Capital Project Detail Data - Dollars

This dataset contains capital commitment plan data by project type, budget line and source of funds. The dollar values are in thousands. The dataset was updated three times a year during the Preliminary, Executive and Adopted Capital Commitment Plans. Starting in January 2024, OMB will no longer update this dataset. It is being replaced by the Capital Projects Dashboard administered by the Mayor's Office of Operations.

City Government Mayor’s Office of Management and Budget (OMB) Dataset wa2y-rh4b 30 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
CS-FB-BWR
Project Descr
FLUSHING BAY BENDING WEIRS AT REGULATORS
Typ Category Name
WATER QUALITY MANDATES
Community Board
400407
Budget Line
WP-0169
Delay Desc
PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGN
Scope Text
FLUSHING BAY BENDING WEIRS AT REGULATORS. FLUSHING BAY WATER QUALITY
Fy Yr1 Plan
2020
Orig Bud Amt
11000
City Prior Actual
38863
City Yr1 Plan
744
City Yr2 Plan
0
City Yr3 Plan
0
City Yr4 Plan
0
City Yr5 Plan
0
City Rtc
0
City Plan Total
39607
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
CS-JA-BWR
Project Descr
JAMAICA BAY BENDING WEIRS AT REGULATORS
Typ Category Name
WATER QUALITY MANDATES
Community Board
400410412413414
Budget Line
WP-0169
Delay Desc
PROJECT DELAYED DUE TO BUDGETARY CONSTRAINTS
Scope Text
JAMAICA BAY BENDING WEIRS
Fy Yr1 Plan
2020
Orig Bud Amt
14366
City Prior Actual
10055
City Yr1 Plan
244
City Yr2 Plan
0
City Yr3 Plan
0
City Yr4 Plan
0
City Yr5 Plan
0
City Rtc
0
City Plan Total
10299
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
CS-NC-BAP
Project Descr
BORDEN AVENUE PUMP STATION EXPANSION
Typ Category Name
WATER QUALITY MANDATES
Community Board
400
Budget Line
WP-0169
Scope Text
THE PROJECT WILL CONTROL CSO DISCHARGES TO DUTCH KILLS BY DIVERTING WET WEATHER FLOW FROM OUTFALL BB-026 VIA A NEW DIVERSION CHAMBER WITH TIDE GATE. NEW GRAVITY PIPING WILL BE CONSTRUCTED TO CONVEY FLOW FROM THE NEW DIVERSION CHAMBER TO THE BORDEN AVENUE PUMP STATION. THE CAPACITY OF THE BORDEN AVENUE PUMP STATION WILL BE EXPANDED TO INCLUDE 26 MGD OF WET WEATHER FLOW AND NEW FORCE MAIN WILL BE CONSTRUCTED FROM THE BORDEN AVENUE PUMP STATION TO UPSTREAM OF THE KENT AVENUE GATE WHICH SERVICES THE NEWTOWN CREEK WWTP.
Fy Yr1 Plan
2020
Orig Bud Amt
74000
City Prior Actual
0
City Yr1 Plan
0
City Yr2 Plan
5310
City Yr3 Plan
0
City Yr4 Plan
0
City Yr5 Plan
6000
City Rtc
60000
City Plan Total
71310
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
CS-NC-CST
Project Descr
NEWTOWN CREEK CSO STORAGE TUNNEL
Typ Category Name
WATER QUALITY MANDATES
Community Board
400
Budget Line
WP-0169
Delay Desc
PROJECT DELAYED DUE TO BUDGETARY CONSTRAINTS
Scope Text
NEWTOWN CREEK CSO STORAGE TUNNEL. WATER QUALITY FACILITY COMBINED SEWER OVERFLOW NEWTOWN CREEK.
Fy Yr1 Plan
2020
Orig Bud Amt
31390
City Prior Actual
0
City Yr1 Plan
0
City Yr2 Plan
0
City Yr3 Plan
0
City Yr4 Plan
0
City Yr5 Plan
2690
City Rtc
13300
City Plan Total
15990
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
CS-NC-EKE
Project Descr
ENGLISH KILLS AERATION, ENHANCED ZONE II
Typ Category Name
WATER QUALITY MANDATES
Community Board
400402405
Budget Line
WP-0169
Delay Desc
PROJECT DELAYED PENDING RESOLUTION OF LEGAL ISSUES
Scope Text
ENGLISH KILLS AERATION, ENHANCED ZONE II. WATER QUALITY FACILITY COMBINED SEWER OVERFLOW NEWTOWN CREEK.
