NYC Open Data Plan: Mayor's Management Report (MMR) Indicators

NOTE: To review the latest plan, make sure to filter the "Report Year" column to the latest year.

This dataset includes a listing of each Mayor's Management Report (MMR) indicator, and either the dataset(s) used to generate them, why those datasets are not yet published, or why they cannot be published.

City Government Office of Technology and Innovation (OTI) Dataset wcrd-6u4m 9 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
Department of Cultural Affairs (DCLA)
Year: 2026 • Agency: Department of Cultural Affairs (DCLA) • Mmr Indicator Id: 3276
Year
2026
Agency
Department of Cultural Affairs (DCLA)
Mmr Indicator Id
3276
Mmr Indicator Name
Materials for the Arts donors
Mmr Indicator Description
The number of individuals and businesses that donated reusable materials to the MFTA Program.
Mmr Indicator Source
Materials for the Arts
Is The Source Of This
Yes
Nyc Open Data Url
https://data.cityofnewyork.us/City-Government/DCLA-Materials-For-The-Arts-Donor-Information/vhtt-kpwy/about_data
Department of Cultural Affairs (DCLA)
Year: 2026 • Agency: Department of Cultural Affairs (DCLA) • Mmr Indicator Id: 3277
Year
2026
Agency
Department of Cultural Affairs (DCLA)
Mmr Indicator Id
3277
Mmr Indicator Name
Materials for the Arts transactions
Mmr Indicator Description
The number of times MFTA recipients - not-for-profit organizations, public schools and City/State agencies - have accessed donations of free materials, either through a visit to the warehouse or by directly picking up an item(s) from a donor.
Mmr Indicator Source
Materials for the Arts
Is The Source Of This
Yes
Nyc Open Data Url
https://data.cityofnewyork.us/City-Government/DCLA-Materials-For-The-Arts-Donor-Information/vhtt-kpwy/about_data
Department of Cultural Affairs (DCLA)
Year: 2026 • Agency: Department of Cultural Affairs (DCLA) • Mmr Indicator Id: 3278
Year
2026
Agency
Department of Cultural Affairs (DCLA)
Mmr Indicator Id
3278
Mmr Indicator Name
Value of contributed Materials for the Arts materials and equipment ($000,000)
Mmr Indicator Description
The estimated dollar value of reusable material and equipment donated to the MFTA Program, as determined by the donor.
Mmr Indicator Source
Database files maintained by MFTA
Is The Source Of This
Yes
Nyc Open Data Url
https://data.cityofnewyork.us/City-Government/DCLA-Materials-For-The-Arts-Donor-Information/vhtt-kpwy/about_data
Department of Cultural Affairs (DCLA)
Year: 2026 • Agency: Department of Cultural Affairs (DCLA) • Mmr Indicator Id: 3279
Year
2026
Agency
Department of Cultural Affairs (DCLA)
Mmr Indicator Id
3279
Mmr Indicator Name
Capital projects planned that were initiated (%)
Mmr Indicator Description
Percent of all capital projects sent to the managing agency for which a full scope of work has been received and capital eligibility verified.
Mmr Indicator Source
Database files maintained by Capital Projects Unit
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
Agency will be having internal conversations over the next year to determine if this data can be published and, if so, confirm the timeline and other publishing details.
Department of Cultural Affairs (DCLA)
Year: 2026 • Agency: Department of Cultural Affairs (DCLA) • Mmr Indicator Id: 5845
Year
2026
Agency
Department of Cultural Affairs (DCLA)
Mmr Indicator Id
5845
Mmr Indicator Name
Letters responded to within 14 days (%)
Mmr Indicator Description
The percentage of letters answered in 14 calendar days or less. Responses should be substantive and adequately address the question/issue raised by the customer. A simple acknowledgement is not considered an adequate response. However, for more complex inquiries that require research and action on the part of the agency, an acknowledgement which includes a description of the next step (either on the agency’s behalf, or the customer’s), as well as an estimated time frame for completion, is considered acceptable and can be reported as part of the 14 day response. Agencies must internally track the additional time until a customer has a complete and full response.
Mmr Indicator Source
Database files maintained by Commissioner’s Unit
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
Agency will be having internal conversations over the next year to determine if this data can be published and, if so, confirm the timeline and other publishing details.
Department of Cultural Affairs (DCLA)
Year: 2026 • Agency: Department of Cultural Affairs (DCLA) • Mmr Indicator Id: 5847
Year
2026
Agency
Department of Cultural Affairs (DCLA)
Mmr Indicator Id
5847
Mmr Indicator Name
E-mails responded to within 14 days (%)
Mmr Indicator Description
The percentage of emails answered in 14 calendar days or less. Responses should be substantive and adequately address the question/issue raised by the customer. A simple acknowledgement is not considered an adequate response. However, for more complex inquiries that require research and action on the part of the agency, an acknowledgement which includes a description of the next step (either on the agency’s behalf, or the customer’s), as well as an estimated time frame for completion, is considered acceptable and can be reported as part of the 14 day response. Agencies must internally track the additional time until a customer has a complete and full response.
Mmr Indicator Source
Database files maintained by Commissioner’s Unit
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
Agency will be having internal conversations over the next year to determine if this data can be published and, if so, confirm the timeline and other publishing details.
