Scope
This project has been initiated to bring three identified utility trenches in SI to a state of good repair. These sites, pulled from a master list, were prioritized with attention to ratings data, field observations, and community needs. The sites are split into scoping categories; full street reconstruction, and trench restoration with resurfacing. Projects will upgrade pedestrian facilities to ADA compliancy, and address adjacent capital assets in poor condition (curbs, sidewalks, and others as needed). SER002333 IS A SUB-PROJECT TO HWTRR1.