Fy Yr1 Plan
2020
Orig Bud Amt
97309
City Prior Actual
27403
City Yr1 Plan
1663
City Yr2 Plan
20000
City Yr3 Plan
0
City Yr4 Plan
0
City Yr5 Plan
0
City Rtc
0
City Plan Total
49066
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
CSO-AC-DF
Project Descr
CSO ALLEY CREEK DISINFECTION
Typ Category Name
WATER QUALITY MANDATES
Community Board
400
Budget Line
WP-0169
Scope Text
CSO ALLEY CREEK DISINFECTION
Fy Yr1 Plan
2020
Orig Bud Amt
12000
City Prior Actual
2365
City Yr1 Plan
153
City Yr2 Plan
0
City Yr3 Plan
1500
City Yr4 Plan
0
City Yr5 Plan
16659
City Rtc
0
City Plan Total
20677
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200416
Pub Date: 20200416 • Boro: CITYWIDE • Managing Agcy Cd: 057
Pub Date
20200416
Boro
CITYWIDE
Managing Agcy Cd
057
Managing Agcy
FIRE DEPARTMENT
Project Id
F175WP276
Project Descr
WATERPROOFING - EC276
Typ Category Name
NEW FACILITIES AND RENOVATIONS
Community Board
0
Budget Line
F-0175
Delay Desc
PROJECT DELAYED DUE TO UNFORESEEN SITE/FIELD CONDITION
Scope Text
WATERPROOFING - EC276
Fy Yr1 Plan
2020
Orig Bud Amt
2329
City Prior Actual
3514
City Yr1 Plan
122
City Yr2 Plan
178
City Yr3 Plan
0
City Yr4 Plan
0
City Yr5 Plan
0
City Rtc
0
City Plan Total
3814
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
CSO-FBAY
Project Descr
CONSTRUCTION OF THE FLUSHING BAY CSO ABATEMENT FACILITIES
Typ Category Name
WATER QUALITY MANDATES
Community Board
400407
Budget Line
WP-0169
Delay Desc
PROJECT DELAYED DUE TO BUDGETARY CONSTRAINTS
Scope Text
CONSTRUCTION OF THE FLUSHING BAY CSO ABATEMENT FACILITIES
Fy Yr1 Plan
2020
Orig Bud Amt
128250
City Prior Actual
0
City Yr1 Plan
0
City Yr2 Plan
66609
City Yr3 Plan
0
City Yr4 Plan
0
City Yr5 Plan
55641
City Rtc
0
City Plan Total
122250
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
CSO-FC-DF
Project Descr
CSO FLUSHING CREEK & TI-011 DISINFECTION
Typ Category Name
WATER QUALITY MANDATES
Community Board
400407
Budget Line
WP-0169
Scope Text
CSO FLUSHING CREEK & TI-011 DISINFECTION
Fy Yr1 Plan
2020
Orig Bud Amt
24000
City Prior Actual
14730
City Yr1 Plan
0
City Yr2 Plan
0
City Yr3 Plan
9500
City Yr4 Plan
56500
City Yr5 Plan
0
City Rtc
9000
City Plan Total
89730
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
CSO-JA
Project Descr
JAMAICA WATER QUALITY COMBINED SEWER OVERLOW
Typ Category Name
WATER QUALITY MANDATES
Community Board
400410412413414
Budget Line
WP-0169
Delay Desc
PROJECT DELAYED DUE TO BUDGETARY CONSTRAINTS
Fy Yr1 Plan
2020
Orig Bud Amt
170508
City Prior Actual
17640
City Yr1 Plan
797
City Yr2 Plan
0
City Yr3 Plan
500
City Yr4 Plan
0
City Yr5 Plan
0
City Rtc
0
City Plan Total
18937
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
FB-001-L
Project Descr
UPGRADE OF FLUSHING BAY CSO FACILITY BAR SCREEN SYSTEM
Typ Category Name
WATER QUALITY MANDATES
Community Board
400407
Budget Line
WP-0169
Delay Desc
PROJECT DELAYED DUE TO UNFORESEEN SITE/FIELD CONDITION
Site Descr
FLUSHING BAY/TALLMAN ISLAND WPCP/QUEENS
Scope Text
RECONSTRUCTION OF SCREENS AT FLUSHING BAY/TALLMAN ISLAND WPCP
Fy Yr1 Plan
2020
Orig Bud Amt
12900
City Prior Actual
10871
City Yr1 Plan
325
City Yr2 Plan
0
City Yr3 Plan
0
City Yr4 Plan
0
City Yr5 Plan
0
City Rtc
0
City Plan Total
11196
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
FCWET
Project Descr
CONSTRUCTION OF FLUSHING CREEK WETLAND PROJECT
Typ Category Name
WATER QUALITY MANDATES
Community Board
400
Budget Line
WP-0169
Scope Text
CONSTRUCTION OF FLUSHING CREEK WETLAND PROJECT
Fy Yr1 Plan
2020
Orig Bud Amt
8000
City Prior Actual
0
City Yr1 Plan
0
City Yr2 Plan
0
City Yr3 Plan
8000
City Yr4 Plan
0
City Yr5 Plan
0
City Rtc
0
City Plan Total
8000
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
GCTI10-1C
Project Descr
CONS OF ROW GI FLUSHING CREEK CSO TRIB AREA TI-10, ST 1 PH C
Typ Category Name
GREEN INFRASTRUCTURE PROGRAM
Community Board
400
Budget Line
WP-0169
Scope Text
CONSTRUCTION OF ROW GREEN INFRASTRUCTURE IN FLUSHING CREEK CSO TRIBUTARY AREA TI-10, STAGE 1, PHASE C
Fy Yr1 Plan
2020
Orig Bud Amt
14000
City Prior Actual
0
City Yr1 Plan
0
City Yr2 Plan
0
City Yr3 Plan
7637
City Yr4 Plan
0
City Yr5 Plan
0
City Rtc
0
City Plan Total
7637
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
J-191-L
Project Descr
RECONSTRUCTION OF THE HVAC (CHILLER) SYSTEM @ JAMAICA WWTP
Typ Category Name
PLANT UPGRADING AND RECONSTRUCTION
Community Board
400
Budget Line
WP-0112
Site Descr
150-20 134TH STREET, JAMAICA, NEW YORK 11430
Scope Text
RECONSTRUCTION OF THE HVAC SYSTEM INTHE ADMINISTRATION BUILDING AT THE JAMAICA WWTP.
