Active Projects - Infrastructure (Historical)

List of currently active infrastructure projects including description and high level schedule and budget range.

Housing & Development Department of Design and Construction (DDC) Dataset rukc-mmqu 9 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
HEDA003
Project Id: HEDA003 • Description: Accelerated Distribution WM replcmnt & sewer rehab: BX • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
HEDA003
Description
Accelerated Distribution WM replcmnt & sewer rehab: BX
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-03-01T00:00:00.000
Scope
ACCELERATED DISTRIBUTION WATER MAIN REPLACEMENT AND SEWER REHABILITATION/REPLACEMENT, BX
Dollar Amount
$10M to 30M
Status
Active
HWBARUCH
Project Id: HWBARUCH • Description: Baruch College - 25th Street Plaza (MED-634) • Client Agency: TRANSPORTATION
Project Id
HWBARUCH
Description
Baruch College - 25th Street Plaza (MED-634)
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-06-16T00:00:00.000
Scope
1. HWBARUCH - Construction of a permanent pedestrian plaza, on East 25th Street from Lexington Ave. to Third Avenue. The plaza will include seating, plantings, pedestrian lighting, etc., Borough of Manhattan
2. MED634 - WM work in E25th Street between 3rd Ave and Lexington Ave.
Dollar Amount
$3M to 10M
Status
Active
HWCPEDLOC
Project Id: HWCPEDLOC • Description: Perimeter Security Measures • Client Agency: TRANSPORTATION
Project Id
HWCPEDLOC
Description
Perimeter Security Measures
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-01-18T00:00:00.000
Scope
This project will install security features around six locations within Manhattan:
1. Broadway at Bowling Green
2. Penn Station
3. Rockefellar Center and St. Patrick's Cathedral
4. Herald Square
5. The Empire State Building
6. Flatiron Plaza
Dollar Amount
$10M to 30M
Status
Active
HWCSCH4B3
Project Id: HWCSCH4B3 • Description: Safe Routes to Schools - Phase 4B3 • Client Agency: TRANSPORTATION
Project Id
HWCSCH4B3
Description
Safe Routes to Schools - Phase 4B3
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-06-05T00:00:00.000
Scope
Safe Routes to Schools - Phase 4B3 - Pedestrian safety improvements at three shools, PS 134, PS 207 Annex and Central Brooklyn Ascend Lower School (formerly St. Jerome School) in Brooklyn.
Dollar Amount
$3M to 10M
Status
Active
HWCSCH4C1
Project Id: HWCSCH4C1 • Description: Safe Routes to Schools - Phase 4C1 • Client Agency: TRANSPORTATION
Project Id
HWCSCH4C1
Description
Safe Routes to Schools - Phase 4C1
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2021-06-12T00:00:00.000
Scope
Safe Routes to Schools - Phase 4C1
Dollar Amount
$3M to 10M
Status
Active
HWCSCH4D
Project Id: HWCSCH4D • Description: Safe Routes to Schools - Phase 4D • Client Agency: TRANSPORTATION
Project Id
HWCSCH4D
Description
Safe Routes to Schools - Phase 4D
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2024-03-14T00:00:00.000
Scope
The Scope of work includes management of final design, procurement and construction of pedestrian safety improvements at the following 4 schools in the Bronx, P.S. 85/ I.S 218, P.S. 307 and Rosalyn Yalow Charter school. Each school should have its own bid items along with the total cost. DOT consultant has completed the preliminary design and will develop the final designs, as well as seeking community board approvals for P.S/I.S 218, P.S. 307 and Rosalyn Yalow Charter school.. DOT has received approvals from Community Board #5 & b6 (attached) for P.S. 85. DDC and consultant must review the attach draft CPI comments including all the additional design considerations recommended, during the final design phase.
Dollar Amount
$10M to 30M
Status
Active
HWCSCHPBX
Project Id: HWCSCHPBX • Description: SAFE ROUTES TO SCHOOLS- BRONX • Client Agency: TRANSPORTATION
Project Id
HWCSCHPBX
Description
SAFE ROUTES TO SCHOOLS- BRONX
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-05-05T00:00:00.000
Scope
Construction of pedestrian safety improvements at the following five schools in the Bronx: PS 73; PS 340; St. Luke's School; PS.159; PS.51. The proposed scope of improvements mainly includes curb extensions and pedestrian safety islands. Receiving pedestrian ramps must comply with ADA standards. Also included is related Green Infrastructure work (DEP).
Dollar Amount
$3M to 10M
Status
Active
HWCSCHPKR
Project Id: HWCSCHPKR • Description: Safe Routes to Schools - Brooklyn & Staten Island • Client Agency: TRANSPORTATION
Project Id
HWCSCHPKR
Description
Safe Routes to Schools - Brooklyn & Staten Island
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-01-30T00:00:00.000
Scope
