Construction of a shared street and plaza (Broadway Boulevard Plaza), Broadway between West 38th Street and West 40th Street, as part of the master plan for the reconstruction of Broadway (Broadway Vision Plan), Manhattan
Minor modifications to the reconstruction of a retaining wall and adjacent site work, East 236th Street, Bronx Boulevard, East 233rd Street, and Bronx River Parkway, Bronx
Borough
Bronx
Level Of Review
Amended Final
Agency
DPR
Certificate Number
30231
Public Private
Public
Action
Delegation Approval
Project Type
Landscape architecture
DOT
Date: 2025-12-01T00:00:00.000 • Project Id: 24585 • Title: Installation of a fenced-in area, 350 East 69th Street, Manhattan
Date
2025-12-01T00:00:00.000
Project Id
24585
Title
Installation of a fenced-in area, 350 East 69th Street, Manhattan
Construction of a compost facility and education building, Lower East Side Ecology Center, East River Park, FDR Drive between Jackson Street and Cherry Street, Manhattan
Minor modifications to the pavers for the design of a stadium, as part of Phase II of Willets Point, 126th Street, 127th Street, and Willets Point Boulevard between 38th Avenue and 35th Avenue, Corona, Queens
Borough
Queens
Level Of Review
Amended Final
Agency
EDC
Certificate Number
30225
Public Private
Public and Private
Action
Calendared for Consent
Project Type
Building systems & Modifications
EDC/DOT/DPR
Date: 2025-11-17T00:00:00.000 • Project Id: 24565 • Borough: Staten Island
Date
2025-11-17T00:00:00.000
Project Id
24565
Title
Minor modifications to the construction of a pier, esplanade, and a maintenance and operations building, Tompkinsville Pier, Murray Hulbert Avenue south of Hannah Street at the Stapleton Waterfront, Staten Island
Construction of a portion of a plaza, as part of Phase IIA of Willets Point, Roosevelt Avenue, 38th Avenue, and Willets Point Boulevard, Corona, Queens
Reconstruction of a pedestrian bridge and restoration of the landscape, Willow Lake Preserve, south of Willow Lake between the Grand Central Parkway and Van Wyck Expressway, Flushing Meadows-Corona Park, Flushing, Queens
Reconstruction of the sidewalk including the removal of distinctive sidewalks, Grand Army Plaza, Prospect Park, east side of Vanderbilt Avenue between Plaza Street East to The Bend, and west side of Plaza Street East between Eastern Parkway to Vanderbilt Avenue, Brooklyn
Construction of a combined sewer overflow (CSO) facility and adjacent open space, Gowanus Canal, Butler Street, Nevins Street, and Degraw Street, Brooklyn
Reconstruction of a playground, Carter G. Woodson Children's Park, adjacent to P.S. 150, Christopher Avenue between Sutter Avenue and Belmont Avenue, Brooklyn
Minor modifications to the reconstruction of High Line Park, Western Rail Yards, West 30th Street, 11th Avenue, West 34th Street, and 12th Avenue, Manhattan
Replacement of two flood light poles, Sludge Pier, Red Hook Wastewater Resource Recovery Facility, West Street and Little Street, Brooklyn Navy Yard Industrial Park, Brooklyn
Construction of a storefront (Kingbridge) and adjacent site work, 209 Brooklyn Navy Yard (formerly Building 275), 63 Flushing Avenue, Brooklyn Navy Yard Industrial Park, Brooklyn
Modifications to the installation of I Am Protected by Jazmine Hayes, Brownsville Multiservice Center and Community Hub (previously Brownsville Youth Empowerment Center and Community Hub), 444 Thomas S. Boyland Street between East New York Avenue and Pitkin Avenue, Brooklyn
Minor modifications to the installation of electric vehicle chargers (PowerCharge) including an electrical switchgear enclosure, Rockaway Park Municipal Parking Field, 248 Beach 116th Street, Far Rockaway, Queens