Capital Projects

All major infrastructure and information technology projects with a budget of $25 million or more that are currently active (in the design, procurement, or construction phase).

City Government Mayor's Office of Operations (OPS) Dataset n7gv-k5yt 16 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
Replacement of The Digester at The Hunts Point WWTP
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 580 • Project Name: Replacement of The Digester at The Hunts Point WWTP
Date Reported As Of
2019-05-01T00:00:00.000
Pid
580
Project Name
Replacement of The Digester at The Hunts Point WWTP
Description
Construction of New Anaerobic Digesters
Category
Wastewater Treatment
Borough
Bronx
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2017-10-22T00:00:00.000
Budget Forecast
428531400.00
Latest Budget Changes
-7119700.00
Total Budget Changes
72852004.14
Forecast Completion
2024-10-22T00:00:00.000
Latest Schedule Changes
400
Total Schedule Changes
1355
Brooklyn Bridge - Approach Arches Rehabilitation
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 584 • Project Name: Brooklyn Bridge - Approach Arches Rehabilitation
Date Reported As Of
2019-05-01T00:00:00.000
Pid
584
Project Name
Brooklyn Bridge - Approach Arches Rehabilitation
Description
Rehabilitate approach arches and towers of Brooklyn Bridge. Including masonry cleaning, masonry repairs, repointing, rehabilition of transverse walls, new infill walls of the approach arch blocks. Clean and repoint the tower masonry, reinforce the gothic arches of the towers, and rehabilitate the tower tops.
Category
Bridges
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2016-04-13T00:00:00.000
Budget Forecast
365264863.00
Latest Budget Changes
21572216.00
Total Budget Changes
33135732.10
Forecast Completion
2022-06-01T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1908
Central Park Light Infrastructure
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 586 • Project Name: Central Park Light Infrastructure
Date Reported As Of
2019-05-01T00:00:00.000
Pid
586
Project Name
Central Park Light Infrastructure
Description
Install, remove, and furnish equipment for electrical work associated with traffic signals, lighting, and distribution systems in Central Park, Manhattan.
Category
Parks, Streets and Roadways
Managing Agency
DOT
Client Agency
DOT
Current Phase
Construction
Design Start
2016-04-29T00:00:00.000
Budget Forecast
42528656.00
Latest Budget Changes
-200000.00
Total Budget Changes
-3323649.60
Total Schedule Changes
1535
Concourse Village Avenue over Metro North
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 587 • Project Name: Concourse Village Avenue over Metro North
Date Reported As Of
2019-05-01T00:00:00.000
Pid
587
Project Name
Concourse Village Avenue over Metro North
Description
Replace the Concourse Village Avenue bridge over Metro North, Bronx
Category
Bridges
Borough
Bronx
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2017-09-19T00:00:00.000
Budget Forecast
51068795.00
Latest Budget Changes
1000000.00
Total Budget Changes
-186092.37
Forecast Completion
2027-10-17T00:00:00.000
Latest Schedule Changes
1153
Total Schedule Changes
1865
East 156th Street Bridge over Access to Housing
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 588 • Project Name: East 156th Street Bridge over Access to Housing
Date Reported As Of
2019-05-01T00:00:00.000
Pid
588
Project Name
East 156th Street Bridge over Access to Housing
Description
Replace the East 156th Street bridge over Access to Housing, Bronx.
Category
Bridges, Streets and Roadways
Borough
Bronx
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2017-10-05T00:00:00.000
Budget Forecast
66500000.00
Latest Budget Changes
1000000.00
Total Budget Changes
-363846.00
Forecast Completion
2027-10-18T00:00:00.000
Latest Schedule Changes
9
Total Schedule Changes
1720
Queensboro Bridge Roadway Replacement over East River
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 594 • Project Name: Queensboro Bridge Roadway Replacement over East River
Date Reported As Of
2019-05-01T00:00:00.000
Pid
594
Project Name
Queensboro Bridge Roadway Replacement over East River
Description
This project includes the replacement of the upper roadway's deck on the main bridge along with steel repairs, fire standpipes, and lighting upgrades.
