Capital Projects

All major infrastructure and information technology projects with a budget of $25 million or more that are currently active (in the design, procurement, or construction phase).

City Government Mayor's Office of Operations (OPS) Dataset n7gv-k5yt 16 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 193 • Project Name: Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation
Date Reported As Of
2020-05-01T00:00:00.000
Pid
193
Project Name
Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation
Category
Streets and Roadways
Borough
Brooklyn
Managing Agency
DDC
Client Agency
Transportation
Total Budget Changes
96724000.00
Total Schedule Changes
3253
Bergen Avenue Street Reconstruction
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 170 • Project Name: Bergen Avenue Street Reconstruction
Date Reported As Of
2020-05-01T00:00:00.000
Pid
170
Project Name
Bergen Avenue Street Reconstruction
Category
Streets and Roadways
Borough
Brooklyn
Managing Agency
DDC
Client Agency
Transportation
Total Budget Changes
45837000.00
Total Schedule Changes
-388
Pelham Parkway Bridge Reconstruction over Hutchinson Parkway
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 506 • Project Name: Pelham Parkway Bridge Reconstruction over Hutchinson Parkway
Date Reported As Of
2020-05-01T00:00:00.000
Pid
506
Project Name
Pelham Parkway Bridge Reconstruction over Hutchinson Parkway
Description
Replace/Rehab the Pelham Parkway bridge over Hutchinson River Parkway, Bronx.
Category
Bridges, Streets and Roadways
Borough
Bronx
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2017-05-30T00:00:00.000
Budget Forecast
56998478.00
Latest Budget Changes
-350000.00
Total Budget Changes
10338071.57
Forecast Completion
2027-06-21T00:00:00.000
Latest Schedule Changes
110
Total Schedule Changes
1934
Storm Mitigation Loan Program at Bowery Bay
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 671 • Project Name: Storm Mitigation Loan Program at Bowery Bay
Date Reported As Of
2020-05-01T00:00:00.000
Pid
671
Project Name
Storm Mitigation Loan Program at Bowery Bay
Description
SMLP portion for Bowery Bay WRRF as part of the New York City Wastewater Resiliency Program.
Category
Wastewater Treatment
Managing Agency
DEP
Client Agency
DEP
Current Phase
Construction Procurement
Design Start
2018-04-30T00:00:00.000
Budget Forecast
33467836.53
Latest Budget Changes
0.00
Total Budget Changes
-19623216.41
Forecast Completion
2022-08-26T00:00:00.000
Latest Schedule Changes
175
Total Schedule Changes
1026
Queens Public School 169 Addition
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 1028 • Project Name: Queens Public School 169 Addition
Date Reported As Of
2020-05-01T00:00:00.000
Pid
1028
Project Name
Queens Public School 169 Addition
Description
ADDITION/WORK IN SUPPORT OF ADDITION/FIRE ALARM SYSTEM
Category
Schools
Managing Agency
SCA
Client Agency
DOE
Current Phase
Construction
Design Start
2019-01-29T00:00:00.000
Budget Forecast
87185686.00
Latest Budget Changes
2785192.00
Total Budget Changes
5307201.00
Forecast Completion
2023-09-03T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
366
Bronx Sanitation Garage Rehabilitation: Community District 6
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 971 • Project Name: Bronx Sanitation Garage Rehabilitation: Community District 6
Date Reported As Of
2020-05-01T00:00:00.000
Pid
971
Project Name
Bronx Sanitation Garage Rehabilitation: Community District 6
Description
Rehabilitation of garage, broom garage and salt shed that serves Bronx Community Disrtict 6 located at 800 East 176th Street, Bronx.
