Active Projects - Infrastructure (Historical)

List of currently active infrastructure projects including description and high level schedule and budget range.

Housing & Development Department of Design and Construction (DDC) Dataset rukc-mmqu 9 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
SANDHW19
Project Id: SANDHW19 • Description: Reconstruction of Downtown Brooklyn - Hurricane Sandy • Client Agency: TRANSPORTATION
Project Id
SANDHW19
Description
Reconstruction of Downtown Brooklyn - Hurricane Sandy
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Initiation
Projected Construction Completion
2024-01-11T00:00:00.000
Scope
Reconstruction of Hurricane Sandy - Non When & Where, Brooklyn
Locatiom: Sackett Street from Bond avenue to Dead End.
Dollar Amount
$1M or less
Status
Active
SANDHWSI
Project Id: SANDHWSI • Description: Non When & Where - Staten Island - Hurricane Sandy • Client Agency: TRANSPORTATION
Project Id
SANDHWSI
Description
Non When & Where - Staten Island - Hurricane Sandy
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2022-01-25T00:00:00.000
Scope
NON WHEN & WHERE, STATEN ISLAND - HURRICANE SANDY
Dollar Amount
$3M to 10M
Status
Active
SANDR01
Project Id: SANDR01 • Description: Hylan Blvd Streetscape Improvements (MIBBNC05) • Client Agency: TRANSPORTATION
Project Id
SANDR01
Description
Hylan Blvd Streetscape Improvements (MIBBNC05)
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2021-09-13T00:00:00.000
Scope
Reconstruct Hylan Boulevard between Seaver & Stobe Avenues.
Dollar Amount
$3M to 10M
Status
Active
SANDR02
Project Id: SANDR02 • Description: FAR ROCKAWAY BUSINESS DISTRICT IMPROVEMENTS (SE-830) • Client Agency: TRANSPORTATION
Project Id
SANDR02
Description
FAR ROCKAWAY BUSINESS DISTRICT IMPROVEMENTS (SE-830)
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2022-08-17T00:00:00.000
Scope
Downtown Far Rockaway Urban Design and Streetscape Reconstruction Project
Dollar Amount
$30M to 100M
Status
Active
SANDR03
Project Id: SANDR03 • Description: Jamaica Bay Greenway - Canarsie Pier Connector • Client Agency: TRANSPORTATION
Project Id
SANDR03
Description
Jamaica Bay Greenway - Canarsie Pier Connector
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2022-07-13T00:00:00.000
Scope
Construct in permanent materials a grade-separated two-way bicycle path along Shore Parkway and Rockaway Parkway in Brooklyn.
Dollar Amount
$1M to 3M
Status
Active
SANDR04
Project Id: SANDR04 • Description: Beach 108th Streetscape Improvements (QED-1044) • Client Agency: TRANSPORTATION
Project Id
SANDR04
Description
Beach 108th Streetscape Improvements (QED-1044)
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2022-04-11T00:00:00.000
Scope
BEACH 108TH STREETSCAPE IMPROVEMENTS - BEACH 108TH STREET FROM BEACH CHANNEL DRIVE TO SHORE FRONT PARKWAY. BOROUGH OF QUEENS.
Dollar Amount
$10M to 30M
Status
Active
SANDRDHK
Project Id: SANDRDHK • Description: Red Hook HMGP • Client Agency: TRANSPORTATION
Project Id
SANDRDHK
Description
Red Hook HMGP
Client Agency
TRANSPORTATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2024-02-14T00:00:00.000
Scope
Reconstruction of Beard Street in the Red Hook neighborhood of Brooklyn, including raising the streets, reconstruction of roadway, curbs and sidewalk, and installing a new bulkhead and floodwall along the waterfront. The reconstruction/raising for Beard Street will cover two blocks (Van Brunt St. to Dwight St).
Dollar Amount
$30M to 100M
Status
Active
SANDRESM-1
Project Id: SANDRESM-1 • Description: Citywide Reiliency Measures, ESCR, Project Area 1 • Client Agency: PARKS & RECREATION
Project Id
SANDRESM-1
Description
Citywide Reiliency Measures, ESCR, Project Area 1
Client Agency
PARKS & RECREATION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-09-26T00:00:00.000
Scope
Coastal Resiliency Area 1 - East 23rd St. to Montgomery St., Manhattan
Dollar Amount
500M or more
Status
Active
SE740B
Project Id: SE740B • Description: SANITARY SEWERS IN ROCKLAND AVENUE • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SE740B
Description
SANITARY SEWERS IN ROCKLAND AVENUE
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-08-13T00:00:00.000
Scope
Sanitary & Storm Sewers and Water Main Work in Rockland Avenue between Meisner Avenue and St. George Road, Etc., Borough of Staten Island
Dollar Amount
$3M to 10M
Status
Active
SE851
Project Id: SE851 • Description: HLSS , STRM, SAN & COMB SWERS & WM IN FRESH CREEK BASIN AREA • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SE851
Description
HLSS , STRM, SAN & COMB SWERS & WM IN FRESH CREEK BASIN AREA
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-09-21T00:00:00.000
Scope
Installations of H.L.S.S., Storm, Sanitary & Combined Sewers and Water Main work in Fresh Creek Basin Area, E 108th Street between Flatlands Ave and Outfall at Ave K, 26th Wards, Brooklyn.

