Hazard Mitigation Plan - Mitigation Actions Database

New York City’s comprehensive effort to reduce or eliminate potential losses from the hazards described in the Hazard Specific section of the website. The map includes existing and completed mitigation actions that will minimize the effects of a hazard event on New York City’s population, economy, property, building stock, and infrastructure. It is the result of a coordinated effort by 46 New York City agencies and partners to develop and implement a broad range of inventive and effective ways to mitigate hazards.

NOTE: This table can be joined to the mapped projects using the HMP Index field.
For the Hazard Mitigation Plan map, please follow this link: https://data.cityofnewyork.us/d/n6jh-qsrw

Spatial data for projects that were mapped is available here:
Points: https://data.cityofnewyork.us/City-Government/New-York-City-Emergency-Management-Points-/t7k8-wj6b
Lines: https://data.cityofnewyork.us/City-Government/Hazard-Mitigation-Plan-Mitigation-Actions-Database/hqhh-iv7p
Polygons: https://data.cityofnewyork.us/City-Government/Hazard-Mitigation-Plan-Mitigation-Actions-Database/cj2p-e3ej

City Government NYC Emergency Management (NYCEM) Dataset veqt-eu3t 28 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
MA.00649
Hmp Index: MA.00649 • Mitigation Actions Title: Staten Island Railway flood mitigation • Lead Agency: MTA New York City Transit
Hmp Index
MA.00649
Mitigation Actions Title
Staten Island Railway flood mitigation
Mitigation Actions Description
Mitigate flooding at St. George Terminal; construct new, resilient Clifton maintenance shop
Lead Agency
MTA New York City Transit
Action Category
Property Protection
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Estimated Start
2014-09-29T00:00:00.000
Estimated Finish
2020-12-30T00:00:00.000
Estimated Cost
$268,477,715.00
Federal Funding Source
FTA
Notes
Project is in financial closout
MA.00650
Hmp Index: MA.00650 • Mitigation Actions Title: Incremental Standards Mitigation • Lead Agency: MTA New York City Transit
Hmp Index
MA.00650
Mitigation Actions Title
Incremental Standards Mitigation
Mitigation Actions Description
Continue upgrade of design standards to improve resilience to seismic activity, wind, and fire events, and apply to new and existing facilities as capital work is performed.
Lead Agency
MTA New York City Transit
Action Category
Infrastructure Projects
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
State Funding Source
MTA
Notes
All street openings except for the stairs at the Cortlandt St BW7 and 96 St Second Avenue stations are complete
MA.00651
Hmp Index: MA.00651 • Mitigation Actions Title: Seal Street Openings • Mitigation Actions Description: Seal all street level openings in SLOSH 2 Flood Zone
Hmp Index
MA.00651
Mitigation Actions Title
Seal Street Openings
Mitigation Actions Description
Seal all street level openings in SLOSH 2 Flood Zone
Lead Agency
MTA New York City Transit
Action Category
Property Protection
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Federal Funding Source
FTA
MA.00652
Hmp Index: MA.00652 • Mitigation Actions Title: Tunnel Sealing • Lead Agency: MTA New York City Transit
Hmp Index
MA.00652
Mitigation Actions Title
Tunnel Sealing
Mitigation Actions Description
Seal key tunnel portals and install internal tunnel barriers at critical locations
Lead Agency
MTA New York City Transit
Action Category
Property Protection
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Federal Funding Source
FTA
Notes
Contract to harden remaining substations is in construction
MA.00653
Hmp Index: MA.00653 • Mitigation Actions Title: Substation Hardening • Mitigation Actions Description: Harden SLOSH 2 vulnerable substations and provide 4 mobile substations
Hmp Index
MA.00653
Mitigation Actions Title
Substation Hardening
Mitigation Actions Description
Harden SLOSH 2 vulnerable substations and provide 4 mobile substations
Lead Agency
MTA New York City Transit
Action Category
Property Protection
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Estimated Cost
$149,000,000.00
Federal Funding Source
FTA
Notes
Projects in design
MA.00654
Hmp Index: MA.00654 • Mitigation Actions Title: Yard Flood Mitigation • Mitigation Actions Description: Perimeter and/or asset protection and pumping/drainage improvements at 3 yards
Hmp Index
MA.00654
Mitigation Actions Title
Yard Flood Mitigation
Mitigation Actions Description
Perimeter and/or asset protection and pumping/drainage improvements at 3 yards
Lead Agency
MTA New York City Transit
Action Category
Property Protection
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Federal Funding Source
FTA
Notes
207 St Yard is in construction, 148 St Yard is complete, Coney Island Yard is in construction
MA.00655
Hmp Index: MA.00655 • Mitigation Actions Title: Pumping System Improvements • Lead Agency: MTA New York City Transit
Hmp Index
MA.00655
Mitigation Actions Title
Pumping System Improvements
Mitigation Actions Description
Procure 2 new pump cars, 10 mobile generators, and install annex pumps at vulnerable locations
Lead Agency
MTA New York City Transit
Action Category
Property Protection
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Federal Funding Source
FTA
Notes
Completed
MA.00656
Hmp Index: MA.00656 • Mitigation Actions Title: Right-of-Way Equipment Hardening • Mitigation Actions Description: Harden pump rooms, signal rooms and circuit breaker houses
Hmp Index
MA.00656
Mitigation Actions Title
Right-of-Way Equipment Hardening
Mitigation Actions Description
Harden pump rooms, signal rooms and circuit breaker houses
Lead Agency
MTA New York City Transit
Action Category
Property Protection
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Federal Funding Source
FTA
Notes
Projects in design/construction
MA.00657