Fy Yr1 Plan
2020
Orig Bud Amt
2117
City Prior Actual
150
City Yr1 Plan
1737
City Yr2 Plan
0
City Yr3 Plan
0
City Yr4 Plan
0
City Yr5 Plan
0
City Rtc
0
City Plan Total
1887
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
JA-179-L
Project Descr
INSTALLATION OF EMERGENCY GENERATORS AT JAMAICA WPCP
Typ Category Name
PLANT UPGRADING AND RECONSTRUCTION
Community Board
400410
Budget Line
WP-0112
Delay Desc
PROJECT DELAYED DUE TO BUDGETARY CONSTRAINTS
Site Descr
150-2- 134TH STREET, JAMAICA, N.Y. 11430
Scope Text
INSTALLATION OF EMERGENCY GENERATORS AT JAMAICA WPCP
Fy Yr1 Plan
2020
Orig Bud Amt
57768
City Prior Actual
6731
City Yr1 Plan
599
City Yr2 Plan
32866
City Yr3 Plan
0
City Yr4 Plan
0
City Yr5 Plan
0
City Rtc
0
City Plan Total
40196
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
JA-STAB
Project Descr
STABILIZATION PROGRAM AT JAMAICA WPCP
Typ Category Name
PLANT COMPONENT STABILIZATION
Community Board
412
Budget Line
WP-0247
Delay Desc
PROJECT DELAYED DUE TO BUDGETARY CONSTRAINTS
Site Descr
QUEENS
Scope Text
FINAL DESIGN TO IMPROVE PROCESS AND TREATMENT OPERATIONS AND TO ALLOWTO ACCEPT FLOW EQUAL TO AT LEAST TWICE THE DRY WEATHER FLOW
Fy Yr1 Plan
2020
Orig Bud Amt
638406
City Prior Actual
479024
City Yr1 Plan
2030
City Yr2 Plan
0
City Yr3 Plan
0
City Yr4 Plan
0
City Yr5 Plan
0
City Rtc
0
City Plan Total
481054
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
MASPETH
Project Descr
RECONSTRUCTION OF BUILDING, MASPETH, QUEENS
Typ Category Name
FACILITY PURCHASES AND RECONSTRUCTION
Community Board
400
Budget Line
EP-0006
Delay Desc
PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGN
Site Descr
RECONSTRUCTION OF BUILDING, MASPETH, QUEENS
Scope Text
RECONSTRUCTION OF BUILDING, MASPETH, QUEENS
Fy Yr1 Plan
2020
Orig Bud Amt
67374
City Prior Actual
5543
City Yr1 Plan
0
City Yr2 Plan
0
City Yr3 Plan
1000
City Yr4 Plan
0
City Yr5 Plan
0
City Rtc
10000
City Plan Total
16543
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
PS-277
Project Descr
RECONSTRUCTION AT 108 STREET PUMPING STATION
Typ Category Name
PLANT UPGRADING AND RECONSTRUCTION
Community Board
400
Budget Line
WP-0269
Site Descr
108 STREET
Scope Text
RECONSTRUCTION OF 108 STREET P.S.