THE SCOPE OF WORK INCLUDES MANAGEMENT OF TOTAL DESIGN, PROCUREMENT AND CONSTRUCTION OF PEDESTRIAN SAFETY IMPROVEMENTS AT THE FOLLOWING EIGHT SCHOOLS IN BK & SI: M.S. 598, PS169, PS156, PS189, PS327 AND PS380 IN BROOKLYN AND PS41-THE NEW DORP SCHOOL IN STATEN ISLAND. THE PROPOSED SCOPE OF IMPROVEMENTS MAINLY INCLUDES SIDEWALKS/CURB EXTENSIONS, BUS PADS AND PEDESTRIAN SAFETY ISLANDS.
Dollar Amount
$10M to 30M
Status
Active
HWCSCHPMN
Project Id: HWCSCHPMN • Description: SAFE ROUTES TO SCHOOLS- MANHATTAN • Client Agency: TRANSPORTATION
Project Id
HWCSCHPMN
Description
SAFE ROUTES TO SCHOOLS- MANHATTAN
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-04-26T00:00:00.000
Scope
THE SCOPE OF WORK INCLUDES MANAGEMENT OF TOTAL DESIGN, PROCUREMENT AND CONSTRUCTION OF PEDESTRIAN SAFETY IMPROVEMENTS AT THE FOLLOWING SIX SCHOOLS IN MANHATTAN: PS92-MARY MCLEOD BETHUNE, JHS275/IS 275-MIDDLE SCHOOL FOR MARKETING & LEGAL, PS 83-LUIS MUNOZ RIVERA SCHOOL, NEW DESIGN MIDDLE & KIPP INFINITY CHARTER SCHOOL, PS 153, AND PS 128-AUDUBON SCHOOL. THE PROPOSED SCOPE OF IMPROVEMENTS MAINLY INCLUDES MEDIAN TIP EXTENSIONS, CURB EXTENSIONS, AND PEDESTRIAN SAFETY ISLANDS. EACH SCHOOL SHOULD HAVE ITS OWN BID ITEMS ALONG WITH THE TOTAL COST. TRAFFIC ANALYSIS INCLUDING AUTO TURN ANALYSIS WITH SCHOOL BUS, CITY BUS, TRUCK AND FDNY VEHICLES MUST BE CONDUCTED. PEDESTRIAN RAMPS MUST COMPLY WITH ADA STANDARDS.
Dollar Amount
$10M to 30M
Status
Active
HWCSCHPQN
Project Id: HWCSCHPQN • Description: SAFE ROUTES TO SCHOOLS- QUEENS • Client Agency: TRANSPORTATION
Project Id
HWCSCHPQN
Description
SAFE ROUTES TO SCHOOLS- QUEENS
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2024-03-13T00:00:00.000
Scope
PEDESTRIAN SAFETY IMPROVEMENTS AT 8 SCHOOLS IN QUEENS: PS 50, PS 71, PS 89, PS 220, IS 125, JHS 210, ST. ELIZABETH SCHOOL, EPIC HIGH SCHOOL NORTH
Dollar Amount
$3M to 10M
Status
Active
HWCURB09
Project Id: HWCURB09 • Description: Curb Reconstruction • Client Agency: TRANSPORTATION
Project Id
HWCURB09
Description
Curb Reconstruction
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-09-27T00:00:00.000
Scope
RECONSTRUCTION OF ROADWAY CURBS, CITYWIDE
Dollar Amount
$3M to 10M
Status
Active
HWK700B
Project Id: HWK700B • Description: WATER MAIN CONNECTIONS TO SHAFT 23B - PHASE II (HWK700B) • Client Agency: TRANSPORTATION
Project Id
HWK700B
Description
WATER MAIN CONNECTIONS TO SHAFT 23B - PHASE II (HWK700B)
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2024-07-14T00:00:00.000
Scope
RECONSTRUCTION OF COLUMBIA STREET AREA PHASE II HAS BEEN DEVELOPED IN COORDINATION WITH NYCDEP BED-768B. IT INCLUDES ALL THE STREETS IN THAT PROJECT SOUTH OF HAMILTON AVE AND ALSO INCLUDES A SERIES OF STREETS IN THE NEIGHBORHOOD REQUIRING CAPITAL RECONSTRUCTION. PROPOSED WORK INCLUDES FULL RECONSTRUCTION OF SEVERAL BLOCKS ALONG WITH STREETSCAPE AND SAFETY IMPROVEMENTS AT A SERIES OF INTERSECTIONS. THE OVERALL PURPOSE OF THIS PROJECT IS TO BRING THE STREETS IN THIS AREA TO A STATE OF GOOD REPAIR IN CONJUNCTION WITH UTILITY REPLACEMENT AND TO PROVIDE SAFETY ENHANCEMENTS AT KEY LOCATIONS.
Dollar Amount
$30M to 100M
Status
Active
SECBRKR01
Project Id: SECBRKR01 • Description: Reconstruction & installation of new catch basins, SI & BK • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SECBRKR01
Description
Reconstruction & installation of new catch basins, SI & BK
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-06-12T00:00:00.000
Scope
INSTALLING NEW CATCH BASINS AND RECONSTRUCTION OF EXISTING COLLAPSED CATCH BASINS IN BROOKLYN AND STATEN ISLAND
Dollar Amount
$3M to 10M
Status
Active
SECBRM01
Project Id: SECBRM01 • Description: Reconstruction & installation of Catch Basins, Manhattan • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SECBRM01
Description
Reconstruction & installation of Catch Basins, Manhattan
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-04-11T00:00:00.000
Scope
INSTALLING NEW CATCH BASINS AND RECONSTRUCTION OF EXISTING COLLAPSED CATCH BASINS IN MANHATTAN
Dollar Amount
$1M to 3M
Status
Active
HWD007K03
Project Id: HWD007K03 • Description: Park Avenue Ped Safety Improvement at the Crossover,BED-830 • Client Agency: TRANSPORTATION
Project Id
HWD007K03
Description
Park Avenue Ped Safety Improvement at the Crossover,BED-830
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2024-07-17T00:00:00.000
Scope
This capital project will reconstruct the area under the BQE so that traffic will be aligned along Grand Avenue and cross Park Avenue. It will eliminate the crossover entirely and instead direct westbound Park Avenue traffic to Grand Avenue, where drivers will turn right and then left to continue westbound on Park Avenue.

