Active Projects - Infrastructure (Historical)

List of currently active infrastructure projects including description and high level schedule and budget range.

Housing & Development Department of Design and Construction (DDC) Dataset rukc-mmqu 9 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
HWX100SBC
Project Id: HWX100SBC • Description: South Bronx East-West Crosstown SBS • Client Agency: TRANSPORTATION
Project Id
HWX100SBC
Description
South Bronx East-West Crosstown SBS
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2025-09-13T00:00:00.000
Scope
The South Bronx Crosstown SBS capital project (BRT) will add bus pads and construct bus bulbs, curb and median extensions, and pedestrian islands for enhanced pedestrian safety and access improvements.
Dollar Amount
$30M to 100M
Status
Active
HWX402
Project Id: HWX402 • Description: Bruner and Ely • Client Agency: TRANSPORTATION
Project Id
HWX402
Description
Bruner and Ely
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2026-02-14T00:00:00.000
Scope
BRUNER & ELY IS A CRITICAL STATE OF REPAIR (SOGR) PROJECT IN THE BAYCHESTER NEIGHBORHOOD OF THE EAST BRONX. THE ROADWAYS , CURBS, AND SIDEWALKS WITHIN THE PROJECT LIMITS HAVE SUNKEN DRRAMATICALLY OVER TIME TO HEAVY VEHICLE USAGE, POOR SUBSURFACE CONDITIONS AND DEFERRED MAINTENANCE. THE PROJECT WILL BRING THESE STREETSD TO STATE OF GOOD REPAIR.
Dollar Amount
$3M to 10M
Status
Active
HWXP136D
Project Id: HWXP136D • Description: Grand Concourse Phase 5 • Client Agency: TRANSPORTATION
Project Id
HWXP136D
Description
Grand Concourse Phase 5
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2025-09-13T00:00:00.000
Scope
THE FIFTH PHASE OF THE RECONSTRUCTION OF THE GRAND CONCOURSE WILL CONTINUE THE DESIGN AND SAFETY IMPROVEMENTS IMPLEMENTED IN THE PREVIOUS PHASES OF THIS VISION ZERO GREAT STREETS PROJECTS. . AS IN THE PREVIOUS PHASES, PHASE 5 WILL INCLUDE THE RECONSTRUCTION OF THE CONCOURSES SERVICE ROADS AND RESURFACING OF THE MAINLINE ROADWAY WHERE NECESSARY.
Dollar Amount
$30M to 100M
Status
Active
HWXPRATT
Project Id: HWXPRATT • Description: Pratt Ave Reconstruction and Retaining Wall • Client Agency: TRANSPORTATION
Project Id
HWXPRATT
Description
Pratt Ave Reconstruction and Retaining Wall
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2022-01-22T00:00:00.000
Scope
The retaining wall along the segment of Pratt Avenue (Needham Ave to Dead End) shows multiple signs of damage. This includes cracking (long cracks run the entire height of the wall) and movement of the individual elements of the wall. The cracks and movement of the wall has allowed the backfill that supports the roadway to escape. The roadway within the project limits has experienced significant damage due to settlement of supporting materials. The proposed scope includes reconstruction of the roadway and retaining wall along this segment.