Hmp Index: MA.00657 • Mitigation Actions Title: Internal Station Hardening • Mitigation Actions Description: Seal critical rooms within vulnerable stations
Hmp Index
MA.00657
Mitigation Actions Title
Internal Station Hardening
Mitigation Actions Description
Seal critical rooms within vulnerable stations
Lead Agency
MTA New York City Transit
Action Category
Property Protection
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Federal Funding Source
FTA
Notes
Completed
MA.00658
Hmp Index: MA.00658 • Mitigation Actions Title: Rockaway Line Flood Mitigation • Mitigation Actions Description: Protection of vulnerable stations, Hammels Wye, and right of way
Hmp Index
MA.00658
Mitigation Actions Title
Rockaway Line Flood Mitigation
Mitigation Actions Description
Protection of vulnerable stations, Hammels Wye, and right of way
Lead Agency
MTA New York City Transit
Action Category
Property Protection
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Estimated Start
2018-01-30T00:00:00.000
Estimated Finish
2019-12-30T00:00:00.000
Estimated Cost
$221,714,995.00
Federal Funding Source
FTA
Notes
Hammels Wye is complete, right of way protections in construction
MA.00659
Hmp Index: MA.00659 • Mitigation Actions Title: Emergency Communications Enhancements • Lead Agency: MTA New York City Transit
Hmp Index
MA.00659
Mitigation Actions Title
Emergency Communications Enhancements
Mitigation Actions Description
Upgraded Emergency Broadcast Communication System, Backup Power Control Center, upgrades to Backup Rail Control Center
Lead Agency
MTA New York City Transit
Action Category
Property Protection
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Estimated Start
2018-12-30T00:00:00.000
Estimated Finish
2021-12-30T00:00:00.000
Estimated Cost
$74,665,281.00
Federal Funding Source
FTA
Notes
Emergency Broadcast Communication System (EBCS) in construction, Backup PCC in construction, Backup RCC complete
MA.00660
Hmp Index: MA.00660 • Mitigation Actions Title: Flood Mitigation of Critical Support Facilities • Mitigation Actions Description: Central Warehouse, Zerega Bus Maintenance Facility, MTA Revenue Facility
Hmp Index
MA.00660
Mitigation Actions Title
Flood Mitigation of Critical Support Facilities
Mitigation Actions Description
Central Warehouse, Zerega Bus Maintenance Facility, MTA Revenue Facility
Lead Agency
MTA New York City Transit
Action Category
Property Protection
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Estimated Start
2018-12-30T00:00:00.000
Estimated Finish
2010-12-30T00:00:00.000
Estimated Cost
$44,862,263.00
Federal Funding Source
FTA
Notes
Central Warehouse complete, Revenue Facility in construction, Zerega Bus Maintenance Facility complete
MA.00661
Hmp Index: MA.00661 • Mitigation Actions Title: Backup generator at Governors Island • Lead Agency: Triborough Bridge and Tunnel Authority
Hmp Index
MA.00661
Mitigation Actions Title
Backup generator at Governors Island
Mitigation Actions Description
Install a standby emergency generator at the Governors Island ventilation building for the Hugh L. Carey Tunnel to provide capacity for pumps and other equipment in case of power outage.
Lead Agency
Triborough Bridge and Tunnel Authority
Action Category
Emergency Services
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms
Estimated Start
2015-11-30T00:00:00.000
Estimated Finish
2017-04-29T00:00:00.000
Estimated Cost
$5,179,449.00
Federal Funding Source
FEMA,FEMA-HMGP
MA.00662
Hmp Index: MA.00662 • Mitigation Actions Title: Mitigation of Hugh L. Carey and Queens Midtown Tunnels • Lead Agency: Triborough Bridge and Tunnel Authority
Hmp Index
MA.00662
Mitigation Actions Title
Mitigation of Hugh L. Carey and Queens Midtown Tunnels
Mitigation Actions Description
Install flood gates at tunnel portals; extend plaza retaining walls; install deployable barriers across roadways as needed to create protected perimeters around tunnel plazas; protect vulnerable ingress locations and building openings; and perform other associated mitigation work. Measures to protect to FEMA 500 year flood elevation.
Lead Agency
Triborough Bridge and Tunnel Authority
Action Category
Infrastructure Projects
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms
Estimated Start
2016-12-17T00:00:00.000
Estimated Finish
2018-12-30T00:00:00.000
Estimated Cost
$65,503,957.00
Federal Funding Source
FEMA
MA.00663
Hmp Index: MA.00663 • Lead Agency: Triborough Bridge and Tunnel Authority • Action Category: Property Protection
Hmp Index
MA.00663
Mitigation Actions Title
Flood-hardening of vital communications, substations, transformers, mechanical equipment, revenue equipment, and other electronic systems at all Triborough Bridge and Tunnel Authority facilities
Mitigation Actions Description
Perform work to harden those areas that are required to maintain Bridges and Tunnels operations and relocate electronic systems to less vulnerable locations at the respective service buildings. Facilities will be elevated above ABFE + 1 foot.
Lead Agency
Triborough Bridge and Tunnel Authority
Action Category
Property Protection
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms
Estimated Start
2015-05-01T00:00:00.000
Estimated Finish
3/1/2023 for facilities other than BWB.
Estimated Cost
$19,700,000.00
Federal Funding Source
FEMA
Notes
Multiple flood hardening projects are outlined in the 2015-19 Capital Plan
MA.00664
Hmp Index: MA.00664 • Mitigation Actions Title: Raising Governors Island seawall for Hugh L. Carey Tunnel • Lead Agency: Triborough Bridge and Tunnel Authority
Hmp Index
MA.00664
Mitigation Actions Title
Raising Governors Island seawall for Hugh L. Carey Tunnel
Mitigation Actions Description
Raise the seawall around the artificial island on which the Governors Island ventilation building is located to prevent storm water from entering the tunnel through the vents.