Category
Bridges, Streets and Roadways
Managing Agency
DOT
Client Agency
DOT
Current Phase
Construction
Design Start
2015-04-09T00:00:00.000
Budget Forecast
70033000.00
Latest Budget Changes
-266427221.26
Total Budget Changes
8567339.67
Forecast Completion
2022-10-28T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1970
Replacement of the Esopus & Route 28A Railroad Bridges
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 443 • Project Name: Replacement of the Esopus & Route 28A Railroad Bridges
Date Reported As Of
2019-05-01T00:00:00.000
Pid
443
Project Name
Replacement of the Esopus & Route 28A Railroad Bridges
Description
Replacement of the Esopus Creek Bridge & Route 28A Railroad Bridge
Category
Bridges
Borough
Olive
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2016-10-11T00:00:00.000
Budget Forecast
82210276.90
Latest Budget Changes
0.00
Total Budget Changes
-50461071.35
Forecast Completion
2024-05-20T00:00:00.000
Latest Schedule Changes
-22
Total Schedule Changes
714
Williamsburg Bridge Miscellaneous Repairs and Painting
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 599 • Project Name: Williamsburg Bridge Miscellaneous Repairs and Painting
Date Reported As Of
2019-05-01T00:00:00.000
Pid
599
Project Name
Williamsburg Bridge Miscellaneous Repairs and Painting
Description
Scope includes paint the south side of the bridge, repair flags and structural steel, evaluate PP20 Bearings, evaluate tension rods at mid-span of the bridge, repair bridge cables and suspenders, replace modular joint, investigate the feasibility of additional clearance at towers, and resurface bridge decks with new waterproofing membrane.
Category
Bridges
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2018-08-15T00:00:00.000
Budget Forecast
308186521.00
Latest Budget Changes
-8378479.00
Total Budget Changes
52784947.00
Forecast Completion
2024-12-06T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
362
BROAD CHANNEL BULKHEADS - PH II
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 617 • Project Name: BROAD CHANNEL BULKHEADS - PH II
Date Reported As Of
2019-05-01T00:00:00.000
Pid
617
Project Name
BROAD CHANNEL BULKHEADS - PH II
Description
West 14th Rd. from Cross Bay Blvd. to Dead end (water side) West 15th Rd. from Cross Bay Blvd. to Dead end (water side) West 16th Rd. from Cross Bay Blvd. to Dead end (water side) West 17th Rd. from Cross Bay Blvd. to Dead end (water side) West 18th Rd. from Cross Bay Blvd. to Dead end (water side) West 19th Rd. from Cross Bay Blvd. to Dead end (water side)
Category
Industrial Development
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Construction Procurement
Design Start
2015-06-01T00:00:00.000
Budget Forecast
39742000.00
Latest Budget Changes
-4128000.00
Total Budget Changes
61781000.00
Forecast Completion
2023-05-25T00:00:00.000
Latest Schedule Changes
-596
Total Schedule Changes
-74
RECONSTRUCTION OF QUEENS BLVD - PHASE 1
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 618 • Project Name: RECONSTRUCTION OF QUEENS BLVD - PHASE 1
Date Reported As Of
2019-05-01T00:00:00.000
Pid
618
Project Name
RECONSTRUCTION OF QUEENS BLVD - PHASE 1
Description
Vision Zero - Queens Boulevard - Segment 1: Roosevelt Avenue to 73rd Street. Variety of safety and streetscape improvements including partial street reconstruction and resurfacing to address roadway conditions
Category
Industrial Development
Borough
Queens
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2016-08-11T00:00:00.000
Budget Forecast
76802000.00
Latest Budget Changes
-44811000.00
Total Budget Changes
176245000.00
Forecast Completion
2025-06-03T00:00:00.000
Latest Schedule Changes
187
Total Schedule Changes
1906
RECONSTRUCTION OF QUEENS BLVD - PHASE 2
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 619 • Project Name: RECONSTRUCTION OF QUEENS BLVD - PHASE 2
Date Reported As Of
2019-05-01T00:00:00.000
Pid
619
Project Name
RECONSTRUCTION OF QUEENS BLVD - PHASE 2
Description
Vision Zero - Queens Boulevard - Segment 2: 73rd Street to Eliot Avenue. Variety of safety and streetscape improvements including partial street reconstruction and resurfacing to address roadway conditions
Category
Industrial Development
Borough
Queens
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2016-10-26T00:00:00.000
Budget Forecast
71692000.00
Latest Budget Changes
-8571000.00
Total Budget Changes
14201000.00
Forecast Completion
2025-09-13T00:00:00.000
Latest Schedule Changes
382
Total Schedule Changes
2315
RECONSTRUCTION OF E 177 STREET/DEVOE AVENUE
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 623 • Project Name: RECONSTRUCTION OF E 177 STREET/DEVOE AVENUE
Date Reported As Of
2019-05-01T00:00:00.000
Pid
623
Project Name
RECONSTRUCTION OF E 177 STREET/DEVOE AVENUE
Description
Road Reconstruction, Water Main and Combined Sewer Work E 177th Street from Devoe Ave to Bronx Park Ave East Tremont Ave from Bronx Park Ave to Boston Rd Devoe Ave from E 177th Street to East Tremont Ave
Category
Industrial Development, Streets and Roadways
Borough
Bronx
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2009-09-03T00:00:00.000
Budget Forecast
25776000.00
Latest Budget Changes
0.00
Total Budget Changes
25050000.00
Forecast Completion
2022-11-15T00:00:00.000
Latest Schedule Changes
93
Total Schedule Changes
1839
CONSTRUCTION OF BMPs NC 6 AND 15 - SI
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 631 • Project Name: CONSTRUCTION OF BMPs NC 6 AND 15 - SI
Date Reported As Of
2019-05-01T00:00:00.000
Pid
631
Project Name
CONSTRUCTION OF BMPs NC 6 AND 15 - SI
Description
CONSTRUCTION OF BMP�s NC 6 AND 15, STORM AND SANITARY SEWERS INSTALLATION, SI
Category
Industrial Development
Borough
Staten Island
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Design
Design Start
2017-08-14T00:00:00.000
Budget Forecast
32279000.00
Latest Budget Changes
-757000.00
Total Budget Changes
1921000.00
Forecast Completion
2022-12-01T00:00:00.000
Latest Schedule Changes
5
Total Schedule Changes
925
New 40th Precinct
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 634 • Project Name: New 40th Precinct
Date Reported As Of
2019-05-01T00:00:00.000
Pid
634
Project Name
New 40th Precinct
Description
Design and build a new Police Precinct with full basement totaling 43,000 sq. ft. on an existing City owned property in the Bronx.