Dollar Amount
$3M to 10M
Status
Active
HWXS511
Project Id: HWXS511 • Description: West Tremont Ave Step Street • Client Agency: TRANSPORTATION
Project Id
HWXS511
Description
West Tremont Ave Step Street
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-01-03T00:00:00.000
Scope
RECONSTRUCTION OF WEST TREMONT AVE STEP STREET, BRONX
Reconstruction of West Tremont Avenue Step Street from Sedgwick Avenue to Fordham Place
Dollar Amount
$3M to 10M
Status
Active
HWXS711
Project Id: HWXS711 • Description: RECONSTRUCTION OF STEP STREET AT DAVIDSON AVE • Client Agency: TRANSPORTATION
Project Id
HWXS711
Description
RECONSTRUCTION OF STEP STREET AT DAVIDSON AVE
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-01-20T00:00:00.000
Scope
RECONSTRUCTION OF DAVIDSON AVE STEP STREET, BRONX. THE PROJECT WILL PERFORM A REPLACEMENT-IN-KIND OF THE DAVIDSON AVE STEP ST. LOCATED AT DAVIDSON AVE BETWEEN FEATHERBED LANE AND WEST 174TH ST. THE GRANITE STEPS ARE HIGHLY UNEVEN DUE TO EROSION AND ARE AT RISK OF DESTABILIZING THE STRUCTURE. THE JOINTS ARE IN POOR CONDITION WITH CRACKING, SPALLING AND SURROUNDING VOIDS. PORTIONS OF THE EXISTING RAILINGS ARE MISSING OR HAVE DISCONNECTED FROM THE BASE. THE PURPOSE OF THIS RECONSTRUCTION PROJECT IS TO PERFORM A REPLACEMENT-IN-KIND OF THE STEP STREET.
Dollar Amount
$3M to 10M
Status
Active
HYDREST05
Project Id: HYDREST05 • Description: Sidewalk restoration around fire hydrants & catch basins • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
HYDREST05
Description
Sidewalk restoration around fire hydrants & catch basins
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-01-11T00:00:00.000
Scope
SIDEWALK RESTORATION AROUND FIRE HYDRANTS, CATCH BASINS AND MAN HOLES
Dollar Amount
$1M to 3M
Status
Active
HYDREST06
Project Id: HYDREST06 • Description: Sidewalk restoration around fire hydrants & catch basins • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
HYDREST06
Description
Sidewalk restoration around fire hydrants & catch basins
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2021-12-24T00:00:00.000
Scope
ROADWAY AND SIDEWALK RESTORATION OVER WATER MAIN AND SEWER REPAIRS AND AROUND HYDRANTS, CATCH BASINS, MANHOLES AND OTHER APPURTENANCES.
Dollar Amount
$1M to 3M
Status
Active
MED598B
Project Id: MED598B • Description: TRUNK WM IN W 30 ST - 9 AV TO 10 AV (SHAFT 26B) - PHASE B • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
MED598B
Description
TRUNK WM IN W 30 ST - 9 AV TO 10 AV (SHAFT 26B) - PHASE B
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-10-19T00:00:00.000
Scope
Installation of trunk water mains in West 30th Street from 9th Avenue to 10th Avenue, etc., to connect Shaft 26B of City Tunnel #3 to the distribution system, and Combine Sewer extensions & replacement, Borough of Manhattan.