Fy Yr1 Plan
2020
Orig Bud Amt
10990
City Prior Actual
500
City Yr1 Plan
0
City Yr2 Plan
4463
City Yr3 Plan
0
City Yr4 Plan
37300
City Yr5 Plan
0
City Rtc
0
City Plan Total
42263
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
PS-284
Project Descr
CLEARVIEW PUMPING STATION
Typ Category Name
PLANT UPGRADING AND RECONSTRUCTION
Community Board
400407
Budget Line
WP-0269
Site Descr
CLEARVIEW PUMPING STATION
Scope Text
CLEARVIEW PUMPING STATION
Fy Yr1 Plan
2020
Orig Bud Amt
25422
City Prior Actual
1000
City Yr1 Plan
3500
City Yr2 Plan
17422
City Yr3 Plan
0
City Yr4 Plan
0
City Yr5 Plan
0
City Rtc
0
City Plan Total
21922
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
PS-286
Project Descr
ST ALBANS PUMPING STATION
Typ Category Name
PLANT UPGRADING AND RECONSTRUCTION
Community Board
400412
Budget Line
WP-0269
Scope Text
ST ALBANS PUMPING STATION
Fy Yr1 Plan
2020
Orig Bud Amt
8000
City Prior Actual
0
City Yr1 Plan
0
City Yr2 Plan
0
City Yr3 Plan
0
City Yr4 Plan
7000
City Yr5 Plan
18000
City Rtc
0
City Plan Total
25000
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
PS-291
Project Descr
154TH STREET PUMPING STATION
Typ Category Name
PLANT UPGRADING AND RECONSTRUCTION
Community Board
400407
Budget Line
WP-0269
Site Descr
154TH STREET PUMPING STATION
Scope Text
154TH STREET PUMPING STATION
Fy Yr1 Plan
2020
Orig Bud Amt
4551
City Prior Actual
0
City Yr1 Plan
0
City Yr2 Plan
0
City Yr3 Plan
0
City Yr4 Plan
2000
City Yr5 Plan
0
City Rtc
18000
City Plan Total
20000
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
PS-292
Project Descr
RECONSTRUCTIONOF LINDEN PLACE PUMPING STATION
Typ Category Name
PLANT UPGRADING AND RECONSTRUCTION
Community Board
400407
Budget Line
WP-0269
Site Descr
LINDEN PLACE PUMPING STATION
Scope Text
LINDEN PLACE PUMPING STATION
Fy Yr1 Plan
2020
Orig Bud Amt
6436
City Prior Actual
0
City Yr1 Plan
0
City Yr2 Plan
0
City Yr3 Plan
0
City Yr4 Plan
10000
City Yr5 Plan
0
City Rtc
10000
City Plan Total
20000
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
PS-293
Project Descr
RECONSTRUCTION AT HOWARD BEACH PUMPING STATION
Typ Category Name
PLANT UPGRADING AND RECONSTRUCTION
Community Board
400410
Budget Line
WP-0269
Site Descr
HOWARD BEACH
Scope Text
RECONSTRUCTION AT HOWARD BEACH PUMPING STATION
Fy Yr1 Plan
2020
Orig Bud Amt
8867
City Prior Actual
0
City Yr1 Plan
0
City Yr2 Plan
0
City Yr3 Plan
0
City Yr4 Plan
5773
City Yr5 Plan
0
City Rtc
19227
City Plan Total
25000
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
PS-304
Project Descr
RECONSTRUCTION AT GLENDALE PUMPING STATION
Typ Category Name
PLANT UPGRADING AND RECONSTRUCTION
Community Board
400405
Budget Line
WP-0269
Site Descr
GLENDALE, QUEENS
Scope Text
RECONSTRUCTION AT GLENDALE PUMPING STATION
Fy Yr1 Plan
2020
Orig Bud Amt
6000
City Prior Actual
0
City Yr1 Plan
0
City Yr2 Plan
0
City Yr3 Plan
0
City Yr4 Plan
0
City Yr5 Plan
0
City Rtc
10000
City Plan Total
10000
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
PS-321
Project Descr
RECONSTRUCTION OF LITTLE NECK PUMPING STATION, QUEENS, N.Y.
Typ Category Name
PLANT UPGRADING AND RECONSTRUCTION
Community Board
400411
Budget Line
WP-0269
Delay Desc
PROJECT DELAYED DUE TO CHANGES IN SCOPE/DESIGN
Site Descr
40TH AVENUE WEST OF 248TH STREET, QUEENS, NEW YORK
Scope Text
RECONSTRUCTION OF LITTLE NECK PUMPING STATION, QUEENS, N.Y.
