All major infrastructure and information technology projects with a budget of $25 million or more that are currently active (in the design, procurement, or construction phase).
City GovernmentMayor's Office of Operations (OPS)
Dataset n7gv-k5yt
16 fields
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 406 • Project Name: Gilboa Dam Reconstruction, Phase IV
Date Reported As Of
2017-04-01T00:00:00.000
Pid
406
Project Name
Gilboa Dam Reconstruction, Phase IV
Description
This project will rehabilitate the mechanics and the architecture of the Shandaken Tunnel Intake Chamber, which includes the replacement of gates and general site improvements.
Category
Water Supply
Borough
Upstate
Managing Agency
DEP
Client Agency
DEP
Current Phase
Construction Procurement
Design Start
2008-12-01T00:00:00.000
Budget Forecast
65207241.00
Latest Budget Changes
11359228.00
Total Budget Changes
33535991.20
Forecast Completion
2021-01-01T00:00:00.000
Latest Schedule Changes
-144
Total Schedule Changes
1684
Edgewood Triangle Roadway Reconstruction
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 204 • Project Name: Edgewood Triangle Roadway Reconstruction
Date Reported As Of
2017-04-01T00:00:00.000
Pid
204
Project Name
Edgewood Triangle Roadway Reconstruction
Description
Reconstruct roadway and extend storm and sanitary sewers in portions of Brookville Boulevard, Edgewood Street, 147th Avenue, and adjacent streets west of 241st Street.
Category
Streets and Roadways
Borough
Queens
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2013-02-13T00:00:00.000
Budget Forecast
33001000.00
Latest Budget Changes
-25784000.00
Total Budget Changes
106503000.00
Forecast Completion
2020-09-06T00:00:00.000
Latest Schedule Changes
43
Total Schedule Changes
3597
Rondout-West Branch Bypass Tunnel Construction Project 2
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 409 • Project Name: Rondout-West Branch Bypass Tunnel Construction Project 2
Date Reported As Of
2017-04-01T00:00:00.000
Pid
409
Project Name
Rondout-West Branch Bypass Tunnel Construction Project 2
Description
To address existing leaks in the Delaware Aqueduct, a 3-mile bypass tunnel will be constructed near the town of Roseton and the existing tunnel will be repaired near the town of Wawarsing.
Category
Water Supply
Borough
Marlboro
Managing Agency
DEP
Client Agency
DEP
Current Phase
Construction
Design Start
2012-03-23T00:00:00.000
Budget Forecast
902209763.56
Latest Budget Changes
27565765.74
Total Budget Changes
202552329.25
Forecast Completion
2023-09-26T00:00:00.000
Latest Schedule Changes
365
Total Schedule Changes
256
Grand Concourse Metro North Railroad Bridge Construction
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 120 • Project Name: Grand Concourse Metro North Railroad Bridge Construction
Date Reported As Of
2017-04-01T00:00:00.000
Pid
120
Project Name
Grand Concourse Metro North Railroad Bridge Construction
Description
Repair the existing bridge and separate the NYCDOT and NYCT components. Includes new steel plate girders, concrete deck, pedestals, backwalls, sidewalks, and bridge railing.
Category
Bridges
Borough
Bronx
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2000-02-14T00:00:00.000
Budget Forecast
71533240.57
Latest Budget Changes
845753.97
Total Budget Changes
22682117.00
Forecast Completion
2021-03-05T00:00:00.000
Latest Schedule Changes
248
Total Schedule Changes
836
Oakwood Beach WWTP Sludge Thickening Improvements
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 449 • Project Name: Oakwood Beach WWTP Sludge Thickening Improvements
Date Reported As Of
2017-04-01T00:00:00.000
Pid
449
Project Name
Oakwood Beach WWTP Sludge Thickening Improvements
Description
Replacement of thickener pumps, piping, sludge pumps, mixing pumps, recirculation pumps, spray water pumps, and heat exchangers. Install Gravity Belt Thickener, GBT pumps, polymer feed system. Rehab of Thickeners, Sludge Box, and Distribution Box.
Category
Wastewater Treatment
Borough
Staten Island
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2016-02-02T00:00:00.000
Budget Forecast
44247976.60
Latest Budget Changes
-711714.40
Total Budget Changes
57138101.30
Forecast Completion
2023-04-08T00:00:00.000
Latest Schedule Changes
13
Total Schedule Changes
3241
North River Wastewater Treatment Plant Cogeneration and Electrification
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 423 • Project Name: North River Wastewater Treatment Plant Cogeneration and Electrification
Date Reported As Of
2017-04-01T00:00:00.000
Pid
423
Project Name
North River Wastewater Treatment Plant Cogeneration and Electrification
Description
This project will replace the 10 existing pump and blower engines with electric motors for the main sewage pumps and a new cogeneration facility consisting of 5 new dual fuel engines, electrical service upgrades and flood protection.
