Participatory Budgeting Project Tracker

Tracking the funding and progress of winning participatory budget projects.

City Government City Council (NYCC) Dataset qm5f-frjb 23 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
NYCHA
Vote Year: 2015 • Fiscal Year: FY16 • District: 8
Vote Year
2015
Fiscal Year
FY16
District
8
Project
Wilson Houses: Basketball Court Renovations
Ballot Price
375000.00
Subproject Cost
375000.00
Total Appropriated
375000.00
Agency
NYCHA
Non City
N
Description
Renovation to basketball court.
Installation Location
405 E.105 St. (El Barrio/East Harlem)
Mapping Location
40.789143, -73.939962
Status Summary
Part of Capital Plan- Funding Approved
Postcode
10029
Borough
MANHATTAN
Community Board
11
Census Tract
162
Bin
1079367
Bbl
1016990001
Nta
East Harlem South
SCA
Vote Year: 2015 • Fiscal Year: FY16 • District: 8
Vote Year
2015
Fiscal Year
FY16
District
8
Project
School Technology Upgrades: Academy of Applied Sciences (site 1 of 4)
Ballot Price
400000.00
Subproject Cost
188000.00
Total Appropriated
500000.00
Agency
SCA
Non City
N
Description
Technology upgrades for the Academy of Applied Math and Technology, South Bronx Preparatory School, P.S. 161 and International Community High School.
Installation Location
(Bronx - Mott Haven & Longwood)
Mapping Location
40.809982, -73.917857
Status Summary
Part of Capital Plan- Funding Approved
SCA
Vote Year: 2015 • Fiscal Year: FY16 • District: 8
Vote Year
2015
Fiscal Year
FY16
District
8
Project
School Technology Upgrades: International Community High School (site 2 of 4)
Ballot Price
400000.00
Subproject Cost
188000.00
Total Appropriated
500000.00
Agency
SCA
Non City
N
Description
Technology upgrades for the Academy of Applied Math and Technology, South Bronx Preparatory School, P.S. 161 and International Community High School.
Installation Location
(Bronx - Mott Haven & Longwood)
Mapping Location
40.813738, -73.920644
Status Summary
Part of Capital Plan- Funding Approved
SCA
Vote Year: 2015 • Fiscal Year: FY16 • District: 8
Vote Year
2015
Fiscal Year
FY16
District
8
Project
School Technology Upgrades: PS 161 (site 3 of 4)
Ballot Price
400000.00
Subproject Cost
188000.00
Total Appropriated
500000.00
Agency
SCA
Non City
N
Description
Technology upgrades for the Academy of Applied Math and Technology, South Bronx Preparatory School, P.S. 161 and International Community High School.
Installation Location
(Bronx - Mott Haven & Longwood)
Mapping Location
40.814452, -73.905442
Status Summary
Part of Capital Plan- Funding Approved
SCA
Vote Year: 2015 • Fiscal Year: FY16 • District: 8
Vote Year
2015
Fiscal Year
FY16
District
8
Project
School Technology Upgrades: South Bronx Prep (site 4 of 4)
Ballot Price
400000.00
Subproject Cost
188000.00
Total Appropriated
500000.00
Agency
SCA
Non City
N
Description
Technology upgrades for the Academy of Applied Math and Technology, South Bronx Preparatory School, P.S. 161 and International Community High School.
Installation Location
(Bronx - Mott Haven & Longwood)
Mapping Location
40.809447, -73.917220
Status Summary
Part of Capital Plan- Funding Approved
NYPL
Vote Year: 2015 • Fiscal Year: FY16 • District: 8
Vote Year
2015
Fiscal Year
FY16
District
8
Project
125th Street Library: ADA Ramp
Ballot Price
500000.00
Subproject Cost
500000.00
Total Appropriated
500000.00
Agency
NYPL
Non City
N
Description
Replace current detachable ramp with a permanent, concrete and ADA-compliant ramp.
Installation Location
224 E. 125th St. (El Barrio/East Harlem)
Mapping Location
40.803081, -73.934987
Status Summary
Part of Capital Plan- Funding Approved
Postcode
10035
Borough
MANHATTAN
Community Board
11
Census Tract
242
Bin
1054674
Bbl
1017890037
Nta
East Harlem North
DPR
Vote Year: 2015 • Fiscal Year: FY16 • District: 8
Vote Year
2015
Fiscal Year
FY16
District
8
Project
Boys & Girls Harbor: Playground Renovations
Ballot Price
275000.00
Subproject Cost
275000.00
Total Appropriated
275000.00
Agency
DPR
Non City
N
Description
Revitalize entire playground; install new basketball courts with standard basketball equipment, softer surfacing and small seating and eating area.