Fy Yr1 Plan
2020
Orig Bud Amt
7000
City Prior Actual
0
City Yr1 Plan
0
City Yr2 Plan
0
City Yr3 Plan
0
City Yr4 Plan
5000
City Yr5 Plan
0
City Rtc
10000
City Plan Total
15000
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
PS-326
Project Descr
INSTALLATION OF SE JAMAICA PUMPING STATION
Typ Category Name
PLANT UPGRADING AND RECONSTRUCTION
Community Board
400
Budget Line
WP-0269
Site Descr
DON AKAMNONU 1943/ 100 MGD 150-20 134TH STREET, JAMAICA QUEENS, N.Y. 11430
Scope Text
INSTALLATION OF SE JAMAICA PUMPING STATION
Fy Yr1 Plan
2020
Orig Bud Amt
21000
City Prior Actual
0
City Yr1 Plan
0
City Yr2 Plan
0
City Yr3 Plan
0
City Yr4 Plan
0
City Yr5 Plan
0
City Rtc
53000
City Plan Total
53000
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
PS-335
Project Descr
RECONSTRUCTION OF TALLMAN ISLAND INTERCEPTOR DAMAGE
Typ Category Name
PLANT UPGRADING AND RECONSTRUCTION
Community Board
400
Budget Line
WP-0269
Site Descr
37TH AVENUE & 114TH STREET, FLUSHING N.Y 11368
Scope Text
RECONSTRUCTION OF TALLMAN ISLAND INTERCEPTOR DUE TO DAMAGE BY CONSTRUCTION COMPANY. APPROXIMATELY 700 FEET OF 87" DIAMETER INTERCEPTING SEWER HAS 69 6" DIAMETER HOLES. DDC WILL PERFORM THE DESIGN WORK, BID THE CONTRACT, AND MANAGE THE CONSRRUCTION
Fy Yr1 Plan
2020
Orig Bud Amt
7650
City Prior Actual
0
City Yr1 Plan
0
City Yr2 Plan
9240
City Yr3 Plan
0
City Yr4 Plan
0
City Yr5 Plan
0
City Rtc
0
City Plan Total
9240
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200416
Pub Date: 20200416 • Boro: CITYWIDE • Managing Agcy Cd: 057
Pub Date
20200416
Boro
CITYWIDE
Managing Agcy Cd
057
Managing Agcy
FIRE DEPARTMENT
Project Id
F175WPE46
Project Descr
Roof and Waterproofing Project - EC46
Typ Category Name
NEW FACILITIES AND RENOVATIONS
Community Board
0
Budget Line
F-0175
Delay Desc
PROJECT DELAYED DUE TO BUDGETARY CONSTRAINTS
Scope Text
ROOF AND WATERPROOFING PROJECT - EC46
Fy Yr1 Plan
2020
Orig Bud Amt
1698
City Prior Actual
233
City Yr1 Plan
0
City Yr2 Plan
1504
City Yr3 Plan
0
City Yr4 Plan
0
City Yr5 Plan
0
City Rtc
0
City Plan Total
1737
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
QED-1051
Project Descr
Water Main Replacement in Maspeth Avenue
Typ Category Name
AUGMENTATION OF WATER SUPPLY SYSTEMS
Community Board
401
Budget Line
WM-0001
Scope Text
TO REPLACE AGEING AND UNDERSIZED WATER MAIN PIPES IN ADDITION TO IMPROVING WATER DISTRIBUTION.IT WILL BENEFIT INDIVIDUALS RESIDENT IN 61ST STREET,56TH AVENUE,56TH ROD,MASPETH AVENUE,CLINTON AVENUE,REMSEN PLACE.
Fy Yr1 Plan
2020
Orig Bud Amt
3221
City Prior Actual
0
City Yr1 Plan
0
City Yr2 Plan
0
City Yr3 Plan
0
City Yr4 Plan
4580
City Yr5 Plan
0
City Rtc
0
City Plan Total
4580
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
QED-1053
Project Descr
Trunk Water Main Replacement in Rockaway Blvd
Typ Category Name
AUGMENTATION OF WATER SUPPLY SYSTEMS
Community Board
400
Budget Line
WM-0001 WM-0006
Scope Text
TRUNK WATER MAIN REPLACEMENT IN ROCKAWAY BLVD
Fy Yr1 Plan
2020
Orig Bud Amt
27621
City Prior Actual
0
City Yr1 Plan
0
City Yr2 Plan
0
City Yr3 Plan
0
City Yr4 Plan
27621
City Yr5 Plan
0
City Rtc
0
City Plan Total
27621
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
QNSREPAIR
Project Descr
REHABILITATION OF QUEENS REPAIR FACILITY
Typ Category Name
FACILITY PURCHASES AND RECONSTRUCTION
Community Board
400
Budget Line
EP-0006
Scope Text
REHABILITATION FO QUEENS REPAIR FACILITY
Fy Yr1 Plan
2020
Orig Bud Amt
37750
City Prior Actual
0
City Yr1 Plan
0
City Yr2 Plan
4000
City Yr3 Plan
0
City Yr4 Plan
0
City Yr5 Plan
8600
City Rtc
49000
City Plan Total
61600
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
R-009-L
Project Descr
RECONSTRUCT FOUR SODIUM HYPOCHLORITE CBS TANKS @ ROCKAWAY
Typ Category Name
PLANT UPGRADING AND RECONSTRUCTION
Community Board
400
Budget Line
WP-0112
Site Descr