Department of Cultural Affairs (DCLA)
Year: 2026 • Agency: Department of Cultural Affairs (DCLA) • Mmr Indicator Id: 8358
Year
2026
Agency
Department of Cultural Affairs (DCLA)
Mmr Indicator Id
8358
Mmr Indicator Name
Average days to issue initial Cultural Development Fund payments after complying with all City requirements
Mmr Indicator Description
The average number of business days to issue a grantee organization its initial Cultural Development Fund payment following the organization’s satisfactory compliance with the City’s grant procedures and requirements, including compliance with Local Law 34 of 2007, which requires disclosures from principal officers, owners and senior managers of groups receiving DCLA funds; current registration with New York State’s Charities Bureau; and other requisites.
Mmr Indicator Source
Grants Management Tracking System
Is The Source Of This
The underlying data is owned by another agency or entity.
Public Statement From Your
This data is tracked, stored, and processed in the city's Financial Management System, and not owned by DCLA directly.
Department of Cultural Affairs (DCLA)
Year: 2026 • Agency: Department of Cultural Affairs (DCLA) • Mmr Indicator Id: 8361
Year
2026
Agency
Department of Cultural Affairs (DCLA)
Mmr Indicator Id
8361
Mmr Indicator Name
Visitors to CIG using free admission and/or tickets (%)
Mmr Indicator Description
Of the total number of visitors to the 34 City-owned cultural institutions (CIG), the percentage utilizing free admission hours/tickets.
Mmr Indicator Source
Cultural Institutions Unit
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
Agency will be having internal conversations over the next year to determine if this data can be published and, if so, confirm the timeline and other publishing details.
Department of Cultural Affairs (DCLA)
Year: 2026 • Agency: Department of Cultural Affairs (DCLA) • Mmr Indicator Id: 8363
Year
2026
Agency
Department of Cultural Affairs (DCLA)
Mmr Indicator Id
8363
Mmr Indicator Name
Visitors to the Cultural Institutions Group (000)
Mmr Indicator Description
The total number of visitors (onsite attendance)at the 39 organizations that comprise the Cultural Institutions Group. Attendance is reported to DCLA by each funded organization.
Mmr Indicator Source
Cultural Institutions Unit
Is The Source Of This
Scheduled for publication
Department of Cultural Affairs (DCLA)
Year: 2026 • Agency: Department of Cultural Affairs (DCLA) • Mmr Indicator Id: 10226
Year
2026
Agency
Department of Cultural Affairs (DCLA)
Mmr Indicator Id
10226
Mmr Indicator Name
Program organizations awarded Cultural Development Fund payments
Mmr Indicator Description
The number of eligible organizations awarded Cultural Development Fund grants. Grantee organizations must satisfactorily comply with the City’s grant procedures and requirements, including compliance with Local Law 34 of 2007, which requires disclosures from principal officers, owners and senior managers of groups receiving DCLA funds; current registration with New York State’s Charities Bureau; and other requisites.
Mmr Indicator Source
Grants Management Tracking System
Is The Source Of This
Yes
Nyc Open Data Url
https://data.cityofnewyork.us/Recreation/DCLA-Programs-Funding/y6fv-k6p7/about_data
Department of Cultural Affairs (DCLA)
Year: 2026 • Agency: Department of Cultural Affairs (DCLA) • Mmr Indicator Id: 10227
Year
2026
Agency
Department of Cultural Affairs (DCLA)
Mmr Indicator Id
10227
Mmr Indicator Name
Capital projects authorized to proceed
Mmr Indicator Description
The number of all capital projects sent to the managing agency for which a full scope of work has been approved to proceed to be funded.
Mmr Indicator Source
Database files maintained by Capital Projects Unit
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
Agency will be having internal conversations over the next year to determine if this data can be published and, if so, confirm the timeline and other publishing details.
Department of Cultural Affairs (DCLA)
Year: 2026 • Agency: Department of Cultural Affairs (DCLA) • Mmr Indicator Id: 10238
Year
2026
Agency
Department of Cultural Affairs (DCLA)
Mmr Indicator Id
10238
Mmr Indicator Name
Schools, non-profits and City/State agencies served by Materials for the Arts
Mmr Indicator Description
The total number of public schools, non-profits and City/State agencies provided free materials and equipment through the MFTA Program, and the number served in each of the two reporting categories.
Mmr Indicator Source
Materials for the Arts
Is The Source Of This
Yes
Nyc Open Data Url
https://data.cityofnewyork.us/City-Government/DCLA-Materials-For-The-Arts-Donor-Information/vhtt-kpwy/about_data
Department of Cultural Affairs (DCLA)
Year: 2026 • Agency: Department of Cultural Affairs (DCLA) • Mmr Indicator Id: 10308
Year
2026
Agency
Department of Cultural Affairs (DCLA)
Mmr Indicator Id
10308
Mmr Indicator Name
Financial support provided to qualifying organizations ($000,000)
Mmr Indicator Description
The total amount of financial support provided to qualifying organizations. This includes monies awarded to the Cultural Institutions Group for operating and energy costs, awards to program organizations, and monies awarded to cultural organizations in support of the Cultural After School adventures program (CASA).
