Installation of a chemical containment pad, fill stations, and lighting as a part of the construction of a chemical addition system, Old Croton Lake Gatehouse, New Croton Reservoir, Croton Dam Road, Yorktown Heights, Westchester County
Borough
Upstate
Level Of Review
Preliminary and Final
Agency
DEP
Certificate Number
27734
Public Private
Public
Action
Calendared for Consent
Project Type
Architecture
DEP
Date: 2021-04-26T00:00:00.000 • Project Id: 22238 • Borough: Staten Island
Date
2021-04-26T00:00:00.000
Project Id
22238
Title
Construction of a path and manholes, Oakwood Beach Wastewater Resource Recovery Facility, 751 Mill Road, Staten Island
Restoration of the landscape, construction of a storage building, and installation of signage, Gilboa Dam, Schoharie Reservoir, adjacent to Route 990V, Gilboa, Schoharie County
Construction of a café kiosk (German Doner Kebab), Columbus Park, Joralemon Street between Court Street and Brooklyn Bridge Boulevard, east of Brooklyn Borough Hall, Brooklyn
Construction of flood protection measures (Brooklyn Bridge Montgomery Coastal Resiliency) and reconstruction of the East River Waterfront, Phases III, IV, and V, Brooklyn Bridge, South Street, Montgomery Street, and the East River, Manhattan
Reconstruction of a swimming pool and skating rink (Lasker Rink) and adjacent site work, between East Drive and the Harlem Meer, Central Park, Manhattan
Construction of a distinctive sidewalk as part of the Downtown Brooklyn and Fulton Mall streetscape master plan, 11 Hoyt Street, Hoyt Street, Livingston Street, and Elm Street, Brooklyn
Reconstruction of Sankofa Park (formerly Livonia Playground), including an African burial ground memorial landscape, African Burial Ground Square, Schenck Avenue, Livonia Avenue, and Barbey Street, Brooklyn
Reconstruction of a plaza (Canal Street Triangle) as part of the Gateways to Chinatown program, Walker Street, Baxter Street, and Canal Street, Manhattan
Borough
Manhattan
Level Of Review
Preliminary
Agency
DOT
Certificate Number
27719
Public Private
Public
Action
Calendared for Public Hearing
Project Type
Landscape architecture
HPD
Date: 2021-03-22T00:00:00.000 • Project Id: 22216 • Title: Rehabilitation of the façade, 79 Post Avenue, Manhattan
Date
2021-03-22T00:00:00.000
Project Id
22216
Title
Rehabilitation of the façade, 79 Post Avenue, Manhattan
Borough
Manhattan
Level Of Review
Preliminary and Final
Agency
HPD
Certificate Number
27718
Public Private
Private
Action
Calendared for Consent
Project Type
Building systems & Modifications
FDNY
Date: 2021-03-22T00:00:00.000 • Project Id: 22215 • Title: Rehabilitation of Engine Company 304, 218-44 97th Avenue, Jamaica, Queens
Date
2021-03-22T00:00:00.000
Project Id
22215
Title
Rehabilitation of Engine Company 304, 218-44 97th Avenue, Jamaica, Queens
Reconstruction of a pier, installation of a barge, gangway, and gate, and adjacent site work to accommodate citywide ferry service, Kaiser Park, between Bayview Avenue, West 29th Street, and Coney Island Creek, Brooklyn
Reconstruction of staircases, High Line Park (formerly elevated rail), Tenth Avenue at West 20th Street, West 26th Street, and West 28th Street, Manhattan
Installation of a plaque commemorating Spanish casualties of the American Revolution, Fort Greene Park, Myrtle Avenue, Washington Park, Dekalb Avenue and Saint Edward Street, Brooklyn
Reconstruction of the Honk Falls Dam, including rehabilitation of the stream channel, and restoration of the landscape, Rondout Creek, Route 55 and Continental Road, Town of Wawarsing, Ulster County
Decommissioning of the Lower Chia Lin Dam (Camp Alamar Lower Lake Dam) and adjacent site work, Route 52 and White Pond Road, Town of East Fishkill, Dutchess County