Category
Sanitation
Managing Agency
DSNY
Client Agency
DSNY
Current Phase
Design
Design Start
2017-06-20T00:00:00.000
Budget Forecast
39941681.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2025-06-30T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
913
RECONST. OF COLUMBIA ST., PH II/BED-768B/SEK002321
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 845 • Project Name: RECONST. OF COLUMBIA ST., PH II/BED-768B/SEK002321
Date Reported As Of
2020-05-01T00:00:00.000
Pid
845
Project Name
RECONST. OF COLUMBIA ST., PH II/BED-768B/SEK002321
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Total Budget Changes
6730000.00
Total Schedule Changes
972
Union Turnpike over Cross Island Parkway
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 932 • Project Name: Union Turnpike over Cross Island Parkway
Date Reported As Of
2020-05-01T00:00:00.000
Pid
932
Project Name
Union Turnpike over Cross Island Parkway
Description
Rehabilitation of Union Turnpike Bridge over Cross Island Parkway
Category
Bridges
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2019-09-06T00:00:00.000
Budget Forecast
66352022.00
Latest Budget Changes
400000.00
Total Budget Changes
3378281.00
Forecast Completion
2027-06-21T00:00:00.000
Latest Schedule Changes
304
Total Schedule Changes
834
WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 981 • Project Name: WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS
Date Reported As Of
2020-05-01T00:00:00.000
Pid
981
Project Name
WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Total Budget Changes
47223000.00
Total Schedule Changes
1840
Combined Sewer And Wm Work In 71 Street, Queens
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 789 • Project Name: Combined Sewer And Wm Work In 71 Street, Queens
Date Reported As Of
2020-05-01T00:00:00.000
Pid
789
Project Name
Combined Sewer And Wm Work In 71 Street, Queens
Category
Sewers
Managing Agency
DDC
Client Agency
Environmental Protection
Total Budget Changes
27172000.00
Total Schedule Changes
1889
Cunningham Park Garage Reconstruction
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 1019 • Project Name: Cunningham Park Garage Reconstruction
Date Reported As Of
2020-05-01T00:00:00.000
Pid
1019
Project Name
Cunningham Park Garage Reconstruction
Description
This project will reconstruct the garage in Cunningham Park.
Category
Parks
Managing Agency
DPR
Client Agency
DPR
Current Phase
Design
Design Start
2018-11-19T00:00:00.000
Budget Forecast
27060000.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2023-02-24T00:00:00.000
Total Schedule Changes
703
Porpoise Bridge In Flushing Meadows-Corona Park
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 749 • Project Name: Porpoise Bridge In Flushing Meadows-Corona Park
Date Reported As Of
2020-05-01T00:00:00.000
Pid
749
Project Name
Porpoise Bridge In Flushing Meadows-Corona Park
Category
Bridges
Managing Agency
DDC
Client Agency
Transportation
Total Budget Changes
82000.00
Total Schedule Changes
1110
DOH Public Health Lab
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 909 • Project Name: DOH Public Health Lab
Date Reported As Of
2020-05-01T00:00:00.000
Pid
909
Project Name
DOH Public Health Lab
Description
The construction of an approximately 230,000 sq ft municipal Public Health Lab building for DOHMH.
Category
Health and Hospitals
Managing Agency
EDC
Client Agency
DOHMH
Current Phase
Design
Design Start
2019-01-01T00:00:00.000
Budget Forecast
613797320.29
Latest Budget Changes
0.00
Total Budget Changes
19334959.71
Forecast Completion
2025-01-01T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1
Roma and Hett Avenue Storm and Sanitary Sewer Installation
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 206 • Project Name: Roma and Hett Avenue Storm and Sanitary Sewer Installation
Date Reported As Of
2020-05-01T00:00:00.000
Pid
206
Project Name
Roma and Hett Avenue Storm and Sanitary Sewer Installation
Category
Sewers
Borough
Staten Island
Managing Agency
DDC
Client Agency
Trans. & Env. Protection
Total Budget Changes
62973000.00
Total Schedule Changes
-8
RED HOOK INTEGRATED FLOOD PROTECTION SYSTEM
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 985 • Project Name: RED HOOK INTEGRATED FLOOD PROTECTION SYSTEM
Date Reported As Of
2020-05-01T00:00:00.000
Pid
985
Project Name
RED HOOK INTEGRATED FLOOD PROTECTION SYSTEM
Category
Public Safety and Criminal Justice
Managing Agency
DDC
Client Agency
Transportation
Total Budget Changes
86623000.00
Total Schedule Changes
1172
East River Esplanade Stabilization and Reconstruction Phase 3
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 973 • Project Name: East River Esplanade Stabilization and Reconstruction Phase 3
Date Reported As Of
2020-05-01T00:00:00.000
Pid
973
Project Name
East River Esplanade Stabilization and Reconstruction Phase 3
Description
This project will stabilize and reconstruct portions of the East River Esplanade from East 62nd Street to East 63rd Street and from East 90th Street to East 94th Street.