H.L.S.S. in
1. E 108th, E 107th, E 106th, E106th, E 104th E 103rd, E 102nd, E 101 St, E 99th and
E 98th Streets, between Ave J and Flatlands Ave
2. E 100th St between Ave J and Conklin Ave
3. Ave J between E 98th and E 10Sth St
4. Flatlands Ave between E 98th and E 108th St
5. Conklin Ave between E 98th St and E 100th St

Storm Sewers in
1. E 108th St between Ave J and Ave K
2. E 100th St between Conklin Ave and Glenwood Rd
3. Flatlands 1st Street between E 105th St and E 108th St
4. Flatlands 2nd Street between E 105th St and E 108 St
5. Ave K, along sewer easement from E 108 St to outfall

Sanitary Sewers in E 108th St between Ave K and Ave J

Combined Sewers in E 108th St between Ave J and Flatlands Ave

WM-l in
1. E 98th St between Ave J and Flatlands Ave
2. E 99th St between Ave J and Flatlands Ave
Dollar Amount
$30M to 100M
Status
Active
SEK002383
Project Id: SEK002383 • Description: Combined SE installation & WM replacement in Dean Street • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SEK002383
Description
Combined SE installation & WM replacement in Dean Street
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-07-17T00:00:00.000
Scope
COMBINED SEWER INSTALLATION AND WATER MAIN REPLACEMENT IN DEAN STREET BETWEEN 6TH AVENUE AND VANDERBILT AVENUE, ETC. PROJECT IS PART OF THE SECOND PHASE PACIFIC PARK PROJECT IN ATLANTIC TERMINAL AREA.
Dollar Amount
$10M to 30M
Status
Active
SE823
Project Id: SE823 • Description: SEQ - 229th Street Laurelton Area - Part 1, Phase A (HWQ823) • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SE823
Description
SEQ - 229th Street Laurelton Area - Part 1, Phase A (HWQ823)
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2021-07-28T00:00:00.000
Scope
STORM SEWER:

1. 230th Place between 144th Avenue and 148th Avenue.
2. 147th Avenuw between 230th Place and 227th Street.
3. 227th Street between 146th Avenue and 149th Avenue.
4. 149th Avenue between 279th Street and 225th Street.
5. 147th Avenue between 229th Street and 227th Street.
6. 147th Avenue between 229th Street and 228th Street.
7. 230th Street between 148th Avenue and 147th Avenue.
8. 229th Street between 148th Avenue and 147th Avenue.
9. 228th Street between 148th Avenue and 147th Avenue.
10. 227th Sterrt between 147th Avenue and 149th Avenue.
11. 149th Avenue between 225th Street and 226th Avenue.
12. 149th Avenue between 228th Street and 227th Street.
13. 229th Street between 145th Avenue and 147th Avenue.
14. 145th Avenue between 230th Place and 226th Street.
15. 230th Street between 146th Avenue and 145th Avenue.
16. 228th Street between 145th Road and 144th Avenue.
17. 227th Street between 145th Avenue and 144th Avenue.

SANITARY SEWER:
1. 227th Street between 148th Avenue and 147th Avenue.
2. 227th Street between 148th Avenue and 147th Avenue.
3. 147th Avenue between 227th Street and 228th Street.
4. 145th Avenue between 230th Place and 229th Street.
5. 230th Place between 145th Avenue and 144th Avenue.

COMBINED SEWER:
1, 230th Place between 144th Avenue and 145th Avenue.
2. 145th Avenue between 230th Place and 229th Street.
3. 229th Street between 145th Avenue and 147th Avenue.