Category
Public Safety and Criminal Justice
Borough
Bronx
Managing Agency
DDC
Client Agency
Police
Current Phase
Construction
Design Start
2014-09-30T00:00:00.000
Budget Forecast
77300000.00
Latest Budget Changes
848812.07
Total Budget Changes
26020000.00
Forecast Completion
2021-06-25T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
711
20th Avenue Storm and Sanitary Sewer Construction
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 432 • Project Name: 20th Avenue Storm and Sanitary Sewer Construction
Date Reported As Of
2019-05-01T00:00:00.000
Pid
432
Project Name
20th Avenue Storm and Sanitary Sewer Construction
Description
Storm and sanitary sewers in 20th Ave between 126th Street and U.S. Bulkhead Line, etc. Water main works.
Category
Sewers
Borough
Queens
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Construction
Design Start
2012-07-10T00:00:00.000
Budget Forecast
132588000.00
Latest Budget Changes
-100000.00
Total Budget Changes
117177000.00
Forecast Completion
2021-06-29T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
2180
253 Broadway Landmark's Space Renovations
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 639 • Project Name: 253 Broadway Landmark's Space Renovations
Date Reported As Of
2019-05-01T00:00:00.000
Pid
639
Project Name
253 Broadway Landmark's Space Renovations
Description
Renovate 4 floors of the building to create new office space for the Landmarks Preservation Commission, including new hearing room.
Category
Other Government Facilities
Borough
Manhattan
Managing Agency
DDC
Client Agency
DCAS
Current Phase
Construction
Design Start
2013-01-23T00:00:00.000
Budget Forecast
73828000.00
Latest Budget Changes
27354224.01
Total Budget Changes
35010000.00
Forecast Completion
2020-06-30T00:00:00.000
Latest Schedule Changes
29
Total Schedule Changes
1696
STM & SAN SWR, WILLET PT BLVD WHITESTONE AREA, PH2
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 651 • Project Name: STM & SAN SWR, WILLET PT BLVD WHITESTONE AREA, PH2
Date Reported As Of
2019-05-01T00:00:00.000
Pid
651
Project Name
STM & SAN SWR, WILLET PT BLVD WHITESTONE AREA, PH2
Description
Installation of Storm sewers, Sanitary sewers, & Water mains in Whitestone Area.
Category
Sewers
Borough
Queens
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Construction
Design Start
2013-03-15T00:00:00.000
Budget Forecast
95997000.00
Latest Budget Changes
764000.00
Total Budget Changes
41243000.00
Forecast Completion
2022-09-15T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
642
STM & SAN SWR, N.B. WHITESTONE EXPWY SERV RD, PH 3
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 652 • Project Name: STM & SAN SWR, N.B. WHITESTONE EXPWY SERV RD, PH 3
Date Reported As Of
2019-05-01T00:00:00.000
Pid
652
Project Name
STM & SAN SWR, N.B. WHITESTONE EXPWY SERV RD, PH 3
Description
Installation of Storm sewers, Sanitary sewers, & Water mains in Whitestone Area-Phase 3
Category
Sewers
Borough
Queens
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Design
Design Start
2016-07-15T00:00:00.000
Budget Forecast
60763000.00
Latest Budget Changes
533000.00
Total Budget Changes
15468000.00
Forecast Completion
2023-08-16T00:00:00.000
Latest Schedule Changes
313
Total Schedule Changes
684
Grand Concourse Metro North Railroad Bridge Construction
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 120 • Project Name: Grand Concourse Metro North Railroad Bridge Construction
Date Reported As Of
2019-05-01T00:00:00.000
Pid
120
Project Name
Grand Concourse Metro North Railroad Bridge Construction
Description
Repair the existing bridge and separate the NYCDOT and NYCT components. Includes new steel plate girders, concrete deck, pedestals, backwalls, sidewalks, and bridge railing.
