Capital Projects

All major infrastructure and information technology projects with a budget of $25 million or more that are currently active (in the design, procurement, or construction phase).

City Government Mayor's Office of Operations (OPS) Dataset n7gv-k5yt 16 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
Revenue Cycle Implementation
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 723 • Project Name: Revenue Cycle Implementation
Date Reported As Of
2023-01-01T00:00:00.000
Pid
723
Project Name
Revenue Cycle Implementation
Description
The Epic Revenue Cycle system will be enterprise-wide and help increase revenue (by proper billing of services provided) in addition to ensuring patient safety and improved patient care, a top priority in workflows.
Category
Health and Hospitals, IT
Borough
Citywide
Managing Agency
HHC
Client Agency
H+H
Current Phase
IT
Budget Forecast
289117990.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2023-12-31T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1279
Battery Park Underpass Emergency Relief Betterments
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 540 • Project Name: Battery Park Underpass Emergency Relief Betterments
Date Reported As Of
2023-01-01T00:00:00.000
Pid
540
Project Name
Battery Park Underpass Emergency Relief Betterments
Description
Resiliency betterments for Battery Park and West Street underpasses.
Category
Bridges
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2018-04-01T00:00:00.000
Budget Forecast
66773308.00
Latest Budget Changes
-2398000.00
Total Budget Changes
47923308.00
Forecast Completion
2025-07-09T00:00:00.000
Latest Schedule Changes
171
Total Schedule Changes
1197
Reconstruction Of Arthur Kill Road, Phase I
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 741 • Project Name: Reconstruction Of Arthur Kill Road, Phase I
Date Reported As Of
2023-01-01T00:00:00.000
Pid
741
Project Name
Reconstruction Of Arthur Kill Road, Phase I
Description
Reconstruction of Arthur Kill Rd from Clark Avenue to Richmond Avenue including widening of roadway
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2016-12-16T00:00:00.000
Budget Forecast
60299000.00
Latest Budget Changes
0.00
Total Budget Changes
22503000.00
Forecast Completion
2026-05-15T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1415
Emergency Communications Transformation Program (ECTP) Upgrades and Enhancements
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 267 • Project Name: Emergency Communications Transformation Program (ECTP) Upgrades and Enhancements
Date Reported As Of
2023-01-01T00:00:00.000
Pid
267
Project Name
Emergency Communications Transformation Program (ECTP) Upgrades and Enhancements
Description
Upgrade and enhancement of emergency technology infrastructure to improve interoperability and coordination among public safety agencies and improve call processing time to decrease overall response times.
Category
IT
Borough
Citywide
Managing Agency
DOITT
Client Agency
FDNY, NYPD
Current Phase
IT
Budget Forecast
2325426529.98
Latest Budget Changes
-1174838.83
Total Budget Changes
73735148.87
Forecast Completion
2024-03-01T00:00:00.000
Latest Schedule Changes
337
Total Schedule Changes
2252
Concourse Village Avenue over Metro North
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 587 • Project Name: Concourse Village Avenue over Metro North
Date Reported As Of
2023-01-01T00:00:00.000
Pid
587
Project Name
Concourse Village Avenue over Metro North
Description
Replace the Concourse Village Avenue bridge over Metro North, Bronx
Category
Bridges
Borough
Bronx
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2019-01-25T00:00:00.000
Budget Forecast
49898190.00
Latest Budget Changes
-239247.00
Total Budget Changes
-186092.37
Forecast Completion
2029-09-28T00:00:00.000
Latest Schedule Changes
210
Total Schedule Changes
1865
Flatbush Avenue Trunk Watermain Replacement
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 370 • Project Name: Flatbush Avenue Trunk Watermain Replacement
Date Reported As Of
2023-01-01T00:00:00.000
Pid
370
Project Name
Flatbush Avenue Trunk Watermain Replacement
Description
72" Trunk Water Main and Combined Sewer Replacement in Flatbush Ave. between Sterling Pl. and 8th Ave., etc., Borough of Brooklyn.
Category
Wastewater Treatment
Borough
Brooklyn
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Construction
Design Start
2014-11-24T00:00:00.000
Budget Forecast
59124000.00
Latest Budget Changes
200000.00
Total Budget Changes
39272000.00
Forecast Completion
2023-09-29T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
2266
Henry Hudson Parkway over Amtrak (Northbound)
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 592 • Project Name: Henry Hudson Parkway over Amtrak (Northbound)
Date Reported As Of
2023-01-01T00:00:00.000
Pid
592
Project Name
Henry Hudson Parkway over Amtrak (Northbound)
Description
Replace the Ramp to northbound Henry Hudson Parkway over Amtrak in Manhattan.
