HWMWTCB1
Project Id: HWMWTCB1 • Description: Reconstruction of Nassau St • Client Agency: TRANSPORTATION
Project Id
HWMWTCB1
Description
Reconstruction of Nassau St
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-12-31T00:00:00.000
Scope
The proposed project will reconstruct 3 blocks of Nassau Street, from Pine St to Maiden Ln. Vaults will be reinforced and filled. The sidewalks and curbs will be upgraded to the Lower Manhattan standards of 6" wide granite curbs and dark pigmented concrete sidewalks. Street lights, signals and curb ramps will be upgraded. This project is part of the WTC Emergency Relief fund from FHWA to reconstruct resources damaged during the events 9/11.

The following work will be included:
Sidewalks and curbs; Roadway; Vaults; Pedestrian Ramps; Street Lights; Street Signals; Tree Planting; Street Markings; Wayfinding Considerations
Dollar Amount
$10M to 30M
Status
Active
HWPR18Q2
Project Id: HWPR18Q2 • Description: Pedestrian Ramp Rehabilitation - Queens • Client Agency: TRANSPORTATION
Project Id
HWPR18Q2
Description
Pedestrian Ramp Rehabilitation - Queens
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-08-15T00:00:00.000
Scope
Rehabilitation (repair and upgrade to ADA specifications to the maximum extent feasible) of existing pedestrian ramps in the borough of Queens. The list of final locations for this contract will be provided by SIM at a later date. The pedestrian ramp repairs will follow resurfacing schedules.

Any upgrades to the ramps must also rehabilitate the receiving corner where possible. Any deviation will require DOT's approval. This contract will be addressing simple pedestrian ramps upgrades.
Dollar Amount
$3M to 10M
Status
Active
HWMWTCB2
Project Id: HWMWTCB2 • Description: Reconstruction of Greenwich • Client Agency: TRANSPORTATION
Project Id
HWMWTCB2
Description
Reconstruction of Greenwich
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-09-14T00:00:00.000
Scope
The proposed project will reconstruct 4 blocks of Greenwich St, from Barclay St to Chambers St. Any vaults encountered will be reinforced and filled. South of Murray St, the sidewalks and curbs will be upgraded to the Lower Manhattan standards of 6" wide granite curbs and dark pigmented concrete sidewalks. North of Murray St. the typical city standards will be used. Street lights, signals, and curb ramps will be upgraded. This project is part of the WTC Emergency Relief fund from FHWA to reconstruct resources damaged during 9/11.

The scope includes the following:
Roadway work; sidewalks and curbs; vaults; pedestrian ramps; street lights and signals; street tree plantings; greenstreet; street markings and wayfinding considerations
Dollar Amount
$10M to 30M
Status
Active
HWMWTCB5A
Project Id: HWMWTCB5A • Description: Liberty Street Reconstruction • Client Agency: TRANSPORTATION
Project Id
HWMWTCB5A
Description
Liberty Street Reconstruction
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Closeout
Projected Construction Completion
2019-08-26T00:00:00.000
Scope
THIS PROJECT WILL RECONSTRUCT ONE BLOCK OF LIBERTY STREET BETWEEN GREENWICH STREET AND CHURCH STREET. THE INTERSECTION OF LIBERTY STREET WITH CHURCH STREET WILL BE RESURFACED. THE SOUTHERN SIDEWALK AND CURB LINE WILL BE RECONSTRUCTED TO MEET GRADES AND ADA ACCESSIBILITY STANDARDS. THE NEW SIDEWALK WILL MEET LOWER MANHATTAN STANDARDS OF GRANITE CURBING AND DARK PIGMENTED CONCRETE. SECURITY DEVICES WILL BE INSTALLED BY THE PORT AUTHORITY OF NY/NJ ON THE WESTERN END OF THE BLOCK, AND ARE OUTSIDE OF THE SCOPE OF THIS PROJECT.
Dollar Amount
$1M to 3M
Status
Active
HWMWTCB6
Project Id: HWMWTCB6 • Description: Reconstruction of Vesey St, MED-668 • Client Agency: TRANSPORTATION
Project Id
HWMWTCB6
Description
Reconstruction of Vesey St, MED-668
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2022-12-27T00:00:00.000
Scope
The proposed scope will reconstruct one block of Vesey St from Church to Broadway. Vaults will be reinforced and back-filled. The sidewalks and curbs will be upgraded to the Lower Manhattan standards of 6" wide granite curbs and dark pigmented concrete sidewalks. Street lights, signals, and curb ramps will be upgraded where necessary. This project is part of the WTC Emergency Relief fund from FHWA (80/20) to reconstruct resources damaged during the events of 9/11.
Dollar Amount
$10M to 30M
Status
Active
HWMWTCB7
Project Id: HWMWTCB7 • Description: Reconstruction of Trinity Pl • Client Agency: TRANSPORTATION
Project Id
HWMWTCB7
Description
Reconstruction of Trinity Pl
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2024-02-15T00:00:00.000
Scope
The proposed scope will reconstruct 4 blocks of Trinity Place, from Morris St to Cedar St. Any vaults encountered will be reinforced and filled. The sidewalks and curbs will be upgraded to the Lower Manhattan standards of 6" wide granite curbs and dark pigmented concrete sidewalks. Street lights, signals and curb ramps will be upgraded to modern safety standards where necessary. This project is part of the WTC Emergency Relief fund from FHWA to reconstruct resources damaged during the events of 9/11.
