Capital Project Detail Data - Milestones

This dataset contains capital commitment plan data by managing agency, project identification number and project schedules. The dataset was updated three times a year during the Preliminary, Executive and Adopted Capital Commitment Plans. Starting in January 2024, OMB will no longer update this dataset. It is being replaced by the Capital Projects Dashboard administered by the Mayor's Office of Operations.

City Government Mayor’s Office of Management and Budget (OMB) Dataset s7yh-frbm 12 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
SANDRF11
Project Descr
Ferry Terminal Floodproofing
Seq Number
8
Task Description
ORIGINAL EQUIP & FURNISHING
Orig Start Date
2018-10-01T00:00:00.000
Orig End Date
2019-01-01T00:00:00.000
Task Start Date
2022-05-01T00:00:00.000
Task End Date
2022-08-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
SANDRF11
Project Descr
Ferry Terminal Floodproofing
Seq Number
9
Task Description
SUBSTANTIAL COMPLETION
Orig Start Date
2019-01-01T00:00:00.000
Orig End Date
2019-03-01T00:00:00.000
Task Start Date
2022-08-01T00:00:00.000
Task End Date
2022-10-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
SANDRF11
Project Descr
Ferry Terminal Floodproofing
Seq Number
10
Task Description
PUNCHLIST COMPLETE, JOB CLOSED
Orig Start Date
2019-03-01T00:00:00.000
Orig End Date
2019-04-01T00:00:00.000
Task Start Date
2022-10-01T00:00:00.000
Task End Date
2022-11-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
SEQUEENS
Project Descr
South East Queens Initiative
Seq Number
1
Task Description
DEVELOP SCOPE
Orig Start Date
2020-06-01T00:00:00.000
Orig End Date
2020-09-01T00:00:00.000
Task Start Date
2026-06-01T00:00:00.000
Task End Date
2026-09-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
SEQUEENS
Project Descr
South East Queens Initiative
Seq Number
2
Task Description
PRELIMINARY DESIGN
Orig Start Date
2020-09-01T00:00:00.000
Orig End Date
2021-01-01T00:00:00.000
Task Start Date
2026-09-01T00:00:00.000
Task End Date
2027-01-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
SEQUEENS
Project Descr
South East Queens Initiative
Seq Number
3
Task Description
FINAL DESIGN
Orig Start Date
2021-01-01T00:00:00.000
Orig End Date
2021-07-01T00:00:00.000
Task Start Date
2027-01-01T00:00:00.000
Task End Date
2027-07-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
SEQUEENS
Project Descr
South East Queens Initiative
Seq Number
4
Task Description
BID AWARD AND REGISTER CONTRCT
Orig Start Date
2021-07-01T00:00:00.000
Orig End Date
2021-10-01T00:00:00.000
Task Start Date
2027-07-01T00:00:00.000
Task End Date
2027-10-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
SEQUEENS
Project Descr
South East Queens Initiative
Seq Number
5
Task Description
CONSTRUCTION TO 25%
Orig Start Date
2021-10-01T00:00:00.000
Orig End Date
2022-02-01T00:00:00.000
Task Start Date
2027-10-01T00:00:00.000
Task End Date
2028-02-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
SEQUEENS
Project Descr
South East Queens Initiative
Seq Number
6
Task Description
CONSTRUCTION TO 50%
Orig Start Date
2022-02-01T00:00:00.000
Orig End Date
2022-06-01T00:00:00.000
Task Start Date
2028-02-01T00:00:00.000
Task End Date
2028-06-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
SEQUEENS
Project Descr
South East Queens Initiative
Seq Number
7
Task Description
CONSTRUCTION TO 75%
Orig Start Date
2022-06-01T00:00:00.000
Orig End Date
2022-10-01T00:00:00.000
Task Start Date
2028-06-01T00:00:00.000
Task End Date
2028-10-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
SEQUEENS
Project Descr
South East Queens Initiative
Seq Number
8
Task Description
ORIGINAL EQUIP & FURNISHING
Orig Start Date
2022-10-01T00:00:00.000
Orig End Date
2023-01-01T00:00:00.000
Task Start Date
2028-10-01T00:00:00.000
Task End Date
2029-01-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
SEQUEENS
Project Descr
South East Queens Initiative
Seq Number
9
Task Description
SUBSTANTIAL COMPLETION
Orig Start Date
2023-01-01T00:00:00.000
Orig End Date
2023-03-01T00:00:00.000
Task Start Date