WATER MAIN:
1. 228th Steeet between 147th Avenue and 148th Avenue.
2. 229th Street between 147th Avenue and 145th Avenue.
3. 230th Place between 147th Avenue and 144th Avenue.
4. 230th Street between 148th Street and 147th Street.
5. Intersection 146th Avenue and 229th Street.
6. Intersection 146th Street and 230th Place.
Dollar Amount
$30M to 100M
Status
Active
SE824
Project Id: SE824 • Description: SEQ - 230th Place Laurelton Area - Part 1, Phase B • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SE824
Description
SEQ - 230th Place Laurelton Area - Part 1, Phase B
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2025-10-29T00:00:00.000
Scope
STORM, SANITARY & COMBINED SEWERS IN 230TH PLACE, QUEENS
Dollar Amount
$100M to 500M
Status
Active
SE825
Project Id: SE825 • Description: SEQ - Laurelton Area - Part 1, Phase C • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SE825
Description
SEQ - Laurelton Area - Part 1, Phase C
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Initiation
Projected Construction Completion
2027-08-29T00:00:00.000
Scope
STORM, SANITARY & COMBINED SEWERS IN 138TH AVENUE, QUEENS
Dollar Amount
$100M to 500M
Status
Active
SE829
Project Id: SE829 • Description: Storm and Sanitary Sewers in Brundwick Ave, Queens • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SE829
Description
Storm and Sanitary Sewers in Brundwick Ave, Queens
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Initiation
Projected Construction Completion
2024-09-24T00:00:00.000
Scope
STORM AND SENITARY SEWERS (EXTENTION and REPL.) IN:
1. Brunswick Ave. b/n Doughty Blvd. and Nameoke Ave.
2. Virginia St. b/n Brunswick Ave. and Central Ave.
3. Sage Ave. b/n Brunswick Ave. and Central Ave.
4.Beach 12th St. b/n Beach 12th ex. And Central Ave.
5. Milton St. b/n Brunswick Ave. and Central Ave.
6. Wheatley St. b/n Brunswick Ave. and Central Ave.
7. Virginia Ave. b/n Central Ave. and Bolton Road.
8. Sage Ave. b/n Central Ave. and Empire Ave.
9. Beach 9th St. b/n Central Ave. and Bolton Road.
10. Beach 12th St. b/n Central Ave. and Channing Road.
11. Central Ave. b/n Doughty Blvd. and Nelson Ave.
12. Augustina Ave. b/n Beach12th St. and Nameoke Ave.
13. Alonzo Road b/n Doughty Blvd. and Beach 9th St.
14. Bolton Road b/n Virginia St AND Beach 9th St.

WATER MAIN WORK (WM-1) IN:
1. B 12th St. b/n Central Ave. and Channing Road.
2. Intersection B12th St. and Brunswick Ave.
3. Sage Ave. b/n Brunswick Ave. and Central Ave.
4. Virginia St. b/n Brunswick Ave. and Central Ave.
5. Beach 9th St. b/n Central Ave. and Channing Road.
6. Sage Ave. b/n Central Ave. and Empire Ave.
7. Virginia St. b/n Central Ave. and Bolton Road.
8. Alonzo Road b/n Doughty Blvd. and Beach 9th St.
9. Bolton Road b/n Virginia St and Beach 9th St.
Dollar Amount
$30M to 100M
Status
Active
SE830
Project Id: SE830 • Description: Storm & Sanitary Sewers, WM Work in Mott Ave, QNS (SANDR02) • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SE830
Description
Storm & Sanitary Sewers, WM Work in Mott Ave, QNS (SANDR02)
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2022-06-16T00:00:00.000
Scope
STORM & SANITARY SEWERS IN REDFERN AVE, QUEENS
Dollar Amount
$30M to 100M
Status
Active
SE842A
Project Id: SE842A • Description: SEQ - Storm, Sanitary Sewers & WM in 225th Street • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SE842A
Description
SEQ - Storm, Sanitary Sewers & WM in 225th Street
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Initiation
Projected Construction Completion
2025-08-28T00:00:00.000
Scope
STORM SEWER ALONG 225TH STREET BETWEEN 145TH RD AND 149TH AVE
Dollar Amount
$30M to 100M
Status
Active
SE-842A1
Project Id: SE-842A1 • Description: SEQ - Storm Sewer Outlet in 224th Street • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SE-842A1
Description
SEQ - Storm Sewer Outlet in 224th Street
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-11-29T00:00:00.000
Scope
INSTALLATION OF STORM SEWER BETWEEN THE INTERSECTION OF 224TH ST AND 149TH AVE AND THE EXISTING JUNCTION CHAMBER SOUTH OF ROCKAWAY BLVD. THE PROPOSED STORM SEWER WILL CONNECT TO A CHAMBER WITH AN EXISTING OUTLET INTO THURSTON BASIN.
Dollar Amount
$100M to 500M
Status
Active
SE842B
Project Id: SE842B • Description: SEQ - Storm & Sanitary Sewers & WM Work in 224th Street • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SE842B
Description
SEQ - Storm & Sanitary Sewers & WM Work in 224th Street
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Initiation
Projected Construction Completion
2027-01-30T00:00:00.000
Scope
STORM AND SANITARY SEWERS AND WATER MAIN IN 224 STREET, QUEENS
Dollar Amount
$30M to 100M
Status
Active
SE-842C
Project Id: SE-842C • Description: SEQ - Storm Sewer in South Conduit Ave • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SE-842C
Description
SEQ - Storm Sewer in South Conduit Ave
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Initiation
Projected Construction Completion
2029-02-14T00:00:00.000
Scope
INSTALLATION OF STORM SEWERS, SANITARY SEWERS, WATER MAINS AND GREEN INFRASTRUCTURE ON SOUTH CONDUIT AVE BETWEEN SPRINGFIELD BLVD AND 224TH ST AND ON SPRINGFIELD BLVD BETWEEN NORTH CONDUIT AVE AND SOUTH CONDUIT AVE.
Dollar Amount
$30M to 100M
Status
Active
SE848
Project Id: SE848 • Description: SEQ - Sewer & WM Work in Baisley Blvd, Guy R Brewer Blvd • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SE848
Description
SEQ - Sewer & WM Work in Baisley Blvd, Guy R Brewer Blvd
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-08-26T00:00:00.000
Scope
Storm extensions, catch basins, sanitary replacements and water main work in Baisley Boulevard, Guy R. Brewer Boulevard and N. Conduit Avenue area, together with all work incidental thereto, Borough of Queens.

