-04-01T00:00:00.000
Pid
1103
Project Name
Bronx Public School 87 Addition
Description
ADDITION / EXISTING SCHOOL RENOVATION WORK
Category
Schools
Managing Agency
SCA
Client Agency
DOE
Current Phase
Construction
Design Start
2019-09-23T00:00:00.000
Budget Forecast
70834393.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2024-09-03T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
0
Reconstruction Of Trinity Pl
Date Reported As Of: 2022-04-01T00:00:00.000 • Pid: 755 • Project Name: Reconstruction Of Trinity Pl
Date Reported As Of
2022-04-01T00:00:00.000
Pid
755
Project Name
Reconstruction Of Trinity Pl
Description
Reconstruction of Trinity Place from Morris Street to Cedar Street, Borough of Manhattan
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2018-10-01T00:00:00.000
Budget Forecast
53255000.00
Latest Budget Changes
374000.00
Total Budget Changes
13224000.00
Forecast Completion
2026-11-08T00:00:00.000
Latest Schedule Changes
258
Total Schedule Changes
730