Capital Project Detail Data - Milestones

This dataset contains capital commitment plan data by managing agency, project identification number and project schedules. The dataset was updated three times a year during the Preliminary, Executive and Adopted Capital Commitment Plans. Starting in January 2024, OMB will no longer update this dataset. It is being replaced by the Capital Projects Dashboard administered by the Mayor's Office of Operations.

City Government Mayor’s Office of Management and Budget (OMB) Dataset s7yh-frbm 12 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
DEP-DRA
Project Descr
DELAWARE-RONDOUT AQUEDUCT (PARALLEL TUNNEL TO RWBT)
Seq Number
8
Task Description
ORIGINAL EQUIP & FURNISHING
Orig Start Date
2015-07-01T00:00:00.000
Orig End Date
2016-04-01T00:00:00.000
Task Start Date
2015-07-01T00:00:00.000
Task End Date
2016-04-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
DEP-DRA
Project Descr
DELAWARE-RONDOUT AQUEDUCT (PARALLEL TUNNEL TO RWBT)
Seq Number
9
Task Description
SUBSTANTIAL COMPLETION
Orig Start Date
2016-04-01T00:00:00.000
Orig End Date
2024-10-01T00:00:00.000
Task Start Date
2016-04-01T00:00:00.000
Task End Date
2024-10-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
DEP-DRA
Project Descr
DELAWARE-RONDOUT AQUEDUCT (PARALLEL TUNNEL TO RWBT)
Seq Number
10
Task Description
PUNCHLIST COMPLETE, JOB CLOSED
Orig Start Date
2024-10-01T00:00:00.000
Orig End Date
2025-01-01T00:00:00.000
Task Start Date
2024-10-01T00:00:00.000
Task End Date
2025-01-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
DEP-LAB
Project Descr
DEP Lab Relocation
Seq Number
1
Task Description
DEVELOP SCOPE
Orig Start Date
2025-06-01T00:00:00.000
Orig End Date
2025-09-01T00:00:00.000
Task Start Date
2025-06-01T00:00:00.000
Task End Date
2025-09-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
DEP-LAB
Project Descr
DEP Lab Relocation
Seq Number
2
Task Description
PRELIMINARY DESIGN
Orig Start Date
2025-09-01T00:00:00.000
Orig End Date
2026-03-01T00:00:00.000
Task Start Date
2025-09-01T00:00:00.000
Task End Date
2026-03-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
DEP-LAB
Project Descr
DEP Lab Relocation
Seq Number
3
Task Description
FINAL DESIGN
Orig Start Date
2026-03-01T00:00:00.000
Orig End Date
2027-09-01T00:00:00.000
Task Start Date
2026-03-01T00:00:00.000
Task End Date
2027-09-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
DEP-LAB
Project Descr
DEP Lab Relocation
Seq Number
4
Task Description
BID AWARD AND REGISTER CONTRCT
Orig Start Date
2027-09-01T00:00:00.000
Orig End Date
2028-03-01T00:00:00.000
Task Start Date
2027-09-01T00:00:00.000
Task End Date
2028-03-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
DEP-LAB
Project Descr
DEP Lab Relocation
Seq Number
5
Task Description
CONSTRUCTION TO 25%
Orig Start Date
2028-03-01T00:00:00.000
Orig End Date
2028-12-01T00:00:00.000
Task Start Date
2028-03-01T00:00:00.000
Task End Date
2028-12-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
DEP-LAB
Project Descr
DEP Lab Relocation
Seq Number
6
Task Description
CONSTRUCTION TO 50%
Orig Start Date
2029-01-01T00:00:00.000
Orig End Date
2029-10-01T00:00:00.000
Task Start Date
2029-01-01T00:00:00.000
Task End Date
2029-10-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
DEP-LAB
Project Descr
DEP Lab Relocation
Seq Number
7
Task Description
CONSTRUCTION TO 75%
Orig Start Date
2029-10-01T00:00:00.000
Orig End Date
2030-07-01T00:00:00.000
Task Start Date
2029-10-01T00:00:00.000
Task End Date
2030-07-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
DEP-LAB
Project Descr
DEP Lab Relocation
Seq Number
8
Task Description
ORIGINAL EQUIP & FURNISHING
Orig Start Date
2030-07-01T00:00:00.000
Orig End Date
2030-10-01T00:00:00.000
Task Start Date
2030-07-01T00:00:00.000
Task End Date
2030-10-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
DEP-LAB
Project Descr
DEP Lab Relocation
Seq Number
9
Task Description
SUBSTANTIAL COMPLETION
Orig Start Date