By removing the crossover, the project will reconstruct the area under the BQE to offer a large open space that will be enhanced and available for the Community. It could be used for programming and/or additional parking. DOT does not anticipate providing amenities to this space; however the design should built capacity for future uses. The open space will be rebuilt in gravel or any similar material within the available budget. The proposed material will need both the Community Board and Public Design Commission review and approval.

To improve the intersection of Grand Avenue and Park Avenue, the project will construct a sidewalk extension on the northeast corner. The curb extension will improve safety by creating a shorter crossing distance for pedestrians, improving visibility, and slowing turning movements.

The project will improve pedestrian safety by building a new sidewalk along the northside of Park Avenue from Steuben Street to Emerson Place (westbound sidewalk). It will fully separate the pedestrian space from the roadway and ensure a pedestrian connection between Williamsburg South, Bedford Stuyvesant and Clinton Hill.

To bring the roadway to a state of good repair, the roadway along Park Avenue Westbound from Steuben Street to Grand Avenue and Eastbound from Grand Avenue to Emerson Place will be entirely resurfaced.

Since the area is located within a DEP stormwater capture priority area, opportunities are available for green infrastructure along Park Avenue. These features would reduce runoff into the sewer system while providing greening and beautification benefits if maintained properly. The potential locations should be 25-ft clear of all overhead structures (BQE). If the clearance is not available, non-infiltrating GI can be explored as well.
Dollar Amount
$3M to 10M
Status
Active
HWD10105
Project Id: HWD10105 • Description: Ped Safety Upgrades on Atlantic Ave (BED-785A, NDF-ATLAV) • Client Agency: TRANSPORTATION
Project Id
HWD10105
Description
Ped Safety Upgrades on Atlantic Ave (BED-785A, NDF-ATLAV)
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-07-15T00:00:00.000
Scope
ATLANTIC AVENUE SAFETY IMPROVEMENTS, BROOKLYN
Dollar Amount
$10M to 30M
Status
Active
HWD10105A
Project Id: HWD10105A • Description: Ped Safety Upgrades on Atlantic Ave - Phase 2 (BED-785B) • Client Agency: TRANSPORTATION
Project Id
HWD10105A
Description
Ped Safety Upgrades on Atlantic Ave - Phase 2 (BED-785B)
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-03-28T00:00:00.000
Scope
ATLANTIC AVE SAFETY IMPROVEMENTS - PH 2, BROOKLYN
Dollar Amount
$30M to 100M
Status
Active
HWD10311
Project Id: HWD10311 • Description: 111th Street Malls (QED-1049) • Client Agency: TRANSPORTATION
Project Id
HWD10311
Description
111th Street Malls (QED-1049)
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-09-12T00:00:00.000
Scope
111TH STREET SAFETY IMPROVEMENTS, QNS
Dollar Amount
$10M to 30M
Status
Active
HWP2019S
Project Id: HWP2019S • Description: Citywide Simple Pedestrian Ramps • Client Agency: TRANSPORTATION
Project Id
HWP2019S
Description
Citywide Simple Pedestrian Ramps
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2022-01-14T00:00:00.000
Scope
CONSTRUCTION OF SIMPLE PEDESTRIAN RAMPS IN 424 CORNERS CITYWIDE. RAMPS MUST COMPLY WITH APPLICABLE FEDERAL ADA REQUIREMENTS. ALL NYS APPROVED STANDARD DESIGN ALTERNATIVES MUST BE CONSIDERED TO THE MAXIMUM EXTENT OF FEASIBILITY.
Dollar Amount
$3M to 10M
Status
Active
SECBRQX01
Project Id: SECBRQX01 • Description: Reconst. & Installation of Catch Basins, BX & Qns • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SECBRQX01
Description
Reconst. & Installation of Catch Basins, BX & Qns
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-05-02T00:00:00.000
Scope
RECONSTRUCTION & INSTALLATION OF CATCH BASINS, BX & QNS. INSTALLING NEW CATCH BASINS AND RECONSTRUCTION OF EXISTING COLLAPSED CATCH BASINS IN QUEENS AND THE BRONX.
Dollar Amount
$1M to 3M
Status
Active
HWD105-03
Project Id: HWD105-03 • Description: LIBRARY LANE PROJECT • Client Agency: TRANSPORTATION
Project Id
HWD105-03
Description
LIBRARY LANE PROJECT
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-01-17T00:00:00.000
Scope
The following road reconstruction:
1. Coles lane from East Kingsbridge Road to Poe place
2. Coles lane from Poe place to Bainbridge Avenue