Category
Bridges
Borough
Manhattan
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2020-01-02T00:00:00.000
Budget Forecast
54051625.00
Latest Budget Changes
500000.00
Total Budget Changes
500625.00
Forecast Completion
2029-11-26T00:00:00.000
Latest Schedule Changes
148
Total Schedule Changes
1693
WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 981 • Project Name: WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS
Date Reported As Of
2023-01-01T00:00:00.000
Pid
981
Project Name
WESTBOURNE - DUNBAR ROADWAYS/BULKHEADS, QNS
Description
PRELIMINARY AND FINAL DESIGN SERVICES FOR RECONSTRUCTION OF WESTBOURNE NORTON DRIVE. BOROUGH OF QUEENS
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2016-12-15T00:00:00.000
Budget Forecast
92665000.00
Latest Budget Changes
28000000.00
Total Budget Changes
47223000.00
Forecast Completion
2029-09-26T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1840
Replacement of the Esopus & Route 28A Railroad Bridges
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 443 • Project Name: Replacement of the Esopus & Route 28A Railroad Bridges
Date Reported As Of
2023-01-01T00:00:00.000
Pid
443
Project Name
Replacement of the Esopus & Route 28A Railroad Bridges
Description
Replacement of the Esopus & Route 28A Railroad Bridges
Category
Bridges
Borough
Olive
Managing Agency
DEP
Client Agency
DEP
Current Phase
Construction
Design Start
2016-10-11T00:00:00.000
Budget Forecast
51873522.24
Latest Budget Changes
663242.28
Total Budget Changes
-50461071.35
Forecast Completion
2025-11-09T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
714
Pelham Parkway Bridge Reconstruction over Hutchinson Parkway
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 506 • Project Name: Pelham Parkway Bridge Reconstruction over Hutchinson Parkway
Date Reported As Of
2023-01-01T00:00:00.000
Pid
506
Project Name
Pelham Parkway Bridge Reconstruction over Hutchinson Parkway
Description
Replace/Rehab the Pelham Parkway bridge over Hutchinson River Parkway, Bronx.
Category
Bridges, Streets and Roadways
Borough
Bronx
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2017-11-08T00:00:00.000
Budget Forecast
67133092.00
Latest Budget Changes
350000.00
Total Budget Changes
10338071.57
Forecast Completion
2029-08-15T00:00:00.000
Latest Schedule Changes
60
Total Schedule Changes
1934
Upgrades At Brooklyn Animal Shelter
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 750 • Project Name: Upgrades At Brooklyn Animal Shelter
Date Reported As Of
2023-01-01T00:00:00.000
Pid
750
Project Name
Upgrades At Brooklyn Animal Shelter
Description
Demolish existing on-story facility. Construct a two-story new building for animal care center with a drive-through parking lot to meet the new program.
Category
Other Government Facilities
Managing Agency
DDC
Client Agency
Health
Current Phase
Construction Procurement
Design Start
2016-07-20T00:00:00.000
Budget Forecast
47132000.00
Latest Budget Changes
0.00
Total Budget Changes
21288000.00
Forecast Completion
2025-12-30T00:00:00.000
Latest Schedule Changes
110
Total Schedule Changes
1355
Brooklyn Civil Court move to 210 Joralemon St
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 509 • Project Name: Brooklyn Civil Court move to 210 Joralemon St
Date Reported As Of
2023-01-01T00:00:00.000
Pid
509
Project Name
Brooklyn Civil Court move to 210 Joralemon St
Description
Relocation of Brooklyn Civil and Housing Court to 210 Joralemon St
Category
Public Safety and Criminal Justice
Borough
Brooklyn
Managing Agency
DCAS
Client Agency
DCAS
Current Phase
Construction
Design Start
2016-07-27T00:00:00.000
Budget Forecast
281430011.96
Latest Budget Changes
0.00
Total Budget Changes
200931011.96
Forecast Completion
2026-03-31T00:00:00.000
Latest Schedule Changes
301
Total Schedule Changes
1977
NEW 48" TRUNK WATER MAIN IN E 233 STREET
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 998 • Project Name: NEW 48" TRUNK WATER MAIN IN E 233 STREET
Date Reported As Of
2023-01-01T00:00:00.000
Pid
998
Project Name
NEW 48" TRUNK WATER MAIN IN E 233 STREET
Description
New 48" Trunk Water Main in E 233rd Street between Bronxwood Avenue & Baychester Avenue, etc.