Mmr Indicator Source
Finance Unit
Is The Source Of This
Yes
Nyc Open Data Url
https://data.cityofnewyork.us/Recreation/DCLA-Programs-Funding/y6fv-k6p7/about_data
Department of Cultural Affairs (DCLA)
Year: 2026 • Agency: Department of Cultural Affairs (DCLA) • Mmr Indicator Id: 12527
Year
2026
Agency
Department of Cultural Affairs (DCLA)
Mmr Indicator Id
12527
Mmr Indicator Name
Operational support to Cultural Institutions Group ($000,000)
Mmr Indicator Description
The total amount of financial support provided to the coalition of 39 nonprofit museums, performing arts centers, historical societies, zoos, and botanical gardens that make up the Cultural Institutions Group.
Mmr Indicator Source
Finance Unit
Is The Source Of This
Yes
Nyc Open Data Url
https://data.cityofnewyork.us/City-Government/DCLA-Cultural-Institutions-Group-Funding/ka27-qx5k/about_data
Department of Cultural Affairs (DCLA)
Year: 2026 • Agency: Department of Cultural Affairs (DCLA) • Mmr Indicator Id: 15298
Year
2026
Agency
Department of Cultural Affairs (DCLA)
Mmr Indicator Id
15298
Mmr Indicator Name
Cultural Development Fund seminar views
Mmr Indicator Description
Total number of views on CDF seminars posted online via Youtube.
Mmr Indicator Source
Programs Unit
Is The Source Of This
The underlying data is owned by another agency or entity.
Public Statement From Your
The data reside on DCLA's YouTube channel and can be viewed there with context.
Department of Design and Construction (DDC)
Year: 2026 • Agency: Department of Design and Construction (DDC) • Mmr Indicator Id: 2054
Year
2026
Agency
Department of Design and Construction (DDC)
Mmr Indicator Id
2054
Mmr Indicator Name
Designs completed — Total
Mmr Indicator Description
The total number of infrastructure and public building design projects for which design was completed during the reporting period and the number in each reporting category. For Design Build projects, the reported design completion date is either: the date of the actual final design submission; or, the date that precedes early work activities on site, whichever activity occurs first.
Mmr Indicator Source
DDC’s Project Management Information System
Is The Source Of This
Yes
Nyc Open Data Url
https://data.cityofnewyork.us/City-Government/Capital-Projects-Dashboard-Citywide-Budget-and-Sch/fb86-vt7u/explore/query/SELECT%0A%20%20%60reporting_period%60%2C%0A%20%20%60managing_agency%60%2C%0A%20%20%60sponsor_agency%60%2C%0A%20%20%60pid%60%2C%0A%20%20%60fms_id%60%2C%0A%20%20%60total_budget%60%2C%0A%20%20%60spend_to_date%60%2C%0A%20%20%60spend_to_date_1%60%2C%0A%20%20%60fms_project_name%60%2C%0A%20%20%60agency_project_name%60%2C%0A%20%20%60agency_project_description%60%2C%0A%20%20%60current_phase%60%2C%0A%20%20%60current_phase_start%60%2C%0A%20%20%60forecast_current_phase_end%60%2C%0A%20%20%60forecast_completion%60%2C%0A%20%20%60actual_design_start%60%2C%0A%20%20%60actual_design_end%60%2C%0A%20%20%60actual_construction%60%2C%0A%20%20%60actual_construction_1%60%2C%0A%20%20%60actual_construction_start%60%2C%0A%20%20%60actual_construction_end%60%2C%0A%20%20%60borough%60%2C%0A%20%20%60community_board%60%2C%0A%20%20%60budget_line%60%2C%0A%20%20%60ten_year_plan_category%60%2C%0A%20%20%60agency_data_date%60%2C%0A%20%20%60fms_data_date%60%0AWHERE%0A%20%20caseless_one_of%28%60managing_agency%60%2C%20%22DDC%22%29%0A%20%20AND%20caseless_one_of%28%60reporting_period%60%2C%20%22202501%22%29%0AORDER%20BY%20%60current_phase%60%20ASC%20NULL%20LAST/page/filter
Department of Design and Construction (DDC)
Year: 2026 • Agency: Department of Design and Construction (DDC) • Mmr Indicator Id: 2061
Year
2026
Agency
Department of Design and Construction (DDC)
Mmr Indicator Id
2061
Mmr Indicator Name
Completed designs early/on time — Infrastructure (%)
Mmr Indicator Description
Of the infrastructure projects for which design was completed during the reporting period, the percentage that were completed ahead of schedule or no more than 30 days behind the baseline schedule, exclusive of programmatic scope changes and delays outside of DDC control.