Category
Parks
Managing Agency
DPR
Client Agency
DPR
Current Phase
Design
Design Start
2019-02-01T00:00:00.000
Budget Forecast
72647778.13
Latest Budget Changes
11225778.13
Total Budget Changes
3616645.26
Total Schedule Changes
612
Manhattan Greenway: Harlem River
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 860 • Project Name: Manhattan Greenway: Harlem River
Date Reported As Of
2020-05-01T00:00:00.000
Pid
860
Project Name
Manhattan Greenway: Harlem River
Description
The Manhattan Greenway Harlem River project, between West 125th Street and Swindler Cove, involves the creation of a park, greenway, and the reconstruction of the bulkhead.
Category
Parks
Managing Agency
EDC
Client Agency
DPR
Current Phase
Design
Design Start
2019-06-15T00:00:00.000
Budget Forecast
227658000.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2024-06-30T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
888
Riverside Drive/West 158th Street Bridge Rehabilitation
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 113 • Project Name: Riverside Drive/West 158th Street Bridge Rehabilitation
Date Reported As Of
2020-05-01T00:00:00.000
Pid
113
Project Name
Riverside Drive/West 158th Street Bridge Rehabilitation
Description
Replace deck of the Riverside Drive viaduct/ bridge over West 158th Street.
Category
Bridges, Streets and Roadways
Borough
Manhattan
Managing Agency
DOT
Client Agency
DOT
Current Phase
Construction
Design Start
2014-10-22T00:00:00.000
Budget Forecast
159713029.00
Latest Budget Changes
-280000.00
Total Budget Changes
96922794.00
Forecast Completion
2022-06-27T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
2152
Asphalt Plant, 30-01 Harper St, Queens Demo/Cons
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 840 • Project Name: Asphalt Plant, 30-01 Harper St, Queens Demo/Cons
Date Reported As Of
2020-05-01T00:00:00.000
Pid
840
Project Name
Asphalt Plant, 30-01 Harper St, Queens Demo/Cons
Category
Industrial Development
Managing Agency
DDC
Client Agency
Transportation
Total Budget Changes
55883745.00
Total Schedule Changes
1211
New Stapleton Waterfront: Phases 2 and 3
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 962 • Project Name: New Stapleton Waterfront: Phases 2 and 3
Date Reported As Of
2020-05-01T00:00:00.000
Pid
962
Project Name
New Stapleton Waterfront: Phases 2 and 3
Description
Mixed-use residential community on Staten Island's North Shore.
Category
Industrial Development
Managing Agency
EDC
Client Agency
EDC
Current Phase
Design
Design Start
2015-09-30T00:00:00.000
Budget Forecast
98407645.00
Latest Budget Changes
0.00
Total Budget Changes
100733778.00
Forecast Completion
2024-11-01T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
913
Hannah Street Pumping Station Construction
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 364 • Project Name: Hannah Street Pumping Station Construction
Date Reported As Of
2020-05-01T00:00:00.000
Pid
364
Project Name
Hannah Street Pumping Station Construction
Description
This project will reconstruct the Hannah St. Pumping Station, the largest City-owned wastewater collection and pumping station on Staten Island. Built in 1977, the facility has numerous deficiencies, needing a comprehensive upgrade.
Category
Wastewater Treatment
Borough
Staten Island
Managing Agency
DEP
Client Agency
DEP
Current Phase
Construction Procurement
Design Start
2012-10-01T00:00:00.000
Budget Forecast
67867304.23
Latest Budget Changes
0.00
Total Budget Changes
67909196.80
Forecast Completion
2022-11-09T00:00:00.000
Latest Schedule Changes
-123
Total Schedule Changes
3238
The Reconstruction of The Lower Catskill Aqueduct
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 667 • Project Name: The Reconstruction of The Lower Catskill Aqueduct
Date Reported As Of
2020-05-01T00:00:00.000
Pid
667
Project Name
The Reconstruction of The Lower Catskill Aqueduct
Description
Reconstruction of Aqueduct structures; Replacement of mechanical equipment; cleaning the aqueduct interior & rehabilitation & repair of cracks & leaks. All relevent assessments, investigations, piloting, plans and reports.