Lead Agency
Triborough Bridge and Tunnel Authority
Action Category
Infrastructure Projects
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms
Estimated Start
2016-12-27T00:00:00.000
Estimated Finish
2018-12-30T00:00:00.000
Estimated Cost
$30,876,047.00
Federal Funding Source
FEMA
Notes
Scoping Study kicked off December 2014. Initial report submitted March, 2015. Scoping study to be completed December, 2015. Next Steps: complete scoping study (end of 2015); Perform inspection of existing timber piles; planned project execution via Design
MA.00665
Hmp Index: MA.00665 • Mitigation Actions Title: Seismic studies and retrofit • Lead Agency: Triborough Bridge and Tunnel Authority
Hmp Index
MA.00665
Mitigation Actions Title
Seismic studies and retrofit
Mitigation Actions Description
Identify and incorporate seismic requirements in bridge and tunnel restoration projects.
Lead Agency
Triborough Bridge and Tunnel Authority
Action Category
Property Protection
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Earthquakes
Other Funding Source
Unknown
MA.00666
Hmp Index: MA.00666 • Mitigation Actions Title: Marine Parkway Bridge protection • Lead Agency: Triborough Bridge and Tunnel Authority
Hmp Index
MA.00666
Mitigation Actions Title
Marine Parkway Bridge protection
Mitigation Actions Description
Perform substructure and underwater work to prevent damage from flooding, including scour.
Lead Agency
Triborough Bridge and Tunnel Authority
Action Category
Property Protection
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Estimated Start
2013-10-31T00:00:00.000
Estimated Finish
2015-08-31T00:00:00.000
Estimated Cost
$14,000,000.00
Federal Funding Source
FEMA
City Funding Source
City Capital
MA.00667
Hmp Index: MA.00667 • Mitigation Actions Title: Marine Parkway/Cross Bay Bridge mitigation master plan • Lead Agency: Triborough Bridge and Tunnel Authority
Hmp Index
MA.00667
Mitigation Actions Title
Marine Parkway/Cross Bay Bridge mitigation master plan
Mitigation Actions Description
Compare various long-term capital investment strategies to rehabilitate/reconstruct the crossings while building resiliency and robustness into the structures.
Lead Agency
Triborough Bridge and Tunnel Authority
Action Category
Prevention and Policy
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms,Earthquakes,High Winds,Non-Natural
Estimated Start
2014-05-01T00:00:00.000
Estimated Finish
2019-01-31T00:00:00.000
Estimated Cost
$9,000,000.00
Federal Funding Source
FEMA
State Funding Source
MTA
MA.00668
Hmp Index: MA.00668 • Mitigation Actions Title: Engineering flood studies at non-tunnel facilities • Mitigation Actions Description: Determine vulnerabilities and prepare conceptual designs for mitigation work.
Hmp Index
MA.00668
Mitigation Actions Title
Engineering flood studies at non-tunnel facilities
Mitigation Actions Description
Determine vulnerabilities and prepare conceptual designs for mitigation work.
Lead Agency
Triborough Bridge and Tunnel Authority
Action Category
Prevention and Policy
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms,Flooding,Non-Natural
Estimated Start
2013-06-30T00:00:00.000
Estimated Finish
2014-12-30T00:00:00.000
Estimated Cost
$1,550,000.00
State Funding Source
MTA
Notes
Multiple B&T structures improvement projects are proposed in the 2015-19 Capital Program.
MA.00669
Hmp Index: MA.00669 • Mitigation Actions Title: Bridge reinforcement • Mitigation Actions Description: Study and design bridge features that mitigate the effects of high-wind events.
Hmp Index
MA.00669
Mitigation Actions Title
Bridge reinforcement
Mitigation Actions Description
Study and design bridge features that mitigate the effects of high-wind events.
Lead Agency
Triborough Bridge and Tunnel Authority
Action Category
Infrastructure Projects
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
High Winds
State Funding Source
MTA
MA.00670
Hmp Index: MA.00670 • Mitigation Actions Title: Flood mitigation at MJ Quill, Castleton, Yukon, Casey Stengel, Ulmer Park depots • Lead Agency: MTA-Buses
Hmp Index
MA.00670
Mitigation Actions Title
Flood mitigation at MJ Quill, Castleton, Yukon, Casey Stengel, Ulmer Park depots
Mitigation Actions Description
Relocate equipment to higher levels; install backflow preventers and high-capacity permanent pumps; reinforce/harden openings/entrances and other water-penetration points.
Lead Agency
MTA-Buses
Action Category
Property Protection
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms
Estimated Start
2018-01-30T00:00:00.000
Estimated Cost
$59,700,000.00
Other Funding Source
Unknown
MA.00671
Hmp Index: MA.00671 • Mitigation Actions Title: Flood mitigation at Far Rockaway depot • Lead Agency: MTA-Buses
Hmp Index
MA.00671
Mitigation Actions Title
Flood mitigation at Far Rockaway depot
Mitigation Actions Description
Relocate equipment to higher elevation; install backflow preventers (10 feet above BFE).
Lead Agency
MTA-Buses
Action Category
Property Protection
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms
Estimated Start
2016-08-30T00:00:00.000
Estimated Finish
2018-08-30T00:00:00.000
Estimated Cost
$15,000,000.00
Other Funding Source
Unknown
MA.00673
Hmp Index: MA.00673 • Mitigation Actions Title: Summer operations manual • Lead Agency: MTA-Buses
Hmp Index
MA.00673
Mitigation Actions Title
Summer operations manual
Mitigation Actions Description
Write guide on how to perform pre-trip bus inspections to confirm windows and hatches are closed and the air conditioning system is working properly. Provide bus operators with summer uniforms and information about heat stress.
Lead Agency
MTA-Buses
Action Category
Prevention and Policy
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Extreme Heat
State Funding Source
MTA
Notes
Implemented.
Student Training Manuals prepared to demonstrate Pre-Trip Procedures, as well as bulletins and directives on A/C functionality. Seasonal uniform bulletins issued each summer/winter. Safety Advisories issued each season.