Category
Wastewater Treatment
Borough
New York
Managing Agency
DEP
Client Agency
DEP
Current Phase
Construction Procurement
Design Start
2013-07-01T00:00:00.000
Budget Forecast
225161153.00
Latest Budget Changes
-12786127.00
Total Budget Changes
134242052.88
Forecast Completion
2021-02-08T00:00:00.000
Latest Schedule Changes
7
Total Schedule Changes
1712
Wyckoff Avenue Street Reconstruction
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 191 • Project Name: Wyckoff Avenue Street Reconstruction
Date Reported As Of
2017-04-01T00:00:00.000
Pid
191
Project Name
Wyckoff Avenue Street Reconstruction
Description
Reconstruction of Wyckoff Avenue from Flushing Avenue to Cooper Avenue, in the Boroughs of Brooklyn and Queens.
Category
Streets and Roadways
Borough
Brooklyn
Managing Agency
DDC
Client Agency
Trans. & Env. Protection
Current Phase
Design
Design Start
2008-06-10T00:00:00.000
Budget Forecast
46929000.00
Latest Budget Changes
37402000.00
Total Budget Changes
43926000.00
Forecast Completion
2030-01-13T00:00:00.000
Latest Schedule Changes
136
Total Schedule Changes
226
Broadway Bridge over Harlem River Replacement
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 106 • Project Name: Broadway Bridge over Harlem River Replacement
Date Reported As Of
2017-04-01T00:00:00.000
Pid
106
Project Name
Broadway Bridge over Harlem River Replacement
Description
Replace deteriorated members of lift span superstructure, concrete deck, lift electrical and mechanical systems, and fenders.
Category
Bridges
Borough
Bronx, Manhattan
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2005-04-01T00:00:00.000
Budget Forecast
168597456.72
Latest Budget Changes
-1084088.92
Total Budget Changes
39724388.00
Forecast Completion
2020-11-13T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
2797
New Ferry Boat Construction
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 94 • Project Name: New Ferry Boat Construction
Date Reported As Of
2017-04-01T00:00:00.000
Pid
94
Project Name
New Ferry Boat Construction
Description
Replace one Barberi class boat and the John F. Kennedy boat which are approaching the end of their useful lives with new Staten Island ferries. Replacement is needed to continue reliable service.
Category
Ferries
Managing Agency
DOT
Client Agency
DOT
Current Phase
Construction Procurement
Design Start
2014-09-15T00:00:00.000
Budget Forecast
348488982.47
Latest Budget Changes
-2153290.14
Total Budget Changes
-238419180.00
Forecast Completion
2020-03-16T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
549
Pelham Parkway Roadway Reconstruction, Phase 2
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 180 • Project Name: Pelham Parkway Roadway Reconstruction, Phase 2
Date Reported As Of
2017-04-01T00:00:00.000
Pid
180
Project Name
Pelham Parkway Roadway Reconstruction, Phase 2
Description
Reconstruction of Pelham Parkway from the Bronx River Parkway to the Hutchinson River Parkway, including the north service road from Bronx Park East to Eastchester Road.
Category
Streets and Roadways
Borough
Bronx
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Construction Procurement
Design Start
2002-02-20T00:00:00.000
Budget Forecast
134439000.00
Latest Budget Changes
3677000.00
Total Budget Changes
125164000.00
Forecast Completion
2018-06-16T00:00:00.000
Latest Schedule Changes
20
Total Schedule Changes
2869
20th Avenue Storm and Sanitary Sewer Construction
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 432 • Project Name: 20th Avenue Storm and Sanitary Sewer Construction
Date Reported As Of
2017-04-01T00:00:00.000
Pid
432
Project Name
20th Avenue Storm and Sanitary Sewer Construction
Description
Construction of a new storm sewer in 20th Avenue between 126th Street and US Bulkhead.
Category
Sewers
Borough
Queens
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Construction Procurement
Design Start
2012-07-10T00:00:00.000
Budget Forecast
126393000.00
Latest Budget Changes
-148891.00
Total Budget Changes
117177000.00
Forecast Completion
2023-08-15T00:00:00.000
Latest Schedule Changes
-365
Total Schedule Changes
2180
Bergen Avenue Street Reconstruction
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 170 • Project Name: Bergen Avenue Street Reconstruction
Date Reported As Of
2017-04-01T00:00:00.000
Pid
170
Project Name
Bergen Avenue Street Reconstruction
Description
Roadway reconstruction Bergen Avenue and vicinity, includes sections of: Avenues N, T, U, V, W, X and Y; 66th Street and 69th through 75th Streets; Veterans Avenue and Royce Street.