Storm Sewer in:
1) Cranston St between 133 Ave and 135 Ave
2) 134 Ave between Rockaway Blvd and 151 P1
3)151 Place between 134 Ave and N. Conduit Ave
4) 153 St between Baisley Blvd and 132 Ave
5) 154 St between 129 Ave and 134 Ave
6) 155 St between 132 Ave and 134 Ave
7) 156 St between 132 Ave and 140 Ave
8) 159 St between Dead End and 140 Ave
9) 160 St between 133 Ave and 140 Ave
10) 161 St between 137 Ave and 140 Ave
11) 129 Ave between 154 St and 155 St
12) 132 Ave between 153 St and 154 St
13) 134 Ave between Rockaway Blvd and 160 St
14) 137 Ave between 160 St and Guy R Brewer Blvd 151 P1

Intent:
To alleviate the flooding and ponding problems in the area.


Sanitary Sewer in:
1) Guy R Brewer Blvd between Baisley Blvd and 129 Ave
2) 129 Ave between Guy R Brewer Blvd and 158 St
3) 158 St between 129 Ave and 132 Ave
4) 132 Ave between 156 St and 158 St
5) 156 St between 134 Ave and 140 Ave

Intent:
To correct back-pitched segments of existing pipes and alleviate surcharging in the sanitary sewer trunk line.

WM-1 in:
1) Guy R Brewer Blvd between 122 Ave and 130 Ave
2) Guy R Brewer Blvd between 134 Ave and 137 Ave
3) Baisley Blvd between Guy R Brewer Blvd and Smith Street
4) 160 St between 134 Ave and 140 Ave
5) 159 St between 134 Ave and 140 Ave
6) 156 St between 132 Ave and 134 Ave
7) 153 St between Baisley Blvd and 132 Ave
8) 132 Ave between 156 St and 157 St
9) 134 Ave between 151 P1 and 156 St
10) 134 Ave between 157 St and Guy R Brewer Blvd

Intent:
To replace old, unlined and undersized east iron water main and to connect dead ends which will improve water quality within the project limits.
Dollar Amount
$30M to 100M
Status
Active
SE850
Project Id: SE850 • Description: SEQ - Storm & Sani Sewers, Force Main & WM in Liverpool St. • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SE850
Description
SEQ - Storm & Sani Sewers, Force Main & WM in Liverpool St.
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2025-08-15T00:00:00.000
Scope
STORM & SANITARY SEWERS, FORCE MAIN AND WATER MAIN IN LIVERPOOL STREET, QUEEN
Dollar Amount
$30M to 100M
Status
Active
SEBLKR01
Project Id: SEBLKR01 • Description: Reconstruction of existing sewers from backlog BK & SI • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SEBLKR01
Description
Reconstruction of existing sewers from backlog BK & SI
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2021-04-14T00:00:00.000
Scope
Reconstruction of existing sewers from back log (Brooklyn & Staten Island)
Dollar Amount
$3M to 10M
Status
Active
SEBLM01
Project Id: SEBLM01 • Description: Reconstruction of existing sewers from back log in Manhattan • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SEBLM01
Description
Reconstruction of existing sewers from back log in Manhattan
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2021-05-25T00:00:00.000
Scope
RECONSTRUCTION OF EXISTING SEWERS FROM BACK LOG, MANHATTAN (95/5 CAPITAL/EXPENSE)
Dollar Amount
$3M to 10M
Status
Active
SEBLQX01
Project Id: SEBLQX01 • Description: Reconstruction of existing sewers from back log QN & BX • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SEBLQX01
Description
Reconstruction of existing sewers from back log QN & BX
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2021-05-25T00:00:00.000
Scope
Reconstruction of Existing Sewers from Backlog. Queens and Bronx
Dollar Amount
$3M to 10M
Status
Active
SEC20004V
Project Id: SEC20004V • Description: Emergency Reconstruction of Sewers • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SEC20004V
Description
Emergency Reconstruction of Sewers
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-09-29T00:00:00.000
Scope
Citywide Emergency Reconstruction of Sewers
Dollar Amount
$10M to 30M
Status
Active
SE853
Project Id: SE853 • Description: HLSS, Strm, San & Comb Swrs, & WM Fresh Creek Basin, Ph 2A • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SE853
Description
HLSS, Strm, San & Comb Swrs, & WM Fresh Creek Basin, Ph 2A
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2021-06-03T00:00:00.000
Scope
Installation of H.L.S.S, storm, combined and sanitary sewers, and water main work in Fresh Creek Basin area, Louisiana Ave between Stanley Ave and Flatland Ave, etc., 26th Ward, Borough of Brooklyn.