Category
Water Supply
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Design
Design Start
2015-10-01T00:00:00.000
Budget Forecast
33954000.00
Latest Budget Changes
0.00
Total Budget Changes
1077000.00
Forecast Completion
2027-02-10T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1796
Porpoise Bridge In Flushing Meadows-Corona Park
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 749 • Project Name: Porpoise Bridge In Flushing Meadows-Corona Park
Date Reported As Of
2023-01-01T00:00:00.000
Pid
749
Project Name
Porpoise Bridge In Flushing Meadows-Corona Park
Description
Feasibility Study for the repair and or restoration for Porpoise (Tide Gate) Bridge in Flushing Meadows Corona Park.
Category
Bridges
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Construction Procurement
Design Start
2017-09-18T00:00:00.000
Budget Forecast
64987000.00
Latest Budget Changes
-12000.00
Total Budget Changes
82000.00
Forecast Completion
2026-08-12T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1110
Reconstruction Of Trinity Pl
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 755 • Project Name: Reconstruction Of Trinity Pl
Date Reported As Of
2023-01-01T00:00:00.000
Pid
755
Project Name
Reconstruction Of Trinity Pl
Description
Reconstruction of Trinity Place from Morris Street to Cedar Street, Borough of Manhattan
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Construction Procurement
Design Start
2018-10-01T00:00:00.000
Budget Forecast
54434000.00
Latest Budget Changes
0.00
Total Budget Changes
13224000.00
Forecast Completion
2026-06-29T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
730
Bergen Avenue Street Reconstruction
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 170 • Project Name: Bergen Avenue Street Reconstruction
Date Reported As Of
2023-01-01T00:00:00.000
Pid
170
Project Name
Bergen Avenue Street Reconstruction
Description
Reconstruction of Bergen Avenue Area, including Storm Sewers, Water Mains, Street Lighting, Traffic Signal Work, and reconstruction of new outfall at East Mill Basin.
Category
Streets and Roadways
Borough
Brooklyn
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Construction
Design Start
2012-12-03T00:00:00.000
Budget Forecast
79564000.00
Latest Budget Changes
0.00
Total Budget Changes
45837000.00
Forecast Completion
2023-06-24T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
-388
Shore Road Bridge over Hutchinson River
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 541 • Project Name: Shore Road Bridge over Hutchinson River
Date Reported As Of
2023-01-01T00:00:00.000
Pid
541
Project Name
Shore Road Bridge over Hutchinson River
Description
Replace the Shore Road Bridge over the Hutchinson River with a new bridge.
Category
Bridges, Streets and Roadways
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2017-06-30T00:00:00.000
Budget Forecast
339641078.00
Latest Budget Changes
-1091765.00
Total Budget Changes
-19049921.84
Forecast Completion
2030-01-02T00:00:00.000
Latest Schedule Changes
162
Total Schedule Changes
1477
Coler Specialty Hospital Priority Mitigation Projects
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 544 • Project Name: Coler Specialty Hospital Priority Mitigation Projects
Date Reported As Of
2023-01-01T00:00:00.000
Pid
544
Project Name
Coler Specialty Hospital Priority Mitigation Projects
Description
The priority mitigation projects at Coler include key critical mitigation projects to improve the resiliency of the campus.
Category
Health and Hospitals
Borough
Manhattan
Managing Agency
EDC
Client Agency
H+H
Current Phase
Construction
Design Start
2014-09-01T00:00:00.000
Budget Forecast
26776342.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2023-08-17T00:00:00.000
Latest Schedule Changes
17
Total Schedule Changes
2085
Queensboro Bridge Roadway Replacement over East River
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 594 • Project Name: Queensboro Bridge Roadway Replacement over East River
Date Reported As Of
2023-01-01T00:00:00.000
Pid
594
Project Name
Queensboro Bridge Roadway Replacement over East River
Description
This project includes the replacement of the upper roadway's deck on the main bridge along with steel repairs, fire standpipes, and lighting upgrades.
Category
Bridges, Streets and Roadways
Managing Agency
DOT
Client Agency
DOT
Current Phase
Construction
Design Start
2015-04-09T00:00:00.000
Budget Forecast
370500573.00
Latest Budget Changes
12305455.00
Total Budget Changes
8567339.67
Forecast Completion
2024-09-28T00:00:00.000
Latest Schedule Changes
3893
Total Schedule Changes
1970
Oakwood Beach WWTP Headworks Improvements
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 450 • Project Name: Oakwood Beach WWTP Headworks Improvements
Date Reported As Of
2023-01-01T00:00:00.000
Pid
450
Project Name
Oakwood Beach WWTP Headworks Improvements
Description
Replacement of six bar screens, grit bin vibrator, six ring flushing pumps, six main sewage pumps and assoc. piping/valves and motor control center, replacement of four exhaust fans, gas and oxygen detectors and a 15 KVA transformer
Category
Wastewater Treatment
Borough
Staten Island
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2023-02-01T00:00:00.000
Budget Forecast
83229440.00
Latest Budget Changes
0.00
Total Budget Changes
31867440.00
Forecast Completion
2029-04-25T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
2857
Construction Of Sanitary Sewers, Storm Sewers (Bm
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 760 • Project Name: Construction Of Sanitary Sewers, Storm Sewers (Bm
Date Reported As Of
2023-01-01T00:00:00.000
Pid
760
Project Name
Construction Of Sanitary Sewers, Storm Sewers (Bm
Description
Construction of storm sewers, sanitary sewers, water mains and Best Management Practice (BMP) NC-16 in Mason Avenue area, Borough of Staten Island.