Installation Location
1 E. 104th St. (El Barrio/East Harlem)
Mapping Location
40.792991, -73.951571
Status Summary
Part of Capital Plan- Funding Approved
Postcode
10029
Borough
MANHATTAN
Community Board
11
Census Tract
168
Bin
1051499
Bbl
1016100001
Nta
East Harlem South
SCA
Vote Year: 2015 • Fiscal Year: FY16 • District: 8
Vote Year
2015
Fiscal Year
FY16
District
8
Project
Air Conditioning at Bronx Schools: PS 161 (site 1 of 4)
Ballot Price
500000.00
Subproject Cost
125000.00
Total Appropriated
500000.00
Agency
SCA
Non City
N
Description
Installation of 1 air conditioning system at 345 Brooke Avenue for schools X343, X224 & X334. Installation of 1 air conditioning system at PS 161x.
Installation Location
628 Tinton Ave, 345 Brook Ave. (Bronx - Mott Haven & Longwood)
Mapping Location
40.814453, -73.905446
Status Summary
Part of Capital Plan- Funding Approved
Postcode
10455
Borough
BRONX
Community Board
1
Census Tract
79
Bin
2004773
Bbl
2026640029
Nta
Melrose South-Mott Haven North
SCA
Vote Year: 2015 • Fiscal Year: FY16 • District: 8
Vote Year
2015
Fiscal Year
FY16
District
8
Project
Air Conditioning at Bronx Schools: PS 171 (site 2 of 4)
Ballot Price
500000.00
Subproject Cost
125000.00
Total Appropriated
500000.00
Agency
SCA
Non City
N
Description
Installation of 1 air conditioning system at 345 Brooke Avenue for schools X343, X224 & X334. Installation of 1 air conditioning system at PS 161x.
Installation Location
628 Tinton Ave, 345 Brook Ave. (Bronx - Mott Haven & Longwood)
Mapping Location
40.814453, -73.905446
Status Summary
Part of Capital Plan- Funding Approved
Postcode
10455
Borough
BRONX
Community Board
1
Census Tract
79
Bin
2004773
Bbl
2026640029
Nta
Melrose South-Mott Haven North
SCA
Vote Year: 2015 • Fiscal Year: FY16 • District: 32S
Vote Year
2015
Fiscal Year
FY16
District
32S
Project
Upgrades to our schools to include: P.S. 47 - Tech equipment (site 1 of 5)
Ballot Price
345000.00
Subproject Cost
50000.00
Total Appropriated
345000.00
Agency
SCA
Non City
N
Mapping Location
40.606481, -73.820786
Status Summary
Part of Capital Plan- Funding Approved
SCA
Vote Year: 2015 • Fiscal Year: FY16 • District: 8
Vote Year
2015
Fiscal Year
FY16
District
8
Project
Air Conditioning at Bronx Schools: PS 352 (site 3 of 4)
Ballot Price
500000.00
Subproject Cost
125000.00
Total Appropriated
500000.00
Agency
SCA
Non City
N
Description
Installation of 1 air conditioning system at 345 Brooke Avenue for schools X343, X224 & X334. Installation of 1 air conditioning system at PS 161x.
Installation Location
628 Tinton Ave, 345 Brook Ave. (Bronx - Mott Haven & Longwood)
Mapping Location
40.809981, -73.917851
Status Summary
Part of Capital Plan- Funding Approved
Postcode
10455
Borough
BRONX
Community Board
1
Census Tract
79
Bin
2004773
Bbl
2026640029
Nta
Melrose South-Mott Haven North
SCA
Vote Year: 2015 • Fiscal Year: FY16 • District: 8
Vote Year
2015
Fiscal Year
FY16
District
8
Project
Air Conditioning at Bronx Schools: PS 369 (site 4 of 4)
Ballot Price
500000.00
Subproject Cost
125000.00
Total Appropriated
500000.00
Agency
SCA
Non City
N
Description
Installation of 1 air conditioning system at 345 Brooke Avenue for schools X343, X224 & X334. Installation of 1 air conditioning system at PS 161x.