2029-01-01T00:00:00.000
Task End Date
2029-03-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
SEQUEENS
Project Descr
South East Queens Initiative
Seq Number
10
Task Description
PUNCHLIST COMPLETE, JOB CLOSED
Orig Start Date
2023-03-01T00:00:00.000
Orig End Date
2023-04-01T00:00:00.000
Task Start Date
2029-03-01T00:00:00.000
Task End Date
2031-06-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
SIGNALSF2
Project Descr
TRAFFIC SIGNAL SAFETY, CITYWIDE
Seq Number
1
Task Description
BID AWARD AND REGISTER CONTRCT
Orig Start Date
2019-06-01T00:00:00.000
Orig End Date
2019-06-01T00:00:00.000
Task Start Date
2020-06-01T00:00:00.000
Task End Date
2020-06-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
SIGNALSF2
Project Descr
TRAFFIC SIGNAL SAFETY, CITYWIDE
Seq Number
2
Task Description
CONSTRUCTION START
Orig Start Date
2019-07-01T00:00:00.000
Orig End Date
2019-08-01T00:00:00.000
Task Start Date
2020-07-01T00:00:00.000
Task End Date
2020-08-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
SIGNALSF2
Project Descr
TRAFFIC SIGNAL SAFETY, CITYWIDE
Seq Number
3
Task Description
CONSTRUCTION COMPLETION
Orig Start Date
2019-08-01T00:00:00.000
Orig End Date
2021-03-01T00:00:00.000
Task Start Date
2020-08-01T00:00:00.000
Task End Date
2022-03-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
SIGNALSF3
Project Descr
Traffic Signals Safety, Citywide
Seq Number
1
Task Description
BID AWARD AND REGISTER CONTRCT
Orig Start Date
2021-06-01T00:00:00.000
Orig End Date
2021-06-01T00:00:00.000
Task Start Date
2021-06-01T00:00:00.000
Task End Date
2021-06-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
SIGNALSF3
Project Descr
Traffic Signals Safety, Citywide
Seq Number
2
Task Description
CONSTRUCTION START
Orig Start Date
2021-07-01T00:00:00.000
Orig End Date
2021-08-01T00:00:00.000
Task Start Date
2021-07-01T00:00:00.000
Task End Date
2021-08-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
SIGNALSF3
Project Descr
Traffic Signals Safety, Citywide
Seq Number
3
Task Description
CONSTRUCTION COMPLETION
Orig Start Date
2021-08-01T00:00:00.000
Orig End Date
2023-03-01T00:00:00.000
Task Start Date
2021-08-01T00:00:00.000
Task End Date
2023-03-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
STEFFSCMV
Project Descr
NYC Street Efficiency Strategic Commercial Vehicle Monitorin
Seq Number
1
Task Description
BID AWARD AND REGISTER CONTRCT
Orig Start Date
2019-06-01T00:00:00.000
Orig End Date
2019-06-01T00:00:00.000
Task Start Date
2022-06-01T00:00:00.000
Task End Date
2022-06-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
STEFFSCMV
Project Descr
NYC Street Efficiency Strategic Commercial Vehicle Monitorin
Seq Number
2
Task Description
CONSTRUCTION START
Orig Start Date
2019-07-01T00:00:00.000
Orig End Date
2019-08-01T00:00:00.000
Task Start Date
2022-07-01T00:00:00.000
Task End Date
2022-08-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
STEFFSCMV
Project Descr
NYC Street Efficiency Strategic Commercial Vehicle Monitorin
Seq Number
3
Task Description
CONSTRUCTION COMPLETION
Orig Start Date
2019-08-01T00:00:00.000
Orig End Date
2021-03-01T00:00:00.000
Task Start Date
2022-08-01T00:00:00.000
Task End Date
2024-03-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
TF012013
Project Descr
NEW SIGNAL INSTALLATION REQUIREMENT CONTRACT FY13
Seq Number
1
Task Description
BID AWARD AND REGISTER CONTRCT
Orig Start Date
2013-06-01T00:00:00.000
Orig End Date
2013-06-01T00:00:00.000
Task Start Date
2019-06-01T00:00:00.000
Task End Date
2019-06-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
TF012013
Project Descr
NEW SIGNAL INSTALLATION REQUIREMENT CONTRACT FY13
Seq Number
2
Task Description
CONSTRUCTION START
Orig Start Date
2013-07-01T00:00:00.000
Orig End Date
2013-08-01T00:00:00.000
Task Start Date
2019-07-01T00:00:00.000
Task End Date
2019-08-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
TF012013
Project Descr
NEW SIGNAL INSTALLATION REQUIREMENT CONTRACT FY13
Seq Number
3
Task Description
CONSTRUCTION COMPLETION
Orig Start Date
2013-08-01T00:00:00.000
Orig End Date