Category
Bridges
Borough
Bronx
Managing Agency
DOT
Client Agency
DOT
Current Phase
Construction Procurement
Design Start
2000-02-14T00:00:00.000
Budget Forecast
72332349.00
Latest Budget Changes
569998.00
Total Budget Changes
22682117.00
Forecast Completion
2022-05-29T00:00:00.000
Latest Schedule Changes
-35
Total Schedule Changes
836
TLC - NEW OFFICE FACILITY - 24-55 BQE WEST
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 665 • Project Name: TLC - NEW OFFICE FACILITY - 24-55 BQE WEST
Date Reported As Of
2019-05-01T00:00:00.000
Pid
665
Project Name
TLC - NEW OFFICE FACILITY - 24-55 BQE WEST
Description
Replace existing administration wing; provide new parking and new inspection lane within the facility.
Category
Other Government Facilities
Borough
Queens
Managing Agency
DDC
Client Agency
DCAS
Current Phase
Design
Design Start
2015-09-15T00:00:00.000
Budget Forecast
79981000.00
Latest Budget Changes
-7173000.00
Total Budget Changes
75370000.00
Forecast Completion
2024-01-28T00:00:00.000
Latest Schedule Changes
105
Total Schedule Changes
1248
The Reconstruction of The Lower Catskill Aqueduct
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 667 • Project Name: The Reconstruction of The Lower Catskill Aqueduct
Date Reported As Of
2019-05-01T00:00:00.000
Pid
667
Project Name
The Reconstruction of The Lower Catskill Aqueduct
Description
Reconstruction of Aqueduct structures; Replacement of mechanical equipment; cleaning the aqueduct interior & rehabilitation & repair of cracks & leaks. All relevent assessments, investigations, piloting, plans and reports.
Category
Water Supply
Borough
Citywide
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2019-04-15T00:00:00.000
Budget Forecast
331260845.00
Latest Budget Changes
16000000.00
Total Budget Changes
-65760729.00
Forecast Completion
2025-06-01T00:00:00.000
Latest Schedule Changes
274
Total Schedule Changes
1421
Storm Mitigation Loan Program at Bowery Bay
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 671 • Project Name: Storm Mitigation Loan Program at Bowery Bay
Date Reported As Of
2019-05-01T00:00:00.000
Pid
671
Project Name
Storm Mitigation Loan Program at Bowery Bay
Description
SMLP portion for Bowery Bay WRRF as part of the New York City Wastewater Resiliency Program.
Category
Wastewater Treatment
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2018-04-30T00:00:00.000
Budget Forecast
29413673.79
Latest Budget Changes
-6273197.81
Total Budget Changes
-19623216.41
Forecast Completion
2021-10-12T00:00:00.000
Latest Schedule Changes
-543
Total Schedule Changes
1026
North River Wastewater Treatment Plant Cogeneration and Electrification
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 423 • Project Name: North River Wastewater Treatment Plant Cogeneration and Electrification
Date Reported As Of
2019-05-01T00:00:00.000
Pid
423
Project Name
North River Wastewater Treatment Plant Cogeneration and Electrification
Description
This project will remove the 10 existing pump and blower engines and add electric motors for the main sewage pumps, a new cogeneration facility consisting of 5 new dual fuel engines, electrical service upgrades and flood protection.
Category
Wastewater Treatment
Borough
New York
Managing Agency
DEP
Client Agency
DEP
Current Phase
Construction
Design Start
2013-07-01T00:00:00.000
Budget Forecast
223508577.37
Latest Budget Changes
7874541.37
Total Budget Changes
134242052.88
Forecast Completion
2022-07-25T00:00:00.000
Latest Schedule Changes
60
Total Schedule Changes
1712
Storm Mitigation Loan Program at Hunts Point
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 672 • Project Name: Storm Mitigation Loan Program at Hunts Point
Date Reported As Of
2019-05-01T00:00:00.000
Pid
672
Project Name
Storm Mitigation Loan Program at Hunts Point
Description
SMLP portion for Hunts Point WRRF as part of the New York City Wastewater Resiliency Program.
Category
Wastewater Treatment
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2018-04-16T00:00:00.000
Budget Forecast
40053442.93
Latest Budget Changes
1768669.54
Total Budget Changes
20080597.79
Forecast Completion
2021-05-26T00:00:00.000
Latest Schedule Changes
-13
Total Schedule Changes
1091
Raise Shorelines Citywide
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 689 • Project Name: Raise Shorelines Citywide
Date Reported As Of
2019-05-01T00:00:00.000
Pid
689
Project Name
Raise Shorelines Citywide
Description
The design and construction of shoreline reconstruction projects necessary to provide Citywide protection from future flooding caused by elevated seal elvels.
