Capital Projects

All major infrastructure and information technology projects with a budget of $25 million or more that are currently active (in the design, procurement, or construction phase).

City Government Mayor's Office of Operations (OPS) Dataset n7gv-k5yt 16 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
Brooklyn Public School 748 New Construction
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 1098 • Project Name: Brooklyn Public School 748 New Construction
Date Reported As Of
2021-07-01T00:00:00.000
Pid
1098
Project Name
Brooklyn Public School 748 New Construction
Description
LEASE
Category
Schools
Managing Agency
SCA
Client Agency
DOE
Current Phase
Construction Procurement
Design Start
2018-02-23T00:00:00.000
Budget Forecast
31421420.00
Total Budget Changes
0.00
Forecast Completion
2023-09-03T00:00:00.000
Total Schedule Changes
0
BROAD CHANNEL BULKHEADS - PH II
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 617 • Project Name: BROAD CHANNEL BULKHEADS - PH II
Date Reported As Of
2021-07-01T00:00:00.000
Pid
617
Project Name
BROAD CHANNEL BULKHEADS - PH II
Description
West 14th Rd. from Cross Bay Blvd. to Dead end (water side) West 15th Rd. from Cross Bay Blvd. to Dead end (water side) West 16th Rd. from Cross Bay Blvd. to Dead end (water side) West 17th Rd. from Cross Bay Blvd. to Dead end (water side)
Category
Industrial Development
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Construction
Design Start
2015-06-01T00:00:00.000
Budget Forecast
86464000.00
Latest Budget Changes
-13646000.00
Total Budget Changes
61781000.00
Forecast Completion
2024-06-14T00:00:00.000
Latest Schedule Changes
386
Total Schedule Changes
-74
Grand Concourse Metro North Railroad Bridge Construction
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 120 • Project Name: Grand Concourse Metro North Railroad Bridge Construction
Date Reported As Of
2021-07-01T00:00:00.000
Pid
120
Project Name
Grand Concourse Metro North Railroad Bridge Construction
Description
Repair the existing bridge and separate the NYCDOT and NYCT components. Includes new steel plate girders, concrete deck, pedestals, backwalls, sidewalks, and bridge railing.
Category
Bridges
Borough
Bronx
Managing Agency
DOT
Client Agency
DOT
Current Phase
Construction
Design Start
2000-02-14T00:00:00.000
Budget Forecast
75217179.00
Latest Budget Changes
-46220000.00
Total Budget Changes
22682117.00
Forecast Completion
2023-01-15T00:00:00.000
Latest Schedule Changes
-1
Total Schedule Changes
836
West 33rd Street
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 861 • Project Name: West 33rd Street
Date Reported As Of
2021-07-01T00:00:00.000
Pid
861
Project Name
West 33rd Street
Description
Regrading and reconstruction of 33rd Street Viaduct between 11th and 12th Avenue..
Category
Streets and Roadways
Managing Agency
EDC
Client Agency
DOT
Current Phase
Design
Design Start
2018-09-01T00:00:00.000
Budget Forecast
100000000.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2025-11-29T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1736
NEW UTRECH LIBRARY MAJOR RENOVATIONS
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 841 • Project Name: NEW UTRECH LIBRARY MAJOR RENOVATIONS
Date Reported As Of
2021-07-01T00:00:00.000
Pid
841
Project Name
NEW UTRECH LIBRARY MAJOR RENOVATIONS
Description
New Utrech branch library is a comprehensive interior and exterior renovation which includes new fire alarm/ BMS, new interior layout, new HVAC, new roof, exterior rehabilitation and landscape.
Category
Libraries
Managing Agency
DDC
Client Agency
Libraries-BPL
Current Phase
Design
Design Start
2018-06-27T00:00:00.000
Budget Forecast
26658000.00
Latest Budget Changes
290000.00
Total Budget Changes
290000.00
Forecast Completion
2026-11-27T00:00:00.000
Latest Schedule Changes
802
Total Schedule Changes
1188
East River Esplanade Stabilization and Reconstruction Phase 3
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 973 • Project Name: East River Esplanade Stabilization and Reconstruction Phase 3
Date Reported As Of
2021-07-01T00:00:00.000
Pid
973
Project Name
East River Esplanade Stabilization and Reconstruction Phase 3
Description
This project will stabilize and reconstruct portions of the East River Esplanade from East 62nd Street to East 63rd Street, at East 76th Street, and from East 90th Street to East 94th Street.