106-21 BEACH CHANNEL DRIVE, ROCKAWAY, N.Y. 11694
Scope Text
RECONSTRUCTION OF FOUR (4) SODIUM HYPOCHLORITE CBS TANKS AT THE ROCKAWAY WASTEWATER TREATMENT PLANT
Fy Yr1 Plan
2020
Orig Bud Amt
2480
City Prior Actual
0
City Yr1 Plan
0
City Yr2 Plan
1980
City Yr3 Plan
0
City Yr4 Plan
0
City Yr5 Plan
0
City Rtc
0
City Plan Total
1980
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
R-153-L
Project Descr
RECONSTRUCT FINAL SETTLING SYSTEM @ ROCKAWAY WWTP
Typ Category Name
PLANT UPGRADING AND RECONSTRUCTION
Community Board
400414
Budget Line
WP-0112
Site Descr
106-21 BECH CHANNEL DRIVE, ROCKAWAY, N.Y. 11694
Scope Text
RECONSTRUCT FINAL SETTLING SYSTEM @ ROCKAWAY WWTP
Fy Yr1 Plan
2020
Orig Bud Amt
21358
City Prior Actual
0
City Yr1 Plan
0
City Yr2 Plan
0
City Yr3 Plan
0
City Yr4 Plan
9000
City Yr5 Plan
0
City Rtc
0
City Plan Total
9000
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
R-156-L
Project Descr
RECONSTRUCT POWER DISTRIBUTION EQUIPMENT @ ROCKAWAY WWTP
Typ Category Name
PLANT UPGRADING AND RECONSTRUCTION
Community Board
400414
Budget Line
WP-0112
Site Descr
106-21 BEACH CHANNEL DRIVE, ROCKAWAY, N.Y. 11694
Scope Text
RECONSTRUCT POWER DISTRIBUTION EQUIPMENT @ ROCKAWAY WWTP
Fy Yr1 Plan
2020
Orig Bud Amt
2254
City Prior Actual
0
City Yr1 Plan
0
City Yr2 Plan
0
City Yr3 Plan
351
City Yr4 Plan
0
City Yr5 Plan
1753
City Rtc
0
City Plan Total
2104
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
RO-2
Project Descr
REPLACE MAIN SEWAGE PUMPS AT ROCKAWAY WPCP
Typ Category Name
PLANT UPGRADING AND RECONSTRUCTION
Community Board
400
Budget Line
WP-0112
Delay Desc
PROJECT DELAYED DUE TO BUDGETARY CONSTRAINTS
Scope Text
REPLACE MAIN SEWAGE PUMPS AT ROCKAWAY WPCP
Fy Yr1 Plan
2020
Orig Bud Amt
25000
City Prior Actual
0
City Yr1 Plan
0
City Yr2 Plan
7100
City Yr3 Plan
0
City Yr4 Plan
0
City Yr5 Plan
7100
City Rtc
54400
City Plan Total
68600
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
RO-3
Project Descr
REPLACE MAIN INFLUENT GATES & ACTUATORS AT ROCKAWAY WPCP
Typ Category Name
PLANT UPGRADING AND RECONSTRUCTION
Community Board
400
Budget Line
WP-0112
Scope Text
REPLACE MAIN INFLUENT GATES & ACTUATORS AT ROCKAWAY WPCP
Fy Yr1 Plan
2020
Orig Bud Amt
15000
City Prior Actual
0
City Yr1 Plan
0
City Yr2 Plan
0
City Yr3 Plan
0
City Yr4 Plan
10000
City Yr5 Plan
0
City Rtc
0
City Plan Total
10000
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
SE-861A
Project Descr
HLSS; Strm, san & comb swers & WM, Borden Ave, Phase 2, Qns
Typ Category Name
REPLACEMENT OF CHRONICALLY FAILING COMPONENTS
Community Board
402
Budget Line
SE-0004 SE-0200Q SE-9336 SE-0002Q WM-0001
Delay Desc
PROJECT DELAYED DUE TO BUDGETARY CONSTRAINTS
Scope Text
NEW HLSS; STRM, SAN & COMB SWERS & WM BORDEN AVE B/T JACKSON AVE & E RIVER, PHASE 2, QNS
Fy Yr1 Plan
2020
Orig Bud Amt
27575
City Prior Actual
0
City Yr1 Plan
0
City Yr2 Plan
0
City Yr3 Plan
0
City Yr4 Plan
0
City Yr5 Plan
0
City Rtc
95000
City Plan Total
95000
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
SE-CD32
Project Descr
Drainage Improvements in City Council District 32
Typ Category Name
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Community Board
409410414
Budget Line
SE-D200Q
Scope Text
DRAINAGE IMPROVEMENTS IN CITY COUNCIL DISTRICT 32
Fy Yr1 Plan
2020
Orig Bud Amt
1500
City Prior Actual
0
City Yr1 Plan
1500
City Yr2 Plan
0
City Yr3 Plan
0
City Yr4 Plan
0
City Yr5 Plan
0
City Rtc
0
City Plan Total
1500
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
SEQ002715
Project Descr
Replmnt & repair of combined SE outfall north 81st &19 Ave
Typ Category Name
REPLACEMENT OR AUGMENTATION OF EXISTING SYSTEMS
Community Board
400
Budget Line
SE-0002Q
Scope Text
REPLACEMENT AND REPAIR OF COMBINED SEWER OUTFALL LOCATED NORTH OF 81 STREET AND 19 AVENUE, ON LAGUARDIA AIRPORT PROPERTY.