West 31st Street between 10th Avenue and 9th Avenue
West 30th Street between 10th Avenue and 9th Avenue
West 29th Street between 10th Avenue and 9th Avenue
9th Avenue between West 31st Street and West 29th Street
10th Avenue between West 30th Street and West 29th Street
10th Avenue between West 29th St. and West 28th St. (Combined sewer replacement work only)
Dollar Amount
$30M to 100M
Status
Active
MED611
Project Id: MED611 • Description: TRUNK WM REPLACMT IN TRANSVERSE RD 3 • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
MED611
Description
TRUNK WM REPLACMT IN TRANSVERSE RD 3
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Initiation
Projected Construction Completion
2024-06-28T00:00:00.000
Scope
Trunk Water Main Replacement in: Transverse Rd 3 between E86 Street and E85 Street and at Intersection of 5th Avenue and E85 Street.
Distribution Water Main in Transverse Rd between E86 Street and E85 Street and at Intersection of 5th Avenue and E85 Street.
Dollar Amount
$3M to 10M
Status
Active
MED616
Project Id: MED616 • Description: Trunk & dist WM replacement 124st b/t 7 & 2 ave, manh. • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
MED616
Description
Trunk & dist WM replacement 124st b/t 7 & 2 ave, manh.
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2028-06-30T00:00:00.000
Scope
CONSTRUCTION OF TRUNK & DIST WM IN W 124TH STREET, MNS
Dollar Amount
$30M to 100M
Status
Active
MED619
Project Id: MED619 • Description: Trunk Main replacement, b'way b/t w 93 & 97 st, Manh • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
MED619
Description
Trunk Main replacement, b'way b/t w 93 & 97 st, Manh
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2024-02-23T00:00:00.000
Scope
Installation of New Trunk Water Main in Broadway between W. 93rd Street and W. 97th Street, etc. in the Borough of Manhattan
Dollar Amount
$3M to 10M
Status
Active
MED630
Project Id: MED630 • Description: WM replacement at 170 st, amsterdam ave & b'way, MANHATTAN • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
MED630
Description
WM replacement at 170 st, amsterdam ave & b'way, MANHATTAN
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2021-06-20T00:00:00.000
Scope
Distribution water main replacement at various locations from W. 170th St. to W. 190th St. between Broadway and Amsterdam Ave. - Borough of Manhattan
Dollar Amount
$10M to 30M
Status
Active
MED-645
Project Id: MED-645 • Description: Distribution water main Installation, Manhattan • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
MED-645
Description
Distribution water main Installation, Manhattan
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-12-12T00:00:00.000
Scope
INSTALL DISTRIBUTION WATER MAINS THROUGHOUT MANHATTAN AS DIRECTED BY THE BOROUGH DISTRIBUTION ENGINEER.
Dollar Amount
$3M to 10M
Status
Active
MEDA002
Project Id: MEDA002 • Description: Accelerated Distribution WM replcmnt & sewer rebhab - MAN • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
MEDA002
Description
Accelerated Distribution WM replcmnt & sewer rebhab - MAN
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-05-22T00:00:00.000
Scope
ACCELERATED DISTRIBUTION WATER MAIN REPLACEMENT AND SEWER REHABILITATION/REPLACEMENT, MANHATTAN
Dollar Amount
$30M to 100M
Status
Active
MEDA003
Project Id: MEDA003 • Description: Accelerated Distribution WM replcmnt & sewer rebhab - MAN • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
MEDA003
Description
Accelerated Distribution WM replcmnt & sewer rebhab - MAN
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2019-12-14T00:00:00.000
Scope
ACCELERATED DISTRIBUTION WATER MAIN REPLACEMENT AND SEWER REHABILITATION/REPLACEMENT, MANHATTAN
Dollar Amount
$10M to 30M
Status
Active
MIBBNC002
Project Id: MIBBNC002 • Description: Last Chance Pond BMP NC 11/12, storm & sanitary sewer constr • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
MIBBNC002
Description
Last Chance Pond BMP NC 11/12, storm & sanitary sewer constr
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2021-06-04T00:00:00.000
Scope
STORM AND SANITARY SEWER CONSTRUCTION, BMP AND WATER MAINREPLACEMENT IN HUSSON STREET, STATEN ISLAND
Dollar Amount
$30M to 100M
Status
Active
MIBBNC003
Project Id: MIBBNC003 • Description: Strm & Sani Swr const & WM replac in Mason Ave, SI • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
MIBBNC003
Description
Strm & Sani Swr const & WM replac in Mason Ave, SI
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2022-11-30T00:00:00.000
Scope