Category
Industrial Development
Borough
Citywide
Managing Agency
EDC
Client Agency
ORR
Current Phase
Design
Design Start
2017-08-01T00:00:00.000
Budget Forecast
60422401.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2022-12-31T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
639
East 174th Street over Sheridan Expressway - Amtrak
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 701 • Project Name: East 174th Street over Sheridan Expressway - Amtrak
Date Reported As Of
2019-05-01T00:00:00.000
Pid
701
Project Name
East 174th Street over Sheridan Expressway - Amtrak
Description
Repair the East 174th Street bridge over Sheridan Expressway/ AMTRAK, the Bronx
Category
Bridges
Borough
Bronx
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2018-08-16T00:00:00.000
Budget Forecast
140940000.00
Latest Budget Changes
0.00
Total Budget Changes
5146882.00
Forecast Completion
2026-11-09T00:00:00.000
Latest Schedule Changes
297
Total Schedule Changes
1431
Pelham Bay Equestrian Park over Amtrak
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 703 • Project Name: Pelham Bay Equestrian Park over Amtrak
Date Reported As Of
2019-05-01T00:00:00.000
Pid
703
Project Name
Pelham Bay Equestrian Park over Amtrak
Description
Repair the Pelham Bay Equestrian Park bridge over Amtrak, the Bronx
Category
Bridges
Borough
Bronx
Managing Agency
DOT
Client Agency
DPR
Current Phase
Design
Design Start
2019-01-30T00:00:00.000
Budget Forecast
2208997.00
Latest Budget Changes
1000000.00
Total Budget Changes
137997.00
Forecast Completion
2026-07-01T00:00:00.000
Latest Schedule Changes
-112
Total Schedule Changes
1029
Harlem River Drive Ramp Reconstruction (George Washington Bridge)
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 708 • Project Name: Harlem River Drive Ramp Reconstruction (George Washington Bridge)
Date Reported As Of
2019-05-01T00:00:00.000
Pid
708
Project Name
Harlem River Drive Ramp Reconstruction (George Washington Bridge)
Description
Repair the Harlem River Drive Ramp to George Washington Bridge over Harlem River Drive Southbound (Trans-Manhattan Expressway), Manhattan
Category
Bridges, Streets and Roadways
Borough
Manhattan
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2019-02-07T00:00:00.000
Budget Forecast
430583000.00
Latest Budget Changes
1000000.00
Total Budget Changes
-3711870.00
Forecast Completion
2028-04-14T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
2697
Reconstruction of the West and North Docks at the OH WWTP
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 720 • Project Name: Reconstruction of the West and North Docks at the OH WWTP
Date Reported As Of
2019-05-01T00:00:00.000
Pid
720
Project Name
Reconstruction of the West and North Docks at the OH WWTP
Description
RECONSTRUCTION OF SEA WALL AND DOCK AT OWLS HEAD WWTP
Category
Wastewater Treatment
Borough
Brooklyn
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2017-08-18T00:00:00.000
Budget Forecast
63323000.00
Latest Budget Changes
3451430.00
Total Budget Changes
10985726.80
Forecast Completion
2021-11-08T00:00:00.000
Latest Schedule Changes
84
Total Schedule Changes
1389
Storm Mitigation Loan Program at Red Hook
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 721 • Project Name: Storm Mitigation Loan Program at Red Hook
Date Reported As Of
2019-05-01T00:00:00.000
Pid
721
Project Name
Storm Mitigation Loan Program at Red Hook
Description
SMLP portion for Red Hook WRRF as part of the New York City Wastewater Resiliency Program.
Category
Wastewater Treatment
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2018-11-01T00:00:00.000
Budget Forecast
38110604.77
Latest Budget Changes
3489506.91
Total Budget Changes
13549422.97
Forecast Completion
2021-11-03T00:00:00.000
Latest Schedule Changes
133
Total Schedule Changes
921
Throgs Neck Pumping Station Rehabilitation and Improvements
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 722 • Project Name: Throgs Neck Pumping Station Rehabilitation and Improvements
Date Reported As Of
2019-05-01T00:00:00.000
Pid
722
Project Name
Throgs Neck Pumping Station Rehabilitation and Improvements
Description
Throgs Neck Pumping Station Rehabilitation and Improvements
Category
Wastewater Treatment
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2018-06-11T00:00:00.000
Budget Forecast
48006911.00
Latest Budget Changes
5850269.00
Total Budget Changes
25708336.86
Forecast Completion
2023-03-10T00:00:00.000
Latest Schedule Changes
80
Total Schedule Changes
1306
Rondout-West Branch Bypass Tunnel Construction Project 2
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 409 • Project Name: Rondout-West Branch Bypass Tunnel Construction Project 2
Date Reported As Of
2019-05-01T00:00:00.000
Pid
409
Project Name
Rondout-West Branch Bypass Tunnel Construction Project 2
Description
To address existing leaks in the Delaware Aqueduct, a 3-mile bypass tunnel will be constructed near the town of Roseton and the existing tunnel will be repaired near the town of Wawarsing.