Installation Location
628 Tinton Ave, 345 Brook Ave. (Bronx - Mott Haven & Longwood)
Mapping Location
40.809981, -73.917851
Status Summary
Part of Capital Plan- Funding Approved
Postcode
10455
Borough
BRONX
Community Board
1
Census Tract
79
Bin
2004773
Bbl
2026640029
Nta
Melrose South-Mott Haven North
DPR
Vote Year: 2015 • Fiscal Year: FY16 • District: 10
Vote Year
2015
Fiscal Year
FY16
District
10
Project
Outdoor Fitness Center by the Hudson River
Ballot Price
100000.00
Subproject Cost
100000.00
Total Appropriated
100000.00
Agency
DPR
Non City
N
Description
Free exercise equipment provides community health: pull-up bars, rings, jump boxes, chest press, leg extension, & more! Get out in the sun, get moving, and take in the inspiring view of the GW Bridge!
Installation Location
Dyckman Fields, Hudson River
Mapping Location
40.869622, -73.931432
Status Summary
Part of Capital Plan- Funding Approved
SCA
Vote Year: 2015 • Fiscal Year: FY16 • District: 10
Vote Year
2015
Fiscal Year
FY16
District
10
Project
WHEELS Playground Installation
Ballot Price
500000.00
Subproject Cost
500000.00
Total Appropriated
500000.00
Agency
SCA
Non City
N
Description
WHEELS Elementary has recess in a fenced concrete yard which will be transformed by this proposal to a playground with safe surface, structure, and hoops. Support our children and neighborhood school.
Installation Location
511 West 182nd Street
Mapping Location
40.849107, -73.931109
Status Summary
Part of Capital Plan- Funding Approved
Postcode
10033
Borough
MANHATTAN
Community Board
12
Census Tract
269
Bin
1063703
Bbl
1021550035
Nta
Washington Heights North
DPR
Vote Year: 2015 • Fiscal Year: FY16 • District: 10
Vote Year
2015
Fiscal Year
FY16
District
10
Project
Highbridge Community Garden
Ballot Price
200000.00
Subproject Cost
200000.00
Total Appropriated
200000.00
Agency
DPR
Non City
N
Description
A Community Food Garden! People working together growing crops from seed to harvest results in neighborhood pride, ownership, education, benefits of physical activity and we get fresh healthy food!
Installation Location
Highbridge Park- South of pool
Mapping Location
40.844643, -73.932968
Status Summary
Part of Capital Plan- Funding Approved
SCA
Vote Year: 2015 • Fiscal Year: FY16 • District: 10
Vote Year
2015
Fiscal Year
FY16
District
10
Project
Dos Puentes/PS 132 Playground Installation: Phase 1
Ballot Price
400000.00
Subproject Cost
200000.00
Total Appropriated
200000.00
Agency
SCA
Non City
N
Description
This is a co-located school without a playground, giving no safe area to hold recess. New fencing and a play structure will help to provide for two safe areas for kids to play!
Installation Location
185 Wadsworth Avenue
Mapping Location
40.850554, -73.933936
Status Summary
Part of Capital Plan- Funding Approved
Postcode
10033
Borough
MANHATTAN
Community Board
12
Census Tract
271
Bin
1063947
Bbl
1021650026
Nta
Washington Heights North
SCA
Vote Year: 2015 • Fiscal Year: FY16 • District: 11
Vote Year
2015
Fiscal Year
FY16
District
11
Project
MS/HS 141 School Auditorium Renovation
Ballot Price
375000.00
Subproject Cost
375000.00
Total Appropriated
400000.00
Agency
SCA
Non City
N
Description
Upgrade 55 year old auditorium used by 1,400 students and several other community organizations. Installation of new stage drapes and replacement of wooden seats in disrepair.
Installation Location
660 W. 237th St. (Riverdale)
Mapping Location
40.887715, -73.913605
Status Summary
Part of Capital Plan- Funding Approved
Postcode
10463
Borough
BRONX
Community Board
8
Census Tract
309
Bin
2085870
Bbl
2059180376
Nta
North Riverdale-Fieldston-Riverdale
DOT
Vote Year: 2015 • Fiscal Year: FY16 • District: 11
Vote Year
2015
Fiscal Year
FY16
District
11
Project
Bus Countdown Clocks
Ballot Price
120000.00
Subproject Cost
120000.00
Total Appropriated
120000.00
Agency
DOT
Non City
N
Description
Commuters wait for long lengths of time without knowing when the next bus will arrive. Bus countdown clocks will alert riders as to how many stops away the next bus is.