Category
Water Supply
Borough
Citywide
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2019-04-15T00:00:00.000
Budget Forecast
292760845.00
Latest Budget Changes
0.00
Total Budget Changes
-65760729.00
Forecast Completion
2025-06-01T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1421
Storm Sanitary Sewer Repl Springfield Gardens
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 790 • Project Name: Storm Sanitary Sewer Repl Springfield Gardens
Date Reported As Of
2020-05-01T00:00:00.000
Pid
790
Project Name
Storm Sanitary Sewer Repl Springfield Gardens
Category
Sewers
Managing Agency
DDC
Client Agency
Environmental Protection
Total Budget Changes
35414000.00
Total Schedule Changes
1097
Lower Concourse Initiative
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 575 • Project Name: Lower Concourse Initiative
Date Reported As Of
2020-05-01T00:00:00.000
Pid
575
Project Name
Lower Concourse Initiative
Description
The Project will improve the roadways and pedestrian facilities. The Project will consist of roadway reconstruction within Exterior Street between East 138th Street and East 150th Street.
Category
Industrial Development
Borough
Bronx
Managing Agency
EDC
Client Agency
EDC
Current Phase
Construction Procurement
Design Start
2017-04-01T00:00:00.000
Budget Forecast
84520367.00
Latest Budget Changes
0.00
Total Budget Changes
-5100000.00
Forecast Completion
2023-01-30T00:00:00.000
Latest Schedule Changes
91
Total Schedule Changes
730
Queens PS 206 New Construction
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 970 • Project Name: Queens PS 206 New Construction
Date Reported As Of
2020-05-01T00:00:00.000
Pid
970
Project Name
Queens PS 206 New Construction
Description
ADDITION
Category
Schools
Managing Agency
SCA
Client Agency
DOE
Current Phase
Construction
Design Start
2018-09-10T00:00:00.000
Budget Forecast
54584235.00
Latest Budget Changes
0.00
Total Budget Changes
2268625.00
Forecast Completion
2022-09-03T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
365
FUEL TANK REPLACEMENT
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 1005 • Project Name: FUEL TANK REPLACEMENT
Date Reported As Of
2020-05-01T00:00:00.000
Pid
1005
Project Name
FUEL TANK REPLACEMENT
Category
Industrial Development
Managing Agency
DDC
Client Agency
DCAS
Total Budget Changes
-6429000.00
Total Schedule Changes
914
79th St Boat Basin
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 862 • Project Name: 79th St Boat Basin
Date Reported As Of
2020-05-01T00:00:00.000
Pid
862
Project Name
79th St Boat Basin
Description
Reconstruction of bulkhead and piers at 79th St Boat Basin on behalf of NYCDPR .
Category
Parks
Managing Agency
EDC
Client Agency
DPR
Current Phase
Design
Design Start
2019-06-13T00:00:00.000
Budget Forecast
89219175.00
Latest Budget Changes
0.00
Total Budget Changes
-1131246.67
Forecast Completion
2023-08-30T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1036
West 59th Street Marine Transfer Station Construction, Phase 2
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 347 • Project Name: West 59th Street Marine Transfer Station Construction, Phase 2
Date Reported As Of
2020-05-01T00:00:00.000
Pid
347
Project Name
West 59th Street Marine Transfer Station Construction, Phase 2
Category
Sanitation
Borough
Manhattan
Managing Agency
DDC
Client Agency
Sanitation
Total Budget Changes
126753576.46
Total Schedule Changes
1949
TRENCH RESTORATION BROOKLYN
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 855 • Project Name: TRENCH RESTORATION BROOKLYN
Date Reported As Of
2020-05-01T00:00:00.000
Pid
855
Project Name
TRENCH RESTORATION BROOKLYN
Category
Industrial Development
Managing Agency
DDC
Client Agency
Transportation
Total Budget Changes
6536000.00
Total Schedule Changes
1467
Croton Above Ground Structure And Landscaping
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 747 • Project Name: Croton Above Ground Structure And Landscaping
Date Reported As Of
2020-05-01T00:00:00.000
Pid
747
Project Name
Croton Above Ground Structure And Landscaping
Category
Industrial Development
Managing Agency
DDC
Client Agency
Environmental Protection
Total Budget Changes
75117000.00
Total Schedule Changes
897
Reconstruction Of Primary Tanks at Bowery Bay WPCP
Date Reported As Of: 2020-05-01T00:00:00.000 • Pid: 942 • Project Name: Reconstruction Of Primary Tanks at Bowery Bay WPCP
Date Reported As Of
2020-05-01T00:00:00.000
Pid
942
Project Name
Reconstruction Of Primary Tanks at Bowery Bay WPCP
Description
Replacement of Primary Settling Tanks collection system mechanisms and miscellaneous improvements at Bowery Bay WRRF.