Category
Water Supply
Borough
Marlboro
Managing Agency
DEP
Client Agency
DEP
Current Phase
Construction
Design Start
2012-03-23T00:00:00.000
Budget Forecast
882239631.71
Latest Budget Changes
-860671.27
Total Budget Changes
202552329.25
Forecast Completion
2025-12-06T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
256
Revenue Cycle Implementation
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 723 • Project Name: Revenue Cycle Implementation
Date Reported As Of
2019-05-01T00:00:00.000
Pid
723
Project Name
Revenue Cycle Implementation
Description
The Epic Revenue Cycle system will be enterprise-wide and help increase revenue (by proper billing of services provided) in addition to ensuring patient safety and improved patient care, a top priority in workflows.
Category
Health and Hospitals, IT
Borough
Citywide
Managing Agency
HHC
Client Agency
H+H
Current Phase
IT
Budget Forecast
289117990.00
Latest Budget Changes
0.00
Total Budget Changes
0.00
Forecast Completion
2017-12-31T00:00:00.000
Latest Schedule Changes
-692
Total Schedule Changes
1279
Far Rockaway New Facility
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 730 • Project Name: Far Rockaway New Facility
Date Reported As Of
2019-05-01T00:00:00.000
Pid
730
Project Name
Far Rockaway New Facility
Description
Construction of a new 18,000 sq.ft. Branch employing the latest technology and sustainable design.
Category
Other Government Facilities
Managing Agency
DDC
Client Agency
Libraries-QBPL
Current Phase
Close-Out
Design Start
2012-01-10T00:00:00.000
Budget Forecast
32709000.00
Latest Budget Changes
-7446315.00
Total Budget Changes
-623757.91
Forecast Completion
2021-07-30T00:00:00.000
Latest Schedule Changes
-747
Total Schedule Changes
-78
Reconstruction Of Arthur Kill Road, Phase I
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 741 • Project Name: Reconstruction Of Arthur Kill Road, Phase I
Date Reported As Of
2019-05-01T00:00:00.000
Pid
741
Project Name
Reconstruction Of Arthur Kill Road, Phase I
Description
Reconstruction of Arthur Kill Rd from Clark Avenue to Richmond Avenue including widening of roadway
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2016-12-16T00:00:00.000
Budget Forecast
40098000.00
Latest Budget Changes
-64000.00
Total Budget Changes
22503000.00
Forecast Completion
2023-10-31T00:00:00.000
Latest Schedule Changes
-488
Total Schedule Changes
1415
Croton Above Ground Structure And Landscaping
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 747 • Project Name: Croton Above Ground Structure And Landscaping
Date Reported As Of
2019-05-01T00:00:00.000
Pid
747
Project Name
Croton Above Ground Structure And Landscaping
Description
The new Mosholu Golf Course Club House, together with fifty-five Driving Range Tee Boxes and ten-acres of re-landscaping comprise the phase IV and final of the vast DEP Croton Water Treatment Plant project, currently under construction in Van Cortlandt Park in the Bronx. Through a multifunctional design strategy the project reinstates the pre-existing golf program and facility, creates civic space for community use and ensures security for a multi-billion dollar public works facility.
Category
Industrial Development
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Construction
Design Start
2012-05-23T00:00:00.000
Budget Forecast
103956000.00
Latest Budget Changes
-6246000.00
Total Budget Changes
75117000.00
Forecast Completion
2021-03-18T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
897
Porpoise Bridge In Flushing Meadows-Corona Park
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 749 • Project Name: Porpoise Bridge In Flushing Meadows-Corona Park
Date Reported As Of
2019-05-01T00:00:00.000
Pid
749
Project Name
Porpoise Bridge In Flushing Meadows-Corona Park
Description
Feasibility Study for the repair and or restoration for Porpoise (Tide Gate) Bridge in Flushing Meadows Corona Park.
Category
Bridges
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2017-09-18T00:00:00.000
Budget Forecast
64905000.00
Latest Budget Changes
4280000.00
Total Budget Changes
82000.00
Forecast Completion
2023-07-24T00:00:00.000
Latest Schedule Changes
-5
Total Schedule Changes
1110
Upgrades At Brooklyn Animal Shelter
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 750 • Project Name: Upgrades At Brooklyn Animal Shelter
Date Reported As Of
2019-05-01T00:00:00.000
Pid
750
Project Name
Upgrades At Brooklyn Animal Shelter
Description
Demolish existing on-story facility. Construct a two-story new building for animal care center with a drive-through parking lot to meet the new program. Phasing is required to meet 24/7 operation.