2015-03-01T00:00:00.000
Task Start Date
2019-08-01T00:00:00.000
Task End Date
2025-03-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
TF012014
Project Descr
NEW SIGNALS INSTALLATION REQUIREMENT
Seq Number
1
Task Description
BID AWARD AND REGISTER CONTRCT
Orig Start Date
2015-06-01T00:00:00.000
Orig End Date
2015-06-01T00:00:00.000
Task Start Date
2023-06-01T00:00:00.000
Task End Date
2023-06-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
TF012014
Project Descr
NEW SIGNALS INSTALLATION REQUIREMENT
Seq Number
2
Task Description
CONSTRUCTION START
Orig Start Date
2015-06-01T00:00:00.000
Orig End Date
2015-07-01T00:00:00.000
Task Start Date
2023-06-01T00:00:00.000
Task End Date
2023-07-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
TF012014
Project Descr
NEW SIGNALS INSTALLATION REQUIREMENT
Seq Number
3
Task Description
CONSTRUCTION COMPLETION
Orig Start Date
2015-07-01T00:00:00.000
Orig End Date
2017-02-01T00:00:00.000
Task Start Date
2023-07-01T00:00:00.000
Task End Date
2025-02-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
TF012019
Project Descr
NEW SIGNALS INSTALLATION REQUIREMENT 2019
Seq Number
1
Task Description
BID AWARD AND REGISTER CONTRCT
Orig Start Date
2018-06-01T00:00:00.000
Orig End Date
2018-06-01T00:00:00.000
Task Start Date
2021-06-01T00:00:00.000
Task End Date
2021-06-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
TF012019
Project Descr
NEW SIGNALS INSTALLATION REQUIREMENT 2019
Seq Number
2
Task Description
CONSTRUCTION START
Orig Start Date
2018-07-01T00:00:00.000
Orig End Date
2018-08-01T00:00:00.000
Task Start Date
2021-07-01T00:00:00.000
Task End Date
2021-08-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
TF012019
Project Descr
NEW SIGNALS INSTALLATION REQUIREMENT 2019
Seq Number
3
Task Description
CONSTRUCTION COMPLETION
Orig Start Date
2018-08-01T00:00:00.000
Orig End Date
2020-03-01T00:00:00.000
Task Start Date
2021-08-01T00:00:00.000
Task End Date
2023-03-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
TF012023
Project Descr
New Signals Installation requirement, citywide FY23
Seq Number
1
Task Description
BID AWARD AND REGISTER CONTRCT
Orig Start Date
2022-06-01T00:00:00.000
Orig End Date
2022-06-01T00:00:00.000
Task Start Date
2022-06-01T00:00:00.000
Task End Date
2022-06-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
TF012023
Project Descr
New Signals Installation requirement, citywide FY23
Seq Number
2
Task Description
CONSTRUCTION START
Orig Start Date
2022-07-01T00:00:00.000
Orig End Date
2022-08-01T00:00:00.000
Task Start Date
2022-07-01T00:00:00.000
Task End Date
2022-08-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
TF012023
Project Descr
New Signals Installation requirement, citywide FY23
Seq Number
3
Task Description
CONSTRUCTION COMPLETION
Orig Start Date
2022-08-01T00:00:00.000
Orig End Date
2024-03-01T00:00:00.000
Task Start Date
2022-08-01T00:00:00.000
Task End Date
2024-03-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
TF01-9910
Project Descr
LOCAL STREET NETWORK MGMT AND INCIDENT MGMT X500.94
Seq Number
1
Task Description
BID AWARD AND REGISTER CONTRCT
Orig Start Date
2004-06-01T00:00:00.000
Orig End Date
2004-06-01T00:00:00.000
Task Start Date
2022-06-01T00:00:00.000
Task End Date
2022-06-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
TF01-9910
Project Descr
LOCAL STREET NETWORK MGMT AND INCIDENT MGMT X500.94
Seq Number
2
Task Description
CONSTRUCTION START
Orig Start Date
2004-06-01T00:00:00.000
Orig End Date
2004-07-01T00:00:00.000
Task Start Date
2022-06-01T00:00:00.000
Task End Date
2022-07-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
TF01-9910
Project Descr
LOCAL STREET NETWORK MGMT AND INCIDENT MGMT X500.94
Seq Number
3
Task Description
CONSTRUCTION COMPLETION
Orig Start Date
2004-07-01T00:00:00.000
Orig End Date
2006-02-01T00:00:00.000
Task Start Date
2022-07-01T00:00:00.000
Task End Date
2024-02-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
TF01-9911
Project Descr
Advance Travel Information System Upgrade
Seq Number
1
Task Description