Category
Sewers
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Construction
Design Start
2016-08-29T00:00:00.000
Budget Forecast
70400000.00
Latest Budget Changes
0.00
Total Budget Changes
37691000.00
Forecast Completion
2023-11-30T00:00:00.000
Latest Schedule Changes
157
Total Schedule Changes
595
RECONSTRUCTION OF FRONT STREET, MANHATTAN
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 1012 • Project Name: RECONSTRUCTION OF FRONT STREET, MANHATTAN
Date Reported As Of
2023-01-01T00:00:00.000
Pid
1012
Project Name
RECONSTRUCTION OF FRONT STREET, MANHATTAN
Description
Reconstruction of Front Street, Manhattan
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Construction
Design Start
2015-07-31T00:00:00.000
Budget Forecast
33509000.00
Latest Budget Changes
0.00
Total Budget Changes
6153000.00
Forecast Completion
2023-10-13T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
484
RECONSTRUCTION OF E 177 STREET/DEVOE AVENUE
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 623 • Project Name: RECONSTRUCTION OF E 177 STREET/DEVOE AVENUE
Date Reported As Of
2023-01-01T00:00:00.000
Pid
623
Project Name
RECONSTRUCTION OF E 177 STREET/DEVOE AVENUE
Description
Road Reconstruction, Water Main and Combined Sewer Work E 177th Street from Devoe Ave to Bronx Park Ave East Tremont Ave from Bronx Park Ave to Boston Rd Devoe Ave from E 177th Street to East Tremont Ave
Category
Industrial Development, Streets and Roadways
Borough
Bronx
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2009-09-03T00:00:00.000
Budget Forecast
50532000.00
Latest Budget Changes
0.00
Total Budget Changes
25050000.00
Forecast Completion
2026-08-27T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1839
Storm & Combined Sewers In 229 Street
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 776 • Project Name: Storm & Combined Sewers In 229 Street
Date Reported As Of
2023-01-01T00:00:00.000
Pid
776
Project Name
Storm & Combined Sewers In 229 Street
Description
Installation of storm, sanitary and combined sewers, and water main: Brookville section of Queens, including sections of 227th, 228th, 229th and 230th Streets, 230th Place, and 145th and 147th Avenues.
Category
Sewers
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Construction
Design Start
2015-04-30T00:00:00.000
Budget Forecast
120459000.00
Latest Budget Changes
0.00
Total Budget Changes
-9148000.00
Forecast Completion
2023-06-30T00:00:00.000
Latest Schedule Changes
181
Total Schedule Changes
652
Westchester Avenue Bridge over Hutch River Parkway Rehabilitation
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 112 • Project Name: Westchester Avenue Bridge over Hutch River Parkway Rehabilitation
Date Reported As Of
2023-01-01T00:00:00.000
Pid
112
Project Name
Westchester Avenue Bridge over Hutch River Parkway Rehabilitation
Description
Repair abutments, piers, approaches, and steel superstructure located in Pelham Bay, Bronx; replace reinforced concrete deck.
Category
Bridges, Streets and Roadways
Borough
Bronx
Managing Agency
DOT
Client Agency
DOT
Current Phase
Construction
Design Start
1995-01-17T00:00:00.000
Budget Forecast
79204057.00
Latest Budget Changes
471000.00
Total Budget Changes
20945057.00
Forecast Completion
2023-07-31T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1592
Cunningham Park Garage Reconstruction
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 1019 • Project Name: Cunningham Park Garage Reconstruction
Date Reported As Of
2023-01-01T00:00:00.000
Pid
1019
Project Name
Cunningham Park Garage Reconstruction
Description
This project will reconstruct the garage in Cunningham Park.
Category
Parks
Managing Agency
DPR
Client Agency
DPR
Current Phase
Construction Procurement
Design Start
2018-11-19T00:00:00.000
Budget Forecast
27060000.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2025-01-27T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
703
Brooklyn Supreme Court Fire Alarm System Upgrade
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 510 • Project Name: Brooklyn Supreme Court Fire Alarm System Upgrade
Date Reported As Of
2023-01-01T00:00:00.000
Pid
510
Project Name
Brooklyn Supreme Court Fire Alarm System Upgrade
Description
Brooklyn Supreme Court, Fire Alarm, Sprinkler, 360 Adams Street - New addressable fire detection and alarm system and new sprinkler system.