Mmr Indicator Source
Infrastructure
Is The Source Of This
Partially
Nyc Open Data Url
https://data.cityofnewyork.us/City-Government/Capital-Projects-Dashboard-Citywide-Budget-and-Sch/fb86-vt7u/explore/query/SELECT%0A%20%20%60reporting_period%60%2C%0A%20%20%60managing_agency%60%2C%0A%20%20%60sponsor_agency%60%2C%0A%20%20%60pid%60%2C%0A%20%20%60fms_id%60%2C%0A%20%20%60total_budget%60%2C%0A%20%20%60spend_to_date%60%2C%0A%20%20%60spend_to_date_1%60%2C%0A%20%20%60fms_project_name%60%2C%0A%20%20%60agency_project_name%60%2C%0A%20%20%60agency_project_description%60%2C%0A%20%20%60current_phase%60%2C%0A%20%20%60current_phase_start%60%2C%0A%20%20%60forecast_current_phase_end%60%2C%0A%20%20%60forecast_completion%60%2C%0A%20%20%60actual_design_start%60%2C%0A%20%20%60actual_design_end%60%2C%0A%20%20%60actual_construction%60%2C%0A%20%20%60actual_construction_1%60%2C%0A%20%20%60actual_construction_start%60%2C%0A%20%20%60actual_construction_end%60%2C%0A%20%20%60borough%60%2C%0A%20%20%60community_board%60%2C%0A%20%20%60budget_line%60%2C%0A%20%20%60ten_year_plan_category%60%2C%0A%20%20%60agency_data_date%60%2C%0A%20%20%60fms_data_date%60%0AWHERE%0A%20%20caseless_one_of%28%60managing_agency%60%2C%20%22DDC%22%29%0A%20%20AND%20caseless_one_of%28%60reporting_period%60%2C%20%22202501%22%29%0AORDER%20BY%20%60current_phase%60%20ASC%20NULL%20LAST/page/filter
Department of Design and Construction (DDC)
Year: 2026 • Agency: Department of Design and Construction (DDC) • Mmr Indicator Id: 2065
Year
2026
Agency
Department of Design and Construction (DDC)
Mmr Indicator Id
2065
Mmr Indicator Name
Construction completed — Total
Mmr Indicator Description
The total number of construction projects that were substantially completed during the reporting period. A project is considered substantially complete when contract work has been finished. For structure projects a Certificate of Occupancy (temporary or final) is required. For infrastructure projects permanent street restoration must be in place.
Mmr Indicator Source
DDC’s Project Management Information System
Is The Source Of This
Yes
Nyc Open Data Url
https://data.cityofnewyork.us/City-Government/Capital-Projects-Dashboard-Citywide-Budget-and-Sch/fb86-vt7u/explore/query/SELECT%0A%20%20%60reporting_period%60%2C%0A%20%20%60managing_agency%60%2C%0A%20%20%60sponsor_agency%60%2C%0A%20%20%60pid%60%2C%0A%20%20%60fms_id%60%2C%0A%20%20%60total_budget%60%2C%0A%20%20%60spend_to_date%60%2C%0A%20%20%60spend_to_date_1%60%2C%0A%20%20%60fms_project_name%60%2C%0A%20%20%60agency_project_name%60%2C%0A%20%20%60agency_project_description%60%2C%0A%20%20%60current_phase%60%2C%0A%20%20%60current_phase_start%60%2C%0A%20%20%60forecast_current_phase_end%60%2C%0A%20%20%60forecast_completion%60%2C%0A%20%20%60actual_design_start%60%2C%0A%20%20%60actual_design_end%60%2C%0A%20%20%60actual_construction%60%2C%0A%20%20%60actual_construction_1%60%2C%0A%20%20%60actual_construction_start%60%2C%0A%20%20%60actual_construction_end%60%2C%0A%20%20%60borough%60%2C%0A%20%20%60community_board%60%2C%0A%20%20%60budget_line%60%2C%0A%20%20%60ten_year_plan_category%60%2C%0A%20%20%60agency_data_date%60%2C%0A%20%20%60fms_data_date%60%0AWHERE%0A%20%20caseless_one_of%28%60managing_agency%60%2C%20%22DDC%22%29%0A%20%20AND%20caseless_one_of%28%60reporting_period%60%2C%20%22202501%22%29%0AORDER%20BY%20%60current_phase%60%20ASC%20NULL%20LAST/page/filter
Department of Design and Construction (DDC)
Year: 2026 • Agency: Department of Design and Construction (DDC) • Mmr Indicator Id: 2073
Year
2026
Agency
Department of Design and Construction (DDC)
Mmr Indicator Id
2073
Mmr Indicator Name
Completed construction early/on time — Infrastructure (%)
Mmr Indicator Description
The percentage of all infrastructure projects for which construction was completed ahead of schedule or no more than 30 days behind the baseline schedule, exclusive of programmatic scope changes and delays outside of DDC control. Additions/adjustments to the design that was agreed on prior to construction start and funding issues caused by such adjustments constitute a programmatic scope change. On larger infrastructure projects (roadway/sewer/water main), delays caused by significant utility interference that are completely out of the agency’s control constitute a programmatic scope change.