Fy Yr1 Plan
2020
Orig Bud Amt
5328
City Prior Actual
0
City Yr1 Plan
0
City Yr2 Plan
0
City Yr3 Plan
0
City Yr4 Plan
4632
City Yr5 Plan
0
City Rtc
0
City Plan Total
4632
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
SEQ200592
Project Descr
Southeast Queens - Rosedale South
Typ Category Name
EXTENSIONS TO ACCOMMODATE NEW DEVELOPMENT
Community Board
413
Budget Line
WM-0001 SE-0200Q SE-0002Q
Scope Text
INSTALLATION OF STORM AND SANITARY SEWERS AND WATER MAINS IN THE ROSEDALE AREA OF QUEENS BOUNDED BY HOOK CREEK BLVD, 257TH ST, CRAFT AVE, AND FRANCIS LEWIS BLVD, ETC. THIS PROJECT IS TO BE COMPLETED IN CONJUNCTION WITH DOT.
Fy Yr1 Plan
2020
Orig Bud Amt
53282
City Prior Actual
0
City Yr1 Plan
0
City Yr2 Plan
0
City Yr3 Plan
0
City Yr4 Plan
38332
City Yr5 Plan
0
City Rtc
0
City Plan Total
38332
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
SEQ-B67
Project Descr
BEACH 67TH STREET MEDIAN GREEN INFRASTRUCTURE
Typ Category Name
BLUEBELT PROGRAM
Community Board
412413
Budget Line
SE-0005
Scope Text
INSTALLATION OF FLOOD CONTROL BIOSWALES, NEW STORMWATER RUNOFF INLETS, AND PIPES TO IMPROVE DRAINAGE CONVEYANCE AND REDUCE FLOODING AT THE INTERSECTION OF BEACH 67TH STREET AND ALMEDA AVENUE
Fy Yr1 Plan
2020
Orig Bud Amt
500
City Prior Actual
0
City Yr1 Plan
500
City Yr2 Plan
0
City Yr3 Plan
0
City Yr4 Plan
0
City Yr5 Plan
0
City Rtc
0
City Plan Total
500
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
SEQ-DKWPK
Project Descr
CONSTRUCTION FOR DETECTIVE KEITH WILLIAMS PARK
Typ Category Name
BLUEBELT PROGRAM
Community Board
412413
Budget Line
SE-0005
Scope Text
CONSTRUCTION FOR DETECTIVE KEITH WILLIAMS PARK
Fy Yr1 Plan
2020
Orig Bud Amt
1250
City Prior Actual
0
City Yr1 Plan
0
City Yr2 Plan
1250
City Yr3 Plan
0
City Yr4 Plan
0
City Yr5 Plan
0
City Rtc
0
City Plan Total
1250
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
SEQGI-01
Project Descr
SEQ - CONSTRUCTION OF GREEN INFRASTRUCTURE SOUTHEAST QUEENS
Typ Category Name
BLUEBELT PROGRAM
Community Board
412413
Budget Line
SE-0005
Scope Text
CONSTRUCTION OG RIGHT OF WAY BIOSWALES, RIGHT OF WAY GREENSTRIPS, STORMWATER GREENSTREETS, AND PRECAST POROUS CONCRETE IN SOUTHEAST QUEENS.
Fy Yr1 Plan
2020
Orig Bud Amt
7957
City Prior Actual
8596
City Yr1 Plan
2410
City Yr2 Plan
1130
City Yr3 Plan
0
City Yr4 Plan
17300
City Yr5 Plan
0
City Rtc
0
City Plan Total
29436
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
SEQ-RAILP
Project Descr
CONSTRUCTION FOR RAILROAD PARK
Typ Category Name
BLUEBELT PROGRAM
Community Board
412413
Budget Line
SE-0005
Scope Text
CONSTRUCTION OF RAILROAD PARK
Fy Yr1 Plan
2020
Orig Bud Amt
2250
City Prior Actual
0
City Yr1 Plan
0
City Yr2 Plan
2250
City Yr3 Plan
0
City Yr4 Plan
0
City Yr5 Plan
0
City Rtc
0
City Plan Total
2250
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
SEQ-ROYWP
Project Descr
CONSTRUCTION OF GREEN INFRASTRUCTURE AT ROY WILKINS PARK
Typ Category Name
BLUEBELT PROGRAM
Community Board
412413
Budget Line
SE-0005
Scope Text
RESTORATION OF THE ROY WILKINS RECREATION CENTER PONDS AND THE REDUCTION IN AN AVERAGE ANNUAL CSO FROM MERRICK BLVD.