MA.00674
Hmp Index: MA.00674 • Mitigation Actions Title: Communications Redundant System • Lead Agency: MTA-Buses
Hmp Index
MA.00674
Mitigation Actions Title
Communications Redundant System
Mitigation Actions Description
Develop communications system with surge protection to allow uninterrupted operation during potential power surges due to rolling black-outs or electrical storms. Additional redundancies include steam generator back-up and "failsoft" computer based protection.
Lead Agency
MTA-Buses
Action Category
Emergency Services
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Extreme Heat
Other Funding Source
Unknown
MA.00675
Hmp Index: MA.00675 • Mitigation Actions Title: Baisley Park depot drainage improvement • Lead Agency: MTA-Buses
Hmp Index
MA.00675
Mitigation Actions Title
Baisley Park depot drainage improvement
Mitigation Actions Description
Implement corrective actions to mitigate repetitive flooding caused by moderate to heavy rain.
Lead Agency
MTA-Buses
Action Category
Property Protection
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Estimated Cost
$8,000,000.00
State Funding Source
MTA
MA.00676
Hmp Index: MA.00676 • Mitigation Actions Title: Dewatering of oil-water separators at the Grand Avenue depot • Lead Agency: MTA-Buses
Hmp Index
MA.00676
Mitigation Actions Title
Dewatering of oil-water separators at the Grand Avenue depot
Mitigation Actions Description
Provide additional capacity for incoming rainwater. Drain 200,000-gallon stormwater retention tank to accept incoming rainwater. (This tank is normally full and used for bus washing.)
Lead Agency
MTA-Buses
Action Category
Prevention and Policy
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Other Funding Source
Unknown
MA.00677
Hmp Index: MA.00677 • Mitigation Actions Title: JFK depot drainage improvement • Lead Agency: MTA-Buses
Hmp Index
MA.00677
Mitigation Actions Title
JFK depot drainage improvement
Mitigation Actions Description
Include on-site stormwater management improvements at new parking facilities to decrease flow to DEP treatment facilities during high-volume precipitation events.
Lead Agency
MTA-Buses
Action Category
Infrastructure Projects
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Estimated Cost
$3,000,000.00
State Funding Source
MTA
MA.00678
Hmp Index: MA.00678 • Mitigation Actions Title: Contingency planning for substitute bus service • Lead Agency: MTA-Buses
Hmp Index
MA.00678
Mitigation Actions Title
Contingency planning for substitute bus service
Mitigation Actions Description
Purchase mobile emergency command center vehicles, fuel tank trucks, and mobile and fixed equipment for bus operations including electronic variable message signs, pumps, portable generators, and portable tower lights.
Lead Agency
MTA-Buses
Action Category
Emergency Services
Action Status
Proposed or Not Started
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms,Flooding,High Winds,Non-Natural
Other Funding Source
Unknown
MA.00679
Hmp Index: MA.00679 • Mitigation Actions Title: Bus command center and radio system • Lead Agency: MTA-Buses
Hmp Index
MA.00679
Mitigation Actions Title
Bus command center and radio system
Mitigation Actions Description
Replace obsolete facility and system with state-of-the-art command center and radio communication system.
Lead Agency
MTA-Buses
Action Category
Emergency Services
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms,Earthquakes,Flooding,High Winds,Winter Weather,Non-Natural
Estimated Start
2012-02-27T00:00:00.000
Estimated Cost
$245,498,363.00
Other Funding Source
Unknown
Notes
These are two separate projects funded in both the NYCT and MTA Bus core capital programs. Each project has separate start and finish dates and distinct budgets. Dates represent the outlying parameters and the budget is combined.
New Bus Command Center (Facility) is now fully staffed. Installation of Radio System on bus fleet projected to be completed August 2024.
MA.00680
Hmp Index: MA.00680 • Mitigation Actions Title: Contingency bus fleet • Mitigation Actions Description: Establish fleet of up to 50 buses to support emergencies.
Hmp Index
MA.00680
Mitigation Actions Title
Contingency bus fleet
Mitigation Actions Description
Establish fleet of up to 50 buses to support emergencies.
Lead Agency
MTA-Buses
Action Category
Emergency Services
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms,Earthquakes,Flooding,High Winds,Winter Weather,Non-Natural
State Funding Source
MTA
MA.00681
Hmp Index: MA.00681 • Mitigation Actions Title: Emergency generators • Lead Agency: MTA-Buses
Hmp Index
MA.00681
Mitigation Actions Title
Emergency generators
Mitigation Actions Description
Install at depots at JFK and LaGuardia Airports and Baisley Park to provide electrical power backup.
Lead Agency
MTA-Buses
Action Category
Property Protection
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms,Earthquakes,Flooding,High Winds,Winter Weather,Non-Natural
Other Funding Source
Unknown
MA.00683
Hmp Index: MA.00683 • Mitigation Actions Title: Continuity of Operations Planning • Lead Agency: New York City Department of Transportation
Hmp Index
MA.00683
Mitigation Actions Title
Continuity of Operations Planning
Mitigation Actions Description
Prepare for continuity of operations to support operations immediately following an event. Maintain and continually update agency Continuity of Operations Plan.
Lead Agency
New York City Department of Transportation
Action Category
Emergency Services
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms,Earthquakes,Flooding,High Winds,Non-Natural
City Funding Source
City Expense
Description Of Social Vulnerability Addressed
NYCDOT operations provide vital services that support all New Yorkers, including the most vulnerable.
Description Of Critical Facility
NYCDOT operations provide critical services that support all New Yorkers.
MA.00684
Hmp Index: MA.00684 • Mitigation Actions Title: Information tracking • Lead Agency: New York City Department of Transportation
Hmp Index
MA.00684
Mitigation Actions Title
Information tracking
Mitigation Actions Description
Follow formalized response to natural hazard-based incidents to identify repetitive loss locations or hazards. Use this information to inform the creation and implementation of future mitigation actions.