Mmr Indicator Source
Infrastructure
Is The Source Of This
Partially
Nyc Open Data Url
https://data.cityofnewyork.us/City-Government/Capital-Projects-Dashboard-Citywide-Budget-and-Sch/fb86-vt7u/explore/query/SELECT%0A%20%20%60reporting_period%60%2C%0A%20%20%60managing_agency%60%2C%0A%20%20%60sponsor_agency%60%2C%0A%20%20%60pid%60%2C%0A%20%20%60fms_id%60%2C%0A%20%20%60total_budget%60%2C%0A%20%20%60spend_to_date%60%2C%0A%20%20%60spend_to_date_1%60%2C%0A%20%20%60fms_project_name%60%2C%0A%20%20%60agency_project_name%60%2C%0A%20%20%60agency_project_description%60%2C%0A%20%20%60current_phase%60%2C%0A%20%20%60current_phase_start%60%2C%0A%20%20%60forecast_current_phase_end%60%2C%0A%20%20%60forecast_completion%60%2C%0A%20%20%60actual_design_start%60%2C%0A%20%20%60actual_design_end%60%2C%0A%20%20%60actual_construction%60%2C%0A%20%20%60actual_construction_1%60%2C%0A%20%20%60actual_construction_start%60%2C%0A%20%20%60actual_construction_end%60%2C%0A%20%20%60borough%60%2C%0A%20%20%60community_board%60%2C%0A%20%20%60budget_line%60%2C%0A%20%20%60ten_year_plan_category%60%2C%0A%20%20%60agency_data_date%60%2C%0A%20%20%60fms_data_date%60%0AWHERE%0A%20%20caseless_one_of%28%60managing_agency%60%2C%20%22DDC%22%29%0A%20%20AND%20caseless_one_of%28%60reporting_period%60%2C%20%22202501%22%29%0AORDER%20BY%20%60current_phase%60%20ASC%20NULL%20LAST/page/filter
Department of Design and Construction (DDC)
Year: 2026 • Agency: Department of Design and Construction (DDC) • Mmr Indicator Id: 2079
Year
2026
Agency
Department of Design and Construction (DDC)
Mmr Indicator Id
2079
Mmr Indicator Name
Roadway lane miles reconstructed
Mmr Indicator Description
Total length of roadway fully reconstructed (new concrete base and asphalt topping) during the reporting period, measured in units 12 feet wide and one mile in length. DDC is responsible for the implementation of capital projects on behalf of client agencies, such as the Department of Transportation.
Mmr Indicator Source
DDC’s Project Management Information System
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
DDC will be having internal conversations over the next year to determine if this data can be published and, if so, confirm the timeline and other publishing details.
Department of Design and Construction (DDC)
Year: 2026 • Agency: Department of Design and Construction (DDC) • Mmr Indicator Id: 2085
Year
2026
Agency
Department of Design and Construction (DDC)
Mmr Indicator Id
2085
Mmr Indicator Name
Water mains (new and replaced) (miles)
Mmr Indicator Description
Total length of water mains newly installed or replaced during the reporting period. DDC is responsible for the implementation of capital projects on behalf of client agencies, such as the Department of Environmental Protection.
Mmr Indicator Source
DDC’s Project Management Information System
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
DDC will be having internal conversations over the next year to determine if this data can be published and, if so, confirm the timeline and other publishing details.
Department of Design and Construction (DDC)
Year: 2026 • Agency: Department of Design and Construction (DDC) • Mmr Indicator Id: 2101
Year
2026
Agency
Department of Design and Construction (DDC)
Mmr Indicator Id
2101
Mmr Indicator Name
Post-construction satisfaction surveys — Surveys returned
Mmr Indicator Description
The total number of completed post-construction satisfaction surveys returned to DDC.
Mmr Indicator Source
Policy Analysis/Client Survey database
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
DDC will be having internal conversations over the next year to determine if this data can be published and, if so, confirm the timeline and other publishing details.
Department of Design and Construction (DDC)
Year: 2026 • Agency: Department of Design and Construction (DDC) • Mmr Indicator Id: 2102
Year
2026
Agency
Department of Design and Construction (DDC)
Mmr Indicator Id
2102
Mmr Indicator Name
Post-construction satisfaction surveys — Respondents rating a completed project as adequate or better (%)
Mmr Indicator Description
The percentage of completed surveys returned with an overall satisfactory rating.
Mmr Indicator Source
Policy Analysis/Client Survey database
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
DDC will be having internal conversations over the next year to determine if this data can be published and, if so, confirm the timeline and other publishing details.
Department of Design and Construction (DDC)
Year: 2026 • Agency: Department of Design and Construction (DDC) • Mmr Indicator Id: 2103
Year
2026
Agency
Department of Design and Construction (DDC)
Mmr Indicator Id
2103
Mmr Indicator Name
Projects audited (%)
Mmr Indicator Description
The percentage of active projects in construction during the reporting period for which at least one quality assurance/site safety audit was performed. Projects that are under $100,000 and those completed within the first six weeks of the reporting period or started within the last six weeks of the period are excluded.
Mmr Indicator Source
Technical Support/Quality assurance database
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
DDC will be having internal conversations over the next year to determine if this data can be published and, if so, confirm the timeline and other publishing details.
Department of Design and Construction (DDC)
Year: 2026 • Agency: Department of Design and Construction (DDC) • Mmr Indicator Id: 4218
Year
2026
Agency
Department of Design and Construction (DDC)
Mmr Indicator Id
4218
Mmr Indicator Name
Completed designs early/on time — Public buildings (%)
Mmr Indicator Description
Of the public building projects for which design was completed during the reporting period, the percentage that were completed ahead of schedule or no more than 30 days behind the baseline schedule, exclusive of programmatic scope changes and delays outside of DDC control.