Category
Wastewater Treatment
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2019-09-27T00:00:00.000
Budget Forecast
99190376.00
Latest Budget Changes
-1377321.00
Total Budget Changes
74442173.00
Forecast Completion
2025-12-16T00:00:00.000
Latest Schedule Changes
-263
Total Schedule Changes
636
NEW 48" TRUNK WATER MAIN IN E 233 STREET
Date Reported As Of: 2020-01-01T00:00:00.000 • Pid: 998 • Project Name: NEW 48" TRUNK WATER MAIN IN E 233 STREET
Date Reported As Of
2020-01-01T00:00:00.000
Pid
998
Project Name
NEW 48" TRUNK WATER MAIN IN E 233 STREET
Category
Water Supply
Managing Agency
DDC
Client Agency
Environmental Protection
Total Budget Changes
1077000.00
Total Schedule Changes
1796
Queens PS 206 New Construction
Date Reported As Of: 2020-01-01T00:00:00.000 • Pid: 970 • Project Name: Queens PS 206 New Construction
Date Reported As Of
2020-01-01T00:00:00.000
Pid
970
Project Name
Queens PS 206 New Construction
Description
ADDITION
Category
Schools
Managing Agency
SCA
Client Agency
DOE
Current Phase
Construction
Design Start
2018-09-10T00:00:00.000
Budget Forecast
54584235.00
Latest Budget Changes
2268625.00
Total Budget Changes
2268625.00
Forecast Completion
2022-09-03T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
365
Bronx Sanitation Garage Rehabilitation: Community District 6
Date Reported As Of: 2020-01-01T00:00:00.000 • Pid: 971 • Project Name: Bronx Sanitation Garage Rehabilitation: Community District 6
Date Reported As Of
2020-01-01T00:00:00.000
Pid
971
Project Name
Bronx Sanitation Garage Rehabilitation: Community District 6
Description
Rehabilitation of garage, broom garage and salt shed that serves Bronx Community Disrtict 6 located at 800 East 176th Street, Bronx.
Category
Sanitation
Managing Agency
DSNY
Client Agency
DSNY
Current Phase
Design
Design Start
2017-06-20T00:00:00.000
Budget Forecast
39941681.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2025-06-30T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
913
East River Esplanade Stabilization and Reconstruction Phase 3
Date Reported As Of: 2020-01-01T00:00:00.000 • Pid: 973 • Project Name: East River Esplanade Stabilization and Reconstruction Phase 3
Date Reported As Of
2020-01-01T00:00:00.000
Pid
973
Project Name
East River Esplanade Stabilization and Reconstruction Phase 3
Description
This project will stabilize and reconstruct portions of the East River Esplanade from East 62nd Street to East 63rd Street and from East 90th Street to East 94th Street.
Category
Parks
Managing Agency
DPR
Client Agency
DPR
Current Phase
Design
Design Start
2019-02-01T00:00:00.000
Budget Forecast
61422000.00
Total Budget Changes
3616645.26
Total Schedule Changes
612
West 59th Street Marine Transfer Station Construction, Phase 2
Date Reported As Of: 2020-01-01T00:00:00.000 • Pid: 347 • Project Name: West 59th Street Marine Transfer Station Construction, Phase 2
Date Reported As Of
2020-01-01T00:00:00.000
Pid
347
Project Name
West 59th Street Marine Transfer Station Construction, Phase 2
Category
Sanitation
Borough
Manhattan
Managing Agency
DDC
Client Agency
Sanitation
Total Budget Changes
126753576.46
Total Schedule Changes
1949
WM REPLMT EAST NEW YORK AVE
Date Reported As Of: 2020-01-01T00:00:00.000 • Pid: 991 • Project Name: WM REPLMT EAST NEW YORK AVE
Date Reported As Of
2020-01-01T00:00:00.000
Pid
991
Project Name
WM REPLMT EAST NEW YORK AVE
Category
Water Supply
Managing Agency
DDC
Client Agency
Environmental Protection
Total Budget Changes
29337000.00
Total Schedule Changes
913
UNION TURNPIKE CENTER MEDIAN REPLACEMENT
Date Reported As Of: 2020-01-01T00:00:00.000 • Pid: 986 • Project Name: UNION TURNPIKE CENTER MEDIAN REPLACEMENT
Date Reported As Of
2020-01-01T00:00:00.000
Pid
986
Project Name
UNION TURNPIKE CENTER MEDIAN REPLACEMENT
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Total Budget Changes
23766000.00
Total Schedule Changes
341
Dutch Kills and Lower Newtown Creek Enhanced Aeration Work
Date Reported As Of: 2020-01-01T00:00:00.000 • Pid: 313 • Project Name: Dutch Kills and Lower Newtown Creek Enhanced Aeration Work
Date Reported As Of
2020-01-01T00:00:00.000
Pid
313
Project Name
Dutch Kills and Lower Newtown Creek Enhanced Aeration Work
Description
This project will upgrade the Borden Ave Pump Station by expanding its footprint; providing replacement equipment; converting dry well to wet well; and providing provisions for future project to expand capacity of pump station to 26 MGD.