Water Main in:

1. Coles Lane between Bainbridge Avenue & 30-40 feet West from Poe Pl.
2. Poe Place between Coles Lane and Dead End.
3. Briggs Avenue intersection of Coles Lane.
4. E. Kingsbridge Rd. intersection of Briggs Avenue.
5. Bainbridge Avenue intersection of Coles Lane.
Dollar Amount
$3M to 10M
Status
Active
HWK100BUS
Project Id: HWK100BUS • Description: Utica Ave Bus Priority • Client Agency: TRANSPORTATION
Project Id
HWK100BUS
Description
Utica Ave Bus Priority
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-04-30T00:00:00.000
Scope
UTICA AVENUE SELECT BUS SERVICES (SBS), BROOKLYN
Dollar Amount
$10M to 30M
Status
Active
HWK100SBC
Project Id: HWK100SBC • Description: South Brooklyn Crosstown SBS • Client Agency: TRANSPORTATION
Project Id
HWK100SBC
Description
South Brooklyn Crosstown SBS
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2024-11-13T00:00:00.000
Scope
The Southern Brooklyn B82 Select Bus Service is part of the Select Bus Service (SBS) program developed in partnership with NYCT. The Southern Brooklyn Crosstown bus route aims to improve bus speeds, reliability, and driver and pedestrian safety along a 10-mile bus route in the Borough of Brooklyn from the Gravesend to Spring Creek neighborhoods. The B82 SBS will be launched in 2018 by NYC DOT and NYCTA.