Installation Location
Bx1, Bx10, Bx16, Bx26, Bx34 (Throughout District 11)
Mapping Location
40.886164, -73.912599
Status Summary
Part of Capital Plan- Funding Approved
SCA
Vote Year: 2015 • Fiscal Year: FY16 • District: 11
Vote Year
2015
Fiscal Year
FY16
District
11
Project
P.S. 24 Technology Expansion
Ballot Price
70000.00
Subproject Cost
70000.00
Total Appropriated
70000.00
Agency
SCA
Non City
N
Description
Purchase of two computer carts consisting of 36 laptop units each. Computer technology is necessary to address current curriculum and prepare students for future subject matter and college readiness.
Installation Location
600 W. 236th St. (Riverdale)
Mapping Location
40.886861, -73.911242
Status Summary
Part of Capital Plan- Funding Approved
Postcode
10463
Borough
BRONX
Community Board
8
Census Tract
297
Nta
Spuyten Duyvil-Kingsbridge
DPR
Vote Year: 2015 • Fiscal Year: FY16 • District: 11
Vote Year
2015
Fiscal Year
FY16
District
11
Project
Spuyen Duyvil Playground Renovation
Ballot Price
400000.00
Subproject Cost
400000.00
Total Appropriated
600000.00
Agency
DPR
Non City
N
Description
Reconstruct existing wading pool as an accessible spray shower and install new pavement, fencing, seating, planting and utilities.
Installation Location
Douglas Ave. and West 235th St (Riverdale)
Mapping Location
40.886953, -73.916674
Status Summary
Part of Capital Plan- Funding Approved
NYPL
Vote Year: 2015 • Fiscal Year: FY16 • District: 11
Vote Year
2015
Fiscal Year
FY16
District
11
Project
Van Cortlandt Library Roof Replacement
Ballot Price
300000.00
Subproject Cost
300000.00
Total Appropriated
300000.00
Agency
NYPL
Non City
N
Description
The current roof is outdated and causes leaks in the library. A new roof will prevent additional water damage to the facility.
Installation Location
3874 Sedgwick Ave. (Van Cortlandt Village)
Mapping Location
40.882893, -73.893943
Status Summary
Part of Capital Plan- Funding Approved
Postcode
10463
Borough
BRONX
Community Board
8
Census Tract
409
Bin
2015233
Bbl
2032460074
Nta
Van Cortlandt Village
NYPL
Vote Year: 2015 • Fiscal Year: FY16 • District: 11
Vote Year
2015
Fiscal Year
FY16
District
11
Project
Mosholu Library Window Replacement
Ballot Price
300000.00
Subproject Cost
300000.00
Total Appropriated
300000.00
Agency
NYPL
Non City
N
Description
New windows and frames for the library will help insulate the facility during the summer and winter months and protect from potential water damage.
Installation Location
285 E. 205th St. (Norwood)
Mapping Location
40.874330, -73.878413
Status Summary
Part of Capital Plan- Funding Approved
Postcode
10467
Borough
BRONX
Community Board
7
Census Tract
423
Bin
2018123
Bbl
2033410076
Nta
Norwood
SCA
Vote Year: 2015 • Fiscal Year: FY16 • District: 11
Vote Year
2015
Fiscal Year
FY16
District
11
Project
P.S. 8 Auditorium Renovation
Ballot Price
450000.00
Subproject Cost
450000.00
Total Appropriated
450000.00
Agency
SCA
Non City
N
Description
Replace outdated seating in auditorium, which is almost 60 years old. Performances and community meetings are held in the auditorium throughout the year.
Installation Location
3010 Briggs Ave. (Bedford Park)
Mapping Location
40.872341, -73.883462
Status Summary
Part of Capital Plan- Funding Approved
Postcode
10458
Borough
BRONX
Community Board
7
Census Tract
415
Bin
2094734
Bbl
2032990060
Nta
Bedford Park-Fordham North
SCA
Vote Year: 2015 • Fiscal Year: FY16 • District: 15
Vote Year
2015
Fiscal Year
FY16
District
15
Project
Security Cameras for Public Schools
Ballot Price
80000.00
Subproject Cost
80000.00
Total Appropriated
80000.00
Agency
SCA
Non City
N
Description
Install security camera systems on the exteriors of KAPPA III and M.S. 391. This would allow staff to monitor the exterior of each school.
Installation Location
2055 Mapes Avenue; 2225 Webster Avenue
Mapping Location
40.854668, -73.897040
Status Summary
Part of Capital Plan- Funding Approved
Postcode
10460
Borough
BRONX
Community Board
6
Census Tract
371
Bin
2012957
Bbl
2031090001
Nta
East Tremont
DPR
Vote Year: 2015 • Fiscal Year: FY16 • District: 15
Vote Year
2015
Fiscal Year
FY16
District
15
Project
Bronx Park Improvements
Ballot Price
450000.00
Subproject Cost
450000.00
Total Appropriated
450000.00
Agency
DPR
Non City
N
Description
Renovations and enhancements throughout Bronx Park, north of Pelham Parkway.