Category
Parks
Managing Agency
DPR
Client Agency
DPR
Current Phase
Design
Design Start
2019-02-01T00:00:00.000
Budget Forecast
73676645.26
Latest Budget Changes
0.00
Total Budget Changes
3616645.26
Forecast Completion
2024-02-24T00:00:00.000
Latest Schedule Changes
92
Total Schedule Changes
612
FUEL TANK REPLACEMENT - 71
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 935 • Project Name: FUEL TANK REPLACEMENT - 71
Date Reported As Of
2021-07-01T00:00:00.000
Pid
935
Project Name
FUEL TANK REPLACEMENT - 71
Description
By Notice To Proceed letter dated September 21, 2018, the New York City Department of Design and Construction (�DDC�) directed PMS Construction Management Corp. (�PMS�) to commence work on Capis ID PW348-71, Contract No. 20191404531 CM/Design/Build for the Replacement and Upgrade of Petroleum Storage Tanks for the Borough of Manhattan. The contract was awarded for a maximum fee of $28,026,750.00 and was partially registered by the Comptroller on September 21, 2018 in the amount of $4,885,000.00. The term of the contract is 1,095 consecutive calendar days from September 21, 2018. Contract termination date is September 19, 2021.
Category
Industrial Development
Managing Agency
DDC
Client Agency
DCAS
Current Phase
Construction
Design Start
2018-10-02T00:00:00.000
Budget Forecast
32709000.00
Latest Budget Changes
3444000.00
Total Budget Changes
3444000.00
Forecast Completion
2023-03-20T00:00:00.000
Latest Schedule Changes
59
Total Schedule Changes
548
Williamsburg Bridge Miscellaneous Repairs and Painting
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 599 • Project Name: Williamsburg Bridge Miscellaneous Repairs and Painting
Date Reported As Of
2021-07-01T00:00:00.000
Pid
599
Project Name
Williamsburg Bridge Miscellaneous Repairs and Painting
Description
Scope includes paint the south side of the bridge, repair flags and structural steel, evaluate PP20 Bearings, evaluate tension rods at mid-span of the bridge, repair bridge cables and suspenders, replace modular joint, investigate the feasibility of additional clearance at towers, and resurface bridge decks with new waterproofing membrane.
Category
Bridges
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2018-08-15T00:00:00.000
Budget Forecast
170791250.00
Latest Budget Changes
-2414000.00
Total Budget Changes
52784947.00
Forecast Completion
2025-05-07T00:00:00.000
Latest Schedule Changes
-1
Total Schedule Changes
362
Brooklyn Public School 710 Pre-K
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 1097 • Project Name: Brooklyn Public School 710 Pre-K
Date Reported As Of
2021-07-01T00:00:00.000
Pid
1097
Project Name
Brooklyn Public School 710 Pre-K
Description
NEW SCHOOL
Category
Schools
Managing Agency
SCA
Client Agency
DOE
Current Phase
Construction
Design Start
2019-06-17T00:00:00.000
Budget Forecast
38697915.00
Total Budget Changes
0.00
Forecast Completion
2023-09-03T00:00:00.000
Total Schedule Changes
0
Jerome Reservoir and Aqueduct Rehabilitation
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 448 • Project Name: Jerome Reservoir and Aqueduct Rehabilitation
Date Reported As Of
2021-07-01T00:00:00.000
Pid
448
Project Name
Jerome Reservoir and Aqueduct Rehabilitation
Description
Improvements to: fencing, vegetation, roadway, drainage, ext. above-ground retaining walls. Including repair of dam inlet archway & wingwall, re-pointing of stones & reinforcement of east reservoir wall, & leakage/seepage protection within OCA.
Category
Water Supply
Borough
Bronx
Managing Agency
DEP
Client Agency
DEP
Current Phase
Construction
Design Start
2016-02-24T00:00:00.000
Budget Forecast
57255623.09
Latest Budget Changes
0.00
Total Budget Changes
-833277.14
Forecast Completion
2026-12-29T00:00:00.000
Latest Schedule Changes
1167
Total Schedule Changes
2363
GI - GRAVESEND BAY CSO - PHASE I
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 1185 • Project Name: GI - GRAVESEND BAY CSO - PHASE I
Date Reported As Of
2021-07-01T00:00:00.000
Pid
1185
Project Name
GI - GRAVESEND BAY CSO - PHASE I
Description
GREEN INFRASTRUCTURE IN OH-015 GRAVESEND BAY CSO PH 1
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Design
Design Start
2017-08-01T00:00:00.000
Budget Forecast
42586000.00
Total Budget Changes
21181000.00
Forecast Completion
2025-10-14T00:00:00.000
Total Schedule Changes
302
Broadway Bridge over Harlem River Replacement
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 106 • Project Name: Broadway Bridge over Harlem River Replacement
Date Reported As Of
2021-07-01T00:00:00.000
Pid
106
Project Name
Broadway Bridge over Harlem River Replacement
Description
Replace deteriorated members of lift span superstructure, concrete deck, lift electrical and mechanical systems, and fenders.