Category
Other Government Facilities
Managing Agency
DDC
Client Agency
Health
Current Phase
Design
Design Start
2016-07-20T00:00:00.000
Budget Forecast
27519000.00
Latest Budget Changes
-8453966.00
Total Budget Changes
21288000.00
Forecast Completion
2023-08-10T00:00:00.000
Latest Schedule Changes
222
Total Schedule Changes
1355
Reconstruction Of Trinity Pl
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 755 • Project Name: Reconstruction Of Trinity Pl
Date Reported As Of
2019-05-01T00:00:00.000
Pid
755
Project Name
Reconstruction Of Trinity Pl
Description
Reconstruction of Trinity Place from Morris Street to Cedar Street, Borough of Manhattan
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2018-10-01T00:00:00.000
Budget Forecast
41510000.00
Latest Budget Changes
0.00
Total Budget Changes
13224000.00
Forecast Completion
2024-01-17T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
730
Construction Of Sanitary Sewers, Storm Sewers (Bm
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 760 • Project Name: Construction Of Sanitary Sewers, Storm Sewers (Bm
Date Reported As Of
2019-05-01T00:00:00.000
Pid
760
Project Name
Construction Of Sanitary Sewers, Storm Sewers (Bm
Description
Construction of storm sewers, sanitary sewers, water mains and Best Management Practice (BMP) NC-16 in Mason Avenue area, Borough of Staten Island.
Category
Sewers
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Construction Procurement
Design Start
2016-08-29T00:00:00.000
Budget Forecast
53468000.00
Latest Budget Changes
2027000.00
Total Budget Changes
37691000.00
Forecast Completion
2022-09-15T00:00:00.000
Latest Schedule Changes
-1
Total Schedule Changes
595
New 116Th Pct
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 762 • Project Name: New 116Th Pct
Date Reported As Of
2019-05-01T00:00:00.000
Pid
762
Project Name
New 116Th Pct
Description
Construction of a new precinct station house facility and associated site work for the new 116th Precinct.
Category
Public Safety and Criminal Justice
Managing Agency
DDC
Client Agency
Police
Current Phase
Construction Procurement
Design Start
2017-09-14T00:00:00.000
Budget Forecast
94557000.00
Latest Budget Changes
-2521483.00
Total Budget Changes
33852900.86
Forecast Completion
2022-04-05T00:00:00.000
Latest Schedule Changes
-58
Total Schedule Changes
727
Water Main Replacement In 222 Street, Queens
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 768 • Project Name: Water Main Replacement In 222 Street, Queens
Date Reported As Of
2019-05-01T00:00:00.000
Pid
768
Project Name
Water Main Replacement In 222 Street, Queens
Description
WATER MAIN REPLACEMENT IN 222 STREET
Category
Water Supply
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Design
Design Start
2018-04-02T00:00:00.000
Budget Forecast
39530000.00
Latest Budget Changes
0.00
Total Budget Changes
7195000.00
Forecast Completion
2023-01-18T00:00:00.000
Latest Schedule Changes
365
Total Schedule Changes
2236
Staten Island 1 & 3 Garage Construction & Rehab
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 769 • Project Name: Staten Island 1 & 3 Garage Construction & Rehab
Date Reported As Of
2019-05-01T00:00:00.000
Pid
769
Project Name
Staten Island 1 & 3 Garage Construction & Rehab
Description
The Department of Sanitation of the City of New York (DSNY) is planning to develop a Staten Island Districts 1 and 3 campus that will include a new garage serving both districts and renovation of the existing Borough Repair Shop. The site is to be reconfigured with new grading and drainage, new covered salt storage, new outdoor fueling, new household special waste collection, outdoor DSNY truck parking and a new force main sanitary line to connect to the NYC DEP sewer.
Category
Sanitation
Borough
Staten Island
Managing Agency
DDC
Client Agency
Sanitation
Current Phase
Construction Procurement
Design Start
2017-07-14T00:00:00.000
Budget Forecast
175532000.00
Latest Budget Changes
-309000.00
Total Budget Changes
68555000.00
Forecast Completion
2023-12-17T00:00:00.000
Latest Schedule Changes
184
Total Schedule Changes
406
Gilboa Dam Reconstruction, Phase IV
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 406 • Project Name: Gilboa Dam Reconstruction, Phase IV
Date Reported As Of
2019-05-01T00:00:00.000
Pid
406
Project Name
Gilboa Dam Reconstruction, Phase IV
Description
This project will rehabilitate the mechanics and the architecture of the Shandaken Tunnel Intake Chamber, which includes the replacement of gates and general site improvements.