Lead Agency
New York City Department of Transportation
Action Category
Emergency Services
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms,Earthquakes,Flooding,High Winds,Non-Natural,Winter Weather
Estimated Cost
$150,000.00
City Funding Source
City Capital,City Expense
MA.00685
Hmp Index: MA.00685 • Mitigation Actions Title: Redundant power for all mission-critical DOT sites • Mitigation Actions Description: Provide and/or upgrade generators at fleet fueling stations.
Hmp Index
MA.00685
Mitigation Actions Title
Redundant power for all mission-critical DOT sites
Mitigation Actions Description
Provide and/or upgrade generators at fleet fueling stations.
Description Problem
NYCDOT facilities can be vulnerable to power loss, but provide essential services that may be required during blackouts and other emergencies.
Lead Agency
New York City Department of Transportation
Action Category
Emergency Services
Action Status
Proposed or Not Started
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms,Flooding,Non-Natural
Other Funding Source
Unknown
Description Of Critical Facility
Mission-critical DOT sites.
Notes
A generator project at 5 Dubois should be starting next year (right now, the project is going out for bids). Harper Street Yard will have an updated generator system as part of the design-build project that will be starting construction in 2024. Flatlands Yard is undergoing a CPSD study, which will include the options for new generators to power the site during emergencies.
MA.00686
Hmp Index: MA.00686 • Mitigation Actions Title: Permeable pavement • Lead Agency: New York City Department of Transportation
Hmp Index
MA.00686
Mitigation Actions Title
Permeable pavement
Mitigation Actions Description
1) NYC DOT is monitoring porous concrete installed on sidewalks in three key locations to detain and infiltrate stormwater to mitigate localized flooding of streets and reduce loads on sewage treatment plants and consequent combined sewer overflows. 2) In partnership with NYC DEP, NYC DOT is testing porous concrete in a bike lane to understand suitability for this application. If porous concrete can be pursued in bike lanes, porous concrete panels and bike lane can coexist without one precluding the other. This will allow DOT and DEP pursue street safety goals and stormwater management goals simultaneously. 3) Porous concrete panels are being installed as a pilot to address ponding at the base of pedestrian ramps which will increase mobility and accessibility for corners with ponding
Description Problem
Porous concrete can help to detain and infiltrate stormwater to mitigate localized flooding of streets and reduce loads on sewage treatment plants and consequent combined sewer overflows.
Lead Agency
New York City Department of Transportation
Action Category
Infrastructure Projects
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Estimated Cost
$1,200,000.00
City Funding Source
City Expense
Notes
There are three porous concrete panel pilots that are in various points of progress. All are meant to address stormwater management, localized flooding, water quality and street safety goals.
MA.00687
Hmp Index: MA.00687 • Mitigation Actions Title: Pedestrian and bicycle facilities • Lead Agency: New York City Department of Transportation
Hmp Index
MA.00687
Mitigation Actions Title
Pedestrian and bicycle facilities
Mitigation Actions Description
Plan for and install new facilities to improve connectivity to key transportation hubs. In addition to improving mobility during normal circumstances, a robust and flexible bicycle and pedestrian network allows for adaptation to disruptions ranging from subway outages to pandemics.
Lead Agency
New York City Department of Transportation
Action Category
Infrastructure Projects
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms,Earthquakes,Flooding,Non-Natural
Federal Funding Source
FHWA
Description Of Social Vulnerability Addressed
Pedestrian and bicycle networks provide mobility to a broad range of New Yorkers, including vulnerable populations.
Description Of Critical Facility
Mobility is critical to the functioning of the city as a whole.
MA.00688
Hmp Index: MA.00688 • Mitigation Actions Title: Resiliency in DOT planning • Lead Agency: New York City Department of Transportation
Hmp Index
MA.00688
Mitigation Actions Title
Resiliency in DOT planning
Mitigation Actions Description
Integrate resiliency data, programs, practice and design in planning and project development.
Description Problem
To encourage the incorporation of Resiliency as intrinsic part of project planning, rather than as a stand alone element.
Lead Agency
New York City Department of Transportation
Support Agency
Department of Design and Construction,Economic Development Corporation, Mayor's Office of Long Term Planning and Sustainability (OLTPS)
Action Category
Infrastructure Projects
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms,Coastal Erosion,Extreme Heat,Flooding,High Winds,Winter Weather,Drought,Non-Natural
Federal Funding Source
FEMA-HMGP
City Funding Source
City Expense
Description Of Social Vulnerability Addressed
NYCDOT operations provide vital services that support all New Yorkers, including the most vulnerable.
Description Of Critical Facility
NYCDOT operations provide critical services that support all New Yorkers.
Notes
As indicated in MH.E.70 and MH.E.71, NYCDOT continues to integrate resiliency into its planning process for capital projects using the Street Design Manual and the New York City Climate Resiliency Design Guidelines. Cost estimate TBD.
MA.00689
Hmp Index: MA.00689 • Mitigation Actions Title: Staten Island Ferry fleet upgrade • Lead Agency: New York City Department of Transportation
Hmp Index
MA.00689
Mitigation Actions Title
Staten Island Ferry fleet upgrade
Mitigation Actions Description
Purchase new vessels to replace the Barberi class vessels, thereby improving the capability of the fleet.
Description Problem
The new ferries are designed to be more stable than the current ones under extreme weather conditions, and more maneuverable so that they can travel improvised routes during emergencies and serve many more landings. The new ferries, each with a capacity of 4,500 passengers, will be the backbone of peak hour service and a more resilient fleet. The Ollis-class ferries, with their superior handling and maneuverability, combined with auxiliary side doors, are better capable of withstanding adverse storm and climate change conditions. The justification for the activity is the need to better prepare the city’s ferry system to respond to transit emergencies such as extreme weather and power outages.
Lead Agency
New York City Department of Transportation
Action Category
Infrastructure Projects
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms,Earthquakes,Flooding,High Winds,Non-Natural
Estimated Start
2017-02-01T00:00:00.000
Estimated Finish
2024-02-01T00:00:00.000
Estimated Cost
$250,900,000.00
Federal Funding Source
FTA
City Funding Source
City Capital
Description Of Social Vulnerability Addressed
The upgrade will allow the continued provision of mobility to the residents of Staten Island and others.