Dollar Amount
$30M to 100M
Status
Active
HWMWTCB8
Project Id: HWMWTCB8 • Description: Reconstruction of Broadway Phase 2 • Client Agency: TRANSPORTATION
Project Id
HWMWTCB8
Description
Reconstruction of Broadway Phase 2
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2026-07-17T00:00:00.000
Scope
RECONSTRUCTION OF BROADWAY PHASE 2 - The proposed project will reconstruct seven blocks of Broadway from Vesey Street to Duane Street. The sidewalks, curbs and curb ramps will be upgraded wherever the materials are in poor condition or not meeting accessibility standards. Special materials will be utilized south of Murray Street, per the Lower Manhattan standards. Street lights and signals will be upgraded where necessary. Curb extensions will also be added at the Barclay / Park Row intersection. This project is part of the World Trade Center Emergency Relief fund from FHWA to reconstruct resources damaged during the events of 9/11.
Dollar Amount
$10M to 30M
Status
Active
HWP15XMTA
Project Id: HWP15XMTA • Description: Complex Ped Ramps - Transit Authority - Manhattan • Client Agency: TRANSPORTATION
Project Id
HWP15XMTA
Description
Complex Ped Ramps - Transit Authority - Manhattan
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-01-20T00:00:00.000
Scope
COMPLEX PED. RAMPS - TRANSIT AUTHORITY, BX & MN
Dollar Amount
$3M to 10M
Status
Active
HWP16MTAL
Project Id: HWP16MTAL • Description: Complex Ped Ramps - Transit Authority & Landmark - Manhattan • Client Agency: TRANSPORTATION
Project Id
HWP16MTAL
Description
Complex Ped Ramps - Transit Authority & Landmark - Manhattan
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-02-25T00:00:00.000
Scope
COMPLEX PEDESTRIAN RAMPS ADJACENT TO TRANSIT AND LANDMARK FACILITIES WITHIN LOWER MANHATTTAN COMMUNITY BOARDS 1, 2 AND 3.
Dollar Amount
$3M to 10M
Status
Active
HWP16XTA
Project Id: HWP16XTA • Description: Citywide Complex Pedestrian Ramps (TA Locations) - Bronx • Client Agency: TRANSPORTATION
Project Id
HWP16XTA
Description
Citywide Complex Pedestrian Ramps (TA Locations) - Bronx
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Closeout
Projected Construction Completion
2019-11-18T00:00:00.000
Scope
RECONSTRUCTION OF COMPLEX PEDESTRIAN RAMPS AT TRANSIT AUTHORITY LOCATIONS IN THE BOROUGH OF THE BRONX
Dollar Amount
$3M to 10M
Status
Active
HWP19CWLM
Project Id: HWP19CWLM • Description: CITYWIDE COMPLEX PED RAMPS (LANDMARK) - MANHATTAN AND BRONX • Client Agency: TRANSPORTATION
Project Id
HWP19CWLM
Description
CITYWIDE COMPLEX PED RAMPS (LANDMARK) - MANHATTAN AND BRONX
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-05-31T00:00:00.000
Scope
COMPLEX PEDESTRIAN RAMPS ADJACENT TO LANDMARK FACILITIES IN 54 CORNERS IN MANHATTAN AND THE BRONX. DESIGNS OF THE RAMPS MUST COMPLY WITH APPLICABLE FEDERAL ADA REQUIREMENTS. ALL NYS APPROVED STANDARD DESIGN ALTERNATIVES MUST BE CONSIDERED TO THE MAXIMUM EXTENT OF FEASIBILITY.
Dollar Amount
$3M to 10M
Status
Active
HWP19KC1
Project Id: HWP19KC1 • Description: Citywide Complex Pedestrian Ramps - Brooklyn • Client Agency: TRANSPORTATION
Project Id
HWP19KC1
Description
Citywide Complex Pedestrian Ramps - Brooklyn
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-02-02T00:00:00.000
Scope
COMPLEX PEDESTRIAN RAMPS IN 48 CORNERS IN BROOKLYN. DESIGNS OF THE RAMPS MUST COMPLY WITH APPLICABLE FEDERAL ADA REQUIREMENTS. ALL NYS APPROVED STANDARD DESIGN ALTERNATIVES MUST BE CONSIDERED TO THE MAXIMUM EXTENT OF FEASIBILITY.
Dollar Amount
$3M to 10M
Status
Active
HWP19KC2
Project Id: HWP19KC2 • Description: Citywide Complex Pedestrian Ramps - Brooklyn • Client Agency: TRANSPORTATION
Project Id
HWP19KC2
Description
Citywide Complex Pedestrian Ramps - Brooklyn
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-01-22T00:00:00.000
Scope
COMPLEX PEDESTRIAN RAMPS IN 48 CORNERS IN BROOKLYN. DESIGNS OF THE RAMPS MUST COMPLY WITH APPLICABLE FEDERAL ADA REQUIREMENTS. ALL NYS APPROVED STANDARD DESIGN ALTERNATIVES MUST BE CONSIDERED TO THE MAXIMUM EXTENT OF FEASIBILITY.