Category
Bridges
Borough
Bronx, Manhattan
Managing Agency
DOT
Client Agency
DOT
Current Phase
Construction
Design Start
2005-04-01T00:00:00.000
Budget Forecast
183862519.00
Latest Budget Changes
-956000.00
Total Budget Changes
39724388.00
Forecast Completion
2027-04-02T00:00:00.000
Latest Schedule Changes
1521
Total Schedule Changes
2797
Queensboro Bridge Roadway Replacement over East River
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 594 • Project Name: Queensboro Bridge Roadway Replacement over East River
Date Reported As Of
2021-07-01T00:00:00.000
Pid
594
Project Name
Queensboro Bridge Roadway Replacement over East River
Description
This project includes the replacement of the upper roadway's deck on the main bridge along with steel repairs, fire standpipes, and lighting upgrades.
Category
Bridges, Streets and Roadways
Managing Agency
DOT
Client Agency
DOT
Current Phase
Construction
Design Start
2015-04-09T00:00:00.000
Budget Forecast
359006966.00
Latest Budget Changes
7296000.00
Total Budget Changes
8567339.67
Forecast Completion
2023-12-15T00:00:00.000
Latest Schedule Changes
14
Total Schedule Changes
1970
GRAND CONCOURSE, PHASE 5
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 1013 • Project Name: GRAND CONCOURSE, PHASE 5
Date Reported As Of
2021-07-01T00:00:00.000
Pid
1013
Project Name
GRAND CONCOURSE, PHASE 5
Description
THE FIFTH PHASE OF THE RECONSTRUCTION OF THE GRAND CONCOURSE WILL CONTINUE THE DESIGN AND SAFETY IMPROVEMENTS IMPLEMENTED IN THE PREVIOUS PHASES OF THIS VISION ZERO GREAT STREETS PROJECTS. . AS IN THE PREVIOUS PHASES, PHASE 5 WILL INCLUDE THE RECONSTRUCTION OF THE CONCOURSES SERVICE ROADS AND RESURFACING OF THE MAINLINE ROADWAY WHERE NECESSARY.
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2019-09-16T00:00:00.000
Budget Forecast
79721000.00
Latest Budget Changes
800000.00
Total Budget Changes
26673000.00
Forecast Completion
2026-09-12T00:00:00.000
Latest Schedule Changes
364
Total Schedule Changes
729
Union Turnpike over Cross Island Parkway
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 932 • Project Name: Union Turnpike over Cross Island Parkway
Date Reported As Of
2021-07-01T00:00:00.000
Pid
932
Project Name
Union Turnpike over Cross Island Parkway
Description
Rehabilitation of Union Turnpike Bridge over Cross Island Parkway
Category
Bridges
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2019-09-06T00:00:00.000
Budget Forecast
66381778.00
Latest Budget Changes
-803000.00
Total Budget Changes
3378281.00
Forecast Completion
2028-09-03T00:00:00.000
Latest Schedule Changes
185
Total Schedule Changes
834
Queens Public School 472 New Construction
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 1099 • Project Name: Queens Public School 472 New Construction
Date Reported As Of
2021-07-01T00:00:00.000
Pid
1099
Project Name
Queens Public School 472 New Construction
Description
NEW SCHOOL
Category
Schools
Managing Agency
SCA
Client Agency
DOE
Current Phase
Construction
Design Start
2019-01-07T00:00:00.000
Budget Forecast
251284250.00
Total Budget Changes
0.00
Forecast Completion
2025-09-03T00:00:00.000
Total Schedule Changes
0
Roma and Hett Avenue Storm and Sanitary Sewer Installation
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 206 • Project Name: Roma and Hett Avenue Storm and Sanitary Sewer Installation
Date Reported As Of
2021-07-01T00:00:00.000
Pid
206
Project Name
Roma and Hett Avenue Storm and Sanitary Sewer Installation
Description
Installation of Storm, Sanitary Sewers in the following Streets:=================================1- Cedar Grove Avenue between Ebbitts Street and new Dorp Lane.2- Milton Avenue between Ebbitts Street and new Dorp Lane.3- Finley Avenue between Ebbitts Street and new Dorp Lane.4- Roma Avenue between Ebbitts Street and new Dorp Lane.5- Hett Avenue between Ebbitts Street and new Dorp Lane.6- Marine Way between Cedar Grove and Milton Avenue7- Beacon Avenue between Roma Avenue and Milton Avenue.8- Dustan Avenue between Marine way and Milton Avenue.9- Garibaldi Avenue between Roma Avenue and Cedar Grove Avenue.10- Cedar Grove Court between Cedar Grove Avenue and Dustan Street.11- Topping Street between Cedar Grove Avenue and Dustan Street.12- Center Way between Cedar Grove Avenue and Dustan Street.13- Neptune Street between Cedar Grove Avenue and Dustan Street.14- Seafoam Street between Cedar Grove Avenue and Dustan Street.15- Waterside Street between Cedar Grove Avenue and Dustan Street.16- Maple Terrace between Cedar Grove Avenue and Dustan Street.17- Herman Street between Cedar Grove Avenue and Dustan Street.18- Neutral Avenue between Cedar Grove Avenue and Dustan Street.19- Milbank Drive between Cedar Grove Avenue and Dustan Street.