Mmr Indicator Source
Public Buildings
Is The Source Of This
Partially
Nyc Open Data Url
https://data.cityofnewyork.us/City-Government/Capital-Projects-Dashboard-Citywide-Budget-and-Sch/fb86-vt7u/explore/query/SELECT%0A%20%20%60reporting_period%60%2C%0A%20%20%60managing_agency%60%2C%0A%20%20%60sponsor_agency%60%2C%0A%20%20%60pid%60%2C%0A%20%20%60fms_id%60%2C%0A%20%20%60total_budget%60%2C%0A%20%20%60spend_to_date%60%2C%0A%20%20%60spend_to_date_1%60%2C%0A%20%20%60fms_project_name%60%2C%0A%20%20%60agency_project_name%60%2C%0A%20%20%60agency_project_description%60%2C%0A%20%20%60current_phase%60%2C%0A%20%20%60current_phase_start%60%2C%0A%20%20%60forecast_current_phase_end%60%2C%0A%20%20%60forecast_completion%60%2C%0A%20%20%60actual_design_start%60%2C%0A%20%20%60actual_design_end%60%2C%0A%20%20%60actual_construction%60%2C%0A%20%20%60actual_construction_1%60%2C%0A%20%20%60actual_construction_start%60%2C%0A%20%20%60actual_construction_end%60%2C%0A%20%20%60borough%60%2C%0A%20%20%60community_board%60%2C%0A%20%20%60budget_line%60%2C%0A%20%20%60ten_year_plan_category%60%2C%0A%20%20%60agency_data_date%60%2C%0A%20%20%60fms_data_date%60%0AWHERE%0A%20%20caseless_one_of%28%60managing_agency%60%2C%20%22DDC%22%29%0A%20%20AND%20caseless_one_of%28%60reporting_period%60%2C%20%22202501%22%29%0AORDER%20BY%20%60current_phase%60%20ASC%20NULL%20LAST/page/filter
Department of Design and Construction (DDC)
Year: 2026 • Agency: Department of Design and Construction (DDC) • Mmr Indicator Id: 4219
Year
2026
Agency
Department of Design and Construction (DDC)
Mmr Indicator Id
4219
Mmr Indicator Name
Completed construction early/on time — Public buildings (%)
Mmr Indicator Description
The percentage of public buildings for which construction was completed ahead of schedule or no more than 30 days behind the baseline schedule, exclusive of programmatic scope changes and delays outside of DDC control. Additions/adjustments to the design that was agreed on prior to construction start and funding issues caused by such adjustments constitute a programmatic scope change.
Mmr Indicator Source
Public Buildings
Is The Source Of This
Partially
Nyc Open Data Url
https://data.cityofnewyork.us/City-Government/Capital-Projects-Dashboard-Citywide-Budget-and-Sch/fb86-vt7u/explore/query/SELECT%0A%20%20%60reporting_period%60%2C%0A%20%20%60managing_agency%60%2C%0A%20%20%60sponsor_agency%60%2C%0A%20%20%60pid%60%2C%0A%20%20%60fms_id%60%2C%0A%20%20%60total_budget%60%2C%0A%20%20%60spend_to_date%60%2C%0A%20%20%60spend_to_date_1%60%2C%0A%20%20%60fms_project_name%60%2C%0A%20%20%60agency_project_name%60%2C%0A%20%20%60agency_project_description%60%2C%0A%20%20%60current_phase%60%2C%0A%20%20%60current_phase_start%60%2C%0A%20%20%60forecast_current_phase_end%60%2C%0A%20%20%60forecast_completion%60%2C%0A%20%20%60actual_design_start%60%2C%0A%20%20%60actual_design_end%60%2C%0A%20%20%60actual_construction%60%2C%0A%20%20%60actual_construction_1%60%2C%0A%20%20%60actual_construction_start%60%2C%0A%20%20%60actual_construction_end%60%2C%0A%20%20%60borough%60%2C%0A%20%20%60community_board%60%2C%0A%20%20%60budget_line%60%2C%0A%20%20%60ten_year_plan_category%60%2C%0A%20%20%60agency_data_date%60%2C%0A%20%20%60fms_data_date%60%0AWHERE%0A%20%20caseless_one_of%28%60managing_agency%60%2C%20%22DDC%22%29%0A%20%20AND%20caseless_one_of%28%60reporting_period%60%2C%20%22202501%22%29%0AORDER%20BY%20%60current_phase%60%20ASC%20NULL%20LAST/page/filter
Department of Design and Construction (DDC)
Year: 2026 • Agency: Department of Design and Construction (DDC) • Mmr Indicator Id: 4411
Year
2026
Agency
Department of Design and Construction (DDC)
Mmr Indicator Id
4411
Mmr Indicator Name
Active construction — Early/on time (%)
Mmr Indicator Description
The percentage of active construction projects for which the expected date of completion is earlier than or within 30 days of the baseline schedule, exclusive of programmatic scope changes and delays outside of DDC control. Active projects are those where work has begun but is not yet completed, as well as those projects that were completed in the reporting month.