Installation Location
(Bronx Park East)
Mapping Location
40.858732, -73.876993
Status Summary
Part of Capital Plan- Funding Approved
NYPD
Vote Year: 2015 • Fiscal Year: FY16 • District: 15
Vote Year
2015
Fiscal Year
FY16
District
15
Project
NYPD Security Cameras: 46th Precinct (site 1 of 4)
Ballot Price
315000.00
Subproject Cost
140000.00
Total Appropriated
315000.00
Agency
NYPD
Non City
N
Description
Place 9 New York City Police Department Security cameras throughout District 15. Security cameras provide video feeds directly to local police precincts.
Installation Location
(Throughout District 15)
Mapping Location
40.854034, -73.900124
Status Summary
Part of Capital Plan- Funding Approved
NYPD
Vote Year: 2015 • Fiscal Year: FY16 • District: 15
Vote Year
2015
Fiscal Year
FY16
District
15
Project
NYPD Security Cameras: 48th Precinct (site 2 of 4)
Ballot Price
315000.00
Subproject Cost
140000.00
Total Appropriated
315000.00
Agency
NYPD
Non City
N
Description
Place 9 New York City Police Department Security cameras throughout District 15. Security cameras provide video feeds directly to local police precincts.
Installation Location
(Throughout District 15)
Mapping Location
40.843924, -73.900370
Status Summary
Part of Capital Plan- Funding Approved
NYPD
Vote Year: 2015 • Fiscal Year: FY16 • District: 15
Vote Year
2015
Fiscal Year
FY16
District
15
Project
NYPD Security Cameras: 49th Precinct (site 3 of 4)
Ballot Price
315000.00
Subproject Cost
140000.00
Total Appropriated
315000.00
Agency
NYPD
Non City
N
Description
Place 9 New York City Police Department Security cameras throughout District 15. Security cameras provide video feeds directly to local police precincts.
Installation Location
(Throughout District 15)
Mapping Location
40.856299, -73.844508
Status Summary
Part of Capital Plan- Funding Approved
NYPD
Vote Year: 2015 • Fiscal Year: FY16 • District: 15
Vote Year
2015
Fiscal Year
FY16
District
15
Project
NYPD Security Cameras: 52nd Precinct (site 4 of 4)
Ballot Price
315000.00
Subproject Cost
140000.00
Total Appropriated
315000.00
Agency
NYPD
Non City
N
Description
Place 9 New York City Police Department Security cameras throughout District 15. Security cameras provide video feeds directly to local police precincts.
Installation Location
(Throughout District 15)
Mapping Location
40.869122, -73.879627
Status Summary
Part of Capital Plan- Funding Approved
SCA
Vote Year: 2015 • Fiscal Year: FY16 • District: 15
Vote Year
2015
Fiscal Year
FY16
District
15
Project
Air Conditioning for Public Schools
Ballot Price
145000.00
Subproject Cost
145000.00
Total Appropriated
145000.00
Agency
SCA
Non City
N
Description
Install air conditioning units at several public schools in District 15, including: P.S. 28, P.S. 32, and P.S. 9. These units would keep classrooms cool in the warmer months.
Installation Location
P.S. 28, P.S. 32 and P.S. 9
Mapping Location
40.848338, -73.903667
Status Summary
Part of Capital Plan- Funding Approved
SCA
Vote Year: 2015 • Fiscal Year: FY16 • District: 19
Vote Year
2015
Fiscal Year
FY16
District
19
Project
Bayside High School Music Studio
Ballot Price
400000.00
Subproject Cost
400000.00
Total Appropriated
400000.00
Agency
SCA
Non City
N
Description
Project will create a state-of-the-art music studio for Bayside High School, which currently has 350 students in the "Career and Technical Education" music production and performance program.
Installation Location
32-24 Corporal Kennedy St. (Bayside)
Mapping Location
40.771410, -73.781158
Status Summary
Part of Capital Plan- Funding Approved
Postcode
11361
Borough
QUEENS
Community Board
11
Census Tract
1097
Bin
4134578
Bbl
4060440001
Nta
Bayside-Bayside Hills
SCA
Vote Year: 2015 • Fiscal Year: FY16 • District: 19
Vote Year
2015
Fiscal Year
FY16
District
19
Project
P.S. 169 Auditorium Upgrade
Ballot Price
400000.00
Subproject Cost
400000.00
Total Appropriated
400000.00
Agency
SCA
Non City
N
Description
Project would replace lighting, curtains, sound system and seating in the P.S. 169 auditorium, which is shared with Bell Academy. Uses include after school, summer and community programs.