The capital project focuses on the 7.5-mile portion of the entire SBS corridor along Kings Highway (Segment K), Flatlands Avenue (Segment F), and Pennsylvania Avenue (Segment P). Along these three corridors, the capital project will build a combination of new bus lanes with high-quality bus stations and signal timing changes, as well as safety improvements for bus passengers, pedestrians, and all street users. Bus stops will be rehabilitated with expanded ADA-accessible platforms, bus shelters, lighting, and seating. Concrete curb extensions and central medians will be built to reduce crossing distances. Additionally, all the medians along Kings Highway will be reconstructed in a state of good repair along with the bus stops.
Dollar Amount
$30M to 100M
Status
Active
HWK1048B
Project Id: HWK1048B • Description: FLUSHING AVE - BROOKLYN GREENWAY • Client Agency: TRANSPORTATION
Project Id
HWK1048B
Description
FLUSHING AVE - BROOKLYN GREENWAY
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-08-24T00:00:00.000
Scope
The reconfiguration of Flushing Avenue from Navy Street to Williamsburg Street will include a two-way, Class 1 separated bike path; a 6' sidewalk extention and improved pavement markings at intersections.
Dollar Amount
$3M to 10M
Status
Active
HWK1048C
Project Id: HWK1048C • Description: KENT AVE • Client Agency: TRANSPORTATION
Project Id
HWK1048C
Description
KENT AVE
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-11-23T00:00:00.000
Scope
Pre-Scoping Services for the Kent Avenue South section of the Brooklyn Waterfront Greenway from Clymer Street to Williamsburg Street West.
Dollar Amount
$3M to 10M
Status
Active
HWK1048D
Project Id: HWK1048D • Description: BK Waterfront Greenway:Sunset Pk Gowanus Connect BED-802 • Client Agency: TRANSPORTATION
Project Id
HWK1048D
Description
BK Waterfront Greenway:Sunset Pk Gowanus Connect BED-802
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2022-12-21T00:00:00.000
Scope
BROOKLYN WATERFRONT GREENWAY - SUNSET PARK GOWANUS CONNECTOR IN CONJUNCTION WITH BED-802, WATER MAIN REPLACEMENT IN HAMILTON AVENUE GOWANUS CONNECTOR, BK
Dollar Amount
$30M to 100M
Status
Active
HWK1048G
Project Id: HWK1048G • Description: OWL'S HEAD-BROOKLYN GREENWAY (SEK002378) • Client Agency: TRANSPORTATION
Project Id
HWK1048G
Description
OWL'S HEAD-BROOKLYN GREENWAY (SEK002378)
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-09-02T00:00:00.000
Scope
This project will construct approximately 12 blocks of the 14-mile Brooklyn Waterfront Greenway. This project establishes the southernmost leg of the Greenway, linking the neighborhoods of Sunset Park and Bay Ridge, where the Greenway will ultimately connect to the Shore Parkway Esplanade. The project will provide safer access to parks and recreational spaces along the waterfront, encourage healthy lifestyles by promoting the use of non-motorized forms of transportation, improve sustainability by capturing storm water, and stimulate economic development by providing connections to employment centers in Downtown Brooklyn and the Sunset Park, Gowanus, and Red Hook neighborhoods. The projects limits include 2nd Avenue from 58th Street to Wakeman Place and Wakeman Place from Ridge Boulevard to Colonial Road. These streets will be reconfigured in order to provide space for the two-way, grade-separated greenway path as well as additional planted areas. This project also includes the rehabilitation (25% replacement & 75% repair) of a retaining wall along the northwest side of 2nd Avenue and between 58th & 65th Streets.
Dollar Amount
$10M to 30M
Status
Active
HWK1148
Project Id: HWK1148 • Description: JEWEL STREET AREA • Client Agency: TRANSPORTATION
Project Id
HWK1148
Description
JEWEL STREET AREA
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Initiation
Projected Construction Completion
2024-07-10T00:00:00.000
Scope
Reconstruction of Jewel Streets Area from Stanley Ave to Blake Ave between Ruby St and Sapphire St
Dollar Amount
$30M to 100M
Status
Active
HWK1182
Project Id: HWK1182 • Description: Belt Parkway Guardrails • Client Agency: TRANSPORTATION
Project Id
HWK1182
Description
Belt Parkway Guardrails
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2022-12-27T00:00:00.000
Scope
BELT PARKWAY GUARDRAILS
Dollar Amount
$1M to 3M
Status
Active
HWK1669
Project Id: HWK1669 • Description: 4th Ave Safety Improvements • Client Agency: TRANSPORTATION
Project Id
HWK1669
Description
4th Ave Safety Improvements
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2021-04-05T00:00:00.000
Scope
4th Avenue Safety Improvements, Brooklyn
This project will mitigate the effects of traffic and enhance pedestrian safety at two contiguous segments along 4th Avenue between 8th to 18th Streets in Park Slope/Gowanus and 33rd to 52nd Street in Sunset Park. The scope includes expanding and raising the existing medians (currently in temporary materials) and includes sidewalk extensions, street trees (where feasible), benches, and wayfinding.
Dollar Amount
$3M to 10M
Status
Active
HWK1669A
Project Id: HWK1669A • Description: 4th Ave Safety Improvements - Phase A • Client Agency: TRANSPORTATION
Project Id
HWK1669A
Description
4th Ave Safety Improvements - Phase A
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2022-10-02T00:00:00.000
Scope
4TH AVENUE SAFETY IMPROVEMENTS PHASE A- VISION ZERO GREAT STREETS

Safety Improvements along 4th Avenue from 8th Street to 64 Street in Sunset Park section of Brooklyn.
Dollar Amount
$30M to 100M
Status
Active
HWK1670
Project Id: HWK1670 • Description: Industry City Safety and Streetscape Improvements • Client Agency: TRANSPORTATION
Project Id
HWK1670
Description
Industry City Safety and Streetscape Improvements
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-06-26T00:00:00.000
Scope
Implement pedestrian safety and streetscape improvements under Gowanus Expressway at the intersection of 36th Street & 3rd Avenue in Sunset Park, Brooklyn. Improvements include sidewalk extensions, citybenches, wayfinding signage, pedestrian ramps, new crosswalks.
Dollar Amount
$1M to 3M
Status
Active
HWK1672
Project Id: HWK1672 • Description: WASHINGTON AVENUE SAFETY IMPROVEMENTS • Client Agency: TRANSPORTATION
Project Id
HWK1672
Description
WASHINGTON AVENUE SAFETY IMPROVEMENTS
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-01-30T00:00:00.000
Scope
The Washington Ave and Ocean Ave Safety Improvements project will build out a range of pedestrian safety-related small geometric improvements at 4 intersections in Prospect Heights, Crown Heights and Prospect Park. The proposed improvements will build out temporary materials that will soon approach the end of their useful life. They include but are not limited to curb extensions, expanded sidewalks, accessible sidewalks and crossings, and road alignment.
Dollar Amount
$3M to 10M
Status
Active
HWPR18Q1
Project Id: HWPR18Q1 • Description: Pedestrian Ramp Rehabilitation - Queens • Client Agency: TRANSPORTATION
Project Id
HWPR18Q1
Description
Pedestrian Ramp Rehabilitation - Queens
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-01-25T00:00:00.000
Scope
Rehabilitation (repair and upgrade to ADA specifications to the maximum extent feasible) of existing pedestrian ramps in the borough of Queens. The list of final locations for this contract will be provided by SIM at a later date. The pedestrian ramp repairs will follow resurfacing schedules.