Category
Streets and Roadways
Borough
Brooklyn
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2012-12-03T00:00:00.000
Budget Forecast
88468000.00
Latest Budget Changes
29762000.00
Total Budget Changes
45837000.00
Forecast Completion
2027-02-12T00:00:00.000
Latest Schedule Changes
91
Total Schedule Changes
-388
Replacement of the Esopus & Route 28A Railroad Bridges
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 443 • Project Name: Replacement of the Esopus & Route 28A Railroad Bridges
Date Reported As Of
2017-04-01T00:00:00.000
Pid
443
Project Name
Replacement of the Esopus & Route 28A Railroad Bridges
Description
Replacement of the Esopus & Route 28A Railroad Bridges
Category
Bridges
Borough
Olive
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2016-12-15T00:00:00.000
Budget Forecast
106590694.00
Latest Budget Changes
650609.00
Total Budget Changes
-50461071.35
Forecast Completion
2025-02-09T00:00:00.000
Latest Schedule Changes
65
Total Schedule Changes
714
Bainbridge Avenue Trunk Water Main
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 454 • Project Name: Bainbridge Avenue Trunk Water Main
Date Reported As Of
2017-04-01T00:00:00.000
Pid
454
Project Name
Bainbridge Avenue Trunk Water Main
Description
Replacement Trunk Water Main in Bainbridge Ave, Bronx
Category
Water Supply
Borough
Bronx
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Construction
Design Start
2014-03-17T00:00:00.000
Budget Forecast
47144000.00
Latest Budget Changes
-40462.00
Total Budget Changes
25547000.00
Forecast Completion
2019-05-31T00:00:00.000
Latest Schedule Changes
194
Total Schedule Changes
1687
Queensboro Bridge Roadway Replacement over East River
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 594 • Project Name: Queensboro Bridge Roadway Replacement over East River
Date Reported As Of
2017-04-01T00:00:00.000
Pid
594
Project Name
Queensboro Bridge Roadway Replacement over East River
Description
This project includes the replacement of the upper roadway's deck on the main bridge along with steel repairs, fire standpipes, and lighting upgrades.
Category
Bridges, Streets and Roadways
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2015-04-09T00:00:00.000
Budget Forecast
361933233.33
Total Budget Changes
8567339.67
Forecast Completion
2019-05-08T00:00:00.000
Total Schedule Changes
1970
Grand Concourse Reconstruction, Phase 4 (Great Streets)
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 476 • Project Name: Grand Concourse Reconstruction, Phase 4 (Great Streets)
Date Reported As Of
2017-04-01T00:00:00.000
Pid
476
Project Name
Grand Concourse Reconstruction, Phase 4 (Great Streets)
Description
Reconstruction of Service Roads and milling and resurfacing of the main roadways on Grand Concourse from E175 Street to E Fordham Road, including median works and ped refuges.
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2016-06-22T00:00:00.000
Budget Forecast
63554000.00
Latest Budget Changes
300000.00
Total Budget Changes
57634000.00
Forecast Completion
2019-06-08T00:00:00.000
Latest Schedule Changes
-141
Total Schedule Changes
1448
Central Park Light Infrastructure
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 586 • Project Name: Central Park Light Infrastructure
Date Reported As Of
2017-04-01T00:00:00.000
Pid
586
Project Name
Central Park Light Infrastructure
Description
Install, remove, and furnish equipment for electrical work associated with traffic signals, lighting, and distribution systems in Central Park, Manhattan.
Category
Parks, Streets and Roadways
Managing Agency
DOT
Client Agency
DOT
Current Phase
Construction Procurement
Design Start
2016-04-29T00:00:00.000
Budget Forecast
42379125.60
Total Budget Changes
-3323649.60
Forecast Completion
2019-06-18T00:00:00.000
Total Schedule Changes
1535
Catskill Aqueduct Repair and Rehabilitation
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 478 • Project Name: Catskill Aqueduct Repair and Rehabilitation
Date Reported As Of
2017-04-01T00:00:00.000
Pid
478
Project Name
Catskill Aqueduct Repair and Rehabilitation
Description
Project to ensure the reliability of the 74 mile upper Catskill Aqueduct, including replacement of mechanical components, leak mitigation, and biofilm removal/condition assessment.
Category
Water Supply
Borough
Citywide
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2015-03-23T00:00:00.000
Budget Forecast
243639057.00
Latest Budget Changes
56893883.00
Total Budget Changes
9642889.68
Forecast Completion
2019-12-19T00:00:00.000
Latest Schedule Changes
654
Total Schedule Changes
1517
Brooklyn Bridge - Approach Arches Rehabilitation
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 584 • Project Name: Brooklyn Bridge - Approach Arches Rehabilitation
Date Reported As Of
2017-04-01T00:00:00.000
Pid
584
Project Name
Brooklyn Bridge - Approach Arches Rehabilitation
Description
Repair approach arches, towers, and ramp substructures of Brooklyn Bridge.