Dollar Amount
$3M to 10M
Status
Active
HWP19KC3
Project Id: HWP19KC3 • Description: Citywide Complex Pedestrian Ramps - Brooklyn • Client Agency: TRANSPORTATION
Project Id
HWP19KC3
Description
Citywide Complex Pedestrian Ramps - Brooklyn
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-05-26T00:00:00.000
Scope
COMPLEX PEDESTRIAN RAMPS IN 48 CORNERS IN BROOKLYN. DESIGNS OF THE RAMPS MUST COMPLY WITH APPLICABLE FEDERAL ADA REQUIREMENTS. ALL NYS APPROVED STANDARD DESIGN ALTERNATIVES MUST BE CONSIDERED TO THE MAXIMUM EXTENT OF FEASIBILITY.
Dollar Amount
$3M to 10M
Status
Active
HWP19KQTA
Project Id: HWP19KQTA • Description: CITYWIDE COMPLEX PED RAMPS (TA) - BROOKLYN AND QUEENS • Client Agency: TRANSPORTATION
Project Id
HWP19KQTA
Description
CITYWIDE COMPLEX PED RAMPS (TA) - BROOKLYN AND QUEENS
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-04-13T00:00:00.000
Scope
COMPLEX PEDESTRIAN RAMPS ADJACENT TO TRANSIT FACILITIES IN 44 CORNERS IN BROOKLYN AND QUEENS. DESIGNS OF THE RAMPS MUST COMPLY WITH APPLICABLE FEDERAL ADA REQUIREMENTS. ALL NYS APPROVED STANDARD DESIGN ALTERNATIVES MUST BE CONSIDERED TO THE MAXIMUM EXTENT OF FEASIBILITY.
Dollar Amount
$3M to 10M
Status
Active
HWP19QRC
Project Id: HWP19QRC • Description: Citywide Complex Pedestrian Ramps - Queens and Staten Island • Client Agency: TRANSPORTATION
Project Id
HWP19QRC
Description
Citywide Complex Pedestrian Ramps - Queens and Staten Island
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-01-10T00:00:00.000
Scope
COMPLEX PEDESTRIAN RAMPS IN QUEENS AND STATEN ISLAND. DESIGNS OF THE RAMPS MUST COMPLY WITH APPLICABLE FEDERAL ADA REQUIREMENTS. ALL NYS APPROVED STANDARD DESIGN ALTERNATIVES MUST BE CONSIDERED TO THE MAXIMUM EXTENT OF FEASIBILITY.
Dollar Amount
$3M to 10M
Status
Active
HWP2013LM
Project Id: HWP2013LM • Description: CITYWIDE COMPLEX PED RAMPS (LANDMARK) - BK & MAN • Client Agency: TRANSPORTATION
Project Id
HWP2013LM
Description
CITYWIDE COMPLEX PED RAMPS (LANDMARK) - BK & MAN
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2019-12-25T00:00:00.000
Scope
Complex Pedestrian Ramps adjacent to Historic and /or Landmark facilities within the Boroughs of Brooklyn & Manhattan.
09/04/2013 - Origianl list of locations 108 corners. 4 corners were added when performing preliminary investigation. There is a total 112 corners. Out of the 112 corners, 63 corners (38 intersections) require detailed design, 7 corners require vault investigation, 1 corner is a simple corner/not in historic district and 41 corners do not required work.
Dollar Amount
$1M to 3M
Status
Active
HWPEDSF4
Project Id: HWPEDSF4 • Description: Multi-Site Pedestrian Safety • Client Agency: TRANSPORTATION
Project Id
HWPEDSF4
Description
Multi-Site Pedestrian Safety
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2022-06-03T00:00:00.000
Scope
MULTI-SITE PEDESTRIAN SAFETY, CITYWIDE

PROJECT SCOPE AND LOCATIONS:
BRONX- Loc.#1- Bruckner Blvd. (Body of water by Concrete Plant Park)
BROOKLYN - Loc.# 2 -8th Ave./57th St.; Loc. #3 -92nd St. /Ft. Hamilton Parkway (Removed).; Loc.#4 Cortelyou Rd./Rugby Rd.;Loc.#5 -Linden Blvd./E. 51st St.; Loc.#6 -Linden Blvd./E. 52nd St.; Loc.#7 -Ocean Parkway N./In front of Coney Island Hosp.(Pending S.G.D)
MANHATTAN- Loc.#8 -E. 125th St/Lexington Ave.; Loc.#9 -W. 125th St./Amsterdam Ave.; Loc.#10-W. 181st St./Broadway; Loc.#11-W. 181st St./St. Nicholas Ave.; Loc.#12-W. 181st St./Amsterdam Ave.; Loc. (Removed).#13-Delancey St./Orchard St.; (Removed) Loc.#14-Delancey St./Essex St. (Removed)
ADDED Location in Manhattan #18 NW corner of W34th St and 8th AVE.
QUEENS- Loc.#15 -Hoyt Ave. South/Columbus Triangle (Will be given to NYCT to bid)
STATEN ISLAND - Loc.#16-Amundsen Circle Roads/Amboy Rd, Riedel Ave., Clark Ave., Savoy St.; (ROW Issues) Loc. #17-Richmond Ave./300' N. from N. Leg of Yukon Ave. to 310' S. of S. leg of Yukon Ave.
