List of all approved construction permits in DOB NOW except for Electrical, Elevator, and Limited Alteration Application (LAA) which have their own datasets.
Housing & DevelopmentDepartment of Buildings (DOB)
Dataset rbx6-tga4
46 fields
NYCHA BOILER: New penetrations for exhaust flue and air intake at wall of boiler room, Remove existing combustion air louvers and replace with new louvers, New facade opening to facilitates new boiler equipment delivery,
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
PROPOSED (a) HORZIONTAL ENLARGEMETNT AT SIDE AND REAR TO THE EXISTING TWO (2) STORY, AND CELLAR FLOOR AS PER PLAN, (b) CONVERT EX. TWO FAMILIES COMMERTIAL AT FIRST FLOOR AND TWO-FAMILY BUILDING AS PER PALN.
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Floor Number(s) 2 through 3, Floor Number(s) 2 through 3
Work Type
Plumbing
Permittee S License Type
F
Applicant License
000578
Applicant First Name
EDWARD
Applicant Last Name
COX
Applicant Business Name
CMA PLUMBING & HEATING IN
Applicant Business Address
737 2ND AVENUE
Approved Date
2021-04-01T00:00:00.000
Issued Date
2021-07-09T00:00:00.000
Expired Date
2022-04-01T00:00:00.000
Job Description
Demolition of Existing Plumbing Fixtures, Piping & Sprinkler System and Installation of TCSP. Installation of Plumbing Fixtures, Non-Gas Water Heater, Sump Pump, Piping and Sprinkler System.
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF 300psf SIDEWALK SHED, CONSTRUCTION FENCE AND ROOF PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Minor interior demo: Remove flooring, wall covering, reception desk & lighting. Installation of new flooring, paint, lighting, glass door, wood panels and finishes on the 7th Floor as per plans (Regus #1508.) No change to use, egress or occupancy.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
INSTALL NEW 3 PCS BATHROOM, NEW GASCOMB. GAS BOILERS, 1 WASHER, NEWDRYER IN CELL. AND INSTALL TWO NEWBATHRM IN 1ST & 2ND FL.NEW KITCHEN IN 2ND FLNO CHANGE IN USE, OCCUPANCY OR EGRESS.FILED IN CONJ. WITH ALTCO#Q01170648-I1
Interior renovation on the sub-cellar (tunnel area) and 2nd floor (footbridge area) as indicated on the attached plans. There is no change in egress, use or occupancy.