Category
Bridges
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2016-04-13T00:00:00.000
Budget Forecast
300246941.90
Total Budget Changes
33135732.10
Forecast Completion
2018-11-30T00:00:00.000
Total Schedule Changes
1908
Reconstruction of the Port Jervis Wastewater Treatment Plant
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 444 • Project Name: Reconstruction of the Port Jervis Wastewater Treatment Plant
Date Reported As Of
2017-04-01T00:00:00.000
Pid
444
Project Name
Reconstruction of the Port Jervis Wastewater Treatment Plant
Description
Reconstruction of the Port Jervis WWTP as required based on the effluent limits proposed by the Delaware River Basin Commission (DRBC)
Category
Wastewater Treatment
Borough
Port Jervis
Managing Agency
DEP
Client Agency
DEP
Current Phase
Construction Procurement
Design Start
2014-06-17T00:00:00.000
Budget Forecast
56470712.00
Latest Budget Changes
-149079.00
Total Budget Changes
9428438.55
Forecast Completion
2021-03-26T00:00:00.000
Latest Schedule Changes
351
Total Schedule Changes
2445
Roosevelt Avenue Bridge Superstructure and Substructure Repairs
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 101 • Project Name: Roosevelt Avenue Bridge Superstructure and Substructure Repairs
Date Reported As Of
2017-04-01T00:00:00.000
Pid
101
Project Name
Roosevelt Avenue Bridge Superstructure and Substructure Repairs
Description
Repair the bridge superstructure and substructure and install a new concrete-filled steel grid deck.
Category
Bridges
Borough
Queens
Managing Agency
DOT
Client Agency
DOT
Current Phase
Construction
Design Start
2003-03-10T00:00:00.000
Budget Forecast
106740014.24
Latest Budget Changes
-51896.00
Total Budget Changes
23798213.00
Forecast Completion
2019-05-07T00:00:00.000
Latest Schedule Changes
-20
Total Schedule Changes
2003
DBCD South Site Cultural Fit-Out
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 484 • Project Name: DBCD South Site Cultural Fit-Out
Date Reported As Of
2017-04-01T00:00:00.000
Pid
484
Project Name
DBCD South Site Cultural Fit-Out
Description
Interior fit-out of the south site cultural unit.
Category
Arts and Culture
Borough
Brooklyn
Managing Agency
EDC
Client Agency
DCLA
Current Phase
Design
Design Start
2014-12-01T00:00:00.000
Budget Forecast
7326030.90
Latest Budget Changes
-27201689.80
Total Budget Changes
36789601.16
Forecast Completion
2019-08-31T00:00:00.000
Latest Schedule Changes
428
Total Schedule Changes
1706
Primary Treatment Improvement at Wards Island WWTP
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 452 • Project Name: Primary Treatment Improvement at Wards Island WWTP
Date Reported As Of
2017-04-01T00:00:00.000
Pid
452
Project Name
Primary Treatment Improvement at Wards Island WWTP
Description
Replacement of internal mechanisms, concrete repairs, effluent weirs, scum troughs, grease pit collection system, electrical upgrades, HVAC upgrades, evaluation and improvement of cross collector drainage in 10 PST.
Category
Wastewater Treatment
Borough
Manhattan
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2017-04-18T00:00:00.000
Budget Forecast
46456631.00
Latest Budget Changes
0.00
Total Budget Changes
99651290.98
Forecast Completion
2020-05-10T00:00:00.000
Latest Schedule Changes
-383
Total Schedule Changes
2142
FDR Rehabilitation, Northbound (East 42nd to 49th Streets)
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 502 • Project Name: FDR Rehabilitation, Northbound (East 42nd to 49th Streets)
Date Reported As Of
2017-04-01T00:00:00.000
Pid
502
Project Name
FDR Rehabilitation, Northbound (East 42nd to 49th Streets)
Description
Repair the northbound FDR from East 42nd to 49th Streets.
Category
Bridges
Managing Agency
DOT
Client Agency
DOT
Current Phase
Design
Design Start
2016-08-30T00:00:00.000
Budget Forecast
98740670.39
Latest Budget Changes
-10616000.00
Total Budget Changes
-2802822.00
Forecast Completion
2026-08-24T00:00:00.000
Latest Schedule Changes
510
Total Schedule Changes
1816
Lower Concourse Initiative
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 575 • Project Name: Lower Concourse Initiative
Date Reported As Of
2017-04-01T00:00:00.000
Pid
575
Project Name
Lower Concourse Initiative
Description
The Project will improve the roadways and pedestrian facilities. The Project will consist of roadway reconstruction within Exterior Street between East 138th Street and East 150th Street.
Category
Industrial Development
Borough
Bronx
Managing Agency
EDC
Client Agency
EDC
Current Phase
Design
Design Start
2017-04-01T00:00:00.000
Budget Forecast
84520367.00
Total Budget Changes
-5100000.00
Forecast Completion
2021-09-01T00:00:00.000
Total Schedule Changes
730
Sunset Park Infrastructure
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 574 • Project Name: Sunset Park Infrastructure
Date Reported As Of
2017-04-01T00:00:00.000
Pid
574
Project Name
Sunset Park Infrastructure
Description
This project is construction of infrastructure and streetscape improvements in Sunset Park from 37th to 43rd Streets, between the Gowanus Expressway and the waterfront - to activate the waterfront and promote future development.