Dollar Amount
$10M to 30M
Status
Active
HWPEDSF4A
Project Id: HWPEDSF4A • Description: Multi-Site Pedestrian Safety - Phase 4A • Client Agency: TRANSPORTATION
Project Id
HWPEDSF4A
Description
Multi-Site Pedestrian Safety - Phase 4A
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2021-09-11T00:00:00.000
Scope
THE PROJECT WILL IMPROVE SAFETY AND CIRCULATION AT THIS HEAVILY USED TRANSIT HUB BY PERMANENTLY INCORPORATING THE TEMPORARY PEDESTRIAN SAFETY IMPROVEMENTS INSTALLED IN 2018 THROUGH FULL RECONSTRUCTION OF PARSONS BOULEVARD (FROM ARCHER TO JAMAICA AVENUES) INVOLVING EXPANDED AND ENHANCED PEDESTRIAN SPACE, INSTALLATION OF CURB EXTENSIONS AT KEY INTERSECTIONS, AND DEDICATED LOCATIONS FOR COMMUTER VAN PICK-UP.
Dollar Amount
$10M to 30M
Status
Active
HWPEDSF5
Project Id: HWPEDSF5 • Description: Multi-Site Pedestrian Safety Phase 5 • Client Agency: TRANSPORTATION
Project Id
HWPEDSF5
Description
Multi-Site Pedestrian Safety Phase 5
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2023-04-03T00:00:00.000
Scope
CONSTRUCT A RANGE OF PEDESTRIAN SAFETY GEOMETRIC IMPROVEMENTS AT VARIOUS SPECIFIED LOCATIONS, CITYWIDE.
Dollar Amount
$30M to 100M
Status
Active
HWPLZ004X
Project Id: HWPLZ004X • Description: Morrison Avenue Plaza (HED-572) • Client Agency: TRANSPORTATION
Project Id
HWPLZ004X
Description
Morrison Avenue Plaza (HED-572)
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2021-06-28T00:00:00.000
Scope
RECONSTRUCTION OF MORRISON AVE PLAZA, BRONX
Dollar Amount
$3M to 10M
Status
Active
HWPLZ011K
Project Id: HWPLZ011K • Description: ZION TRIANGLE PLAZA • Client Agency: TRANSPORTATION
Project Id
HWPLZ011K
Description
ZION TRIANGLE PLAZA
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-04-10T00:00:00.000
Scope
Reconstruction and expansion of Zion Triangle. Also, water main work in the project area.
Zion Triangle lies at the intersection of Pitkin and East New York Avenues and Legion Street in Brownsville, Brooklyn.

The scope includes: Reconstruct pedestrian plaza with resting/sitting area, walkways/sidewalks and landscaping (grass/planting spaces), drinking fountain, & refurbishing of war memorial. The scope of work also involves the reconstruction and re-configuration of Zion Triangle bounded by Pitkin Ave, East NY Ave, and Legion St, expanding the public space into East New York Ave by approximately 6 feet, plus 10' width roadways (around the public plaza) including all related works (street lighting, traffic signals & marking, catch basin installation); build ADA ramps and sidewalk. Legion Street will be closed to vehicular traffic and incorporate that street into the enhanced public space.

WM - 1
1. East New York Avenue between Howard Avenue and Legion St.
2. Intersection of East New York Ave and Pikin Avenue.

WM - 6
1. East New York Avenue between Howard Avenue and Legion St.

BED804 Water Main work is cancelled and this work will now be done under BED776 and in conjunction with HWPLZ011K
Dollar Amount
$3M to 10M
Status
Active
HWPLZ012M
Project Id: HWPLZ012M • Description: Bogardus Plaza Clock Tower • Client Agency: TRANSPORTATION
Project Id
HWPLZ012M
Description
Bogardus Plaza Clock Tower
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2019-12-06T00:00:00.000
Scope
To make permanent improvements to the temporary plaza on Hudson Street from Reade Street to Chambers Street. The Bogardus Garden Park will also be incorporated into the plaza design.
Dollar Amount
$3M to 10M
Status
Active
HWPLZ015M
Project Id: HWPLZ015M • Description: Pershing Square East Plaza/Streetscape Reconstruction • Client Agency: TRANSPORTATION
Project Id
HWPLZ015M
Description
Pershing Square East Plaza/Streetscape Reconstruction
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2024-01-01T00:00:00.000
Scope
THIS PROJECT WILL RECONSTRUCT THE EASTERN HALF OF PARK AVENUE BETWEEN 41ST AND 42ND STREETS, ALSO KNOWN AS PERSHING SQUARE EAST. THIS BLOCK WILL INTEGRATE WITH THE PERSHING SQUARE WEST PLAZA TO CREATE A SINGULAR PUBLIC SPACE COLLECTIVELY KNOWN AS PERSHING SQUARE PLAZA.
Dollar Amount
$10M to 30M
Status
Active
HWPLZ017K
Project Id: HWPLZ017K • Description: Osborn Street Plaza • Client Agency: TRANSPORTATION
Project Id
HWPLZ017K
Description
Osborn Street Plaza
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2022-12-15T00:00:00.000
Scope
THIS PROJECT WILL RECONSTRUCT THE DEAD END SEGMENT OF OSBORN STREET SOUTH OF BELMONT AVE TO CREATE AN INVITING PLAZA SPACE FOR PEDESTRIANS. THE ROADBED WILL BE RAISED TO SIDEWALK LEVEL, STREET TREES WILL REMAIN WHERE THE FORMER CURB LINE EXISTED AND BIKE RACKS AND BENCHES WILL BE INSTALLED. THE PLAZA ITSELF WILL BECOME CONCRETE. ADDITIONALLY THE INTERSECTION OF OSBORN STREET AND BELMONT AVE WILL BE RAISED TO SIDEWALK LEVEL. THIS RAISED INTERSECTION WILL PROVIDE TRAFFIC CALMING AND FURTHER CREATE A WELCOMING PEDESTRIAN ENVIRONMENT. OSBORN STREET IS PART OF THE ROUND 7 PLAZA PROGRAM AND WILL BE MAINTAINED BY THE BROWNSVILLE COMMUNITY JUSTICE CENTER.