H.L.S.S in:
1. Williams Ave between Flatlands Ave and Outfall at Fresh Creek Basin
2. Flatlands Ave between E. 108 St and Alabama Ave
3. Cozine Ave between Williams Ave and Alabama Ave
4. Stanley Ave between Anna Ct and Louisiana Ave
5. Louisiana Ave between Stanley Ave and Wortman Ave
6. Malta Ave between Wortman Ave and Flatlands Ave
7. Alabama Ave between Cozine Ave and Flatlands Ave

Storm Sewers in:
1. Louisiana Ave between Wortman Ave and Flatlands Ave
2. Stanley Ave between Louisiana and Malta Avenues
3. Malta Ave between Dewitt Ave and Stanley Ave
4. Malta Ave between Wortman Ave and Cozine Ave

Combined Sewers in:
1. Louisiana Ave between Stanley Ave and Wortman Ave
2. Alabama Ave between Cozine Ave and Flatlands Ave

Sanitary Sewers in:
1. Stanley Ave between Williams Ave and Malta Ave

Water Main in:
1. Alabama Ave between Wortman Ave and Cozine Ave
Dollar Amount
$30M to 100M
Status
Active
SE855
Project Id: SE855 • Description: HLSS, Strm, San & Comb Swrs, & WM Fresh Creek Basin, Ph 2B • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SE855
Description
HLSS, Strm, San & Comb Swrs, & WM Fresh Creek Basin, Ph 2B
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-09-17T00:00:00.000
Scope
Installation of H.L.S.S, storm, combined and sanitary sewers, and water main work in Fresh Creek Basin area, Farragut Rd between E. 102nd Street and E. 108th Street, etc., 26th Ward, Borough of Brooklyn.

H.L.S.S. in:
1. Glenwood Rd between E. 98th Street and Williams Ave
2. Farragut Rd between E. 102nd Street and E. 108th Street
3. E. 102nd Street between Glenwood Rd and Flatlands Ave
4. E. 103 Rd Street between Farragut Rd and Glenwood Ave
5. E. 104th Street between Farragut Rd and Glenwood Avenue
6. E. 105th Street Dead End North of Farragut Rd and Glenwood Rd
7. E. 108th Street between Stanley Ave and Farragut Rd
8. Stanley Ave between E. 108th Street and Hinsdale Street

Storm Sewers in:
1. E. 102nd Street between Farragut Rd and Glenwood Rd
2. E. 105th Street between Glenwood Rd and Flatlands Ave
3. E. E. 108th street between Farragut Rd and Flatlands Ave

Combined Sewers in:
1. Glenwood Rd between E. 98th Street and E. 99th Street
2. E. 102nd Street between Farragut Rd and Flatlands Ave
3. E. 103rd Street between Farragut Rd and Glenwood Rd
4. E. 104th Street between Farragut Rd and Glenwood Rd
5. E. 105th Street between Farragut Rd and Glenwood Rd
6. E. 108th Street between Stanley Ave and Farragut Rd
7. Stanley Ave between E. 108th Street and Williams Ave

Water Main in:
1. Glenwood Rd between Rockaway Parkway and E. 108th Street
2. Intersections along Glenwood Ave from E. 98th Street to E. 105th Street
3. E. 98th between Rd and Conklin Ave
4. Turnbull Ave between E. 107th Street and E. 108th Street
Dollar Amount
$30M to 100M
Status
Active
SE856
Project Id: SE856 • Description: HLSS, Strm, San & Comb Swrs, & WM Fresh Creek Basin ,Ph 3A • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SE856
Description
HLSS, Strm, San & Comb Swrs, & WM Fresh Creek Basin ,Ph 3A
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2024-09-01T00:00:00.000
Scope
Installation of H.L.S.S., Storm & Combined Sewers & WM work in Fresh Creek Basin Area, Flatlands Ave Between Geogia Ave and Van Siclen Ave, etc., 26th Ward

H.L.S.S. in:
1-Flatland Ave. b/t Georgia Ave and Pennsylvania Ave
2-Flatland Ave. b/t New Jersey Ave and Van Siclen Ave
3-Cozine Ave b/t Sheffield Ave and Pennsylvania Ave
4-Cozine Ave b/t Vermont St and Van Siclen Ave
5-Wortmsn Ave b/t Alabama Ave and Sheffield Ave
6-Georgia Ave b/t Cozine Ave and Flatland Ave
7-Sheffield Ave b/t Cozine Ave and Flatland Ave