Category
Sewers
Borough
Staten Island
Managing Agency
DDC
Client Agency
Trans. & Env. Protection
Current Phase
Construction
Design Start
2014-10-15T00:00:00.000
Budget Forecast
91854000.00
Latest Budget Changes
-6642000.00
Total Budget Changes
62973000.00
Forecast Completion
2023-06-20T00:00:00.000
Latest Schedule Changes
357
Total Schedule Changes
-8
Henry Hudson Parkway over Amtrak (Northbound)
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 592 • Project Name: Henry Hudson Parkway over Amtrak (Northbound)
Date Reported As Of
2021-07-01T00:00:00.000
Pid
592
Project Name
Henry Hudson Parkway over Amtrak (Northbound)
Description
Replace the Ramp to northbound Henry Hudson Parkway over Amtrak in Manhattan.
Category
Bridges
Borough
Manhattan
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2020-01-02T00:00:00.000
Budget Forecast
54051625.00
Latest Budget Changes
-1638000.00
Total Budget Changes
500625.00
Forecast Completion
2029-11-27T00:00:00.000
Latest Schedule Changes
-273
Total Schedule Changes
1693
RECONSTRUCTION OF FRONT STREET, MANHATTAN
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 1012 • Project Name: RECONSTRUCTION OF FRONT STREET, MANHATTAN
Date Reported As Of
2021-07-01T00:00:00.000
Pid
1012
Project Name
RECONSTRUCTION OF FRONT STREET, MANHATTAN
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Total Budget Changes
6153000.00
Total Schedule Changes
484
East 156th Street Bridge over Access to Housing
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 588 • Project Name: East 156th Street Bridge over Access to Housing
Date Reported As Of
2021-07-01T00:00:00.000
Pid
588
Project Name
East 156th Street Bridge over Access to Housing
Description
Replace the East 156th Street bridge over Access to Housing, Bronx.
Category
Bridges, Streets and Roadways
Borough
Bronx
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2019-01-25T00:00:00.000
Budget Forecast
66000331.00
Latest Budget Changes
-500000.00
Total Budget Changes
-363846.00
Forecast Completion
2027-09-07T00:00:00.000
Latest Schedule Changes
-601
Total Schedule Changes
1720
Installation of Dechlorination System at Hunts Point WRRF
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 1094 • Project Name: Installation of Dechlorination System at Hunts Point WRRF
Date Reported As Of
2021-07-01T00:00:00.000
Pid
1094
Project Name
Installation of Dechlorination System at Hunts Point WRRF
Description
Install a Dechlorination System, replace the existing chlorination system including chemical storage tanks, metering pumps, electrical distribution equipment and upgrade the HVAC within the existing Chlorination Building.
Category
Wastewater Treatment
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2021-05-25T00:00:00.000
Budget Forecast
34756021.00
Total Budget Changes
-6856021.00
Forecast Completion
2027-06-30T00:00:00.000
Total Schedule Changes
-9
Reconstruction of the Port Jervis Wastewater Treatment Plant
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 444 • Project Name: Reconstruction of the Port Jervis Wastewater Treatment Plant
Date Reported As Of
2021-07-01T00:00:00.000
Pid
444
Project Name
Reconstruction of the Port Jervis Wastewater Treatment Plant
Description
Reconstruction of the Port Jervis WWTP as required based on the effluent limits proposed by the Delaware River Basin Commission (DRBC)
Category
Wastewater Treatment
Borough
Port Jervis
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2014-06-17T00:00:00.000
Budget Forecast
59709566.99
Latest Budget Changes
-7945152.00
Total Budget Changes
9428438.55
Forecast Completion
2025-05-21T00:00:00.000
Latest Schedule Changes
-28
Total Schedule Changes
2445
Concourse Village Avenue over Metro North
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 587 • Project Name: Concourse Village Avenue over Metro North
Date Reported As Of
2021-07-01T00:00:00.000
Pid
587
Project Name
Concourse Village Avenue over Metro North
Description
Replace the Concourse Village Avenue bridge over Metro North, Bronx
Category
Bridges
Borough
Bronx
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2019-01-25T00:00:00.000
Budget Forecast
50569190.00
Latest Budget Changes
-500000.00
Total Budget Changes
-186092.37
Forecast Completion
2027-09-09T00:00:00.000
Latest Schedule Changes
-500
Total Schedule Changes
1865
SAFE ROUTES TO SCHOOL MANHATTAN
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 1181 • Project Name: SAFE ROUTES TO SCHOOL MANHATTAN
Date Reported As Of
2021-07-01T00:00:00.000
Pid
1181
Project Name
SAFE ROUTES TO SCHOOL MANHATTAN
Description
SAFE ROUTES TO SCHOOLS - MANHATTAN
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2018-06-25T00:00:00.000
Budget Forecast
44746000.00
Total Budget Changes
7175000.00
Forecast Completion
2024-11-27T00:00:00.000
Total Schedule Changes
505
Manhattan Greenway: Harlem River
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 860 • Project Name: Manhattan Greenway: Harlem River
Date Reported As Of
2021-07-01T00:00:00.000
Pid
860
Project Name
Manhattan Greenway: Harlem River
Description
The Manhattan Greenway Harlem River project, between West 125th Street and Swindler Cove, involves the creation of a park, greenway, and the reconstruction of the bulkhead.