Category
Public Safety and Criminal Justice
Borough
Brooklyn
Managing Agency
DDC
Client Agency
DCAS
Current Phase
Design
Design Start
2017-03-31T00:00:00.000
Budget Forecast
90313000.00
Latest Budget Changes
0.00
Total Budget Changes
47003000.00
Forecast Completion
2027-01-12T00:00:00.000
Latest Schedule Changes
105
Total Schedule Changes
1533
Coney Island Area, Phase 3A
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 516 • Project Name: Coney Island Area, Phase 3A
Date Reported As Of
2023-01-01T00:00:00.000
Pid
516
Project Name
Coney Island Area, Phase 3A
Description
Reconstruction of Storm and Sanitary sewer, Trunk and distribution water main in Coney Island area - Phase 3A, Borough of Brooklyn
Category
Industrial Development
Borough
Brooklyn
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Construction
Design Start
2014-03-17T00:00:00.000
Budget Forecast
63426000.00
Latest Budget Changes
0.00
Total Budget Changes
25273000.00
Forecast Completion
2023-11-27T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1215
Flushing Meadows Corona Park World's Fair Marina Reconstruction (Hurricane Sandy)
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 1031 • Category: Parks
Date Reported As Of
2023-01-01T00:00:00.000
Pid
1031
Project Name
Flushing Meadows Corona Park World's Fair Marina Reconstruction (Hurricane Sandy)
Description
This project will reconstruct the deteriorated fixed piers, floating docks, bulkhead, and related components, including Sandy-damaged elements.
Category
Parks
Managing Agency
DPR
Client Agency
DPR
Current Phase
Design
Design Start
2017-08-15T00:00:00.000
Budget Forecast
48487000.00
Latest Budget Changes
0.00
Total Budget Changes
4947362.68
Total Schedule Changes
708
Reconstruction of the Port Jervis Wastewater Treatment Plant
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 444 • Project Name: Reconstruction of the Port Jervis Wastewater Treatment Plant
Date Reported As Of
2023-01-01T00:00:00.000
Pid
444
Project Name
Reconstruction of the Port Jervis Wastewater Treatment Plant
Description
Reconstruction of the Port Jervis WWTP as required based on the effluent limits proposed by the Delaware River Basin Commission (DRBC)
Category
Wastewater Treatment
Borough
Port Jervis
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2014-06-17T00:00:00.000
Budget Forecast
60624916.55
Latest Budget Changes
0.00
Total Budget Changes
9428438.55
Forecast Completion
2026-10-04T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
2445
Bellevue Medical Center Priority Mitigation Projects
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 545 • Project Name: Bellevue Medical Center Priority Mitigation Projects
Date Reported As Of
2023-01-01T00:00:00.000
Pid
545
Project Name
Bellevue Medical Center Priority Mitigation Projects
Description
Priority mitigation projects for the repair/restoration and hazard mitigation for Bellevue Hospital, damaged during Superstorm Sandy
Category
Health and Hospitals
Borough
Manhattan
Managing Agency
EDC
Client Agency
H+H
Current Phase
Construction
Design Start
2014-01-01T00:00:00.000
Budget Forecast
50941375.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2023-04-28T00:00:00.000
Latest Schedule Changes
-143
Total Schedule Changes
1854
Reconstruction of Mersereau, Richmond Ave and Mayflower Ave PSs
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 1040 • Project Name: Reconstruction of Mersereau, Richmond Ave and Mayflower Ave PSs
Date Reported As Of
2023-01-01T00:00:00.000
Pid
1040
Project Name
Reconstruction of Mersereau, Richmond Ave and Mayflower Ave PSs
Description
Design & DSDC for the upgrade of three NYCDEP Pumping Stations. The scope of the project is to provide a safe, reliable, efficient, resilient and low maintenance pumping station for the Operating Bureau.
Category
Wastewater Treatment
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2021-04-30T00:00:00.000
Budget Forecast
156161744.80
Latest Budget Changes
966915.00
Total Budget Changes
45860651.80
Forecast Completion
2026-01-08T00:00:00.000
Latest Schedule Changes
62
Total Schedule Changes
641
Staten Island 1 & 3 Garage Construction & Rehab
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 769 • Project Name: Staten Island 1 & 3 Garage Construction & Rehab
Date Reported As Of
2023-01-01T00:00:00.000
Pid
769
Project Name
Staten Island 1 & 3 Garage Construction & Rehab
Description
The Department of Sanitation of the City of New York (DSNY) is planning to develop a Staten Island Districts 1 and 3 campus that will include a new garage serving both districts and renovation of the existing Borough Repair Shop. The site is to be reconfigured with new grading and drainage, new covered salt storage, new outdoor fueling, new household special waste collection, outdoor DSNY truck parking and a new force main sanitary line to connect to the NYC DEP sewer.