Fy Yr1 Plan
2020
Orig Bud Amt
2020
City Prior Actual
0
City Yr1 Plan
2025
City Yr2 Plan
0
City Yr3 Plan
0
City Yr4 Plan
0
City Yr5 Plan
0
City Rtc
0
City Plan Total
2025
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
SEQ-SJH
Project Descr
CONSTRUCTION FOR CLOUDBURST PROJECT AT SOUTH JAMAICA HOUSES
Typ Category Name
BLUEBELT PROGRAM
Community Board
412413
Budget Line
SE-0005
Scope Text
CONSTRUCTION FOR CLOUDBURST PROJECT AT SOUTH JAMAICA HOUSES
Fy Yr1 Plan
2020
Orig Bud Amt
5000
City Prior Actual
0
City Yr1 Plan
0
City Yr2 Plan
0
City Yr3 Plan
5000
City Yr4 Plan
0
City Yr5 Plan
0
City Rtc
0
City Plan Total
5000
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
SEQ-STA
Project Descr
CONSTRUCTION FOR CLOUDBURST PROJECT AT ST ALBANS
Typ Category Name
BLUEBELT PROGRAM
Community Board
412413
Budget Line
SE-0005
Scope Text
CONSTRUCTION FOR CLOUDBURST PROJECT AT ST ALBANS
Fy Yr1 Plan
2020
Orig Bud Amt
2800
City Prior Actual
0
City Yr1 Plan
0
City Yr2 Plan
0
City Yr3 Plan
2800
City Yr4 Plan
0
City Yr5 Plan
0
City Rtc
0
City Plan Total
2800
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200416
Pub Date: 20200416 • Boro: CITYWIDE • Managing Agcy Cd: 057
Pub Date
20200416
Boro
CITYWIDE
Managing Agcy Cd
057
Managing Agcy
FIRE DEPARTMENT
Project Id
F175WU299
Project Descr
Cellar Reconstruction - EC299
Typ Category Name
NEW FACILITIES AND RENOVATIONS
Community Board
0
Budget Line
F-0175
Scope Text
WATER UTILITIES- EC299
Fy Yr1 Plan
2020
Orig Bud Amt
994
City Prior Actual
0
City Yr1 Plan
0
City Yr2 Plan
994
City Yr3 Plan
0
City Yr4 Plan
0
City Yr5 Plan
0
City Rtc
0
City Plan Total
994
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20201123
Pub Date: 20201123 • Boro: BROOKLYN • Managing Agcy Cd: 856
Pub Date
20201123
Boro
BROOKLYN
Managing Agcy Cd
856
Managing Agcy
DEPT OF CITYWIDE ADMIN SERVS
Project Id
PW291EV
Project Descr
209 JORALEMON ST.- ELEVATOR UPGRADE
Typ Category Name
REHABILITATION OF CITY-OWNED OFFICE SPACE
Community Board
201
Budget Line
PW-0291
Scope Text
PER UNIT
Fy Yr1 Plan
2021
Orig Bud Amt
5007
City Prior Actual
0
City Yr1 Plan
417
City Yr2 Plan
0
City Yr3 Plan
4198
City Yr4 Plan
0
City Yr5 Plan
0
City Rtc
0
City Plan Total
4615
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0
20200116
Pub Date: 20200116 • Boro: QUEENS • Managing Agcy Cd: 826
Pub Date
20200116
Boro
QUEENS
Managing Agcy Cd
826
Managing Agcy
DEPT ENVIRONMENTAL PROTECTION
Project Id
SF-BNR-RK
Project Descr
STEP FEED BNR AT ROCKAWAY
Typ Category Name
BIOLOGICAL NUTRIENT REMOVAL
Community Board
400414
Budget Line
WP-0285
Delay Desc
PROJECT DELAYED PENDING RESOLUTION OF LEGAL ISSUES
Scope Text
THIS PROJECT IS TO RETROFIT THE EXISTING ROCKAWAY WWTP FOR THE STEP FEED BNR PROCESS. THIS WORK IS A REQUIREMENT OF THE JAMAICA BAY NEGOTIATIONS WITHT THE DEC AND WILL BE ENFORCEABLE UNDER THE NEW NITROGEN CONSENT JUDGMENT. THE WORK WILL INVOLVE INSTALLING NEW DIFFUSERS, SUBMERSIBLE MIXERS, BAFFLES, FROTH CONTROL AND INSTRUMENTAION IN ALL FOUR AERATION TANKS.
Fy Yr1 Plan
2020
Orig Bud Amt
27250
City Prior Actual
19461
City Yr1 Plan
115
City Yr2 Plan
0
City Yr3 Plan
0
City Yr4 Plan
0
City Yr5 Plan
0
City Rtc
0
City Plan Total
19576
Noncity Prior Actual
0
Noncity Yr1 Plan
0
Noncity Yr2 Plan
0
Noncity Yr3 Plan
0
Noncity Yr4 Plan
0
Noncity Yr5 Plan
0
Noncity Rtc
0
Noncity Plan Total
0