Dollar Amount
$1M to 3M
Status
Active
HWPR17K
Project Id: HWPR17K • Description: Pedestrian Ramp Rehabilitation - Brooklyn • Client Agency: TRANSPORTATION
Project Id
HWPR17K
Description
Pedestrian Ramp Rehabilitation - Brooklyn
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-06-01T00:00:00.000
Scope
Rehabilitation (repair and upgrade to ADA specifications) of existing pedestrian ramps in the borough of Brooklyn. The list of final locations for this contract will be provided by CPM at a later date. The pedestrian ramp repairs will follow resurfacing schedules.
Dollar Amount
$3M to 10M
Status
Active
HWPR18K1
Project Id: HWPR18K1 • Description: Pedestrian Ramp Rehabilitation - Brooklyn • Client Agency: TRANSPORTATION
Project Id
HWPR18K1
Description
Pedestrian Ramp Rehabilitation - Brooklyn
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-06-07T00:00:00.000
Scope
Rehabilitation (repair and upgrade to ADA specifications to the maximum extent feasible) of existing pedestrian ramps in the borough of Brooklyn. The list of final locations for this contract will be provided by SIM at a later date. The pedestrian ramp repairs will follow resurfacing schedules.

Any upgrades to the ramps must also rehabilitate the receiving corner where possible. Any deviation will require DOT's approval. This contract will be addressing simple pedestrian ramps upgrades.
Dollar Amount
$3M to 10M
Status
Active
HWPR18K2
Project Id: HWPR18K2 • Description: Pedestrian Ramp Rehabilitation - Brooklyn • Client Agency: TRANSPORTATION
Project Id
HWPR18K2
Description
Pedestrian Ramp Rehabilitation - Brooklyn
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-08-29T00:00:00.000
Scope
Rehabilitation (repair and upgrade to ADA specifications to the maximum extent feasible) of existing pedestrian ramps in the borough of Brooklyn. The list of final locations for this contract will be provided by SIM at a later date. The pedestrian ramp repairs will follow resurfacing schedules.

Any upgrades to the ramps must also rehabilitate the receiving corner where possible. Any deviation will require DOT's approval. This contract will be addressing simple pedestrian ramps upgrades.
Dollar Amount
$3M to 10M
Status
Active
HWPR18M
Project Id: HWPR18M • Description: Pedestrian Ramp Rehabilitation - Manhattan • Client Agency: TRANSPORTATION
Project Id
HWPR18M
Description
Pedestrian Ramp Rehabilitation - Manhattan
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-09-19T00:00:00.000
Scope
Rehabilitation (repair and upgrade to ADA specifications to the maximum extent feasible) of existing pedestrian ramps in the borough of Manhattan. The list of final locations for this contract will be provided by SIM at a later date. The pedestrian ramp repairs will follow resurfacing schedules.

Any upgrades to the ramps must also rehabilitate the receiving corner where possible. Any deviation will require DOT's approval. This contract will be addressing simple pedestrian ramps upgrades.
Dollar Amount
$3M to 10M
Status
Active
HWQ1195
Project Id: HWQ1195 • Description: Colfax and Murdock Street Raising (SEQNS003) • Client Agency: TRANSPORTATION
Project Id
HWQ1195
Description
Colfax and Murdock Street Raising (SEQNS003)
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2022-08-08T00:00:00.000
Scope
SOUTHEAST QUEENS COLFAX / MURDOCK STREETS AREA-WIDE
Dollar Amount
$10M to 30M
Status
Active
HWPR18R
Project Id: HWPR18R • Description: Pedestrian Ramp Rehabilitation - Staten Island • Client Agency: TRANSPORTATION
Project Id
HWPR18R
Description
Pedestrian Ramp Rehabilitation - Staten Island
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-07-04T00:00:00.000
Scope
Rehabilitation (repair and upgrade to ADA specifications to the maximum extent feasible) of existing pedestrian ramps in the borough of Staten Island. The list of final locations for this contract will be provided by SIM at a later date. The pedestrian ramp repairs will follow resurfacing schedules.

Any upgrades to the ramps must also rehabilitate the receiving corner where possible. Any deviation will require DOT's approval. This contract will be addressing simple pedestrian ramps upgrades.
Dollar Amount
$3M to 10M
Status
Active
HWPR18X
Project Id: HWPR18X • Description: Pedestrian Ramp Rehabilitation - Bronx • Client Agency: TRANSPORTATION
Project Id
HWPR18X
Description
Pedestrian Ramp Rehabilitation - Bronx
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-06-23T00:00:00.000
Scope
Rehabilitation (repair and upgrade to ADA specifications to the maximum extent feasible) of existing pedestrian ramps in the borough of Bronx. The list of final locations for this contract will be provided by SIM at a later date. The pedestrian ramp repairs will follow resurfacing schedules.