Any upgrades to the ramps must also rehabilitate the receiving corner where possible. Any deviation will require DOT's approval. This contract will be addressing simple pedestrian ramps upgrades.
Dollar Amount
$3M to 10M
Status
Active
SE-GUN-19
Project Id: SE-GUN-19 • Description: Emergency Guniting of Sewers, Citywide • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SE-GUN-19
Description
Emergency Guniting of Sewers, Citywide
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2020-11-23T00:00:00.000
Scope
EMERGENCY GUNITING OF SEWERS, CITYWIDE
Dollar Amount
$3M to 10M
Status
Active
SE-GUN-20
Project Id: SE-GUN-20 • Description: Emergency Guniting of Sewers, Citywide • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SE-GUN-20
Description
Emergency Guniting of Sewers, Citywide
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2021-06-24T00:00:00.000
Scope
EMERGENCY GUNITING OF SEWERS, CITYWIDE
Dollar Amount
$3M to 10M
Status
Active
HWK2013GB
Project Id: HWK2013GB • Description: Gerritsen Beach - Street Reconstruction • Client Agency: TRANSPORTATION
Project Id
HWK2013GB
Description
Gerritsen Beach - Street Reconstruction
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2022-12-07T00:00:00.000
Scope
Reconstruction & Resurfacing of Gerritsen Beach Area, including Storm Sewer Installation and Water Main Replacement, Brooklyn.

Reconstruction: Beacon Court, Canton Court, Dare Court, and Frank Court from Bartlett Place to Seba Avenue and Eaton Court from Bartlett Place to Cyrus Avenue. Eaton Court from Cyrus Avenue to Seba Avenue, Bartlett Place from Gerritsen Avenue to Plumb Beach Ave, Kay Court from Just Court to End, Noel Avenue from Bartlett Place to Cyrus Avenue, and Post Court from Madoc Avenue to Dead End.

Resurfacing: Abbey Court from Bartlett Place to Dead End, Cyrus Avenue from Just Court to Gerritsen Avenue, three sections of Madoc Avenue (from Cyrus Avenue to Lester Court, from Melba Court to Nova Court, from Post Court to Dead End), Noel Avenue from Cyrus Avenue to Lois Avenue and Seba Avenue from Madoc Avenue to Gerritsen Avenue, Channel Ave between Celeste Court and Bevy Court , Channel Ave between Aster Court and Gerritsen Ave .
Dollar Amount
$10M to 30M
Status
Active
HWK2048
Project Id: HWK2048 • Description: Jamaica Bay Greenway - Paerdegat Ave. North Connector • Client Agency: TRANSPORTATION
Project Id
HWK2048
Description
Jamaica Bay Greenway - Paerdegat Ave. North Connector
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-02-14T00:00:00.000
Scope
JAMAICA BAY GREENWAY - PAERDEGAT AVENUE NORTH CONNECTOR
Dollar Amount
$1M to 3M
Status
Active
HWK639WA
Project Id: HWK639WA • Description: RECON: TILLARY STREET PHASE 2 • Client Agency: TRANSPORTATION
Project Id
HWK639WA
Description
RECON: TILLARY STREET PHASE 2
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-10-03T00:00:00.000
Scope
TILLARY STREET - PHASE II, BROOKLYN
Dollar Amount
$30M to 100M
Status
Active
HWK700B
Project Id: HWK700B • Description: COMBINED SEWER AT SHAFT 23B IN COLUMBUS ST AREA PHASE II • Client Agency: TRANSPORTATION
Project Id
HWK700B
Description
COMBINED SEWER AT SHAFT 23B IN COLUMBUS ST AREA PHASE II
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2024-07-14T00:00:00.000
Scope
RECONSTRUCTION OF COLUMBIA STREET AREA PHASE II HAS BEEN DEVELOPED IN COORDINATION WITH NYCDEP BED-768B. IT INCLUDES ALL THE STREETS IN THAT PROJECT SOUTH OF HAMILTON AVE AND ALSO INCLUDES A SERIES OF STREETS IN THE NEIGHBORHOOD REQUIRING CAPITAL RECONSTRUCTION. PROPOSED WORK INCLUDES FULL RECONSTRUCTION OF SEVERAL BLOCKS ALONG WITH STREETSCAPE AND SAFETY IMPROVEMENTS AT A SERIES OF INTERSECTIONS. THE OVERALL PURPOSE OF THIS PROJECT IS TO BRING THE STREETS IN THIS AREA TO A STATE OF GOOD REPAIR IN CONJUNCTION WITH UTILITY REPLACEMENT AND TO PROVIDE SAFETY ENHANCEMENTS AT KEY LOCATIONS.
Dollar Amount
$3M to 10M
Status
Active
SEK002376
Project Id: SEK002376 • Description: COMB SWR REPLCMNT & WM WORK IN PRESIDENT ST • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SEK002376
Description
COMB SWR REPLCMNT & WM WORK IN PRESIDENT ST
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Initiation
Projected Construction Completion
2022-12-27T00:00:00.000
Scope
COMBINED SEWER REPLACEMENT IN PRESIDENT STREET, BK
Dollar Amount
$3M to 10M
Status
Active
HWK779W
Project Id: HWK779W • Description: EMPIRE BOULEVARD • Client Agency: TRANSPORTATION
Project Id
HWK779W
Description
EMPIRE BOULEVARD
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2021-10-12T00:00:00.000
Scope
Empire Boulevard Safety Improvements