Category
Sanitation
Borough
Staten Island
Managing Agency
DDC
Client Agency
Sanitation
Current Phase
Construction
Design Start
2017-07-14T00:00:00.000
Budget Forecast
206699000.00
Latest Budget Changes
4595000.00
Total Budget Changes
68555000.00
Forecast Completion
2024-03-25T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
406
RECONSTRUCTION OF QUEENS BLVD - PHASE 1
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 618 • Project Name: RECONSTRUCTION OF QUEENS BLVD - PHASE 1
Date Reported As Of
2023-01-01T00:00:00.000
Pid
618
Project Name
RECONSTRUCTION OF QUEENS BLVD - PHASE 1
Description
Vision Zero - Queens Boulevard - Segment 1: Roosevelt Avenue to 73rd Street. Variety of safety and streetscape improvements including partial street reconstruction and resurfacing to address roadway conditions
Category
Industrial Development
Borough
Queens
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2016-08-11T00:00:00.000
Budget Forecast
251711000.00
Latest Budget Changes
0.00
Total Budget Changes
176245000.00
Forecast Completion
2029-02-01T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1906
Grand Concourse Reconstruction, Phase 4 (Great Streets)
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 476 • Project Name: Grand Concourse Reconstruction, Phase 4 (Great Streets)
Date Reported As Of
2023-01-01T00:00:00.000
Pid
476
Project Name
Grand Concourse Reconstruction, Phase 4 (Great Streets)
Description
RECONSTRUCTION OF GRAND CONCOURSE FROM E 175 ST TO EAST FORDHAM RD- PHASE 4, BX
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Construction
Design Start
2016-07-19T00:00:00.000
Budget Forecast
96108000.00
Latest Budget Changes
0.00
Total Budget Changes
57634000.00
Forecast Completion
2023-06-13T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1448
BROAD CHANNEL BULKHEADS - PH II
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 617 • Project Name: BROAD CHANNEL BULKHEADS - PH II
Date Reported As Of
2023-01-01T00:00:00.000
Pid
617
Project Name
BROAD CHANNEL BULKHEADS - PH II
Description
West 14th Rd. from Cross Bay Blvd. to Dead end (water side) West 15th Rd. from Cross Bay Blvd. to Dead end (water side) West 16th Rd. from Cross Bay Blvd. to Dead end (water side) West 17th Rd. from Cross Bay Blvd. to Dead end (water side)
Category
Industrial Development
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Construction
Design Start
2015-06-01T00:00:00.000
Budget Forecast
92714000.00
Latest Budget Changes
0.00
Total Budget Changes
61781000.00
Forecast Completion
2024-06-14T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
-74
HEMPSTEAD AVE BR/CIP 2231780
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 1049 • Project Name: HEMPSTEAD AVE BR/CIP 2231780
Date Reported As Of
2023-01-01T00:00:00.000
Pid
1049
Project Name
HEMPSTEAD AVE BR/CIP 2231780
Description
Rehabilitation of Hempstead Avenue Bridge over Cross island Parkway
Category
Bridges, Streets and Roadways
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2022-01-31T00:00:00.000
Budget Forecast
89723909.00
Latest Budget Changes
1051720.00
Total Budget Changes
1747189.00
Forecast Completion
2030-04-23T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
327
Rehab Of Queens District 11/13 Sanitation Garage
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 770 • Project Name: Rehab Of Queens District 11/13 Sanitation Garage
Date Reported As Of
2023-01-01T00:00:00.000
Pid
770
Project Name
Rehab Of Queens District 11/13 Sanitation Garage
Description
The Department of Sanitation of the City of New York (DSNY) is planning to rehabilitate Queens Districts 11 and 13 garage. The renovation serving both districts is to extend the useful life of the facility through rehabilitation of the building structure and systems. The renovation includes: Extensive structural work that includes the replacement of reinforced concrete slabs and stiffening of the existing steel frame, select replacement of building MEP systems, including BMS systems, architectural renovation of the entire building, study and implementation of deep energy conservation measures (DECMs), and site work which includes new landscape work and replacement of sidewalks and driveways. Rehabilitation is required to meet LEED Silver requirements.