BMP NC-16 STORM & SANITARY SEWERS IN MASON AVE, SI
Dollar Amount
$30M to 100M
Status
Active
MIBBNC005
Project Id: MIBBNC005 • Description: Storm Sewer Tributary for BMPs NC-13 and NC-14 • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
MIBBNC005
Description
Storm Sewer Tributary for BMPs NC-13 and NC-14
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2022-01-14T00:00:00.000
Scope
CONSTRUCTION OF BMP’s NC13 AND 14 ASSOCIATED WITH SANITARY SEWER AND WATER MAIN WORK, SI
Dollar Amount
$10M to 30M
Status
Active
MIBBNC04A
Project Id: MIBBNC04A • Description: BMP NC 6 and 15 storm & sanitary sewer installation • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
MIBBNC04A
Description
BMP NC 6 and 15 storm & sanitary sewer installation
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2022-12-01T00:00:00.000
Scope
CONSTRUCTION OF BMP’s NC 6 AND 15, STORM AND SANITARY SEWERS INSTALLATION, SI
Dollar Amount
$30M to 100M
Status
Active
NDFIBZ
Project Id: NDFIBZ • Description: NDF - ENY IBZ Improvements • Client Agency: TRANSPORTATION
Project Id
NDFIBZ
Description
NDF - ENY IBZ Improvements
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-07-05T00:00:00.000
Scope
Van Sinderen Avenue is a narrow corridor, adjacent to both the MTA L-train elevated subway line and LIRR freight rail right-of-way to its west. The focus area of this project will address the substandard pedestrian conditions near the entrance to the L-Train station at the intersection of Van Sinderen and Sutter Avenues. Additional capital improvements on Van Sinderen Avenue, between Sutter to East New York Avenues, will seek to enhance the streetscape and may include repeating elements such as decorative fencing, lighting, and pedestrian amenities.
Dollar Amount
$3M to 10M
Status
Active
P-303ERPK
Project Id: P-303ERPK • Description: East River Park • Client Agency: DCAS
Project Id
P-303ERPK
Description
East River Park
Client Agency
DCAS
Division
Infrastructure
Phase
Design
Projected Construction Completion
2021-11-28T00:00:00.000
Scope
Reconstruction of the East River Park bulkheads and platforms in order to bring the structures up to a state of good repair, using the attached inspection reports as guidance for their scope. Final Design would be coordinated with East Side Coastal Resiliency to facilitate that project’s objectives. Parks requests that this work include priority work identified in the 2015/2016 reports, as well as all routine work identified in the 2015/2016 reports necessary to keep the structure in a state of good repair.
Dollar Amount
$3M to 10M
Status
Active
P-3RANDAL
Project Id: P-3RANDAL • Description: Randall's Island Infrastructure, Roadways, Drainage, & CS • Client Agency: PARKS & RECREATION
Project Id
P-3RANDAL
Description
Randall's Island Infrastructure, Roadways, Drainage, & CS
Client Agency
PARKS & RECREATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2022-07-22T00:00:00.000
Scope
RECONSTRUCTION OF ROADWAYS AT RANDALL'S ISLAND
Dollar Amount
$10M to 30M
Status
Active
P-415PAS3
Project Id: P-415PAS3 • Description: FMCP-PASSERELLE BRIDGE - Q099 • Client Agency: PARKS & RECREATION
Project Id
P-415PAS3
Description
FMCP-PASSERELLE BRIDGE - Q099
Client Agency
PARKS & RECREATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2022-10-20T00:00:00.000
Scope
FMCP - PASSERELLE BRIDGE - Q099. RECONSTRUCTION OF EXISTING PASSERELLE BRIDGE
Dollar Amount
$100M to 500M
Status
Active
PW77GOWAN
Project Id: PW77GOWAN • Description: GOWANUS CANAL 1 ST TURNING BASIN • Client Agency: DCAS
Project Id
PW77GOWAN
Description
GOWANUS CANAL 1 ST TURNING BASIN
Client Agency
DCAS
Division
Infrastructure
Phase
Design
Projected Construction Completion
2021-09-27T00:00:00.000
Scope
GOWANUS CANAL 1ST STREET TURNING BASIN
Dollar Amount
$1M or less
Status
Active
QED1003B
Project Id: QED1003B • Description: WM Replacement in Jamaica/Richmond Hill Area, Queens • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
QED1003B
Description
WM Replacement in Jamaica/Richmond Hill Area, Queens
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-09-02T00:00:00.000
Scope
REPLACEMENT OF WATER MAIN IN JAMAICA AVE, QNS
Dollar Amount
$10M to 30M
Status
Active
QED1005
Project Id: QED1005 • Description: DIST WATER MAIN REPLACEMENT LONG ISLAND CITY • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
QED1005
Description
DIST WATER MAIN REPLACEMENT LONG ISLAND CITY
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-03-20T00:00:00.000
Scope
Distribution Water Main Replacement.
Long Island City, Astoria, Queens.
Project Q2008-04