Storm Sewer in:
1-Georgia Ave b/t Wortman Ave and Flatlands Ave
2-Sheffield Ave b/t Cozine Ave and Flatlands Ave
3-Vermont St b/t Cozine Ave and Flatlands Ave

Combined Sewer in:
1-Georgia Ave b/t Cozine Ave and Flatlands Ave
2-Sheffield Ave b/t Cozine Ave and Flatlands Ave
3-Wortman Ave b/t Georgia Ave and Pennsylvania Ave
4-Cozine Ave b/t Sheffield Ave and Pennsylvania Ave

WM-1 in:
1-Flatlands Ave b/t New Jersey Ave and Vermont St
2-Cozine Ave b/t Pennsylvania Ave and New Jersey Ave
3-Wortman Ave b/t Georgia Ave and Sheffield Ave
4-Flatlands Ave b/t Georgia Ave and Pennsylvania Ave (added as per the revised water main scope from DEP received on 7/12/13.)
Dollar Amount
$10M to 30M
Status
Active
SE857
Project Id: SE857 • Description: HLSS, Strm, San & Comb Swrs, & WM Fresh Creek Basin ,Ph 3B • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SE857
Description
HLSS, Strm, San & Comb Swrs, & WM Fresh Creek Basin ,Ph 3B
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2024-06-28T00:00:00.000
Scope
(CS-FC-SEW) Phase 3B: Installation of H.L.S.S., Storm, Combined & Sanitary Sewers & WM work in Fresh Creek Basin Area, Foster Ave between Rockway Parkway and Bank St.

H.L.S.S. in:
1-Farragut Rd b/t E98 St and Dead End East of 100 St.
2-Foster Ave. b/t Rockaway Pkwy and Bank St
3-Ave D b/t Rockaway Ave and Dewitt Ave
4-Dewitt Ave b/t Ave D and William Ave
5-William Ave b/t Dewitt Ave and Stanley Ave
6-bank St b/t Dewitt Ave and Foster Ave
7-Rocaway Ave b/t Ave D and Ditmas Ave
8-E 98 St b/t Rockaway Ave and Smiths Ln
9-E 99st b/t Rockawayr Ave and Smiths Ln
10-E 101 St b/t Ave D and Foster Ave

Storm Sewer in:
1-RockawayAve b/t E 98 St and Foster Ave.
2-bank St b/t Dewitt Ave and Foster Ave
3-E 100 St b/t Farragut Rd and Dead End South

Combined Sewer in:
1-E 98 St b/t foster Ave and Smiths Ln (Parking lot South)
2-E 99 St b/t Rockaway Ave and Farragut Rd
3-William Ave b/t Dewitt Ave and Stanley Ave
4-E 105 St b/t Ave D and Foster Ave.