Reconstruction of Empire Boulevard at The Following Locations:

Empire Boulevard from Washington Avenue to Franklin Avenue
Franklin Avenue from Washington Avenue to Sullivan Place
Washington Avenue from Sterling Street to Sullivan Place
Empire Boulevard from Schenectady Avenue to East 91st Street
Utica Avenue from Maple Street to Montgomery Street
Lefferts Avenue from Schenectady Avenue to Empire Boulevard
East New York Avenue (North) From East New York Avenue (South) To East 91st Street
East New York Avenue (South) From East New York Avenue (North) To Remsen Avenue
Remsen Avenue from East New York Avenue (South) To Empire Boulevard
Including Curb and Sidewalk Reconstruction Bus Pads, Sewer, Water Main, Street Lighting,and Traffic Work .
Dollar Amount
$10M to 30M
Status
Active
HWK797W
Project Id: HWK797W • Description: Schenck Avenue • Client Agency: TRANSPORTATION
Project Id
HWK797W
Description
Schenck Avenue
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2022-02-27T00:00:00.000
Scope
Reconstruction of Schenck Avenue
Dollar Amount
$3M to 10M
Status
Active
HWKKP005
Project Id: HWKKP005 • Description: DUMBO D.M.A. - VINEGAR HILL AREA • Client Agency: TRANSPORTATION
Project Id
HWKKP005
Description
DUMBO D.M.A. - VINEGAR HILL AREA
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2024-06-04T00:00:00.000
Scope
Reconstruction and restoration of Belgian block roadways in the DUMBO (Down under the Manhattan Bridge overpass) and Vinegar Hill communities and the permanently build out the Pearl Street Triangle Plaza.

Trunk Water Main (WM-6) Replacement In:
1. Water Street between Adams Street and Gold Street

Water Main (WM-1) Replacement In:
1. Plymouth Street between Main Street and Adams Street
2. Water Street between Adams Street and Gold Street
3. Anchorage Pl between Plymouth Street and Water Street
4. Main Street between Plymouth Street and Water Street
5. Main Street between Water Street and Front Street
6. Adams Street between John Street and Plymouth Street
7. Pearl Street between Plymouth Street and Front Street
8. Jay Street intersection of Water Street
9. Bridge Street intersection of Water Street

Combined Sewer Replacement In:
1. Anchorage Pl between Plymouth Street and Water Street
2. Water Street between Pearl Street and Gold Street

High Level Storm Sewer Extention:
1. John Street between Adams Street and Pearl Street
2. Pearl Street between John Street and Front Street
3. Water Street between Pearl Street and Gold Street
4. Adams Street between John Street and Plymouth Street
5. Anchorage Pl between Plymouth Street and Water Stree

.
Dollar Amount
$30M to 100M
Status
Active
HWKKP005
Project Id: HWKKP005 • Description: DUMBO/Vinegar Hill Area Reconstruction & Plaza. • Client Agency: TRANSPORTATION
Project Id
HWKKP005
Description
DUMBO/Vinegar Hill Area Reconstruction & Plaza.
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2024-06-04T00:00:00.000
Scope
Reconstruction and restoration of Belgian block roadways in the DUMBO (Down under the Manhattan Bridge overpass) and Vinegar Hill communities and the permanently build out the Pearl Street Triangle Plaza.