BID AWARD AND REGISTER CONTRCT
Orig Start Date
2022-06-01T00:00:00.000
Orig End Date
2022-06-01T00:00:00.000
Task Start Date
2021-06-01T00:00:00.000
Task End Date
2021-07-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
TF01-9911
Project Descr
Advance Travel Information System Upgrade
Seq Number
2
Task Description
CONSTRUCTION START
Orig Start Date
2022-07-01T00:00:00.000
Orig End Date
2022-08-01T00:00:00.000
Task Start Date
2021-07-01T00:00:00.000
Task End Date
2021-09-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
TF01-9911
Project Descr
Advance Travel Information System Upgrade
Seq Number
3
Task Description
CONSTRUCTION COMPLETION
Orig Start Date
2022-08-01T00:00:00.000
Orig End Date
2024-03-01T00:00:00.000
Task Start Date
2021-09-01T00:00:00.000
Task End Date
2023-04-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
TF01APS
Project Descr
Accessible Pedestrian Signals, citywide - TEN YEARS
Seq Number
1
Task Description
BID AWARD AND REGISTER CONTRCT
Orig Start Date
2019-06-01T00:00:00.000
Orig End Date
2019-06-01T00:00:00.000
Task Start Date
2025-06-01T00:00:00.000
Task End Date
2025-06-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
TF01APS
Project Descr
Accessible Pedestrian Signals, citywide - TEN YEARS
Seq Number
2
Task Description
CONSTRUCTION START
Orig Start Date
2019-07-01T00:00:00.000
Orig End Date
2019-08-01T00:00:00.000
Task Start Date
2025-07-01T00:00:00.000
Task End Date
2025-08-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
TF01APS
Project Descr
Accessible Pedestrian Signals, citywide - TEN YEARS
Seq Number
3
Task Description
CONSTRUCTION COMPLETION
Orig Start Date
2019-08-01T00:00:00.000
Orig End Date
2021-03-01T00:00:00.000
Task Start Date
2025-08-01T00:00:00.000
Task End Date
2027-03-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
TF01TPM21
Project Descr
Thermoplastic Marking-FY21
Seq Number
1
Task Description
BID AWARD AND REGISTER CONTRCT
Orig Start Date
2022-03-01T00:00:00.000
Orig End Date
2022-03-01T00:00:00.000
Task Start Date
2021-03-01T00:00:00.000
Task End Date
2027-03-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
TF01TPM21
Project Descr
Thermoplastic Marking-FY21
Seq Number
2
Task Description
CONSTRUCTION START
Orig Start Date
2022-03-01T00:00:00.000
Orig End Date
2022-05-01T00:00:00.000
Task Start Date
2027-03-01T00:00:00.000
Task End Date
2027-05-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
TF01TPM21
Project Descr
Thermoplastic Marking-FY21
Seq Number
3
Task Description
CONSTRUCTION COMPLETION
Orig Start Date
2022-05-01T00:00:00.000
Orig End Date
2023-06-01T00:00:00.000
Task Start Date
2027-05-01T00:00:00.000
Task End Date
2028-06-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
TF01VARMS
Project Descr
Variable Message Signs Replacement, Citywide
Seq Number
1
Task Description
BID AWARD AND REGISTER CONTRCT
Orig Start Date
2020-06-01T00:00:00.000
Orig End Date
2020-06-01T00:00:00.000
Task Start Date
2023-06-01T00:00:00.000
Task End Date
2023-06-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
TF01VARMS
Project Descr
Variable Message Signs Replacement, Citywide
Seq Number
2
Task Description
CONSTRUCTION START
Orig Start Date
2020-07-01T00:00:00.000
Orig End Date
2020-08-01T00:00:00.000
Task Start Date
2023-07-01T00:00:00.000
Task End Date
2023-08-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
TF01VARMS
Project Descr
Variable Message Signs Replacement, Citywide
Seq Number
3
Task Description
CONSTRUCTION COMPLETION
Orig Start Date
2020-08-01T00:00:00.000
Orig End Date
2022-03-01T00:00:00.000
Task Start Date
2023-08-01T00:00:00.000
Task End Date
2025-03-01T00:00:00.000
20220517
Pub Date: 20220517 • Boro: CITYWIDE • Managing Agcy Cd: 841
Pub Date
20220517
Boro
CITYWIDE
Managing Agcy Cd
841
Managing Agcy
DEPARTMENT OF TRANSPORTATION
Project Id
TF18-LUMP
Project Descr
LUMP SUM FOR PARKING RECONSTRUCTION
Seq Number
1
Task Description
BID AWARD AND REGISTER CONTRCT
Orig Start Date
2008-06-01T00:00:00.000
Orig End Date
2008-06-01T00:00:00.000
Task Start Date
2020-06-01T00:00:00.000
Task End Date
2020-06-01T00:00:00.000