Sanitary Sewer in:
1-Bnak St b/t Dewitt Ave and Foster Ave

WM-1 in:
1-Foster Ave b/t Rockaway Pkwy and e 108 St
2-Rockway Ave b/t Rockaway Pkwy and Ditmas Ave
3-E 98 St b/t Foster Ave and smiths Ln
4-E 99 St b/t Foster Ave and Farragut Rd
5-E 100 St b/t Foster Ave and Dead end North
Dollar Amount
$30M to 100M
Status
Active
SE859
Project Id: SE859 • Description: Combined Sewer Replmnt & WM work 70 st & calamus ave, Qns • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SE859
Description
Combined Sewer Replmnt & WM work 70 st & calamus ave, Qns
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2023-08-10T00:00:00.000
Scope
COMBINED SEWER IN 70TH STREET, QUEENS
Dollar Amount
$100M to 500M
Status
Active
SE860
Project Id: SE860 • Description: Combined Swr Replac & WM work 71st, QNS • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SE860
Description
Combined Swr Replac & WM work 71st, QNS
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-10-14T00:00:00.000
Scope
COMBINED SEWER REPLACEMENT AND WATER MAIN WORK IN 71 STREET, QUEENS
Dollar Amount
$30M to 100M
Status
Active
SE-862
Project Id: SE-862 • Description: SEQ - Storm & Sanitary Sewer Replcmnt/Ext. 146 Ave (HWQ662G) • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SE-862
Description
SEQ - Storm & Sanitary Sewer Replcmnt/Ext. 146 Ave (HWQ662G)
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2026-09-13T00:00:00.000
Scope
SPRINGFIELD GARDENS RECONSTRUCTION PHASE 5; STORM AND SANITARY SEWER EXTENSIONS AND UPGRADES AND WATER MAIN REPLACEMENT IN 146TH AVENUE BETWEEN 153RD PLACE AND 159TH STREET, ETC, BOROUGH OF QUEENS (HWQ662G)
Dollar Amount
$30M to 100M
Status
Active
SE-885
Project Id: SE-885 • Description: SEQ - 150th St Spine: Phase I, Outlet at Bergen Basin • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SE-885
Description
SEQ - 150th St Spine: Phase I, Outlet at Bergen Basin
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Initiation
Projected Construction Completion
2024-08-15T00:00:00.000
Scope
SOUTHEAST QUEENS 150TH STREET SPINE, PHASE 1. TRUNK STORM SEWER AND OUTFALL AT BERGEN BASIN FOR THE 150TH STREET TRUNK SEWER WHICH SHARES AN OUTFALL WITH THE GUY R BREWER TRUNK SEWER.
Dollar Amount
$30M to 100M
Status
Active
SE-885A
Project Id: SE-885A • Description: SEQ - 150th St Spine: Phase II, Trunk Storm Sewer in JFK • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SE-885A
Description
SEQ - 150th St Spine: Phase II, Trunk Storm Sewer in JFK
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2025-09-13T00:00:00.000
Scope
Southeast Queens 150th Street Spine, Phase II - Installation of a new double barrel trunk storm sewer that will run through JFK airport; approximately 1,000 feet east of Bergen Basin, to the north side of the Belt Parkway at Inwood Street and 150th Street
Dollar Amount
$100M to 500M
Status
Active
SE-889
Project Id: SE-889 • Description: SEQ - New Storm Sewer N. Conduit Ave • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SE-889
Description
SEQ - New Storm Sewer N. Conduit Ave
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2024-09-13T00:00:00.000
Scope
Storm, Sanitary and Water Mains work in North Conduit between Baisley Blvd and Guy Brewer Blvd, South Queens
Dollar Amount
$100M to 500M
Status
Active
SEK002386
Project Id: SEK002386 • Description: Replace combined sewer & WM work,Park Pl & Underhill Ave, BK • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SEK002386
Description
Replace combined sewer & WM work,Park Pl & Underhill Ave, BK
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2021-06-12T00:00:00.000
Scope
REPLACEMENT OF COMBINED SEWER, BULKHEADING OF EXISTING SEWERS AND WATER MAIN WORK IN PARK PLACE BETWEEN UNDERHILL AVE & FLATBUSH AVE, AND OTHER LOCATIONS.
Dollar Amount
$10M to 30M
Status
Active
SEK20067
Project Id: SEK20067 • Description: High level storm sewer Gowanus Canal Area. Phase 2. • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SEK20067
Description
High level storm sewer Gowanus Canal Area. Phase 2.
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2021-09-29T00:00:00.000
Scope
High Level Storm and Combine Sewer installation and Water Main replacement in Gowanus Canal Area Phase-2 in the Borough of Brooklyn including 6 sewer chamber.

New High Level Storm Sewer In;

1-3rd Ave. b/t Douglass St. and State St.
2-Douglass St. b/t 4th Ave. and 3rd Ave.
3-Butler St. b/t 4th Ave. and 3rd Ave.
4-Baltic St. b/t 4th Ave. and 3rd Ave.
5-Warren St. b/t 4th Ave. and 3rd Ave.
6-St. Marks Pl. b/t 4th Ave. and 3rd Ave.
7-Bergen St. b/t 4th Ave. and 3rd Ave.
8-Dean St. b/t 4th Ave. and 3rd Ave.
9-Pacific St. b/t 4th Ave. and 3rd Ave.
10-Atlantic Ave. b/t 4th Ave. and 3rd Ave.
11-State St. b/t 4th Ave. and 3rd Ave.

Combined Sewer:

1-Bergen St. b/t 3rd Ave. and 4th Ave.

Water Main (WM-1) In:

1-3rd Ave. b/t Douglass St and State St.
2-Butler St b/t 4th Ave. and 3rd Ave. including intersection:
3-Intersection b/t 3rd Ave. and :
Douglass St.
Butler St.
Baltic St.
Warren St.
St. Mark's Place
Bergen St.
Pacific St.
State St.
4-Dean St. b/t 4th Ave. and 3rd Ave.
5-Pacific St. b/t 4th Ave. and 3rd Ave.
Dollar Amount
$10M to 30M
Status
Active
SEK20068
Project Id: SEK20068 • Description: New Storm and Combined Sewers and Water Main work in 9th st. • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SEK20068
Description
New Storm and Combined Sewers and Water Main work in 9th st.
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2021-06-07T00:00:00.000
Scope
New storm and combined sewers and water main work in 9th Street between 2nd Ave and Gowanus canal, etc.