Category
Industrial Development
Borough
Brooklyn
Managing Agency
EDC
Client Agency
Mayor's Office
Current Phase
Design
Design Start
2016-06-08T00:00:00.000
Budget Forecast
5866058.31
Total Budget Changes
31633941.69
Forecast Completion
2020-10-18T00:00:00.000
Total Schedule Changes
1290
Metropolitan Hospital Perimeter Flood Protection
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 562 • Project Name: Metropolitan Hospital Perimeter Flood Protection
Date Reported As Of
2017-04-01T00:00:00.000
Pid
562
Project Name
Metropolitan Hospital Perimeter Flood Protection
Description
Flood mitigation system to protect Metropolitan's campus from future flooding due and sea level rise
Category
Industrial Development
Borough
Manhattan
Managing Agency
EDC
Client Agency
H+H
Current Phase
Design
Design Start
2016-12-01T00:00:00.000
Budget Forecast
81159381.00
Latest Budget Changes
0.00
Total Budget Changes
27046705.00
Forecast Completion
2020-11-30T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1452
Coney Island Hospital CSS Building and Perimeter Flood Protection
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 561 • Project Name: Coney Island Hospital CSS Building and Perimeter Flood Protection
Date Reported As Of
2017-04-01T00:00:00.000
Pid
561
Project Name
Coney Island Hospital CSS Building and Perimeter Flood Protection
Description
Renovation of CIH to advance the City’s resiliency plan, repair damages, and protect the hospital from future disasters.
Category
Health and Hospitals
Borough
Brooklyn
Managing Agency
EDC
Client Agency
H+H
Current Phase
Design
Design Start
2016-02-01T00:00:00.000
Budget Forecast
665168171.00
Latest Budget Changes
0.00
Total Budget Changes
30635879.93
Forecast Completion
2022-08-08T00:00:00.000
Latest Schedule Changes
548
Total Schedule Changes
1243
Brooklyn Sanitation Garage Construction: Community District 3
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 560 • Project Name: Brooklyn Sanitation Garage Construction: Community District 3
Date Reported As Of
2017-04-01T00:00:00.000
Pid
560
Project Name
Brooklyn Sanitation Garage Construction: Community District 3
Description
Construction of new Sanitation garage facility for services to Brooklyn Community District 3 to be located at Warsoff Place in Brooklyn
Category
Sanitation
Borough
Brooklyn
Managing Agency
DSNY
Client Agency
DSNY
Current Phase
Design
Design Start
2005-07-25T00:00:00.000
Budget Forecast
178760628.00
Latest Budget Changes
0.00
Total Budget Changes
25603365.00
Forecast Completion
2022-12-31T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
790
Brooklyn Civil Court move to 210 Joralemon St
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 509 • Project Name: Brooklyn Civil Court move to 210 Joralemon St
Date Reported As Of
2017-04-01T00:00:00.000
Pid
509
Project Name
Brooklyn Civil Court move to 210 Joralemon St
Description
Relocation of Brooklyn Civil and Housing Court to 210 Joralemon St
Category
Public Safety and Criminal Justice
Borough
Brooklyn
Managing Agency
DCAS
Client Agency
DCAS
Current Phase
Design
Design Start
2016-07-27T00:00:00.000
Budget Forecast
126411000.00
Latest Budget Changes
45912000.00
Total Budget Changes
200931011.96
Forecast Completion
2021-09-29T00:00:00.000
Latest Schedule Changes
188
Total Schedule Changes
1977
Park Avenue Tunnel (Murray Hill)
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 536 • Project Name: Park Avenue Tunnel (Murray Hill)
Date Reported As Of
2017-04-01T00:00:00.000
Pid
536
Project Name
Park Avenue Tunnel (Murray Hill)
Description
Repair Park Avenue tunnel, located in Midtown, Manhattan.
Category
Bridges
Managing Agency
DOT
Client Agency
DOT
Current Phase
Construction
Design Start
2006-08-01T00:00:00.000
Budget Forecast
40372464.48
Latest Budget Changes
-23035197.13
Total Budget Changes
-17773389.61
Forecast Completion
2019-01-15T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1568
Jerome Reservoir and Aqueduct Rehabilitation
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 448 • Project Name: Jerome Reservoir and Aqueduct Rehabilitation
Date Reported As Of
2017-04-01T00:00:00.000
Pid
448
Project Name
Jerome Reservoir and Aqueduct Rehabilitation
Description
Improvements to: fencing, vegetation, roadway, drainage, ext. above-ground retaining walls. Including repair of dam inlet archway & wingwall, re-pointing of stones & reinforcement of east reservoir wall, & leakage/seepage protection within OCA.