Description Of Critical Facility
Staten Island Ferry
Notes
Vessels replace obsolete vessels with capability for side door loading/offloading. Project done in concert with Emergency Landings installation where the new Ollis-class vessels can unload passangers being evacuated from Lower Manhattan
MA.00690
Hmp Index: MA.00690 • Mitigation Actions Title: Resiliency upgrades at Harper Street Yard and Harper Street Asphalt • Lead Agency: New York City Department of Transportation
Hmp Index
MA.00690
Mitigation Actions Title
Resiliency upgrades at Harper Street Yard and Harper Street Asphalt
Mitigation Actions Description
The peninsula encompassing the NYCDOT Harper Street Asphalt Plant and Harper Street Fleet Yard is vulnerable to flooding from storms and extreme tides. This problem is likely to become worse with sea level rise. Resiliency measures are being incorporated into the reconstruction of the Harper Street Fleet Yard (joint project with DDC) as well as to the reconstruction of the wharf at the adjacent Harper Street Asphalt Plant (joint project with EDC).
Description Problem
The peninsula encompassing the NYCDOT Harper Street Asphalt Plant and Harper Street Fleet Yard is vulnerable to flooding from storms and extreme tides. This problem is likely to become worse with sea level rise.
Lead Agency
New York City Department of Transportation
Support Agency
Department of Design and Construction,Economic Development Corporation
Action Category
Infrastructure Projects
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Description Of Social Vulnerability Addressed
Asphalt production and DOT fleet support provide critical functionality to maintenance of the city's roadway and bridge network. This network provides essential mobility for all New Yorkers, including the most vulnerable.
Description Of Critical Facility
Asphalt production and DOT fleet support provide critical functionality to maintenance of the city's roadway and bridge network.
Notes
The peninsula encompassing the NYCDOT Harper Street Asphalt Plant and Harper Street Fleet Yard is vulnerable to flooding from storms and extreme tides. This problem is likely to become worse with sea level rise. Resiliency measures are being incorporated into the reconstruction of the Harper Street Fleet Yard (joint project with DDC) as well as to the reconstruction of the wharf at the adjacent Harper Street Asphalt Plant (joint project with EDC).
MA.00691
Hmp Index: MA.00691 • Mitigation Actions Title: Resiliency Improvements to Flatlands Highway Yard • Lead Agency: New York City Department of Transportation
Hmp Index
MA.00691
Mitigation Actions Title
Resiliency Improvements to Flatlands Highway Yard
Mitigation Actions Description
Study the provision of enhanced flood protection at the NYCDOT Flatlands Highway Yard
Description Problem
The NYCDOT Flatlands Highway Yard is located along the banks of Paerdegat Basin in Brooklyn, and is vulnerable to flooding.
Lead Agency
New York City Department of Transportation
Support Agency
Economic Development Corporation
Action Category
Infrastructure Projects
Action Status
Proposed or Not Started
Action Status Date
2023-12-15T00:00:00.000
Description Of Critical Facility
Flatlands Highway Yard
Notes
Project is in planning stage.
MA.00692
Hmp Index: MA.00692 • Mitigation Actions Title: Cool Corridors (Project Scoping) • Lead Agency: New York City Department of Transportation
Hmp Index
MA.00692
Mitigation Actions Title
Cool Corridors (Project Scoping)
Mitigation Actions Description
Develop a template for heat mitigation projects that could be applied in cities nationwide. This planning project will have three principal areas of focus: 1. To develop a toolkit of interventions and best practices that are suited, when used singly and especially in combination, to treat urban streets (including sidewalks) to mitigate the effects of heat. 2. To apply this toolkit conceptually to a number of archetypical neighborhood situations (“typologies”), each with distinct street grids, densities, land uses and community needs – based on actual local examples. 3. To explore, identify and refine the analytical tools and performance metrics necessary to properly assess potential interventions, including a sound benefit-cost methodology and prospective future proposal for BRIC funding to support a follow up capital project.
Description Problem
Heat is already one of the largest climate-related factors influencing health and mortality. Increased temperatures is expected to amplify the negative impacts of heat.
Lead Agency
New York City Department of Transportation
Support Agency
Department of Health and Mental Hygiene,New York City Emergency Management
Action Category
Prevention and Policy
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Extreme Heat
Estimated Start
2023-04-05T00:00:00.000
Estimated Finish
2024-09-30T00:00:00.000
Estimated Cost
$430,500.00
Federal Funding Source
FEMA
City Funding Source
City Expense
Description Of Social Vulnerability Addressed
Heat is already one of the largest climate-related factors influencing health and mortality, especially for the most vulnerable New Yorkers. Increased temperatures is expected to amplify the negative impacts of heat.
Description Of Critical Facility
The street network provides critical mobility to all residents, including those walking and cycling.
Planning Regulation Capability
NYCDOT Street Design Manual
Financial Capability
FEMA BRIC Program
Notes
It is anticipated that the results of the study will inform the development of future capital projects.
MA.00693
Hmp Index: MA.00693 • Mitigation Actions Title: Incorporation of climate resiliency features in DOT capital projects • Lead Agency: New York City Department of Transportation
Hmp Index
MA.00693
Mitigation Actions Title
Incorporation of climate resiliency features in DOT capital projects
Mitigation Actions Description
Apply the City's Climate Resiliency Design Guidelines into the prescopoing process for capital roadway projects in high-risk areas. As solutions and features are refined and their effectiveness and cost-effectiveness are demonstrated, evaluate feasibility for inclusion in design phase future NYCDOT capital projects. Examples include: FEMA 406-funded work at various roadway locations (see PW#'s including 4393, 3666, and 3957)
Lead Agency
New York City Department of Transportation
Action Category
Prevention and Policy
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms,Coastal Erosion,Extreme Heat,Flooding,High Winds,Winter Weather,Non-Natural
Federal Funding Source
FEMA-HMGP,FHWA
City Funding Source
City Capital,City Expense
Notes
NYCDOT incorporated resiliency/ climate adaptation in the new and revised Street Design Manual 4.1 in 2022. The roadway reconstruction scoping process from NYCDOT to DDC now includes flood risk and sea level rise as design consideration for DDC. Toolbox e
MA.00694
Hmp Index: MA.00694 • Mitigation Actions Title: Emergency traffic management • Lead Agency: New York City Department of Transportation
Hmp Index
MA.00694
Mitigation Actions Title
Emergency traffic management
Mitigation Actions Description
The agency maintains plans and capabilities to operate the street network in the event of natural disasters and other emergencies.