Installation Location
18-25 212th St. (Bay Terrace)
Mapping Location
40.782363, -73.778442
Status Summary
Part of Capital Plan- Funding Approved
Postcode
11360
Borough
QUEENS
Community Board
7
Census Tract
99704
Bin
4131147
Bbl
4058650050
Nta
Ft. Totten-Bay Terrace-Clearview
SCA
Vote Year: 2015 • Fiscal Year: FY16 • District: 19
Vote Year
2015
Fiscal Year
FY16
District
19
Project
P.S. 159 Technology Upgrade
Ballot Price
90000.00
Subproject Cost
90000.00
Total Appropriated
90000.00
Agency
SCA
Non City
N
Description
Project would allow P.S. 159 to acquire smart boards for classrooms and laptops for school community use. This upgrade will help enhance instruction and allow students greater learning opportunities.
Installation Location
205-01 33rd Ave. (Bayside)
Mapping Location
40.770117, -73.783989
Status Summary
Part of Capital Plan- Funding Approved
Postcode
11361
Borough
QUEENS
Community Board
11
Census Tract
1099
Bin
4134525
Bbl
4060380013
Nta
Bayside-Bayside Hills
NYPD
Vote Year: 2015 • Fiscal Year: FY16 • District: 19
Vote Year
2015
Fiscal Year
FY16
District
19
Project
NYPD Security Cameras
Ballot Price
105000.00
Subproject Cost
105000.00
Total Appropriated
105000.00
Agency
NYPD
Non City
N
Description
Project would fund NYPD security cameras in District 19. These security cameras would enhance crime prevention, provide a sense of security in public areas and establish surveillance in remote areas.
Installation Location
District 19 (At NYPD discretion)
Mapping Location
40.760363, -73.767775
Status Summary
Part of Capital Plan- Funding Approved
SCA
Vote Year: 2015 • Fiscal Year: FY16 • District: 21
Vote Year
2015
Fiscal Year
FY16
District
21
Project
PS 307Q Pioneer Academy New Smartboards
Ballot Price
186000.00
Subproject Cost
186000.00
Total Appropriated
186000.00
Agency
SCA
Non City
N
Description
This project is a request to purchase 31 new smart boards for P.S. 307Q. Many of the school's existing smart boards are broken.
Installation Location
40-20 100th St. (Corona)
Mapping Location
40.749282, -73.865950
Status Summary
Part of Capital Plan- Funding Approved
Postcode
11368
Borough
QUEENS
Community Board
4
Census Tract
407
Bin
4040271
Bbl
4016080058
Nta
North Corona
NYPD
Vote Year: 2015 • Fiscal Year: FY16 • District: 21
Vote Year
2015
Fiscal Year
FY16
District
21
Project
NYPD Cameras Throughout Community
Ballot Price
200000.00
Subproject Cost
60000.00
Total Appropriated
35000.00
Agency
NYPD
Non City
N
Description
Community Police Cameras will help provide a sense of safety while helping to monitor the community and any potential crimes.
Installation Location
Multiple Addresses (Corona)
Mapping Location
40.745364, -73.870072
Status Summary
Part of Capital Plan- Funding Approved
DOT
Vote Year: 2015 • Fiscal Year: FY16 • District: 21
Vote Year
2015
Fiscal Year
FY16
District
21
Project
Upgraded Lighting Along Roosevelt Avenue from 82nd Street to 90th Street
Ballot Price
350000.00
Subproject Cost
350000.00
Total Appropriated
350000.00
Agency
DOT
Non City
N
Description
Better lighting along Roosevelt Avenue, between 82nd Street to 90th Street, to help increase community safety and visibility. Increased lighting would help promote a safer community.
Installation Location
Roosevelt Avenue (Corona)
Mapping Location
40.748297, -73.878352
Status Summary
Part of Capital Plan- Funding Approved
DPR
Vote Year: 2015 • Fiscal Year: FY16 • District: 21
Vote Year
2015
Fiscal Year
FY16
District
21
Project
More Trees and Green Areas in LeFrak City
Ballot Price
150000.00
Subproject Cost
150000.00
Total Appropriated
150000.00
Agency
DPR
Non City
Y
Description
This project will add more trees and greenery for residents to enjoy, and be able to learn and appreciate nature. The area is located on 57th Street between Junction Boulevard and 99th Street.