Trunk Water Main (WM-6) Replacement In:
1. Water Street between Adams Street and Gold Street

Water Main (WM-1) Replacement In:
1. Plymouth Street between Main Street and Adams Street
2. Water Street between Adams Street and Gold Street
3. Anchorage Pl between Plymouth Street and Water Street
4. Main Street between Plymouth Street and Water Street
5. Main Street between Water Street and Front Street
6. Adams Street between John Street and Plymouth Street
7. Pearl Street between Plymouth Street and Front Street
8. Jay Street intersection of Water Street
9. Bridge Street intersection of Water Street

Combined Sewer Replacement In:
1. Anchorage Pl between Plymouth Street and Water Street
2. Water Street between Pearl Street and Gold Street

High Level Storm Sewer Extention:
1. John Street between Adams Street and Pearl Street
2. Pearl Street between John Street and Front Street
3. Water Street between Pearl Street and Gold Street
4. Adams Street between John Street and Plymouth Street
5. Anchorage Pl between Plymouth Street and Water Stree

.
Dollar Amount
$30M to 100M
Status
Active
HWM100SNC
Project Id: HWM100SNC • Description: 79TH STREET SBS, MED-673 • Client Agency: TRANSPORTATION
Project Id
HWM100SNC
Description
79TH STREET SBS, MED-673
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2025-09-13T00:00:00.000
Scope
79TH STREET CROSSTOWN SELECT BUS SERVICE (M79 SBS)
Dollar Amount
$10M to 30M
Status
Active
HWM2025
Project Id: HWM2025 • Description: Delancey Street Safety Improvements (MED-667) • Client Agency: TRANSPORTATION
Project Id
HWM2025
Description
Delancey Street Safety Improvements (MED-667)
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2024-06-22T00:00:00.000
Scope
DELANCEY STREET SAFETY IMPROVEMENTS
Dollar Amount
$10M to 30M
Status
Active
HWMME43ST
Project Id: HWMME43ST • Description: 43rd Street Shared Street, MED-670 • Client Agency: TRANSPORTATION
Project Id
HWMME43ST
Description
43rd Street Shared Street, MED-670
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-01-15T00:00:00.000
Scope
THIS PROJECT WILL IMPLEMENT A SHARED STREET ON 43RD STREET BETWEEN LEXINGTON AVENUE AND 3RD AVENUE. THIS ENTAILS THE RECONSTRUCTION OF THE ENTIRE BLOCK IN ORDER TO ACHIEVE THE DESIRED PEDESTRIAN SAFETY BENEFITS. THE PROJECT WILL ALSO BUILD OUT THE TWO "TOP OF THE T" NECKDOWNS NEXT TO GRAND CENTRAL TERMINAL LOCATED ALONG LEXINGTON AVENUE AT 43RD AND 44TH STREETS. THIS IS ONE OF THE FIRST PROJECTS TO BE BUILD OUT AS PART OF THE NEW EAST MIDTOWN REZONING AGREEMENT.
Dollar Amount
$10M to 30M
Status
Active
HWMNYPL
Project Id: HWMNYPL • Description: New York Public Library Pedestrian Improvements • Client Agency: TRANSPORTATION
Project Id
HWMNYPL
Description
New York Public Library Pedestrian Improvements
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-02-21T00:00:00.000
Scope
New York Public Library Pedestrian Improvements at the following locations in Manhattan:

- Southern sidewalk and curb of West 42nd Street between 5th Avenue and 6th Avenue
- Northern sidewalk and curb of West 40th Street between 5th Avenue and 6th Avenue
- Curb extension at 6th Avenue on West 40th Street
Dollar Amount
$3M to 10M
Status
Active
HWMP2020
Project Id: HWMP2020 • Description: Reconstruction of Gansevoort Area, Manhattan • Client Agency: TRANSPORTATION
Project Id
HWMP2020
Description
Reconstruction of Gansevoort Area, Manhattan
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-06-30T00:00:00.000
Scope
Street Reconstruction and Pedestrian Space improvement within the following limits:

- Ninth Avenue from Gansevoort Street to West 16 th Street
-Gansevoort Street from Ninth Ave to Hudson Street
-Hudson Street from West 14th Street to a point approximately 100' south of West 14th Street

The project corridor is bordered by Chelsea and Gansevoort Market Historic District on the north and south, respectively.

DEP Scope:Trunk Water Main in W. 13th St. and in following locations to connect Shaft 27B of City Water Tunnel #3 to the water distribution system, Phase 2, Borough of Manhattan:
Dollar Amount
$10M to 30M
Status
Active