Category
Parks
Managing Agency
EDC
Client Agency
DPR
Current Phase
Design
Design Start
2019-06-15T00:00:00.000
Budget Forecast
227658000.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2024-12-31T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
888
Cross River and Croton Falls Dam Refacing
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 1092 • Project Name: Cross River and Croton Falls Dam Refacing
Date Reported As Of
2021-07-01T00:00:00.000
Pid
1092
Project Name
Cross River and Croton Falls Dam Refacing
Description
Provide design and design services during construction for the dam refacing, and drainage work at Cross River and Croton Falls Dams, including but not limited to resurface fascia, address seepage from the dams face.
Category
Water Supply
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2021-03-23T00:00:00.000
Budget Forecast
45195800.00
Total Budget Changes
23950000.00
Forecast Completion
2026-06-06T00:00:00.000
Total Schedule Changes
298
Hansborough Recreation Center Reconstruction
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 1090 • Project Name: Hansborough Recreation Center Reconstruction
Date Reported As Of
2021-07-01T00:00:00.000
Pid
1090
Project Name
Hansborough Recreation Center Reconstruction
Description
This project will reconstruct the pool, entrance and interior spaces of the Hansborough Recreation Center.
Category
Parks
Managing Agency
DPR
Client Agency
DPR
Current Phase
Design
Design Start
2020-03-23T00:00:00.000
Budget Forecast
41368800.00
Total Budget Changes
-4700000.00
Total Schedule Changes
186
150th Street Spine: Phase II - DOT Van Wyck Expressway - Trunk Combined Sewer
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 1202 • Project Name: 150th Street Spine: Phase II - DOT Van Wyck Expressway - Trunk Combined Sewer
Date Reported As Of
2021-07-01T00:00:00.000
Pid
1202
Project Name
150th Street Spine: Phase II - DOT Van Wyck Expressway - Trunk Combined Sewer
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Design
Design Start
2021-03-04T00:00:00.000
Budget Forecast
139368000.00
Total Budget Changes
-676000.00
Forecast Completion
2025-10-25T00:00:00.000
Total Schedule Changes
-194
Bronx River CSO Reduction
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 943 • Project Name: Bronx River CSO Reduction
Date Reported As Of
2021-07-01T00:00:00.000
Pid
943
Project Name
Bronx River CSO Reduction
Description
The project will provide hydraulic relief to Outfalls HP-007 and HP-009 by creating new sewers parallel to the existing combined sewers. It will also provide floatables control at Outfall HP-011 by replacing Regulator 5.
Category
Wastewater Treatment
Managing Agency
DEP
Client Agency
WWC
Current Phase
Design
Design Start
2020-04-16T00:00:00.000
Budget Forecast
184348203.00
Latest Budget Changes
0.00
Total Budget Changes
1210235.00
Forecast Completion
2028-12-14T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
-712
Central Park Light Infrastructure
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 586 • Project Name: Central Park Light Infrastructure
Date Reported As Of
2021-07-01T00:00:00.000
Pid
586
Project Name
Central Park Light Infrastructure
Description
Install, remove, and furnish equipment for electrical work associated with traffic signals, lighting, and distribution systems in Central Park, Manhattan.