1. Install new 12" water main in 21st Avenue between Shore Blvd. and
41st Street to replace the existing 12" water main.

2. Install new 8" water main in 27thStreet between Ditmars Blvd. and
23rdAvenue to replace the existing 8" water main.

3. Install new 20" water main in 23rdAvenue between 26thStreet and
29thStreet to replace the existing 16" water main.

4. Install new 8" water main in 47th street between Astoria Blvd North and
Ditmars Blvd to replace the existing 8"water main.

5. Install new 8" water main in Ditmars Blvd. between 47thStreet and
45thStreet to replace the existing 8" water main.

6. Install new 12" water main in 31st Street between 23rd Avenue and Astoria
Blvd to replace the replace existing 12" water main.

7. Install new 8" water main in 29thStreet between Hoyt Avenue South and
Astoria Blvd to replace the existing 8" water main.

8. Install new 12" water main in 31st Street between Hoyt Avenue North and
Astoria Blvd to replace the existing 12" water main.

9. Install new 8" water main in Astoria Blvd between 29th Street and 32nd
Street.

10. Install new 8" water main in 30th Street between Astoria Blvd and Newton
Avenue

11. Install new 8" water main in Astoria Blvd between 22nd Street and
Crescent Street to replace the existing 8" water main.

12. Install new 8" water main in Newtown Avenue between 22nd Street and
Crescent Street to replace the existing 8" water main.

13. Install new 8" water main on Astoria Blvd between Astoria Houses
Project and 12th St to replace the existing 8" water main.

14. Install new 8" water main in 30th Road between Vernon Blvd and
12th St to replace the existing 8" water main.

15. Install new 8" water main in 30th Drive between 12th Street and 23rd
Street to replace the existing 8" water main.

16. Install new 8" water main in 31st Avenue between Vernon Blvd and
Crescent Street to replace the existing 8" water main.

17. Install new 8" water main in Newtown Road between 43rd Street and
45thStreet to replace the existing 8" water main.

18. Install new 8" water main in 45th Street between 31st Avenue and 34th
Avenue to replace the existing 8" water main.

19. Install new 12" water main in 54th Street between 31st Avenue and
Northern Blvd to replace the existing 12" water main.

20. Install new 8" water main in Astoria Blvd South between 33rd Street and
45th Street to replace the existing 8" water main.

21. Install new 8" water main in 30th Street between 36th Avenue and 36th
Avenue to replace the existing 8" water main.

22. Install new 12" water main in 11th Street between 36th Avenue and
38thAvenue to replace the existing 12" water main.

23. Install new 8" water main in 38th Avenue between lOth Street and 14th
Street to replace the existing 8" water main.

24. Install new 8" water main in 38th A venue between 27th Street and 29th
Street to replace the existing 8" water main.

25. Install new 12" water main in 38th Avenue between 29th Street and 31st
Street to replace the existing 12" water main.

26. Install new 12" water main in 39th Avenue between Crescent Street and
31st Street to replace the existing 12" water main.

27. Install new 8" water main in 27th Street between 38th Avenue and 41st
Avenue to replace the existing.

28. Install new 8" water main in 28th Street between 38th Avenue and 41st
Avenue to replace the existing

29. Install new 8" water main in 30th Street between 38th Avenue and 40th
Avenue.

30. Install new 12" water main in 31st Street between 38th Avenue and 40th
Avenue.

31.
Dollar Amount
$30M to 100M
Status
Active
QED1007
Project Id: QED1007 • Description: New Trunk Water Main in Rockaway Beach Blvd (SANDHW12) • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
QED1007
Description
New Trunk Water Main in Rockaway Beach Blvd (SANDHW12)
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2020-03-31T00:00:00.000
Scope
Installation of Trunk Water Main in Rockaway Beach Boulevard together with all work incidental thereto in the Borough of Queens.