2030-10-01T00:00:00.000
Orig End Date
2030-12-01T00:00:00.000
Task Start Date
2030-10-01T00:00:00.000
Task End Date
2030-12-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
DEP-LAB
Project Descr
DEP Lab Relocation
Seq Number
10
Task Description
PUNCHLIST COMPLETE, JOB CLOSED
Orig Start Date
2030-12-01T00:00:00.000
Orig End Date
2031-03-01T00:00:00.000
Task Start Date
2030-12-01T00:00:00.000
Task End Date
2031-03-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-GUN24
Project Descr
Emergency Guniting of Sewers, Citywide
Seq Number
1
Task Description
DEVELOP SCOPE
Orig Start Date
2024-06-01T00:00:00.000
Orig End Date
2024-08-01T00:00:00.000
Task Start Date
2024-06-01T00:00:00.000
Task End Date
2024-08-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-GUN24
Project Descr
Emergency Guniting of Sewers, Citywide
Seq Number
2
Task Description
PRELIMINARY DESIGN
Orig Start Date
2024-08-01T00:00:00.000
Orig End Date
2024-12-01T00:00:00.000
Task Start Date
2024-08-01T00:00:00.000
Task End Date
2024-12-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-GUN24
Project Descr
Emergency Guniting of Sewers, Citywide
Seq Number
3
Task Description
FINAL DESIGN
Orig Start Date
2024-12-01T00:00:00.000
Orig End Date
2025-06-01T00:00:00.000
Task Start Date
2024-12-01T00:00:00.000
Task End Date
2025-06-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-GUN24
Project Descr
Emergency Guniting of Sewers, Citywide
Seq Number
4
Task Description
BID AWARD AND REGISTER CONTRCT
Orig Start Date
2025-06-01T00:00:00.000
Orig End Date
2025-09-01T00:00:00.000
Task Start Date
2025-06-01T00:00:00.000
Task End Date
2025-09-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-GUN24
Project Descr
Emergency Guniting of Sewers, Citywide
Seq Number
5
Task Description
CONSTRUCTION TO 25%
Orig Start Date
2025-09-01T00:00:00.000
Orig End Date
2026-01-01T00:00:00.000
Task Start Date
2025-09-01T00:00:00.000
Task End Date
2026-01-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-GUN24
Project Descr
Emergency Guniting of Sewers, Citywide
Seq Number
6
Task Description
CONSTRUCTION TO 50%
Orig Start Date
2026-01-01T00:00:00.000
Orig End Date
2026-05-01T00:00:00.000
Task Start Date
2026-01-01T00:00:00.000
Task End Date
2026-05-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-GUN24
Project Descr
Emergency Guniting of Sewers, Citywide
Seq Number
7
Task Description
CONSTRUCTION TO 75%
Orig Start Date
2026-05-01T00:00:00.000
Orig End Date
2026-09-01T00:00:00.000
Task Start Date
2026-05-01T00:00:00.000
Task End Date
2026-09-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-GUN24
Project Descr
Emergency Guniting of Sewers, Citywide
Seq Number
8
Task Description
ORIGINAL EQUIP & FURNISHING
Orig Start Date
2026-09-01T00:00:00.000
Orig End Date
2026-12-01T00:00:00.000
Task Start Date
2026-09-01T00:00:00.000
Task End Date
2026-12-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-GUN24
Project Descr
Emergency Guniting of Sewers, Citywide
Seq Number
9
Task Description
SUBSTANTIAL COMPLETION
Orig Start Date
2026-12-01T00:00:00.000
Orig End Date
2027-02-01T00:00:00.000
Task Start Date
2026-12-01T00:00:00.000
Task End Date
2027-02-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-GUN24
Project Descr
Emergency Guniting of Sewers, Citywide
Seq Number
10
Task Description
PUNCHLIST COMPLETE, JOB CLOSED
Orig Start Date
2027-02-01T00:00:00.000
Orig End Date
2027-03-01T00:00:00.000
Task Start Date
2027-02-01T00:00:00.000
Task End Date
2027-03-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-LC24
Project Descr
Emergency Sewer Lining Contract, Citywide
Seq Number
1
Task Description
DEVELOP SCOPE
Orig Start Date
2024-06-01T00:00:00.000
Orig End Date
2024-08-01T00:00:00.000
Task Start Date
2024-06-01T00:00:00.000
Task End Date
2024-08-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-LC24
Project Descr
Emergency Sewer Lining Contract, Citywide
Seq Number
2
Task Description
PRELIMINARY DESIGN
Orig Start Date
2024-08-01T00:00:00.000