Category
Wastewater Treatment
Borough
Queens
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2014-01-01T00:00:00.000
Budget Forecast
33671569.00
Latest Budget Changes
0.00
Total Budget Changes
-4338327.57
Forecast Completion
2024-01-14T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1891
Red Hook Recreation Area Track 1, Soccer Fields 3-5, and Ballfields 1-4 Reconstruction
Date Reported As Of: 2020-01-01T00:00:00.000 • Pid: 974 • Category: Parks
Date Reported As Of
2020-01-01T00:00:00.000
Pid
974
Project Name
Red Hook Recreation Area Track 1, Soccer Fields 3-5, and Ballfields 1-4 Reconstruction
Description
This project will reconstruct the track & field and convert three soccer fields and four ballfields from natural turf to synthetic turf at Red Hook Recreation Area.
Category
Parks
Managing Agency
DPR
Client Agency
DPR
Current Phase
Construction Procurement
Design Start
2017-11-01T00:00:00.000
Budget Forecast
79267000.00
Latest Budget Changes
0.00
Total Budget Changes
-10555000.00
Forecast Completion
2021-12-27T00:00:00.000
Latest Schedule Changes
103
Total Schedule Changes
1082
RED HOOK INTEGRATED FLOOD PROTECTION SYSTEM
Date Reported As Of: 2020-01-01T00:00:00.000 • Pid: 985 • Project Name: RED HOOK INTEGRATED FLOOD PROTECTION SYSTEM
Date Reported As Of
2020-01-01T00:00:00.000
Pid
985
Project Name
RED HOOK INTEGRATED FLOOD PROTECTION SYSTEM
Category
Public Safety and Criminal Justice
Managing Agency
DDC
Client Agency
Transportation
Total Budget Changes
86623000.00
Total Schedule Changes
1172
DELANCEY STREET SAFETY IMPROVEMENTS
Date Reported As Of: 2020-01-01T00:00:00.000 • Pid: 983 • Project Name: DELANCEY STREET SAFETY IMPROVEMENTS
Date Reported As Of
2020-01-01T00:00:00.000
Pid
983
Project Name
DELANCEY STREET SAFETY IMPROVEMENTS
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Total Budget Changes
20937000.00
Total Schedule Changes
1217
BROWNSVILLE LIBRARY MAJOR RENOVATIONS
Date Reported As Of: 2020-01-01T00:00:00.000 • Pid: 977 • Project Name: BROWNSVILLE LIBRARY MAJOR RENOVATIONS
Date Reported As Of
2020-01-01T00:00:00.000
Pid
977
Project Name
BROWNSVILLE LIBRARY MAJOR RENOVATIONS
Category
Libraries
Managing Agency
DDC
Client Agency
Libraries-BPL
Total Budget Changes
6752000.00
Total Schedule Changes
916
Emergency Communications Transformation Program (ECTP) Upgrades and Enhancements
Date Reported As Of: 2020-01-01T00:00:00.000 • Pid: 267 • Project Name: Emergency Communications Transformation Program (ECTP) Upgrades and Enhancements
Date Reported As Of
2020-01-01T00:00:00.000
Pid
267
Project Name
Emergency Communications Transformation Program (ECTP) Upgrades and Enhancements
Description
Upgrade and enhancement of emergency technology infrastructure to improve interoperability and coordination among public safety agencies and improve call processing time to decrease overall response times.