Category
Sanitation
Borough
Queens
Managing Agency
DDC
Client Agency
Sanitation
Current Phase
Design
Design Start
2017-03-06T00:00:00.000
Budget Forecast
74046000.00
Latest Budget Changes
655000.00
Total Budget Changes
36221000.00
Forecast Completion
2026-12-30T00:00:00.000
Latest Schedule Changes
201
Total Schedule Changes
1521
Storm Sewer Outlet In 224Th St
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 784 • Project Name: Storm Sewer Outlet In 224Th St
Date Reported As Of
2023-01-01T00:00:00.000
Pid
784
Project Name
Storm Sewer Outlet In 224Th St
Description
Installation of storm sewers at 224th St and 149th Ave and along the access road through Idlewild Parks known as Springfield Lane (Spine Farmers Blvd)
Category
Sewers
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Construction Procurement
Design Start
2016-01-04T00:00:00.000
Budget Forecast
157553000.00
Latest Budget Changes
0.00
Total Budget Changes
155854000.00
Forecast Completion
2026-04-20T00:00:00.000
Latest Schedule Changes
22
Total Schedule Changes
1238
Combined Sewer And Wm Work In 71 Street, Queens
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 789 • Project Name: Combined Sewer And Wm Work In 71 Street, Queens
Date Reported As Of
2023-01-01T00:00:00.000
Pid
789
Project Name
Combined Sewer And Wm Work In 71 Street, Queens
Description
Replacement of combined sewer in 71st Street between Juniper Boulevard South and Queens Midtown Expressway, etc.
Category
Sewers
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Design
Design Start
2018-09-10T00:00:00.000
Budget Forecast
76194000.00
Latest Budget Changes
341000.00
Total Budget Changes
27172000.00
Forecast Completion
2028-10-30T00:00:00.000
Latest Schedule Changes
366
Total Schedule Changes
1889
Pelham Parkway Roadway Reconstruction, Phase 2
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 180 • Project Name: Pelham Parkway Roadway Reconstruction, Phase 2
Date Reported As Of
2023-01-01T00:00:00.000
Pid
180
Project Name
Pelham Parkway Roadway Reconstruction, Phase 2
Description
Pelham Pkwy main road W/B from Bronx River Pkwy to Hutchinson River Pkwy Pelham Pkwy North Service Rd. (S/R) from Bronx Park East to Eastchester Rd. Stillwell Ave from westbound mainline to north service road
Category
Streets and Roadways
Borough
Bronx
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Construction
Design Start
2002-02-15T00:00:00.000
Budget Forecast
158533000.00
Latest Budget Changes
0.00
Total Budget Changes
125164000.00
Forecast Completion
2023-12-22T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
2869
GI-OWLS HEAD TRIBUTARY DRAINAGE AREAS, BROOKLYN
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 1200 • Project Name: GI-OWLS HEAD TRIBUTARY DRAINAGE AREAS, BROOKLYN
Date Reported As Of
2023-01-01T00:00:00.000
Pid
1200
Project Name
GI-OWLS HEAD TRIBUTARY DRAINAGE AREAS, BROOKLYN
Description
GREEN INFRASTRUCTURE IN OWLS HEAD TRIBUTARY DRAINAGE AREAS, BROOKLYN
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Design
Design Start
2019-01-02T00:00:00.000
Budget Forecast
60387000.00
Latest Budget Changes
300000.00
Total Budget Changes
24278000.00
Forecast Completion
2027-07-02T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
396
Construction of Gowanus CSO retention FAC Superfund Site
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 550 • Project Name: Construction of Gowanus CSO retention FAC Superfund Site
Date Reported As Of
2023-01-01T00:00:00.000
Pid
550
Project Name
Construction of Gowanus CSO retention FAC Superfund Site
Description
CSO Facilities, bulkheads, pilots and other requirements to comply with Gowanus Canal Superfund Adminstrative Orders
Category
Industrial Development
Borough
Brooklyn
Managing Agency
DEP
Client Agency
DEP
Current Phase
Construction Procurement
Design Start
2017-11-22T00:00:00.000
Budget Forecast
1547300000.00
Latest Budget Changes
0.00
Total Budget Changes
432995114.00
Forecast Completion
2031-11-25T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1086
Pier 42 and East River Park Connector Program
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 1085 • Project Name: Pier 42 and East River Park Connector Program
Date Reported As Of
2023-01-01T00:00:00.000
Pid
1085
Project Name
Pier 42 and East River Park Connector Program
Description
Abatement, demolition, and replacement of shed with an upland park on Pier 42 in Manhattan.
Category
Parks
Managing Agency
EDC
Client Agency
DPR
Current Phase
Construction
Design Start
2017-06-01T00:00:00.000
Budget Forecast
60215737.00
Latest Budget Changes
0.00
Total Budget Changes
100000.00
Forecast Completion
2023-10-31T00:00:00.000
Latest Schedule Changes
61
Total Schedule Changes
214
Kensico Eastview Connection Tunnel Construction
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 554 • Project Name: Kensico Eastview Connection Tunnel Construction
Date Reported As Of
2023-01-01T00:00:00.000
Pid
554
Project Name
Kensico Eastview Connection Tunnel Construction
Description
The redundant connection between Kensico and Hillview Reservoirs provides resiliency against planned or unplanned tunnel outages to deliver water.