TRUNK WATER MAIN: Rockaway Beach Boulevard between Beach 59 Street and Beach 49 Street.
Dollar Amount
$10M to 30M
Status
Active
QED1022
Project Id: QED1022 • Description: Replcmnt of Water Mains in Former Jamaica Water Supply Area • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
QED1022
Description
Replcmnt of Water Mains in Former Jamaica Water Supply Area
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-06-27T00:00:00.000
Scope
REPLACEMENT OF WM IN VARIOUS LOCATIONS (JWS), QNS
Dollar Amount
$10M to 30M
Status
Active
QED1023B
Project Id: QED1023B • Description: Distr & Trunk WM Replacement Cypress Ave, Queens (Joint Bid) • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
QED1023B
Description
Distr & Trunk WM Replacement Cypress Ave, Queens (Joint Bid)
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2022-06-13T00:00:00.000
Scope
REPLACEMENT OF TRUNK & DIST. WATER MAINS IN CYPRESS AVENUE, QNS
Dollar Amount
$30M to 100M
Status
Active
QED1027
Project Id: QED1027 • Description: Replacement of Dist WM in 222nd St • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
QED1027
Description
Replacement of Dist WM in 222nd St
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2024-08-15T00:00:00.000
Scope
WATER MAIN REPLACEMENT IN 222 STREET, QUEENS
Dollar Amount
$30M to 100M
Status
Active
QED1037
Project Id: QED1037 • Description: WM Replacement in South Conduit Ave, Queens • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
QED1037
Description
WM Replacement in South Conduit Ave, Queens
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-06-23T00:00:00.000
Scope
WATER MAIN REPLACEMENT IN SOUTH CONDUIT AVENUE BETWEEN 124TH STREET AND 134TH STREET. BOROUGH OF QUEENS, NEW YORK
Dollar Amount
$3M to 10M
Status
Active
QED1047
Project Id: QED1047 • Description: Area Contract for Water Main Replacement, Queens & Bronx • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
QED1047
Description
Area Contract for Water Main Replacement, Queens & Bronx
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-03-31T00:00:00.000
Scope
Replace old watermains and improve water quality and residual pressure in the area.
Dollar Amount
$3M to 10M
Status
Active
QED-1050
Project Id: QED-1050 • Description: Install Distribution WM throughout Bronx & Queens • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
QED-1050
Description
Install Distribution WM throughout Bronx & Queens
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2022-02-26T00:00:00.000
Scope
INSTALLATION DISTRIBUTION WATER MAINS THROUGHOUT BRONX AND QUEENS.
Dollar Amount
$3M to 10M
Status
Active
QED991
Project Id: QED991 • Description: New WM, Trunk Main Ext, 33 Ave & Francis Lewis Blvd, Queens • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
QED991
Description
New WM, Trunk Main Ext, 33 Ave & Francis Lewis Blvd, Queens
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2021-06-26T00:00:00.000
Scope
New Water Main (WM-6) in:

1 -72" w/m - in 33rd Avenue between 157th & Utopia Parkway

2 - 72" w/m - in Utopia Parkway between 33rd Ave & 37th Ave.

3 -48" w/m - in 37th Ave. between Utopia Parkway & Francis Lewis Blvd.

4 - 48" w/m - in 38th Ave. between Francis Lewis Blvd & 216th Street

5- 48" w/m - in 216th Street between 38th Ave. & 40th Ave.

New Water Main (WM-1) in:

1 -20" w/m - in 33rd Ave. between 156th Street & Francis Lewis Blvd.

2 - 12" w/m - in Utopia Parkway between 33rd Ave. & 37th Ave.

3 - 8" w/m - in 37th Ave. between Utopia Parkway & Francis Lewis Blvd.