STORM SEWER:
1-9th Street b/t 2nd Ave and Gowanus Canal
2-9th Street b/t Smith Street and Gowanus Canal

COMBINED SEWER:
1-2nd Ave b/t 9th Street and 7th Street

WATER MAIN WORK (WM-1):
1-2nd Ave from 9th Street to 7th Street
Dollar Amount
$10M to 30M
Status
Active
SEK20070
Project Id: SEK20070 • Description: Guniting & exterior repair of the 25th Ave outfall sewer • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SEK20070
Description
Guniting & exterior repair of the 25th Ave outfall sewer
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2021-12-08T00:00:00.000
Scope
GUNITING & EXTERIOR REPAIR OF THE 25TH AVE SEWER AT GRAVESEND BAY, BROOKLYN
Dollar Amount
$3M to 10M
Status
Active
SEK201BN8
Project Id: SEK201BN8 • Description: Reconstruction of Existing Sewers, North Brooklyn • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SEK201BN8
Description
Reconstruction of Existing Sewers, North Brooklyn
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2020-11-26T00:00:00.000
Scope
RECONSTRUCTION OF EXISTING SEWERS, NORTH BROOKLYN
Dollar Amount
$3M to 10M
Status
Active
SEK201BS7
Project Id: SEK201BS7 • Description: Reconstruction of Existing Sewers, South Brooklyn • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SEK201BS7
Description
Reconstruction of Existing Sewers, South Brooklyn
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2021-02-24T00:00:00.000
Scope
Reconstruction of Existing Sewers, North Brooklyn
Dollar Amount
$3M to 10M
Status
Active
SEKBN9
Project Id: SEKBN9 • Description: Reconstruction of Existing Sewers, North Brooklyn • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SEKBN9
Description
Reconstruction of Existing Sewers, North Brooklyn
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2021-04-01T00:00:00.000
Scope
Reconstruction of Existing Sewers, North Brooklyn
Dollar Amount
$3M to 10M
Status
Active
SEKBS8
Project Id: SEKBS8 • Description: Reconstruction of Existing Sewers, South Brooklyn • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SEKBS8
Description
Reconstruction of Existing Sewers, South Brooklyn
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2021-04-01T00:00:00.000
Scope
Reconstruction of Existing Sewers in South Brooklyn
Dollar Amount
$3M to 10M
Status
Active
SE-LC-21
Project Id: SE-LC-21 • Description: Emergency Lining Contract Citywide • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SE-LC-21
Description
Emergency Lining Contract Citywide
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-09-08T00:00:00.000
Scope
Emergency Lining of Sewers
Dollar Amount
$3M to 10M
Status
Active
SE-LC-22
Project Id: SE-LC-22 • Description: Emergency Sewer Lining • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SE-LC-22
Description
Emergency Sewer Lining
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Procurement
Projected Construction Completion
2021-06-24T00:00:00.000
Scope
EMERGENCY SEWER LINING CONTRACT, CITYWIDE
Dollar Amount
$3M to 10M
Status
Active
SELCDDC09
Project Id: SELCDDC09 • Description: SEWER LINING CONTRACT, CITYWIDE • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SELCDDC09
Description
SEWER LINING CONTRACT, CITYWIDE
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-08-02T00:00:00.000
Scope
SEWER LINING CONTRACT, CITYWIDE
Dollar Amount
$3M to 10M
Status
Active
SEN002178
Project Id: SEN002178 • Description: Replacement & guniting comb SE in W. Broadway • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SEN002178
Description
Replacement & guniting comb SE in W. Broadway
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2021-08-24T00:00:00.000
Scope
COMBINED SEWER REPLACEMENT AND GUNITING IN WEST BROADWAY BETWEEN THOMAS STREET AND LEONARD ST, BOROUGH OF MANHATTAN. THIS WORK IS REPLACEMENT IN KIND OF DAMAGED COMBINED SEWERS AS RECOMMENDED BY DEP CMOM AND EMERGENCY CONSTRUCTION IN REPORT DATED 2/26/16.
Dollar Amount
$1M to 3M
Status
Active
SEQ002710
Project Id: SEQ002710 • Description: Combined sewer replcmnt & water main work in Selfridge St. • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SEQ002710
Description
Combined sewer replcmnt & water main work in Selfridge St.
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Design
Projected Construction Completion
2023-08-14T00:00:00.000
Scope
Combined Sewer Replacement and WM Work in Selfridge Street, b/t Metropolitan Ave & Loubert Street, Queens
Dollar Amount
$3M to 10M
Status
Active
SEQ002714
Project Id: SEQ002714 • Description: Sanitary Sewer & WM Work in 150th Ave, Queens (Joint Bid) • Client Agency: ENVIRONMENTAL PROTECTION
Project Id
SEQ002714
Description
Sanitary Sewer & WM Work in 150th Ave, Queens (Joint Bid)
Client Agency
ENVIRONMENTAL PROTECTION
Division
Infrastructure
Phase
Construction
Projected Construction Completion
2020-12-26T00:00:00.000
Scope
SANITARY SEWER & WATER MAIN WORK IN 150TH AVENUE BETWEEN 129TH ST, JUST SOUTH OF 150TH AVE, QUEENS
Dollar Amount
$3M to 10M
Status
Active