Category
Water Supply
Borough
Valhalla
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2017-08-01T00:00:00.000
Budget Forecast
2058435326.00
Latest Budget Changes
0.00
Total Budget Changes
881770648.00
Forecast Completion
2033-12-05T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
3132
Combined Sewer In 70Th Street, Queens
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 788 • Project Name: Combined Sewer In 70Th Street, Queens
Date Reported As Of
2023-01-01T00:00:00.000
Pid
788
Project Name
Combined Sewer In 70Th Street, Queens
Description
COMBINED SEWER IN 70TH STREET, QUEENS
Category
Sewers
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Construction
Design Start
2016-08-31T00:00:00.000
Budget Forecast
132158000.00
Latest Budget Changes
0.00
Total Budget Changes
94201000.00
Forecast Completion
2023-08-10T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1155
Catskill Aqueduct Repair and Rehabilitation
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 478 • Project Name: Catskill Aqueduct Repair and Rehabilitation
Date Reported As Of
2023-01-01T00:00:00.000
Pid
478
Project Name
Catskill Aqueduct Repair and Rehabilitation
Description
Project to ensure the reliability of the 74 mile upper Catskill Aqueduct, including replacement of mechanical components, leak mitigation, and biofilm removal/condition assessment.
Category
Water Supply
Borough
Citywide
Managing Agency
DEP
Client Agency
DEP
Current Phase
Construction
Design Start
2015-06-19T00:00:00.000
Budget Forecast
237517401.68
Latest Budget Changes
-4752101.50
Total Budget Changes
9642889.68
Forecast Completion
2022-11-30T00:00:00.000
Latest Schedule Changes
15
Total Schedule Changes
1517
RECONSTRUCTION OF QUEENS BLVD - PHASE 2
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 619 • Project Name: RECONSTRUCTION OF QUEENS BLVD - PHASE 2
Date Reported As Of
2023-01-01T00:00:00.000
Pid
619
Project Name
RECONSTRUCTION OF QUEENS BLVD - PHASE 2
Description
Vision Zero - Queens Boulevard - Segment 2: 73rd Street to Eliot Avenue. Variety of safety and streetscape improvements including partial street reconstruction and resurfacing to address roadway conditions
Category
Industrial Development
Borough
Queens
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2016-10-26T00:00:00.000
Budget Forecast
86043000.00
Latest Budget Changes
0.00
Total Budget Changes
14201000.00
Forecast Completion
2029-08-13T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
2315
Dutch Kills and Lower Newtown Creek Enhanced Aeration Work
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 313 • Project Name: Dutch Kills and Lower Newtown Creek Enhanced Aeration Work
Date Reported As Of
2023-01-01T00:00:00.000
Pid
313
Project Name
Dutch Kills and Lower Newtown Creek Enhanced Aeration Work
Description
This project will upgrade the Borden Ave Pump Station. Footprint of the PS will be increased to ~ 2750 square feet. Convert dry well into wet well. Replace existing non-submersible pumps with submersible pumps while maintaining PS capacity of 3.9 MGD. Provide emergency portable diesel driven 4.5 MGD pump. Installation of new electrical, controls (SCADA), mechanical & HVAC systems. Provisions to support a future project to expand capacity of the PS from 3.9 MGD to 26 MGD. Upgrade resiliency per BWT guidelines. Line existing 14" Force Main
Category
Wastewater Treatment
Borough
Queens
Managing Agency
DEP
Client Agency
DEP
Current Phase
Construction
Design Start
2014-01-01T00:00:00.000
Budget Forecast
33485716.43
Latest Budget Changes
0.00
Total Budget Changes
-4338327.57
Forecast Completion
2024-06-18T00:00:00.000
Latest Schedule Changes
19
Total Schedule Changes
1891
Bronx Public School 077 Addition
Date Reported As Of: 2023-01-01T00:00:00.000 • Pid: 1101 • Project Name: Bronx Public School 077 Addition
Date Reported As Of
2023-01-01T00:00:00.000
Pid
1101
Project Name
Bronx Public School 077 Addition
Description
ADDITION / EXISTING SCHOOL RENOVATION WORK (PHASE I) / DEMOLITION (PHASE II)
Category
Schools
Managing Agency
SCA
Client Agency
DOE
Current Phase
Construction
Design Start
2019-09-25T00:00:00.000
Budget Forecast
86862349.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2024-09-03T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
0