Category
Water Supply
Borough
Bronx
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2016-02-24T00:00:00.000
Budget Forecast
34306267.00
Latest Budget Changes
-27132930.00
Total Budget Changes
-833277.14
Forecast Completion
2020-06-19T00:00:00.000
Latest Schedule Changes
-21
Total Schedule Changes
2363
Brooklyn Supreme Court Fire Alarm System Upgrade
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 510 • Project Name: Brooklyn Supreme Court Fire Alarm System Upgrade
Date Reported As Of
2017-04-01T00:00:00.000
Pid
510
Project Name
Brooklyn Supreme Court Fire Alarm System Upgrade
Description
New Fire Alarm and Sprinkler System at 360 Adams Street Kings County Supreme Courhouse
Category
Public Safety and Criminal Justice
Borough
Brooklyn
Managing Agency
DDC
Client Agency
DCAS
Current Phase
Design
Design Start
2017-03-31T00:00:00.000
Budget Forecast
47040232.00
Latest Budget Changes
3730232.00
Total Budget Changes
47003000.00
Forecast Completion
2022-11-01T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1533
Oakwood Beach WWTP Headworks Improvements
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 450 • Project Name: Oakwood Beach WWTP Headworks Improvements
Date Reported As Of
2017-04-01T00:00:00.000
Pid
450
Project Name
Oakwood Beach WWTP Headworks Improvements
Description
Replacement of six bar screens, grit bin vibrator, six ring flushing pumps, six main sewage pumps and assoc. piping/valves and motor control center, replacement of four exhaust fans, gas and oxygen detectors and a 15 KVA transformer
Category
Wastewater Treatment
Borough
Staten Island
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2015-10-20T00:00:00.000
Budget Forecast
43164076.80
Latest Budget Changes
-4109214.20
Total Budget Changes
31867440.00
Forecast Completion
2022-05-05T00:00:00.000
Latest Schedule Changes
132
Total Schedule Changes
2857
Coney Island Area, Phase 3A
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 516 • Project Name: Coney Island Area, Phase 3A
Date Reported As Of
2017-04-01T00:00:00.000
Pid
516
Project Name
Coney Island Area, Phase 3A
Description
Reconstruction of Storm and Sanitary sewers, Trunk and Distribution Water Main in Coney Island Area -Phase 3A, Borough of Brooklyn.
Category
Industrial Development
Borough
Brooklyn
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Design
Design Start
2014-03-17T00:00:00.000
Budget Forecast
39427000.00
Latest Budget Changes
0.00
Total Budget Changes
25273000.00
Forecast Completion
2021-07-08T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1215
Ped Safety Upgrades on Atlantic Avenue, Phase 2
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 519 • Project Name: Ped Safety Upgrades on Atlantic Avenue, Phase 2
Date Reported As Of
2017-04-01T00:00:00.000
Pid
519
Project Name
Ped Safety Upgrades on Atlantic Avenue, Phase 2
Description
Safety Improvements on Atlantic Ave from Conduit Avenue to Rockaway Blvd, Phase 2, Brooklyn
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2016-08-04T00:00:00.000
Budget Forecast
37375000.00
Latest Budget Changes
7015148.00
Total Budget Changes
10136496.00
Forecast Completion
2021-02-27T00:00:00.000
Latest Schedule Changes
212
Total Schedule Changes
1400
Bellevue Medical Center Priority Mitigation Projects
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 545 • Project Name: Bellevue Medical Center Priority Mitigation Projects
Date Reported As Of
2017-04-01T00:00:00.000
Pid
545
Project Name
Bellevue Medical Center Priority Mitigation Projects
Description
Priority mitigation projects for the repair/restoration and hazard mitigation for Bellevue Hospital, damaged during Superstorm Sandy
The priority mitigation projects at Coler include key critical mitigation projects to improve the resiliency of the campus.
Category
Health and Hospitals
Borough
Manhattan
Managing Agency
EDC
Client Agency
H+H
Current Phase
Construction
Design Start
2014-09-01T00:00:00.000
Budget Forecast
21312417.00
Latest Budget Changes
-5512070.00
Total Budget Changes
0.00
Forecast Completion
2018-06-30T00:00:00.000
Latest Schedule Changes
-138
Total Schedule Changes
2085
Power Distribution at Bowery Bay WWTP
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 522 • Project Name: Power Distribution at Bowery Bay WWTP
Date Reported As Of
2017-04-01T00:00:00.000
Pid
522
Project Name
Power Distribution at Bowery Bay WWTP
Description
Power Distribution at Bowery Bay WWTP.