Category
Parks, Streets and Roadways
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2016-04-29T00:00:00.000
Budget Forecast
40065476.00
Latest Budget Changes
-13849000.00
Total Budget Changes
-3323649.60
Total Schedule Changes
1535
Brooklyn Public School 322 New Construction
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 1104 • Project Name: Brooklyn Public School 322 New Construction
Date Reported As Of
2021-07-01T00:00:00.000
Pid
1104
Project Name
Brooklyn Public School 322 New Construction
Description
NEW SCHOOL
Category
Schools
Managing Agency
SCA
Client Agency
DOE
Current Phase
Construction Procurement
Design Start
2020-06-04T00:00:00.000
Budget Forecast
85395900.00
Total Budget Changes
0.00
Forecast Completion
2024-09-03T00:00:00.000
Total Schedule Changes
0
RECONSTRUCTION OF ROSEDALE AREA, PHASE 2
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 1011 • Project Name: RECONSTRUCTION OF ROSEDALE AREA, PHASE 2
Date Reported As Of
2021-07-01T00:00:00.000
Pid
1011
Project Name
RECONSTRUCTION OF ROSEDALE AREA, PHASE 2
Description
RECONSTRUCTION OF STREETS IN ROSEDALE AREA - PHASE 2
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2018-06-07T00:00:00.000
Budget Forecast
46870000.00
Latest Budget Changes
7510000.00
Total Budget Changes
61291000.00
Forecast Completion
2026-03-13T00:00:00.000
Latest Schedule Changes
576
Total Schedule Changes
829
150Th St Spine Phase 1 Storm Sewer At Bergen Basin
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 791 • Project Name: 150Th St Spine Phase 1 Storm Sewer At Bergen Basin
Date Reported As Of
2021-07-01T00:00:00.000
Pid
791
Project Name
150Th St Spine Phase 1 Storm Sewer At Bergen Basin
Description
SOUTHEAST QUEENS 150TH STREET SPINE, PHASE 1. TRUNK STORM SEWER AND OUTFALL AT BERGEN BASIN FOR THE 150TH STREET TRUNK SEWER WHICH SHARES AN OUTFALL WITH THE GUY R BREWER TRUNK SEWER
Category
Sewers
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Design
Design Start
2019-07-23T00:00:00.000
Budget Forecast
142801000.00
Latest Budget Changes
91800000.00
Total Budget Changes
101452000.00
Forecast Completion
2025-06-30T00:00:00.000
Latest Schedule Changes
319
Total Schedule Changes
753
Beverly Road over Brighton Subway Line
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 709 • Project Name: Beverly Road over Brighton Subway Line
Date Reported As Of
2021-07-01T00:00:00.000
Pid
709
Project Name
Beverly Road over Brighton Subway Line
Description
Repair the Beverly Road bridge over BMT Subway Brighton, Brooklyn
Category
Bridges
Borough
Brooklyn
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2020-01-06T00:00:00.000
Budget Forecast
48202235.00
Latest Budget Changes
-1215000.00
Total Budget Changes
1279646.00
Forecast Completion
2029-10-04T00:00:00.000
Latest Schedule Changes
-110
Total Schedule Changes
1864
Reconstruction of Regulator HP06
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 1180 • Project Name: Reconstruction of Regulator HP06
Date Reported As Of
2021-07-01T00:00:00.000
Pid
1180
Project Name
Reconstruction of Regulator HP06
Description
Project REG-HP06 is for the reconstruction of Regulator HP06 . The work shall include, but is not limited to, the following items: 1. Reconstruction of the existing Diversion Chamber (see attachment labeled 'REG-HP06 As-builts'). 2. Reconstruction of the existing Regulator Chamber (see attachment labeled 'REG-HP06 As-builts'). 3. Rehabilitation of the existing Interceptor (scope previously included in PS-312MX) 4. Replacement of existing instrumentation and monitoring systems, as needed (i.e., sensors, probes, conduits, cables, etc.). 5. Restoration of construction areas as needed (i.e., roadways, sidewalks, etc.) 6. Implementation of an approved plan to maintain regulator and interceptor operations during construction. 7. Shop drawings, as-built drawings, and equipment information.
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Design
Design Start
2020-10-27T00:00:00.000
Budget Forecast
54926000.00
Total Budget Changes
8706000.00
Forecast Completion
2025-08-15T00:00:00.000
Total Schedule Changes
-64
Porpoise Bridge In Flushing Meadows-Corona Park
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 749 • Project Name: Porpoise Bridge In Flushing Meadows-Corona Park
Date Reported As Of
2021-07-01T00:00:00.000
Pid
749
Project Name
Porpoise Bridge In Flushing Meadows-Corona Park
Description
Feasibility Study for the repair and or restoration for Porpoise (Tide Gate) Bridge in Flushing Meadows Corona Park.
Category
Bridges
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2017-09-18T00:00:00.000
Budget Forecast
62925000.00
Latest Budget Changes
-1980000.00
Total Budget Changes
82000.00
Forecast Completion
2025-12-14T00:00:00.000
Latest Schedule Changes
509
Total Schedule Changes
1110
New York State Pavilion Observation Towers Reconstruction
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 1018 • Project Name: New York State Pavilion Observation Towers Reconstruction
Date Reported As Of
2021-07-01T00:00:00.000
Pid
1018
Project Name
New York State Pavilion Observation Towers Reconstruction
Description
This project will reconstruct portions of the New York State Pavilion Observation Towers in Flushing Meadows Corona Park.
Category
Parks
Managing Agency
DPR
Client Agency
DPR
Current Phase
Construction
Design Start
2015-09-21T00:00:00.000
Budget Forecast
28778000.00
Latest Budget Changes
0.00
Total Budget Changes
1000.00
Forecast Completion
2022-02-28T00:00:00.000
Latest Schedule Changes
223
Total Schedule Changes
772
Rehab Of Queens District 11/13 Sanitation Garage
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 770 • Project Name: Rehab Of Queens District 11/13 Sanitation Garage
Date Reported As Of
2021-07-01T00:00:00.000
Pid
770
Project Name
Rehab Of Queens District 11/13 Sanitation Garage
Description
The Department of Sanitation of the City of New York (DSNY) is planning to rehabilitate Queens Districts 11 and 13 garage. The renovation serving both districts is to extend the useful life of the facility through rehabilitation of the building structure and systems. The renovation includes: Extensive structural work that includes the replacement of reinforced concrete slabs and stiffening of the existing steel frame, select replacement of building MEP systems, including BMS systems, architectural renovation of the entire building, study and implementation of deep energy conservation measures (DECMs), and site work which includes new landscape work and replacement of sidewalks and driveways. Rehabilitation is required to meet LEED Silver requirements.