Lead Agency
New York City Department of Transportation
Action Category
Prevention and Policy
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms,Earthquakes,Flooding,Non-Natural
Federal Funding Source
FEMA-HMGP,FHWA
Description Of Social Vulnerability Addressed
The roadway network essential mobility for all New Yorkers, especially our most vulnerable populations.
Description Of Critical Facility
The roadway network is critical to the operation of the City, both during ordinary circumstances, and during periods of transportation disruptions.
Notes
The City has developed and regularly updates plans for traffic and transit management strategies in the wake of major system disruptions, including storms, blizzards, a maritime emergency and a transit strike. The City regularly holds tabletop preparedn
MA.00695
Hmp Index: MA.00695 • Mitigation Actions Title: Bus Priority Strategies • Lead Agency: New York City Department of Transportation
Hmp Index
MA.00695
Mitigation Actions Title
Bus Priority Strategies
Mitigation Actions Description
Expand Select Bus Service and other bus priority strategies. In addition to improving mobility during normal circumstances, a robust and flexible bus network allows for adaptation to disruptions ranging from subway outages to pandemics.
Lead Agency
New York City Department of Transportation
Support Agency
MTA-Buses
Action Category
Prevention and Policy
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms,Earthquakes,Flooding,Non-Natural
Federal Funding Source
FHWA,FTA
Description Of Social Vulnerability Addressed
Bus transit provides essential mobility for all New Yorkers, especially our most vulnerable populations.
Description Of Critical Facility
Bus transit is critical to the operation of the City, both during ordinary circumstances, and during periods of transportation disruptions.
Notes
The City and the MTA continue to expand Select Bus Service (SBS) and other bus priority treatments.
MA.00696
Hmp Index: MA.00696 • Mitigation Actions Title: Secure HAZMAT at DOT facilities • Lead Agency: New York City Department of Transportation
Hmp Index
MA.00696
Mitigation Actions Title
Secure HAZMAT at DOT facilities
Mitigation Actions Description
Examples include: Prevent release, in the event of hazard event, of herbicides at Arterials yards; combustible materials at sites such as Webster Fleet Services Shop; fuel from above-ground tanks at sites such as Conner Street Yard.
Lead Agency
New York City Department of Transportation
Action Category
Property Protection
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Non-Natural
City Funding Source
City Capital
Description Of Critical Facility
NYCDOT operations provide critical services that support all New Yorkers.
Notes
Paint storage facility completed at Wythe Yard; truck wash stations and spill containment equipment; on-going HAZMAT compliance work across the agency.
MA.00697
Hmp Index: MA.00697 • Lead Agency: New York City Department of Transportation • Action Category: Property Protection
Hmp Index
MA.00697
Mitigation Actions Title
Protection of NYCDOT tunnels in Lower Manhattan (Floodproofing of Battery Park Underpass + West Street Underpass)
Mitigation Actions Description
Install permanent structures to mitigate against future flooding of the tunnels and damage to its electrical and mechanical systems.
Description Problem
Battery Park Underpass and West Street Underpass were flooded during Hurricane Sandy, requiring extensive repair work. These underpasses are critical infrastructure that require a permanent solution to the risk of future flooding.
Lead Agency
New York City Department of Transportation
Action Category
Property Protection
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Flooding
Estimated Start
2024-05-27T00:00:00.000
Estimated Cost
$76,000,000.00
Federal Funding Source
FHWA
City Funding Source
City Capital
Description Of Social Vulnerability Addressed
The Underpasses connect vital transportation routes throughout the city, which in turn provide multitudes of communities with the goods, services, and basic necessity of movement required to function. The stability (and in turn, vulnerability) of these social networks depends directly on their ability to maintain access via their transportation networks, thus safeguarding transit routes such as the Underpasses also safeguards society. The hardening of the Underpasses (floodproof barriers, elevation of entry points, etc.) protects access and minimizes vulnerability for community members, increases community resilience, preserves safe evacuation routes, and mitigates strain and congestion that would be put on other routes if the Underpasses were to become unusable.
Description Of Critical Facility
The underpasses are critical infrastructure that help to facilitate the flow of traffic in and around lower Manhattan. Protecting these underpasses by mitigating physical damage against the structures will decrease future repair costs, enhance the long-term resilience (avoid accelerated aging) of the structure, and other issues (traffic needing to be diverted around damage or subsequent repair work, etc.) that would result if left unprotected during severe flooding events.
Administrative Technical Capability
NYC Waterfront Inspection Program (and Guideline Manual),NYC Waterfront Revitalization Program (WRP),NYC Hazard Mitigation Plan (HMP),NYC Climate Resiliency Design Guidelines,DHSES (NYS) Hazard Mitigation Plan (HMP),FEMA Federal Flood Risk Management Standard (FFRMS),FEMA National Flood Insurance Program (NFIP),NYMTC Regional Tranportation Plan - Resilience Improvement Plan (addendum).,NYC Waterfront Inspection Program (and Guideline Manual),NYC Waterfront Revitalization Program (WRP),NYC Hazard Mitigation Plan (HMP),NYC Climate Resiliency Design Guidelines,DHSES (NYS) Hazard Mitigation Plan (HMP),FEMA Federal Flood Risk Management Standard (FFRMS),FEMA National Flood Insurance Program (NFIP),NYMTC Regional Tranportation Plan - Resilience Improvement Plan (addendum).,NYC Waterfront Inspection Program (and Guideline Manual); NYC Waterfront Revitalization Program (WRP); NYC Hazard Mitigation Plan (HMP); NYC Climate Resiliency Design Guidelines; DHSES (NYS) Hazard Mitigation Plan (HMP); FEMA Federal Flood Risk Management Standard (FFRMS); FEMA National Flood Insurance Program (NFIP); NYMTC Regional Tranportation Plan - Resilience Improvement Plan (addendum).