Mmr Indicator Source
Infrastructure and Public Buildings
Is The Source Of This
Partially
Nyc Open Data Url
https://data.cityofnewyork.us/City-Government/Capital-Projects-Dashboard-Citywide-Budget-and-Sch/fb86-vt7u/explore/query/SELECT%0A%20%20%60reporting_period%60%2C%0A%20%20%60managing_agency%60%2C%0A%20%20%60sponsor_agency%60%2C%0A%20%20%60pid%60%2C%0A%20%20%60fms_id%60%2C%0A%20%20%60total_budget%60%2C%0A%20%20%60spend_to_date%60%2C%0A%20%20%60spend_to_date_1%60%2C%0A%20%20%60fms_project_name%60%2C%0A%20%20%60agency_project_name%60%2C%0A%20%20%60agency_project_description%60%2C%0A%20%20%60current_phase%60%2C%0A%20%20%60current_phase_start%60%2C%0A%20%20%60forecast_current_phase_end%60%2C%0A%20%20%60forecast_completion%60%2C%0A%20%20%60actual_design_start%60%2C%0A%20%20%60actual_design_end%60%2C%0A%20%20%60actual_construction%60%2C%0A%20%20%60actual_construction_1%60%2C%0A%20%20%60actual_construction_start%60%2C%0A%20%20%60actual_construction_end%60%2C%0A%20%20%60borough%60%2C%0A%20%20%60community_board%60%2C%0A%20%20%60budget_line%60%2C%0A%20%20%60ten_year_plan_category%60%2C%0A%20%20%60agency_data_date%60%2C%0A%20%20%60fms_data_date%60%0AWHERE%0A%20%20caseless_one_of%28%60managing_agency%60%2C%20%22DDC%22%29%0A%20%20AND%20caseless_one_of%28%60reporting_period%60%2C%20%22202501%22%29%0AORDER%20BY%20%60current_phase%60%20ASC%20NULL%20LAST/page/filter
Department of Design and Construction (DDC)
Year: 2026 • Agency: Department of Design and Construction (DDC) • Mmr Indicator Id: 4412
Year
2026
Agency
Department of Design and Construction (DDC)
Mmr Indicator Id
4412
Mmr Indicator Name
Active designs — Early/on time (%)
Mmr Indicator Description
The percentage of active design projects for which the expected date of completion is earlier than or within 30 days of the baseline schedule, exclusive of programmatic scope changes and delays outside of DDC control. Active projects are those where work has begun but is not yet completed, as well as those projects that were completed in the reporting month.
Mmr Indicator Source
Infrastructure & Public Buildings
Is The Source Of This
Partially
Nyc Open Data Url
https://data.cityofnewyork.us/City-Government/Capital-Projects-Dashboard-Citywide-Budget-and-Sch/fb86-vt7u/explore/query/SELECT%0A%20%20%60reporting_period%60%2C%0A%20%20%60managing_agency%60%2C%0A%20%20%60sponsor_agency%60%2C%0A%20%20%60pid%60%2C%0A%20%20%60fms_id%60%2C%0A%20%20%60total_budget%60%2C%0A%20%20%60spend_to_date%60%2C%0A%20%20%60spend_to_date_1%60%2C%0A%20%20%60fms_project_name%60%2C%0A%20%20%60agency_project_name%60%2C%0A%20%20%60agency_project_description%60%2C%0A%20%20%60current_phase%60%2C%0A%20%20%60current_phase_start%60%2C%0A%20%20%60forecast_current_phase_end%60%2C%0A%20%20%60forecast_completion%60%2C%0A%20%20%60actual_design_start%60%2C%0A%20%20%60actual_design_end%60%2C%0A%20%20%60actual_construction%60%2C%0A%20%20%60actual_construction_1%60%2C%0A%20%20%60actual_construction_start%60%2C%0A%20%20%60actual_construction_end%60%2C%0A%20%20%60borough%60%2C%0A%20%20%60community_board%60%2C%0A%20%20%60budget_line%60%2C%0A%20%20%60ten_year_plan_category%60%2C%0A%20%20%60agency_data_date%60%2C%0A%20%20%60fms_data_date%60%0AWHERE%0A%20%20caseless_one_of%28%60managing_agency%60%2C%20%22DDC%22%29%0A%20%20AND%20caseless_one_of%28%60reporting_period%60%2C%20%22202501%22%29%0AORDER%20BY%20%60current_phase%60%20ASC%20NULL%20LAST/page/filter
Department of Design and Construction (DDC)
Year: 2026 • Agency: Department of Design and Construction (DDC) • Mmr Indicator Id: 5889
Year
2026
Agency
Department of Design and Construction (DDC)
Mmr Indicator Id
5889
Mmr Indicator Name
Letters responded to within 14 days (%)
Mmr Indicator Description
The percentage of letters answered in 14 calendar days or less. Responses should be substantive and adequately address the question/issue raised by the customer. A simple acknowledgement is not considered an adequate response. However, for more complex inquiries that require research and action on the part of the agency, an acknowledgement which includes a description of the next step (either on the agency’s behalf, or the customer’s), as well as an estimated time frame for completion, is considered acceptable and can be reported as part of the 14 day response. Agencies must internally track the additional time until a customer has a complete and full response.
Mmr Indicator Source
DDC's correspondence tracking database
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
DDC will be having internal conversations over the next year to determine if this data can be published and, if so, confirm the timeline and other publishing details.