Category
Sanitation
Borough
Queens
Managing Agency
DDC
Client Agency
Sanitation
Current Phase
Design
Design Start
2017-03-06T00:00:00.000
Budget Forecast
72557000.00
Latest Budget Changes
4463000.00
Total Budget Changes
36221000.00
Forecast Completion
2025-06-30T00:00:00.000
Latest Schedule Changes
730
Total Schedule Changes
1521
Replacement of the Esopus & Route 28A Railroad Bridges
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 443 • Project Name: Replacement of the Esopus & Route 28A Railroad Bridges
Date Reported As Of
2021-07-01T00:00:00.000
Pid
443
Project Name
Replacement of the Esopus & Route 28A Railroad Bridges
Description
Replacement of the Esopus Creek Bridge & Route 28A Railroad Bridge
Category
Bridges
Borough
Olive
Managing Agency
DEP
Client Agency
DEP
Current Phase
Construction
Design Start
2016-10-11T00:00:00.000
Budget Forecast
51210279.96
Latest Budget Changes
0.00
Total Budget Changes
-50461071.35
Forecast Completion
2025-11-09T00:00:00.000
Latest Schedule Changes
143
Total Schedule Changes
714
Brooklyn Bridge - Approach Arches Rehabilitation
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 584 • Project Name: Brooklyn Bridge - Approach Arches Rehabilitation
Date Reported As Of
2021-07-01T00:00:00.000
Pid
584
Project Name
Brooklyn Bridge - Approach Arches Rehabilitation
Description
Rehabilitate approach arches and towers of Brooklyn Bridge. Including masonry cleaning, masonry repairs, repointing, rehabilition of transverse walls, new infill walls of the approach arch blocks. Clean and repoint the tower masonry, reinforce the gothic arches of the towers, and rehabilitate the tower tops.
Category
Bridges
Managing Agency
DOT
Client Agency
DOT
Current Phase
Construction
Design Start
2016-04-13T00:00:00.000
Budget Forecast
431344048.00
Latest Budget Changes
108984874.00
Total Budget Changes
33135732.10
Forecast Completion
2024-05-23T00:00:00.000
Latest Schedule Changes
94
Total Schedule Changes
1908
Asphalt Plant, 30-01 Harper St, Queens Demo/Cons
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 840 • Project Name: Asphalt Plant, 30-01 Harper St, Queens Demo/Cons
Date Reported As Of
2021-07-01T00:00:00.000
Pid
840
Project Name
Asphalt Plant, 30-01 Harper St, Queens Demo/Cons
Description
Demolition and rebuild of the existing structures housing the equipment and related facilities necessary for the production, storage and distribution of asphalt at the NYC Harper Street Asphalt Plant facility. All of the existing equipment, storage facilities, and related buildings will be replaced with a new state of the art plant. In addition, the work will involve installing sanitary and storm drainage systems to comply with current government regulatory standard
Category
Industrial Development
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2019-04-03T00:00:00.000
Budget Forecast
59313000.00
Latest Budget Changes
17536000.00
Total Budget Changes
55883745.00
Forecast Completion
2025-04-16T00:00:00.000
Latest Schedule Changes
437
Total Schedule Changes
1211
DOH Public Health Lab
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 909 • Project Name: DOH Public Health Lab
Date Reported As Of
2021-07-01T00:00:00.000
Pid
909
Project Name
DOH Public Health Lab
Description
The construction of an approximately 230,000 sq ft municipal Public Health Lab building for DOHMH.
Category
Health and Hospitals
Managing Agency
EDC
Client Agency
DOHMH
Current Phase
Construction Procurement
Design Start
2019-01-01T00:00:00.000
Budget Forecast
633132280.00
Latest Budget Changes
0.00
Total Budget Changes
19334959.71
Forecast Completion
2022-12-02T00:00:00.000
Latest Schedule Changes
-761
Total Schedule Changes
1
Network Infrastructure Refresh Program
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 863 • Project Name: Network Infrastructure Refresh Program
Date Reported As Of
2021-07-01T00:00:00.000
Pid
863
Project Name
Network Infrastructure Refresh Program
Description
This project has a two-fold basis: 1) The ongoing Network Refresh which is needed to replace aging, end-of-life, end-of-support equipment across the NYC H+H. 2) Networking capacity needed to support the Electronic Medical Records system.