Orig End Date
2024-12-01T00:00:00.000
Task Start Date
2024-08-01T00:00:00.000
Task End Date
2024-12-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-LC24
Project Descr
Emergency Sewer Lining Contract, Citywide
Seq Number
3
Task Description
FINAL DESIGN
Orig Start Date
2024-12-01T00:00:00.000
Orig End Date
2025-06-01T00:00:00.000
Task Start Date
2024-12-01T00:00:00.000
Task End Date
2025-06-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-LC24
Project Descr
Emergency Sewer Lining Contract, Citywide
Seq Number
4
Task Description
BID AWARD AND REGISTER CONTRCT
Orig Start Date
2025-06-01T00:00:00.000
Orig End Date
2025-09-01T00:00:00.000
Task Start Date
2025-06-01T00:00:00.000
Task End Date
2025-09-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-LC24
Project Descr
Emergency Sewer Lining Contract, Citywide
Seq Number
5
Task Description
CONSTRUCTION TO 25%
Orig Start Date
2025-09-01T00:00:00.000
Orig End Date
2026-01-01T00:00:00.000
Task Start Date
2025-09-01T00:00:00.000
Task End Date
2026-01-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-LC24
Project Descr
Emergency Sewer Lining Contract, Citywide
Seq Number
6
Task Description
CONSTRUCTION TO 50%
Orig Start Date
2026-01-01T00:00:00.000
Orig End Date
2026-05-01T00:00:00.000
Task Start Date
2026-01-01T00:00:00.000
Task End Date
2026-05-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-LC24
Project Descr
Emergency Sewer Lining Contract, Citywide
Seq Number
7
Task Description
CONSTRUCTION TO 75%
Orig Start Date
2026-05-01T00:00:00.000
Orig End Date
2026-09-01T00:00:00.000
Task Start Date
2026-05-01T00:00:00.000
Task End Date
2026-09-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-LC24
Project Descr
Emergency Sewer Lining Contract, Citywide
Seq Number
8
Task Description
ORIGINAL EQUIP & FURNISHING
Orig Start Date
2026-09-01T00:00:00.000
Orig End Date
2026-12-01T00:00:00.000
Task Start Date
2026-09-01T00:00:00.000
Task End Date
2026-12-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-LC24
Project Descr
Emergency Sewer Lining Contract, Citywide
Seq Number
9
Task Description
SUBSTANTIAL COMPLETION
Orig Start Date
2026-12-01T00:00:00.000
Orig End Date
2027-02-01T00:00:00.000
Task Start Date
2026-12-01T00:00:00.000
Task End Date
2027-02-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-LC24
Project Descr
Emergency Sewer Lining Contract, Citywide
Seq Number
10
Task Description
PUNCHLIST COMPLETE, JOB CLOSED
Orig Start Date
2027-02-01T00:00:00.000
Orig End Date
2027-03-01T00:00:00.000
Task Start Date
2027-02-01T00:00:00.000
Task End Date
2027-03-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-SEC24
Project Descr
Emergency Construction of Sewers, Citywide
Seq Number
1
Task Description
DEVELOP SCOPE
Orig Start Date
2024-06-01T00:00:00.000
Orig End Date
2024-08-01T00:00:00.000
Task Start Date
2024-06-01T00:00:00.000
Task End Date
2024-08-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-SEC24
Project Descr
Emergency Construction of Sewers, Citywide
Seq Number
2
Task Description
PRELIMINARY DESIGN
Orig Start Date
2024-08-01T00:00:00.000
Orig End Date
2024-12-01T00:00:00.000
Task Start Date
2024-08-01T00:00:00.000
Task End Date
2024-12-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-SEC24
Project Descr
Emergency Construction of Sewers, Citywide
Seq Number
3
Task Description
FINAL DESIGN
Orig Start Date
2024-12-01T00:00:00.000
Orig End Date
2025-06-01T00:00:00.000
Task Start Date
2024-12-01T00:00:00.000
Task End Date
2025-06-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-SEC24
Project Descr
Emergency Construction of Sewers, Citywide
Seq Number
4
Task Description
BID AWARD AND REGISTER CONTRCT
Orig Start Date
2025-06-01T00:00:00.000
Orig End Date
2025-09-01T00:00:00.000
Task Start Date
2025-06-01T00:00:00.000
Task End Date
2025-09-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-SEC24
Project Descr
Emergency Construction of Sewers, Citywide
Seq Number
5
Task Description
CONSTRUCTION TO 25%