Any upgrades to the ramps must also rehabilitate the receiving corner where possible. Any deviation will require DOT's approval. This contract will be addressing simple pedestrian ramps upgrades.
Dollar Amount
$3M to 10M
Status
Active
HWPR19K1
Project Id: HWPR19K1 • Description: Pedestrian Ramp Rehabilitation - Brooklyn • Client Agency: TRANSPORTATION
Project Id
HWPR19K1
Description
Pedestrian Ramp Rehabilitation - Brooklyn
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2021-04-03T00:00:00.000
Scope
REHABILITATION (REPAIR AND UPGRADE TO ADA SPECIFICATIONS TO THE MAXIMUM EXTENT FEASIBLE) OF EXISTING PEDESTRIAN RAMPS IN THE BOROUGH OF BROOKLYN. THE LIST OF LOCATIONS FOR THIS CONTRACT WILL BE PROVIDED BY SIM AT A LATER DATE. THE PED RAMP REPAIRS WILL FOLLOW RESURFACING SCHEDULES. ANY UPGRADES TO THE RAMPS MUST ALSO REHABILITATE THE RECEIVING CORNER WHERE POSSIBLE. ANY DEVIATION WILL REQUIRE DOT'S APPROVAL. THIS CONTRACT WILL BE ADDRESSING SIMPLE PED RAMP UPGRADES. THIS CONTRACT WILL BE ESTABLISHED FOR 1 YEAR AND MAY ONLY BE RENEWED IF A TIME EXTENSION IS NEEDED. ALL THE PROJECT FUNDS MUST BE REGISTERED IN THE 1ST YEAR.
Dollar Amount
$10M to 30M
Status
Active
HWPR19K2
Project Id: HWPR19K2 • Description: Pedestrian Ramp Rehabilitation - Brooklyn • Client Agency: TRANSPORTATION
Project Id
HWPR19K2
Description
Pedestrian Ramp Rehabilitation - Brooklyn
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2021-03-06T00:00:00.000
Scope
REHABILITATION (REPAIR AND UPGRADE TO ADA SPECIFICATIONS TO THE MAXIMUM EXTENT FEASIBLE) OF EXISTING PEDESTRIAN RAMPS IN THE BOROUGH OF BROOKLYN. THE LIST OF LOCATIONS FOR THIS CONTRACT WILL BE PROVIDED BY SIM AT A LATER DATE. THE PED RAMP REPAIRS WILL FOLLOW RESURFACING SCHEDULES. ANY UPGRADES TO THE RAMPS MUST ALSO REHABILITATE THE RECEIVING CORNER WHERE POSSIBLE. ANY DEVIATION WILL REQUIRE DOT'S APPROVAL. THIS CONTRACT WILL BE ADDRESSING SIMPLE PED RAMP UPGRADES. THIS CONTRACT WILL BE ESTABLISHED FOR 1 YEAR AND MAY ONLY BE RENEWED IF A TIME EXTENSION IS NEEDED. ALL THE PROJECT FUNDS MUST BE REGISTERED IN THE 1ST YEAR.
Dollar Amount
$10M to 30M
Status
Active
HWPR19KC
Project Id: HWPR19KC • Description: Complex Upgrades Ped Ramp - Brooklyn • Client Agency: TRANSPORTATION
Project Id
HWPR19KC
Description
Complex Upgrades Ped Ramp - Brooklyn
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-08-14T00:00:00.000
Scope
The scope of this project includes Complex Pedestrian Ramps Upgrades, for 54 corners in the borough of
Brooklyn.
Dollar Amount
$3M to 10M
Status
Active
HWPR19M
Project Id: HWPR19M • Description: Pedestrian Ramp Rehabilitation - Manhattan • Client Agency: TRANSPORTATION
Project Id
HWPR19M
Description
Pedestrian Ramp Rehabilitation - Manhattan
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2021-04-24T00:00:00.000
Scope
REHABILITATION (REPAIR AND UPGRADE TO ADA SPECIFICATIONS TO THE MAXIMUM EXTENT FEASIBLE) OF EXISTING PEDESTRIAN RAMPS IN THE BOROUGH OF BROOKLYN. THE LIST OF LOCATIONS FOR THIS CONTRACT WILL BE PROVIDED BY SIM AT A LATER DATE. THE PED RAMP REPAIRS WILL FOLLOW RESURFACING SCHEDULES. ANY UPGRADES TO THE RAMPS MUST ALSO REHABILITATE THE RECEIVING CORNER WHERE POSSIBLE. ANY DEVIATION WILL REQUIRE DOT'S APPROVAL. THIS CONTRACT WILL BE ADDRESSING SIMPLE PED RAMP UPGRADES. THIS CONTRACT WILL BE ESTABLISHED FOR 1 YEAR AND MAY ONLY BE RENEWED IF A TIME EXTENSION IS NEEDED. ALL THE PROJECT FUNDS MUST BE REGISTERED IN THE 1ST YEAR.