Category
Health and Hospitals, IT
Managing Agency
HHC
Client Agency
H+H
Current Phase
IT
Budget Forecast
0.00
Latest Budget Changes
0.00
Total Budget Changes
180514000.00
NYPD Firearms and Tactics Facility
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 1194 • Project Name: NYPD Firearms and Tactics Facility
Date Reported As Of
2021-07-01T00:00:00.000
Pid
1194
Project Name
NYPD Firearms and Tactics Facility
Category
Other Government Facilities
Managing Agency
DDC
Client Agency
Police
Current Phase
Design
Design Start
2018-09-18T00:00:00.000
Budget Forecast
281500000.00
Total Budget Changes
3365000.00
Forecast Completion
2026-11-24T00:00:00.000
Total Schedule Changes
328
Manhattan Greenway: East Midtown
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 859 • Project Name: Manhattan Greenway: East Midtown
Date Reported As Of
2021-07-01T00:00:00.000
Pid
859
Project Name
Manhattan Greenway: East Midtown
Description
The East Midtown Waterfront Greenway project involves the creation of a waterfront esplanade between East 53rd and East 59th Streets.
Category
Parks
Managing Agency
EDC
Client Agency
EDC
Current Phase
Construction
Design Start
2017-10-01T00:00:00.000
Budget Forecast
130000000.00
Latest Budget Changes
0.00
Total Budget Changes
24840000.00
Forecast Completion
2022-11-30T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
487
Power Distribution Improvements at Tallman Island
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 907 • Project Name: Power Distribution Improvements at Tallman Island
Date Reported As Of
2021-07-01T00:00:00.000
Pid
907
Project Name
Power Distribution Improvements at Tallman Island
Description
Power Distribution Improvements
Category
Industrial Development
Managing Agency
DEP
Client Agency
WWC
Current Phase
Design
Design Start
2019-05-31T00:00:00.000
Budget Forecast
62187140.80
Latest Budget Changes
0.00
Total Budget Changes
10926063.83
Forecast Completion
2026-01-02T00:00:00.000
Latest Schedule Changes
30
Total Schedule Changes
651
Replacement of The Digester at The Hunts Point WWTP
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 580 • Project Name: Replacement of The Digester at The Hunts Point WWTP
Date Reported As Of
2021-07-01T00:00:00.000
Pid
580
Project Name
Replacement of The Digester at The Hunts Point WWTP
Description
Construction of New Anaerobic Digesters
Category
Wastewater Treatment
Borough
Bronx
Managing Agency
DEP
Client Agency
DEP
Current Phase
Construction Procurement
Design Start
2017-10-22T00:00:00.000
Budget Forecast
458653902.00
Latest Budget Changes
0.00
Total Budget Changes
72852004.14
Forecast Completion
2026-01-07T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1355
Bush Terminal Development Site Preparation
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 1086 • Project Name: Bush Terminal Development Site Preparation
Date Reported As Of
2021-07-01T00:00:00.000
Pid
1086
Project Name
Bush Terminal Development Site Preparation
Description
Sitework (including but not limited to: excavation, utility, and bulkhead work) at Bush Terminal in preparation of the Steiner Studio campus.
Category
Industrial Development
Managing Agency
EDC
Client Agency
EDC
Current Phase
Design
Design Start
2021-03-01T00:00:00.000
Budget Forecast
29000000.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2023-12-31T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
517
STM & SAN SWR, WILLET PT BLVD WHITESTONE AREA, PH2
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 651 • Project Name: STM & SAN SWR, WILLET PT BLVD WHITESTONE AREA, PH2
Date Reported As Of
2021-07-01T00:00:00.000
Pid
651
Project Name
STM & SAN SWR, WILLET PT BLVD WHITESTONE AREA, PH2
Description
Installation of Storm sewers, Sanitary sewers, & Water mains in Whitestone Area.
Category
Sewers
Borough
Queens
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Construction
Design Start
2013-03-15T00:00:00.000
Budget Forecast
108079000.00
Latest Budget Changes
8389000.00
Total Budget Changes
41243000.00
Forecast Completion
2022-09-15T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
642
Storm Sanitary Sewer Repl Springfield Gardens
Date Reported As Of: 2021-07-01T00:00:00.000 • Pid: 790 • Project Name: Storm Sanitary Sewer Repl Springfield Gardens
Date Reported As Of
2021-07-01T00:00:00.000
Pid
790
Project Name
Storm Sanitary Sewer Repl Springfield Gardens
Description
SPRINGFIELD GARDENS RECONSTRUCTION PHASE 5; STORM AND SANITARY SEWER EXTENSIONS AND UPGRADES AND WATER MAIN REPLACEMENT IN 146TH AVENUE BETWEEN 153RD PLACE AND 159TH STREET, ETC, BOROUGH OF QUEENS (HWQ662G)
Category
Sewers
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Design
Design Start
2018-05-09T00:00:00.000
Budget Forecast
113408000.00
Latest Budget Changes
10129000.00
Total Budget Changes
35414000.00
Forecast Completion
2025-11-19T00:00:00.000
Latest Schedule Changes
65
Total Schedule Changes
1097