Category
Wastewater Treatment
Borough
Queens
Managing Agency
DEP
Client Agency
DEP
Current Phase
Construction Procurement
Design Start
2015-11-13T00:00:00.000
Budget Forecast
41557728.20
Latest Budget Changes
-4650597.80
Total Budget Changes
24235381.01
Forecast Completion
2021-04-23T00:00:00.000
Latest Schedule Changes
79
Total Schedule Changes
1684
Dutch Kills and Lower Newtown Creek Enhanced Aeration Work
Date Reported As Of: 2017-04-01T00:00:00.000 • Pid: 313 • Project Name: Dutch Kills and Lower Newtown Creek Enhanced Aeration Work
Date Reported As Of
2017-04-01T00:00:00.000
Pid
313
Project Name
Dutch Kills and Lower Newtown Creek Enhanced Aeration Work
Description
This project will construct a blower facility and install a diffused aeration system in Dutch Kills and Newtown Creek to increase dissolved oxygen content in the project area to meet DEC standards for the water body.
Category
Wastewater Treatment
Borough
Queens
Managing Agency
DEP
Client Agency
DEP
Current Phase
Construction Procurement
Design Start
2014-01-01T00:00:00.000
Budget Forecast
39918112.00
Latest Budget Changes
-2937512.00
Total Budget Changes
-4338327.57
Forecast Completion
2022-12-12T00:00:00.000
Latest Schedule Changes
924
Total Schedule Changes
1891
Dutch Kills and Lower Newtown Creek Enhanced Aeration Work
Date Reported As Of: 2016-11-01T00:00:00.000 • Pid: 313 • Project Name: Dutch Kills and Lower Newtown Creek Enhanced Aeration Work
Date Reported As Of
2016-11-01T00:00:00.000
Pid
313
Project Name
Dutch Kills and Lower Newtown Creek Enhanced Aeration Work
Description
This project will construct a blower facility and install a diffused aeration system in Dutch Kills and Newtown Creek to increase dissolved oxygen content in the project area to meet DEC standards for the water body.
Category
Wastewater Treatment
Borough
Queens
Managing Agency
DEP
Client Agency
DEP
Current Phase
Construction Procurement
Design Start
2014-01-01T00:00:00.000
Budget Forecast
42855624.00
Latest Budget Changes
2387605.00
Total Budget Changes
-4338327.57
Forecast Completion
2020-06-01T00:00:00.000
Latest Schedule Changes
148
Total Schedule Changes
1891
North River Wastewater Treatment Plant Cogeneration and Electrification
Date Reported As Of: 2016-11-01T00:00:00.000 • Pid: 423 • Project Name: North River Wastewater Treatment Plant Cogeneration and Electrification
Date Reported As Of
2016-11-01T00:00:00.000
Pid
423
Project Name
North River Wastewater Treatment Plant Cogeneration and Electrification
Description
This project will replace the 10 existing pump and blower engines with electric motors for the main sewage pumps and a new cogeneration facility consisting of 5 new dual fuel engines, electrical service upgrades and flood protection.
Category
Wastewater Treatment
Borough
New York
Managing Agency
DEP
Client Agency
DEP
Current Phase
Construction Procurement
Design Start
2013-07-01T00:00:00.000
Budget Forecast
237947280.00
Latest Budget Changes
12613363.00
Total Budget Changes
134242052.88
Forecast Completion
2021-02-01T00:00:00.000
Latest Schedule Changes
51
Total Schedule Changes
1712
Bellevue Medical Center Priority Mitigation Projects
Date Reported As Of: 2016-11-01T00:00:00.000 • Pid: 545 • Project Name: Bellevue Medical Center Priority Mitigation Projects
Date Reported As Of
2016-11-01T00:00:00.000
Pid
545
Project Name
Bellevue Medical Center Priority Mitigation Projects
Description
Priority mitigation projects for the repair/restoration and hazard mitigation for Bellevue Hospital, damaged during Superstorm Sandy
Category
Health and Hospitals
Borough
Manhattan
Managing Agency
EDC
Client Agency
H+H
Current Phase
Design
Design Start
2014-01-01T00:00:00.000
Budget Forecast
42407946.00
Latest Budget Changes
-8533429.00
Total Budget Changes
0.00
Forecast Completion
2018-03-31T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
1854
Edgewood Triangle Roadway Reconstruction
Date Reported As Of: 2016-11-01T00:00:00.000 • Pid: 204 • Project Name: Edgewood Triangle Roadway Reconstruction
Date Reported As Of
2016-11-01T00:00:00.000
Pid
204
Project Name
Edgewood Triangle Roadway Reconstruction
Description
Reconstruct roadway and extend storm and sanitary sewers in portions of Brookville Boulevard, Edgewood Street, 147th Avenue, and adjacent streets west of 241st Street.
Category
Streets and Roadways
Borough
Queens
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2013-02-13T00:00:00.000
Budget Forecast
58785000.00
Latest Budget Changes
25722000.00
Total Budget Changes
106503000.00
Forecast Completion
2020-07-25T00:00:00.000
Latest Schedule Changes
304
Total Schedule Changes
3597
Grand Concourse Reconstruction, Phase 4 (Great Streets)
Date Reported As Of: 2016-11-01T00:00:00.000 • Pid: 476 • Project Name: Grand Concourse Reconstruction, Phase 4 (Great Streets)
Date Reported As Of
2016-11-01T00:00:00.000
Pid
476
Project Name
Grand Concourse Reconstruction, Phase 4 (Great Streets)
Description
Reconstruction of Service Roads and milling and resurfacing of the main roadways on Grand Concourse from E175 Street to E Fordham Road, including median works and ped refuges.