Installation Location
59-17 Junction Blvd. (LeFrak City)
Mapping Location
40.734814, -73.864490
Status Summary
Part of Capital Plan- Funding Approved
Postcode
11373
Borough
QUEENS
Community Board
4
Census Tract
455
Bin
4047310
Bbl
4019180001
Nta
Corona
DPR
Vote Year: 2015 • Fiscal Year: FY16 • District: 21
Vote Year
2015
Fiscal Year
FY16
District
21
Project
Better Lighting at Junction Playground
Ballot Price
200000.00
Subproject Cost
200000.00
Total Appropriated
200000.00
Agency
DPR
Non City
N
Description
Increased lighting at Junction Playground will make this playground a safer place for children to play and enjoy. This upgrade would decrease dark areas plagued by poor lighting.
Installation Location
Corona Avenue & 34th Avenue (Corona)
Mapping Location
40.754884, -73.872429
Status Summary
Part of Capital Plan- Funding Approved
SCA
Vote Year: 2015 • Fiscal Year: FY16 • District: 22
Vote Year
2015
Fiscal Year
FY16
District
22
Project
Public School District-wide Technology Upgrades
Ballot Price
245000.00
Subproject Cost
245000.00
Total Appropriated
90000.00
Agency
SCA
Non City
N
Description
Technology upgrades of $35,000 each for the following schools: P.S. 84, P.S. 122, P.S. 234, I.S. 235, P.S. 17, P.S. 2, and I.S. 141.
Installation Location
District wide (Astoria)
Mapping Location
40.771231, -73.906122
Status Summary
Part of Capital Plan- Funding Approved
DPR
Vote Year: 2015 • Fiscal Year: FY16 • District: 22
Vote Year
2015
Fiscal Year
FY16
District
22
Project
Dog Run in Astoria
Ballot Price
500000.00
Subproject Cost
500000.00
Total Appropriated
500000.00
Agency
DPR
Non City
N
Description
Turn Triborough Lot C under the RFK Bridge in Astoria into a dog run.
Installation Location
Hoyt Ave. bet. 23 St. & 24 St. (Astoria)
Mapping Location
40.774208, -73.921979
Status Summary
Part of Capital Plan- Funding Approved
SCA
Vote Year: 2015 • Fiscal Year: FY16 • District: 22
Vote Year
2015
Fiscal Year
FY16
District
22
Project
I.S. 126 Playground
Ballot Price
500000.00
Subproject Cost
500000.00
Total Appropriated
250000.00
Agency
SCA
Non City
N
Description
Transformation of I.S. 126's parking lot into a recreational playground for the school and the entire community.
Installation Location
31-51 21 Street (Astoria)
Mapping Location
40.766056, -73.929968
Status Summary
Part of Capital Plan- Funding Approved
Postcode
11106
Borough
QUEENS
Community Board
1
Census Tract
77
Bin
4006382
Bbl
4005530001
Nta
Astoria
SCA
Vote Year: 2015 • Fiscal Year: FY16 • District: 23
Vote Year
2015
Fiscal Year
FY16
District
23
Project
Technology Upgrades at 9 Schools Within the Council District
Ballot Price
455000.00
Subproject Cost
455000.00
Total Appropriated
455000.00
Agency
SCA
Non City
N
Description
A combination of desktops, laptops & printers for P.S. 18Q, 26Q ,115Q, 188Q, P4 @ 179Q & 213Q, Queens High School of Teaching, 811Q @ QHST & Main Building, Marathon Parkway
Installation Location
P.S. 18Q, 26Q ,115Q, 188Q, P4 @ 179Q & 213Q, Queens High School of Teaching, 811Q @ QHST & Main Building, Marathon Parkway
Mapping Location
40.732138, -73.732071
Status Summary
Part of Capital Plan- Funding Approved
DPR
Vote Year: 2015 • Fiscal Year: FY16 • District: 23
Vote Year
2015
Fiscal Year
FY16
District
23
Project
Adult Fitness Equipment at Alley Pond Park
Ballot Price
450000.00
Subproject Cost
450000.00
Total Appropriated
450000.00
Agency
DPR
Non City
N
Description
Fitness stations with new exercise equipment at two locations within the park: - Winchester Boulevard and Union Turnpike, Bellerose - Springfield Boulevard and 73rd Avenue, Oakland Gardens
Installation Location
Alley Pond Park
Mapping Location
40.739136, -73.734060
Status Summary
Part of Capital Plan- Funding Approved
SCA
Vote Year: 2015 • Fiscal Year: FY16 • District: 23
Vote Year
2015
Fiscal Year
FY16
District
23
Project
Gym Renovations at Two High Schools within the Council District
Ballot Price
300000.00
Subproject Cost
300000.00
Total Appropriated
300000.00
Agency
SCA
Non City
N
Description
Benjamin N. Cardozo H.S., 57-00 223 St, new rubberized floor and equipment for the weight training room. - Martin Van Buren H.S., 230-17 Hillside Ave., new bleachers & basketball hoops for the gym.