4 -8" w/m - in 38th Ave. between Francis Lewis Blvd. & 216th Street

5 -8" w/m - in 216th Street between 38th Ave. & 40th Ave.
Dollar Amount
$30M to 100M
Status
Active
RED385
Project Id: RED385 • Description: Area Contract for Water Main Replacement • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
RED385
Description
Area Contract for Water Main Replacement
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-04-11T00:00:00.000
Scope
INSTALL DISTRIBUTION WATER MAINS THROUGHOUT STATEN ISLAND AND BROOKLYN
Dollar Amount
$3M to 10M
Status
Active
RED386
Project Id: RED386 • Description: Water Main replacement, South & Arlington Aves, SI • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
RED386
Description
Water Main replacement, South & Arlington Aves, SI
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
NA
Projected Construction Completion
2022-06-30T00:00:00.000
Scope
Installation of distribution water mains and appurtenances in South Avenue between Richmond Terrace and Netherland Avenue, Arlington Place between South Avenue and Arlington Avenue, Cable Way between South Avenue and Dead End, Staten Island.
Dollar Amount
$3M to 10M
Status
Active
RED-388
Project Id: RED-388 • Description: Install Distribution WM throughout Brooklyn & Staten Island • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
RED-388
Description
Install Distribution WM throughout Brooklyn & Staten Island
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2021-08-16T00:00:00.000
Scope
DISTRIBUTION WATER MAIN REPLACEMENT IN BROOKLYN AND STATEN ISLAND
Dollar Amount
$3M to 10M
Status
Active
REDA003
Project Id: REDA003 • Description: Accelerated Distribution WM replcmnt & sewer rehab: S.I. • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
REDA003
Description
Accelerated Distribution WM replcmnt & sewer rehab: S.I.
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-06-30T00:00:00.000
Scope
ACCELERATED DISTRIBUTION WATER MAIN REPLACEMENT AND SEWER REHABILITATION/REPLACEMENT, STATEN ISLAND
Dollar Amount
$10M to 30M
Status
Active
S216-401R
Project Id: S216-401R • Description: CONSTRUCTION, E. 92 ST RAMP TO E. 91 ST MTS • Client Agency: SANITATION
Project Id
S216-401R
Description
CONSTRUCTION, E. 92 ST RAMP TO E. 91 ST MTS
Client Agency
SANITATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2025-07-02T00:00:00.000
Scope
CONSTRUCTION OF E. 92 ST RAMP TO E. 91 ST MTS, MANHATTAN
Dollar Amount
$10M to 30M
Status
Active
SEK002377
Project Id: SEK002377 • Description: Santy sewer & WM replmnt in E 72nd St btwn Ave L & Royce Pl • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SEK002377
Description
Santy sewer & WM replmnt in E 72nd St btwn Ave L & Royce Pl
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Initiation
Projected Construction Completion
2023-01-12T00:00:00.000
Scope
SANITARY SEWER AND WATER MAIN REPLACEMENT IN EAST 72ND ST BETWEEN AVENUE L AND ROYCE PLACE., BOROUGH OF BROOKLYN
Dollar Amount
$3M to 10M
Status
Active
SEK002380
Project Id: SEK002380 • Description: Combined relief sewer & WM replac. at 7ST B/T 3 & 4 AV, BKL • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SEK002380
Description
Combined relief sewer & WM replac. at 7ST B/T 3 & 4 AV, BKL
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2021-09-20T00:00:00.000
Scope
COMBINED SEWER AND CHAMBERS IN 7TH STREET, BK
Dollar Amount
$10M to 30M
Status
Active
SAND1048
Project Id: SAND1048 • Description: BWG - Sunset Park North • Client Agency: TRANSPORTATION
Project Id
SAND1048
Description
BWG - Sunset Park North
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2022-02-28T00:00:00.000
Scope
This project will construct a two-way, grade-separated greenway path along 29th Street between the Gowanus Expressway (3rd Avenue) and 2nd Avenue and on 2nd Avenue from 29th street to the railway tracks North of 39th street, in Sunset Park, Brooklyn. The 39th Street intersection will be designed and reconstructed by NYC EDC.

The project will provide safer access to parks and recreational spaces along the waterfront, encourage healthy lifestyles by promoting the use of non-motorized forms of transportation, and stimulate economic development by providing connections to employment centers in the Sunset Park, Gowanus, Red Hook and Downtown Brooklyn neighborhoods. The project will bring the streets to a state of good repair and incorporate any necessary hazard mitigation measures into the design (including green infrastructure and infrastructure hardening) to provide long-term climate resiliency. Additional improvements such a concrete curb extensions will shorten crossing distances to enhance pedestrian safety at key intersections.