Category
IT
Borough
Citywide
Managing Agency
DOITT
Client Agency
FDNY, NYPD
Current Phase
IT
Budget Forecast
2264609611.71
Latest Budget Changes
-12702371.92
Total Budget Changes
73735148.87
Forecast Completion
2020-10-19T00:00:00.000
Latest Schedule Changes
49
Total Schedule Changes
2252
SUNSET PARK GOWANUS CONNECTOR, BK
Date Reported As Of: 2020-01-01T00:00:00.000 • Pid: 979 • Project Name: SUNSET PARK GOWANUS CONNECTOR, BK
Date Reported As Of
2020-01-01T00:00:00.000
Pid
979
Project Name
SUNSET PARK GOWANUS CONNECTOR, BK
Category
Parks, Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Total Budget Changes
-16441000.00
Total Schedule Changes
445
WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS
Date Reported As Of: 2020-01-01T00:00:00.000 • Pid: 981 • Project Name: WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS
Date Reported As Of
2020-01-01T00:00:00.000
Pid
981
Project Name
WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Total Budget Changes
47223000.00
Total Schedule Changes
1840
Oakwood Beach WWTP Sludge Thickening Improvements
Date Reported As Of: 2020-01-01T00:00:00.000 • Pid: 449 • Project Name: Oakwood Beach WWTP Sludge Thickening Improvements
Date Reported As Of
2020-01-01T00:00:00.000
Pid
449
Project Name
Oakwood Beach WWTP Sludge Thickening Improvements
Description
Replacement of thickener pumps, piping, sludge pumps, mixing pumps, recirculation pumps, spray water pumps, and heat exchangers. Install Gravity Belt Thickener, GBT pumps, polymer feed system. Rehab of Thickeners, Sludge Box, and Distribution Box.
Category
Wastewater Treatment
Borough
Staten Island
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2018-08-02T00:00:00.000
Budget Forecast
78856779.65
Latest Budget Changes
272831.95
Total Budget Changes
57138101.30
Forecast Completion
2024-11-28T00:00:00.000
Latest Schedule Changes
162
Total Schedule Changes
3241
Coney Island Area, Phase 3A
Date Reported As Of: 2020-01-01T00:00:00.000 • Pid: 516 • Project Name: Coney Island Area, Phase 3A
Date Reported As Of
2020-01-01T00:00:00.000
Pid
516
Project Name
Coney Island Area, Phase 3A
Category
Industrial Development
Borough
Brooklyn
Managing Agency
DDC
Client Agency
Environmental Protection
Total Budget Changes
25273000.00
Total Schedule Changes
1215
Kensico Eastview Connection Tunnel Construction
Date Reported As Of: 2020-01-01T00:00:00.000 • Pid: 554 • Project Name: Kensico Eastview Connection Tunnel Construction
Date Reported As Of
2020-01-01T00:00:00.000
Pid
554
Project Name
Kensico Eastview Connection Tunnel Construction
Description
A new 2+ mile, 27-ft internal diameter tunnel between Kensico and the Cat-Del UV Facility. The tunnel will include a new screen chamber and rehab of existing intake, and will provide critical redundancy to the Delaware Aqueduct in this area.
Category
Water Supply
Borough
Valhalla
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2017-08-01T00:00:00.000
Budget Forecast
1984467323.00
Latest Budget Changes
0.00
Total Budget Changes
881770648.00
Forecast Completion
2031-05-17T00:00:00.000
Latest Schedule Changes
-10
Total Schedule Changes
3132
Brooklyn Supreme Court Fire Alarm System Upgrade
Date Reported As Of: 2020-01-01T00:00:00.000 • Pid: 510 • Project Name: Brooklyn Supreme Court Fire Alarm System Upgrade
Date Reported As Of
2020-01-01T00:00:00.000
Pid
510
Project Name
Brooklyn Supreme Court Fire Alarm System Upgrade
Category
Public Safety and Criminal Justice
Borough
Brooklyn
Managing Agency
DDC
Client Agency
DCAS
Total Budget Changes
47003000.00
Total Schedule Changes
1533