Category
Water Supply
Borough
Upstate
Managing Agency
DEP
Client Agency
DEP
Current Phase
Construction
Design Start
2008-12-01T00:00:00.000
Budget Forecast
66972781.91
Latest Budget Changes
356685.86
Total Budget Changes
33535991.20
Forecast Completion
2021-10-07T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1684
Rehab Of Queens District 11/13 Sanitation Garage
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 770 • Project Name: Rehab Of Queens District 11/13 Sanitation Garage
Date Reported As Of
2019-05-01T00:00:00.000
Pid
770
Project Name
Rehab Of Queens District 11/13 Sanitation Garage
Description
The project is to extend the useful life of the facility through rehabilitation of the building structure and systems. This shall include: structural work, replacement of building MEP systems, architectural upgrade and replacement in kind of sidewalks and driveways
Category
Sanitation
Borough
Queens
Managing Agency
DDC
Client Agency
Sanitation
Current Phase
Design
Design Start
2017-03-06T00:00:00.000
Budget Forecast
61897000.00
Latest Budget Changes
12701000.00
Total Budget Changes
36221000.00
Forecast Completion
2023-07-01T00:00:00.000
Latest Schedule Changes
-97
Total Schedule Changes
1521
Coastal Resiliency Area 1 - East 23Rd St. To Montg
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 773 • Project Name: Coastal Resiliency Area 1 - East 23Rd St. To Montg
Date Reported As Of
2019-05-01T00:00:00.000
Pid
773
Project Name
Coastal Resiliency Area 1 - East 23Rd St. To Montg
Description
East Side Coastal Resiliency - East 23rd St. to Montgomery St., Manhattan
Category
Industrial Development, Parks
Managing Agency
DDC
Client Agency
Parks & Recreation
Current Phase
Design
Design Start
2016-04-27T00:00:00.000
Budget Forecast
1239704000.00
Latest Budget Changes
0.00
Total Budget Changes
-418193636.37
Forecast Completion
2023-03-31T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
836
Storm & Combined Sewers In 229 Street
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 776 • Project Name: Storm & Combined Sewers In 229 Street
Date Reported As Of
2019-05-01T00:00:00.000
Pid
776
Project Name
Storm & Combined Sewers In 229 Street
Description
Installation of storm, sanitary and combined sewers, and water main: Brookville section of Queens, including sections of 227th, 228th, 229th and 230th Streets, 230th Place, and 145th and 147th Avenues.
Category
Sewers
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Construction
Design Start
2015-04-30T00:00:00.000
Budget Forecast
108295000.00
Latest Budget Changes
60610000.00
Total Budget Changes
-9148000.00
Forecast Completion
2021-07-28T00:00:00.000
Latest Schedule Changes
54
Total Schedule Changes
652
Storm Sewer Outlet In 224Th St
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 784 • Project Name: Storm Sewer Outlet In 224Th St
Date Reported As Of
2019-05-01T00:00:00.000
Pid
784
Project Name
Storm Sewer Outlet In 224Th St
Description
Installation of storm sewers at 224th St and 149th Ave and along the access road through Idlewild Parks known as Springfield Lane (Spine Farmers Blvd)
Category
Sewers
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Design
Design Start
2017-01-04T00:00:00.000
Budget Forecast
102946000.00
Latest Budget Changes
-52496000.00
Total Budget Changes
155854000.00
Forecast Completion
2023-11-29T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1238
Combined Sewer In 70Th Street, Queens
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 788 • Project Name: Combined Sewer In 70Th Street, Queens
Date Reported As Of
2019-05-01T00:00:00.000
Pid
788
Project Name
Combined Sewer In 70Th Street, Queens
Description
COMBINED SEWER IN 70TH STREET, QUEENS
Category
Sewers
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Construction Procurement
Design Start
2016-08-31T00:00:00.000
Budget Forecast
119840000.00
Latest Budget Changes
1239842.00
Total Budget Changes
94201000.00
Forecast Completion
2023-08-10T00:00:00.000
Latest Schedule Changes
992
Total Schedule Changes
1155
Combined Sewer And Wm Work In 71 Street, Queens
Date Reported As Of: 2019-05-01T00:00:00.000 • Pid: 789 • Project Name: Combined Sewer And Wm Work In 71 Street, Queens
Date Reported As Of
2019-05-01T00:00:00.000
Pid
789
Project Name
Combined Sewer And Wm Work In 71 Street, Queens
Description
Replacement of combined sewer in 71st Street between Juniper Boulevard South and Queens Midtown Expressway, etc.
Category
Sewers
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Design
Design Start
2018-09-10T00:00:00.000
Budget Forecast
60142000.00
Latest Budget Changes
250000.00
Total Budget Changes
27172000.00
Forecast Completion
2023-08-29T00:00:00.000
Latest Schedule Changes
1094
Total Schedule Changes
1889