A total of $10,411,000 is funded for this project. The project will be funded with FEMA and HUD CDBG-DR funding. The FEMA grant is currently approved under Pre-Award Authorization. FEMA grants have not yet reached obligation but require 10% local (Mayoral) matching funds. Federal funds (FEMA) may be used for final design, construction and supervision. $800,000 is funded in FY18 for design, $8,021,000 in FY19 for construction, and $1,590,000 in FY19 for REI. Please see the enclosed CPI for additional details.
Dollar Amount
$3M to 10M
Status
Active
SAND1187
Project Id: SAND1187 • Description: Recon of Norton Drive - Hurricane Sandy (HWQ1187, SEQ200595) • Client Agency: TRANSPORTATION
Project Id
SAND1187
Description
Recon of Norton Drive - Hurricane Sandy (HWQ1187, SEQ200595)
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2024-09-12T00:00:00.000
Scope
NORTON DRIVE, QUEENS - HURRICANE SANDY
Dollar Amount
$1M to 3M
Status
Active
SANDHW06
Project Id: SANDHW06 • Description: Reconstruction of Vestry Street- Hurricane Sandy • Client Agency: TRANSPORTATION
Project Id
SANDHW06
Description
Reconstruction of Vestry Street- Hurricane Sandy
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2021-06-10T00:00:00.000
Scope
RECONSTRUCTION OF VESTRY STREET, MANHATTAN
Dollar Amount
$3M to 10M
Status
Active
SANDHW08
Project Id: SANDHW08 • Description: Reconstruction of Front Street-Hurricane Sandy • Client Agency: TRANSPORTATION
Project Id
SANDHW08
Description
Reconstruction of Front Street-Hurricane Sandy
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2022-06-16T00:00:00.000
Scope
RECONSTRUCTION OF FRONT STREET, MANHATTAN
Dollar Amount
$10M to 30M
Status
Active
SANDHW11
Project Id: SANDHW11 • Description: Recon of Beach Channel Drive - Hurricane Sandy (QED-1030) • Client Agency: TRANSPORTATION
Project Id
SANDHW11
Description
Recon of Beach Channel Drive - Hurricane Sandy (QED-1030)
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-06-08T00:00:00.000
Scope
RECONSTRUCTION OF BEACH CHANNEL DRIVE, QUEENS
Dollar Amount
$10M to 30M
Status
Active
SANDHW12
Project Id: SANDHW12 • Description: Reconstruction of Edgemere - Hurricane Sandy (QED-1007) • Client Agency: TRANSPORTATION
Project Id
SANDHW12
Description
Reconstruction of Edgemere - Hurricane Sandy (QED-1007)
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2021-08-04T00:00:00.000
Scope
RECONSTRUCTION OF EDGMERE, QUEENS
Dollar Amount
$3M to 10M
Status
Active
SANDHW13
Project Id: SANDHW13 • Description: Reconstruction of Rockaway Beach - Hurricane Sandy (QED-982) • Client Agency: TRANSPORTATION
Project Id
SANDHW13
Description
Reconstruction of Rockaway Beach - Hurricane Sandy (QED-982)
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-09-20T00:00:00.000
Scope
RECONSTRUCTION OF ROCKAWAY BEACH, QUEENS
Dollar Amount
$10M to 30M
Status
Active
SANDHW14
Project Id: SANDHW14 • Description: Reconstruction of South Beach - Hurricane Sandy - RED-375 • Client Agency: TRANSPORTATION
Project Id
SANDHW14
Description
Reconstruction of South Beach - Hurricane Sandy - RED-375
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-06-30T00:00:00.000
Scope
RECONSTRUCTION OF FATHER CAPODANNO BOULEVARD FROM 200 FEET +/- NORTH EAST OF SEAVIEW AVENUE TO 420 FEET +/- NORTH EAST OF SAND LANE IN SOUTH BEACH, BOROUGH OF STATEN ISLAND
Dollar Amount
$10M to 30M
Status
Active