Orig Start Date
2025-09-01T00:00:00.000
Orig End Date
2026-01-01T00:00:00.000
Task Start Date
2025-09-01T00:00:00.000
Task End Date
2026-01-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-SEC24
Project Descr
Emergency Construction of Sewers, Citywide
Seq Number
6
Task Description
CONSTRUCTION TO 50%
Orig Start Date
2026-01-01T00:00:00.000
Orig End Date
2026-05-01T00:00:00.000
Task Start Date
2026-01-01T00:00:00.000
Task End Date
2026-05-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-SEC24
Project Descr
Emergency Construction of Sewers, Citywide
Seq Number
7
Task Description
CONSTRUCTION TO 75%
Orig Start Date
2026-05-01T00:00:00.000
Orig End Date
2026-09-01T00:00:00.000
Task Start Date
2026-05-01T00:00:00.000
Task End Date
2026-09-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-SEC24
Project Descr
Emergency Construction of Sewers, Citywide
Seq Number
8
Task Description
ORIGINAL EQUIP & FURNISHING
Orig Start Date
2026-09-01T00:00:00.000
Orig End Date
2026-12-01T00:00:00.000
Task Start Date
2026-09-01T00:00:00.000
Task End Date
2026-12-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-SEC24
Project Descr
Emergency Construction of Sewers, Citywide
Seq Number
9
Task Description
SUBSTANTIAL COMPLETION
Orig Start Date
2026-12-01T00:00:00.000
Orig End Date
2027-02-01T00:00:00.000
Task Start Date
2026-12-01T00:00:00.000
Task End Date
2027-02-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-SEC24
Project Descr
Emergency Construction of Sewers, Citywide
Seq Number
10
Task Description
PUNCHLIST COMPLETE, JOB CLOSED
Orig Start Date
2027-02-01T00:00:00.000
Orig End Date
2027-03-01T00:00:00.000
Task Start Date
2027-02-01T00:00:00.000
Task End Date
2027-03-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-WMC24
Project Descr
Emergency Construction of Water Mains, Citywide
Seq Number
1
Task Description
DEVELOP SCOPE
Orig Start Date
2024-06-01T00:00:00.000
Orig End Date
2024-08-01T00:00:00.000
Task Start Date
2024-06-01T00:00:00.000
Task End Date
2024-08-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-WMC24
Project Descr
Emergency Construction of Water Mains, Citywide
Seq Number
2
Task Description
PRELIMINARY DESIGN
Orig Start Date
2024-08-01T00:00:00.000
Orig End Date
2024-12-01T00:00:00.000
Task Start Date
2024-08-01T00:00:00.000
Task End Date
2024-12-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-WMC24
Project Descr
Emergency Construction of Water Mains, Citywide
Seq Number
3
Task Description
FINAL DESIGN
Orig Start Date
2024-12-01T00:00:00.000
Orig End Date
2025-06-01T00:00:00.000
Task Start Date
2024-12-01T00:00:00.000
Task End Date
2025-06-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-WMC24
Project Descr
Emergency Construction of Water Mains, Citywide
Seq Number
4
Task Description
BID AWARD AND REGISTER CONTRCT
Orig Start Date
2025-06-01T00:00:00.000
Orig End Date
2025-09-01T00:00:00.000
Task Start Date
2025-06-01T00:00:00.000
Task End Date
2025-09-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-WMC24
Project Descr
Emergency Construction of Water Mains, Citywide
Seq Number
5
Task Description
CONSTRUCTION TO 25%
Orig Start Date
2025-09-01T00:00:00.000
Orig End Date
2026-01-01T00:00:00.000
Task Start Date
2025-09-01T00:00:00.000
Task End Date
2026-01-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-WMC24
Project Descr
Emergency Construction of Water Mains, Citywide
Seq Number
6
Task Description
CONSTRUCTION TO 50%
Orig Start Date
2026-01-01T00:00:00.000
Orig End Date
2026-05-01T00:00:00.000
Task Start Date
2026-01-01T00:00:00.000
Task End Date
2026-05-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 826
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
EC-WMC24
Project Descr
Emergency Construction of Water Mains, Citywide
Seq Number
7
Task Description
CONSTRUCTION TO 75%
Orig Start Date
2026-05-01T00:00:00.000
Orig End Date
2026-09-01T00:00:00.000
Task Start Date
2026-05-01T00:00:00.000
Task End Date
2026-09-01T00:00:00.000