Installation Location
Benjamin N. Cardozo H.S., 57-00 223 Street and Martin Van Buren H.S., 230-17 Hillside Avenue
Mapping Location
40.751938, -73.756542
Status Summary
Part of Capital Plan- Funding Approved
Postcode
11364
Borough
QUEENS
Community Board
11
Census Tract
138501
Bin
4161735
Bbl
4075290001
Nta
Oakland Gardens
DOT
Vote Year: 2015 • Fiscal Year: FY16 • District: 26
Vote Year
2015
Fiscal Year
FY16
District
26
Project
Long Island City Bikeway
Ballot Price
500000.00
Subproject Cost
500000.00
Total Appropriated
500000.00
Agency
DOT
Non City
N
Description
Elements of a bike path exist already, an improved safe and reliable bike way system would increase the level of bike use, reduce cars using path for parking and enhance the neighborhood.
Installation Location
Long Island City
Mapping Location
40.744771, -73.948548
Status Summary
Part of Capital Plan- Funding Approved
NYCHA
Vote Year: 2015 • Fiscal Year: FY16 • District: 26
Vote Year
2015
Fiscal Year
FY16
District
26
Project
Senior Van - Jacob Riis Settlement House
Ballot Price
55000.00
Subproject Cost
55000.00
Total Appropriated
65000.00
Agency
NYCHA
Non City
N
Description
Ten-person van for the Jacob Riis Settlement House for seniors. The seniors at Jacob Riis need this van for transportation to and from senior programs.
Installation Location
Jacob Riis Settlement House (Queensbridge)
Mapping Location
40.755552, -73.944598
Status Summary
Part of Capital Plan- Funding Approved
NYCHA
Vote Year: 2015 • Fiscal Year: FY16 • District: 26
Vote Year
2015
Fiscal Year
FY16
District
26
Project
Playground Upgrade at Queensbridge South
Ballot Price
500000.00
Subproject Cost
500000.00
Total Appropriated
500000.00
Agency
NYCHA
Non City
N
Description
Replacement of rubber matting on playground in five jungle gym areas within the development.
Installation Location
Queensbridge Houses
Mapping Location
40.754885, -73.945233
Status Summary
Part of Capital Plan- Funding Approved
QPL
Vote Year: 2015 • Fiscal Year: FY16 • District: 26
Vote Year
2015
Fiscal Year
FY16
District
26
Project
Sunnyside Library Accessibility
Ballot Price
50000.00
Subproject Cost
50000.00
Total Appropriated
50000.00
Agency
QPL
Non City
N
Description
ADA-compliant push button for Sunnyside Library. Currently, physically handicapped community members cannot enter the Sunnyside Library without the assistance of the staff.
Installation Location
43-06 Greenpoint Ave. (Sunnyside)
Mapping Location
40.740874, -73.921798
Status Summary
Part of Capital Plan- Funding Approved
Postcode
11104
Borough
QUEENS
Community Board
2
Census Tract
18502
Bin
4002111
Bbl
4001730016
Nta
Hunters Point-Sunnyside-West Maspeth
QPL
Vote Year: 2015 • Fiscal Year: FY16 • District: 26
Vote Year
2015
Fiscal Year
FY16
District
26
Project
Woodside Library Accessibility
Ballot Price
50000.00
Subproject Cost
50000.00
Total Appropriated
50000.00
Agency
QPL
Non City
N
Description
ADA-compliant push buttons for the Woodside Library. Currently, physically handicapped community members cannot enter the Woodside Library without the assistance of the staff.
Installation Location
54-22 Skillman Ave. (Woodside)
Mapping Location
40.745340, -73.909791
Status Summary
Part of Capital Plan- Funding Approved
Postcode
11377
Borough
QUEENS
Community Board
2
Census Tract
251
Bin
4030847
Bbl
4013170085
Nta
Woodside