Dollar Amount
$10M to 30M
Status
Active
HWPR19MC1
Project Id: HWPR19MC1 • Description: Complex Upgrades Ped Ramps - Manhattan • Client Agency: TRANSPORTATION
Project Id
HWPR19MC1
Description
Complex Upgrades Ped Ramps - Manhattan
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2024-02-12T00:00:00.000
Scope
Complex Upgrades Ped Ramps - Manhattan
Dollar Amount
$3M to 10M
Status
Active
HWPR19MC2
Project Id: HWPR19MC2 • Description: Complex Upgrades Ped Ramps - Manhattan • Client Agency: TRANSPORTATION
Project Id
HWPR19MC2
Description
Complex Upgrades Ped Ramps - Manhattan
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2024-02-07T00:00:00.000
Scope
The scope of this project includes Complex Pedestrian Ramps Upgrades, for 50 corners in the borough of Manhattan.
Dollar Amount
$3M to 10M
Status
Active
HWPR19MXC
Project Id: HWPR19MXC • Description: Complex Upgrades Ped Ramps - Manhattan and the Bronx • Client Agency: TRANSPORTATION
Project Id
HWPR19MXC
Description
Complex Upgrades Ped Ramps - Manhattan and the Bronx
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Initiation
Projected Construction Completion
2024-07-30T00:00:00.000
Scope
Complex Upgrades Ped Ramps - Manhattan and the Bronx
Dollar Amount
$3M to 10M
Status
Active
HWPR19Q1
Project Id: HWPR19Q1 • Description: Pedestrian Ramp Rehabilitation - Queens • Client Agency: TRANSPORTATION
Project Id
HWPR19Q1
Description
Pedestrian Ramp Rehabilitation - Queens
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2021-03-22T00:00:00.000
Scope
REHABILITATION (REPAIR AND UPGRADE TO ADA SPECIFICATIONS TO THE MAXIMUM EXTENT FEASIBLE) OF EXISTING PEDESTRIAN RAMPS IN THE BOROUGH OF BROOKLYN. THE LIST OF LOCATIONS FOR THIS CONTRACT WILL BE PROVIDED BY SIM AT A LATER DATE. THE PED RAMP REPAIRS WILL FOLLOW RESURFACING SCHEDULES. ANY UPGRADES TO THE RAMPS MUST ALSO REHABILITATE THE RECEIVING CORNER WHERE POSSIBLE. ANY DEVIATION WILL REQUIRE DOT'S APPROVAL. THIS CONTRACT WILL BE ADDRESSING SIMPLE PED RAMP UPGRADES. THIS CONTRACT WILL BE ESTABLISHED FOR 1 YEAR AND MAY ONLY BE RENEWED IF A TIME EXTENSION IS NEEDED. ALL THE PROJECT FUNDS MUST BE REGISTERED IN THE 1ST YEAR.
Dollar Amount
$10M to 30M
Status
Active
HWPR19Q2
Project Id: HWPR19Q2 • Description: Pedestrian Ramp Rehabilitation - Queens • Client Agency: TRANSPORTATION
Project Id
HWPR19Q2
Description
Pedestrian Ramp Rehabilitation - Queens
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2021-03-13T00:00:00.000
Scope
REHABILITATION (REPAIR AND UPGRADE TO ADA SPECIFICATIONS TO THE MAXIMUM EXTENT FEASIBLE) OF EXISTING PEDESTRIAN RAMPS IN THE BOROUGH OF BROOKLYN. THE LIST OF LOCATIONS FOR THIS CONTRACT WILL BE PROVIDED BY SIM AT A LATER DATE. THE PED RAMP REPAIRS WILL FOLLOW RESURFACING SCHEDULES. ANY UPGRADES TO THE RAMPS MUST ALSO REHABILITATE THE RECEIVING CORNER WHERE POSSIBLE. ANY DEVIATION WILL REQUIRE DOT'S APPROVAL. THIS CONTRACT WILL BE ADDRESSING SIMPLE PED RAMP UPGRADES. THIS CONTRACT WILL BE ESTABLISHED FOR 1 YEAR AND MAY ONLY BE RENEWED IF A TIME EXTENSION IS NEEDED. ALL THE PROJECT FUNDS MUST BE REGISTERED IN THE 1ST YEAR.
Dollar Amount
$10M to 30M
Status
Active
HWPR19QRC
Project Id: HWPR19QRC • Description: Complex Upgrades Ped Ramps - Queens and Staten Island • Client Agency: TRANSPORTATION
Project Id
HWPR19QRC
Description
Complex Upgrades Ped Ramps - Queens and Staten Island
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-09-14T00:00:00.000
Scope
Complex Upgrades Ped Ramps - Queens and Staten Island
Dollar Amount
$3M to 10M
Status
Active
HWPR19R
Project Id: HWPR19R • Description: Pedestrian Ramp Rehabilitation - Staten Island • Client Agency: TRANSPORTATION
Project Id
HWPR19R
Description
Pedestrian Ramp Rehabilitation - Staten Island
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2021-07-31T00:00:00.000
Scope
REHABILITATION (REPAIR AND UPGRADE TO ADA SPECIFICATIONS TO THE MAXIMUM EXTENT FEASIBLE) OF EXISTING PEDESTRIAN RAMPS IN THE BOROUGH OF BROOKLYN. THE LIST OF LOCATIONS FOR THIS CONTRACT WILL BE PROVIDED BY SIM AT A LATER DATE. THE PED RAMP REPAIRS WILL FOLLOW RESURFACING SCHEDULES. ANY UPGRADES TO THE RAMPS MUST ALSO REHABILITATE THE RECEIVING CORNER WHERE POSSIBLE. ANY DEVIATION WILL REQUIRE DOT'S APPROVAL. THIS CONTRACT WILL BE ADDRESSING SIMPLE PED RAMP UPGRADES. THIS CONTRACT WILL BE ESTABLISHED FOR 1 YEAR AND MAY ONLY BE RENEWED IF A TIME EXTENSION IS NEEDED. ALL THE PROJECT FUNDS MUST BE REGISTERED IN THE 1ST YEAR.