Category
Streets and Roadways
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2016-06-22T00:00:00.000
Budget Forecast
63254000.00
Latest Budget Changes
-75000.00
Total Budget Changes
57634000.00
Forecast Completion
2019-10-27T00:00:00.000
Latest Schedule Changes
-169
Total Schedule Changes
1448
Oakwood Beach WWTP Sludge Thickening Improvements
Date Reported As Of: 2016-11-01T00:00:00.000 • Pid: 449 • Project Name: Oakwood Beach WWTP Sludge Thickening Improvements
Date Reported As Of
2016-11-01T00:00:00.000
Pid
449
Project Name
Oakwood Beach WWTP Sludge Thickening Improvements
Description
Replacement of thickener pumps, controls/piping, digested sludge pumps, sludge mixing pumps, sludge recirculation pumps, spray water pumps, and seal water pumps. Installation of GBT and rehab of GTs
Category
Wastewater Treatment
Borough
Staten Island
Managing Agency
DEP
Client Agency
DEP
Current Phase
Design
Design Start
2016-02-02T00:00:00.000
Budget Forecast
44959691.00
Latest Budget Changes
-219968.00
Total Budget Changes
57138101.30
Forecast Completion
2023-03-26T00:00:00.000
Latest Schedule Changes
438
Total Schedule Changes
3241
Rondout-West Branch Bypass Tunnel Construction Project 2
Date Reported As Of: 2016-11-01T00:00:00.000 • Pid: 409 • Project Name: Rondout-West Branch Bypass Tunnel Construction Project 2
Date Reported As Of
2016-11-01T00:00:00.000
Pid
409
Project Name
Rondout-West Branch Bypass Tunnel Construction Project 2
Description
To address existing leaks in the Delaware Aqueduct, a 3-mile bypass tunnel will be constructed near the town of Roseton and the existing tunnel will be repaired near the town of Wawarsing.
Category
Water Supply
Borough
Marlboro
Managing Agency
DEP
Client Agency
DEP
Current Phase
Construction
Design Start
2012-03-23T00:00:00.000
Budget Forecast
874643997.83
Latest Budget Changes
2020719.00
Total Budget Changes
202552329.25
Forecast Completion
2022-09-26T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
256
20th Avenue Storm and Sanitary Sewer Construction
Date Reported As Of: 2016-11-01T00:00:00.000 • Pid: 432 • Project Name: 20th Avenue Storm and Sanitary Sewer Construction
Date Reported As Of
2016-11-01T00:00:00.000
Pid
432
Project Name
20th Avenue Storm and Sanitary Sewer Construction
Description
Construction of a new storm sewer in 20th Avenue between 126th Street and US Bulkhead.
Category
Sewers
Borough
Queens
Managing Agency
DDC
Client Agency
Environmental Protection
Current Phase
Construction Procurement
Design Start
2012-07-10T00:00:00.000
Budget Forecast
126541891.00
Latest Budget Changes
609891.00
Total Budget Changes
117177000.00
Forecast Completion
2024-08-14T00:00:00.000
Latest Schedule Changes
2023
Total Schedule Changes
2180
Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation
Date Reported As Of: 2016-11-01T00:00:00.000 • Pid: 193 • Project Name: Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation
Date Reported As Of
2016-11-01T00:00:00.000
Pid
193
Project Name
Dumbo and Vinegar Hill Area Roadway Reconstruction and Renovation
Description
Reconstruction and restoration of Belgian block roadways in the DUMBO and Vinegar Hill communities concurrent with installation of new water main, combined sewers and storm sewers, plus construction of the Pearl Street Triangle Plaza.
Category
Streets and Roadways
Borough
Brooklyn
Managing Agency
DDC
Client Agency
Transportation
Current Phase
Design
Design Start
2012-06-07T00:00:00.000
Budget Forecast
60750000.00
Latest Budget Changes
13656000.00
Total Budget Changes
96724000.00
Forecast Completion
2018-11-23T00:00:00.000
Latest Schedule Changes
0
Total Schedule Changes
3253
Grand Concourse Metro North Railroad Bridge Construction
Date Reported As Of: 2016-11-01T00:00:00.000 • Pid: 120 • Project Name: Grand Concourse Metro North Railroad Bridge Construction
Date Reported As Of
2016-11-01T00:00:00.000
Pid
120
Project Name
Grand Concourse Metro North Railroad Bridge Construction
Description
Repair the existing bridge and separate the NYCDOT and NYCT components. Includes new steel plate girders, concrete deck, pedestals, backwalls, sidewalks, and bridge railing.