Financial Capability
Federal Highway Administration Emergency Relief
Notes
NYCDOT has purchased and tested inflatable water dams to protect the Battery and West Street Underpasses in Lower Manhattan in case of flood risk. The current contract anticipated to begin next year will install flood protection gates and measures for the ventilation shafts.
MA.00698
Hmp Index: MA.00698 • Mitigation Actions Title: Brookville Boulevard Study • Lead Agency: New York City Department of Transportation
Hmp Index
MA.00698
Mitigation Actions Title
Brookville Boulevard Study
Mitigation Actions Description
The New York City Department of Transportation (NYC DOT), in partnership with the New York City Mayor’s Office of Climate & Environmental Justice, the Department of Parks and Recreation, and the Department of Emergency Management, seek Advance Assistance funding to mitigate the impacts of flooding on Brookville Boulevard between 149th Avenue and Rockaway Boulevard.
Description Problem
The southern portion of Brookville Boulevard is already susceptible to flooding, and is expected to become increasingly vulnerable with sea level rise and more intense rainfall.
Lead Agency
New York City Department of Transportation
Support Agency
Department of Parks and Recreation
Action Category
Property Protection
Action Status
Proposed or Not Started
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms,Flooding
Estimated Cost
$2,887,500.00
Federal Funding Source
FEMA-HMGP
Description Of Social Vulnerability Addressed
The road provides an important local connection
Description Of Critical Facility
The southern portion of Brookville Boulevard is the only roadway in its immediate corridor, and does not offer nearby detours or alternate routes.
MA.00699
Hmp Index: MA.00699 • Mitigation Actions Title: Traffic signal and street light equipment • Mitigation Actions Description: Elevate equipment in flood zones.
Hmp Index
MA.00699
Mitigation Actions Title
Traffic signal and street light equipment
Mitigation Actions Description
Elevate equipment in flood zones.
Description Problem
During Hurricane Sandy, street lights and traffic signals sustained considerable damage to their electrical systems.
Lead Agency
New York City Department of Transportation
Action Category
Property Protection
Action Status
Completed
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms,Flooding,High Winds
Estimated Cost
$3,000,000.00
Federal Funding Source
FEMA-HMGP,FHWA
City Funding Source
City Capital
Description Of Social Vulnerability Addressed
Proper lighting directly and immediately affects safety, thus the resilience of the lighting network directly impacts the resiliency (i.e., vulnerability) of the community. Using LED lighting is particularly beneficial for public safety and improving social vulnerability, as well-lit areas enhance visibility and reduce the risk of accidents, crimes, or other safety concerns. Elevating electrical components protects them from flooding, thus protect communities, especially those with higher social vulnerabilities, by maintaining essential infrastructure functionality before, during, and after climate-related events.
Description Of Critical Facility
Roads are critical facilities required for even the most basic functioning of a community, and their lighting (signals and street lights) is at the core of its ability to manage safe and efficient movement for all users. Roads need to safe and accessible at all times, which means that their lights need to be resilient and dependable (regardless of the weather).
Planning Regulation Capability
NYC Waterfront Inspection Program (and Guideline Manual),NYC Waterfront Revitalization Program (WRP),NYC Hazard Mitigation Plan (HMP),NYC Climate Resiliency Design Guidelines,DHSES (NYS) Hazard Mitigation Plan (HMP),FEMA Federal Flood Risk Management Standard (FFRMS),FEMA National Flood Insurance Program (NFIP)
Notes
Work at certain critical locations has been completed. Given the location of some sites in the future flood plain, reducing that risk on Street Lighting and Traffic electrical system, such as boxes, conduits, foundations, and poles may be required. Designers have to coordinate possible details with NYC DOT Traffic and Street Lighting Units for individual projects. Further, DOT does not have planned funding or resources to take on this type of designs at this time.
MA.00700
Hmp Index: MA.00700 • Mitigation Actions Title: Protection of New York City bridges from hazards • Lead Agency: New York City Department of Transportation
Hmp Index
MA.00700
Mitigation Actions Title
Protection of New York City bridges from hazards
Mitigation Actions Description
Examples include implementing measures such as: seismic retrofits, structural hardening, inspections, and retrofits to protect moveable bridge machinery and four NYC East River Bridges.
Description Problem
EXAMPLE, FEMA ONLY: Carroll Street Bridge, and its control room, were damaged by flooding in Hurricane Sandy.
Lead Agency
New York City Department of Transportation
Action Category
Property Protection
Action Status
In-Progress
Action Status Date
2023-12-15T00:00:00.000
Hazards Addressed
Coastal Storms,Earthquakes,High Winds,Non-Natural
Estimated Cost
$1,000,000,000.00
City Funding Source
City Capital
Description Of Social Vulnerability Addressed
Bridges are critical infrastructure anywhere, and exceptionally so in NYC, which is comprised of several islands and is surrounded by water along much of its perimeter. The social network of this city requires constant access and freedom of motion, thus its bridges must remain in operable order no matter the climate-related event. Implementing resilient features to the bridges make them more dependable for all members of the vulnerable social structure that relies on them.
Description Of Critical Facility
Many NYCDOT bridges, including the East River Bridges, are critical facilities
Notes
Hazard mitigation work continues on the East River Bridges. FEMA work on Carroll Street Bridge completed.