Dollar Amount
$10M to 30M
Status
Active
HWXP136B
Project Id: HWXP136B • Description: Grand Concourse Phase 3 • Client Agency: TRANSPORTATION
Project Id
HWXP136B
Description
Grand Concourse Phase 3
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-05-29T00:00:00.000
Scope
RECONSTRUCTION OF THE GRAND CONCOURSE - PHASE 3, BRONX
Dollar Amount
$10M to 30M
Status
Active
HWXP136C
Project Id: HWXP136C • Description: Grand Concourse Phase 4 (SEX002268) • Client Agency: TRANSPORTATION
Project Id
HWXP136C
Description
Grand Concourse Phase 4 (SEX002268)
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2022-09-28T00:00:00.000
Scope
RECONSTRUCTION OF GRAND CONCOURSE FROM E 175 ST TO EAST FORDHAM RD- PHASE 4, BX
Dollar Amount
$30M to 100M
Status
Active
HWPR19X
Project Id: HWPR19X • Description: Pedestrian Ramp Rehabilitation - The Bronx • Client Agency: TRANSPORTATION
Project Id
HWPR19X
Description
Pedestrian Ramp Rehabilitation - The Bronx
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2021-03-13T00:00:00.000
Scope
REHABILITATION (REPAIR AND UPGRADE TO ADA SPECIFICATIONS TO THE MAXIMUM EXTENT FEASIBLE) OF EXISTING PEDESTRIAN RAMPS IN THE BOROUGH OF BROOKLYN. THE LIST OF LOCATIONS FOR THIS CONTRACT WILL BE PROVIDED BY SIM AT A LATER DATE. THE PED RAMP REPAIRS WILL FOLLOW RESURFACING SCHEDULES. ANY UPGRADES TO THE RAMPS MUST ALSO REHABILITATE THE RECEIVING CORNER WHERE POSSIBLE. ANY DEVIATION WILL REQUIRE DOT'S APPROVAL. THIS CONTRACT WILL BE ADDRESSING SIMPLE PED RAMP UPGRADES. THIS CONTRACT WILL BE ESTABLISHED FOR 1 YEAR AND MAY ONLY BE RENEWED IF A TIME EXTENSION IS NEEDED. ALL THE PROJECT FUNDS MUST BE REGISTERED IN THE 1ST YEAR.
Dollar Amount
$10M to 30M
Status
Active
HWPR20K1
Project Id: HWPR20K1 • Description: Pedestrian Ramps Rehabilitation - Brooklyn • Client Agency: TRANSPORTATION
Project Id
HWPR20K1
Description
Pedestrian Ramps Rehabilitation - Brooklyn
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2022-07-06T00:00:00.000
Scope
The scope includes rehabilitation (repair and upgrade to the maximum extent feasible under Federal ADA 2010 specifications and PROWAG requirements as outlined In the Minimum Design Requirements section of this document) of existing pedestrian ramps In Queens' Community Districts 401, 403, 404, 481, 407, 411 and 480.
Dollar Amount
$10M to 30M
Status
Active
HWPR20K2
Project Id: HWPR20K2 • Description: Pedestrian Ramp Rehabilitation - Brooklyn • Client Agency: TRANSPORTATION
Project Id
HWPR20K2
Description
Pedestrian Ramp Rehabilitation - Brooklyn
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2022-07-20T00:00:00.000
Scope
The scope includes rehabilitation (repair and upgrade to the maximum extent feasible under Federal ADA 2010 specifications and PROWAG guidelines as outlined In the Minimum Design Requirements section of this document) of existing pedestrian ramps in Brooklyn's Community Districts 307, 312, 314, 317, 318, and 305.
Dollar Amount
$10M to 30M
Status
Active
HWPR20K3
Project Id: HWPR20K3 • Description: Pedestrian Ramp Rehabilitation - Brooklyn • Client Agency: TRANSPORTATION
Project Id
HWPR20K3
Description
Pedestrian Ramp Rehabilitation - Brooklyn
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2021-07-05T00:00:00.000
Scope
The scope includes rehabilitation (repair and upgrade to the maximum extent feasible under Federal ADA 2010 specifications and PROWAG guidelines as outlined in the Minimum Design Requirements section of this document) of existing pedestrian ramps In Brooklyn's Community Districts 301, 302, 308, 355, 309, 308, 303, and 304.
Dollar Amount
$10M to 30M
Status
Active
HWPR20MX
Project Id: HWPR20MX • Description: Pedestrian Ramp Rehabilitation - Manhattan and Bronx • Client Agency: TRANSPORTATION
Project Id
HWPR20MX
Description
Pedestrian Ramp Rehabilitation - Manhattan and Bronx
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2022-06-18T00:00:00.000
Scope
The scope includes rehabilitation (repair and upgrade to the maximum extent feasible under Federal ADA 2010 specifications and PROWAG guidelines as outlined in the Minimum Design Requirements section of this document) of existing pedestrian ramps in Manhattan and the Bronx.
Dollar Amount
$10M to 30M
Status
Active