Department of Design and Construction (DDC)
Year: 2026 • Agency: Department of Design and Construction (DDC) • Mmr Indicator Id: 5891
Year
2026
Agency
Department of Design and Construction (DDC)
Mmr Indicator Id
5891
Mmr Indicator Name
E-mails responded to within 14 days (%)
Mmr Indicator Description
The percentage of e-mails answered in 14 calendar days or less. Responses should be substantive and adequately address the question/issue raised by the customer. A simple acknowledgement is not considered an adequate response. However, for more complex inquiries that require research and action on the part of the agency, an acknowledgement which includes a description of the next step (either on the agency’s behalf, or the customer’s), as well as an estimated time frame for completion, is considered acceptable and can be reported as part of the 14 day response. Agencies must internally track the additional time until a customer has a complete and full response.
Mmr Indicator Source
DDC's correspondence tracking database
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
DDC will be having internal conversations over the next year to determine if this data can be published and, if so, confirm the timeline and other publishing details.
Department of Design and Construction (DDC)
Year: 2026 • Agency: Department of Design and Construction (DDC) • Mmr Indicator Id: 10114
Year
2026
Agency
Department of Design and Construction (DDC)
Mmr Indicator Id
10114
Mmr Indicator Name
Completed designs early/on time (%)
Mmr Indicator Description
Of the projects for which design was completed during the reporting period, the percentage that were completed ahead of schedule or no more than 30 days behind the baseline schedule, exclusive of programmatic scope changes and delays outside of DDC control.
Mmr Indicator Source
Infrastructure and Public Buildings
Is The Source Of This
Partially
Nyc Open Data Url
https://data.cityofnewyork.us/City-Government/Capital-Projects-Dashboard-Citywide-Budget-and-Sch/fb86-vt7u/explore/query/SELECT%0A%20%20%60reporting_period%60%2C%0A%20%20%60managing_agency%60%2C%0A%20%20%60sponsor_agency%60%2C%0A%20%20%60pid%60%2C%0A%20%20%60fms_id%60%2C%0A%20%20%60total_budget%60%2C%0A%20%20%60spend_to_date%60%2C%0A%20%20%60spend_to_date_1%60%2C%0A%20%20%60fms_project_name%60%2C%0A%20%20%60agency_project_name%60%2C%0A%20%20%60agency_project_description%60%2C%0A%20%20%60current_phase%60%2C%0A%20%20%60current_phase_start%60%2C%0A%20%20%60forecast_current_phase_end%60%2C%0A%20%20%60forecast_completion%60%2C%0A%20%20%60actual_design_start%60%2C%0A%20%20%60actual_design_end%60%2C%0A%20%20%60actual_construction%60%2C%0A%20%20%60actual_construction_1%60%2C%0A%20%20%60actual_construction_start%60%2C%0A%20%20%60actual_construction_end%60%2C%0A%20%20%60borough%60%2C%0A%20%20%60community_board%60%2C%0A%20%20%60budget_line%60%2C%0A%20%20%60ten_year_plan_category%60%2C%0A%20%20%60agency_data_date%60%2C%0A%20%20%60fms_data_date%60%0AWHERE%0A%20%20caseless_one_of%28%60managing_agency%60%2C%20%22DDC%22%29%0A%20%20AND%20caseless_one_of%28%60reporting_period%60%2C%20%22202501%22%29%0AORDER%20BY%20%60current_phase%60%20ASC%20NULL%20LAST/page/filter
Department of Design and Construction (DDC)
Year: 2026 • Agency: Department of Design and Construction (DDC) • Mmr Indicator Id: 10115
Year
2026
Agency
Department of Design and Construction (DDC)
Mmr Indicator Id
10115
Mmr Indicator Name
Completed construction early/on time (%)
Mmr Indicator Description
The percentage of all construction projects completed ahead of schedule or no more than 30 days behind the baseline schedule, exclusive of programmatic scope changes and delays outside of DDC control. Additions/adjustments to the design that was agreed on prior to construction start and funding issues caused by such adjustments constitute a programmatic scope change. On larger infrastructure projects (roadway/sewer/water main), delays caused by significant utility interference that are completely out of the agency’s control constitute a programmatic scope change.
Mmr Indicator Source
Infrastructure and Public Buildings
Is The Source Of This
Partially
Nyc Open Data Url
https://data.cityofnewyork.us/City-Government/Capital-Projects-Dashboard-Citywide-Budget-and-Sch/fb86-vt7u/explore/query/SELECT%0A%20%20%60reporting_period%60%2C%0A%20%20%60managing_agency%60%2C%0A%20%20%60sponsor_agency%60%2C%0A%20%20%60pid%60%2C%0A%20%20%60fms_id%60%2C%0A%20%20%60total_budget%60%2C%0A%20%20%60spend_to_date%60%2C%0A%20%20%60spend_to_date_1%60%2C%0A%20%20%60fms_project_name%60%2C%0A%20%20%60agency_project_name%60%2C%0A%20%20%60agency_project_description%60%2C%0A%20%20%60current_phase%60%2C%0A%20%20%60current_phase_start%60%2C%0A%20%20%60forecast_current_phase_end%60%2C%0A%20%20%60forecast_completion%60%2C%0A%20%20%60actual_design_start%60%2C%0A%20%20%60actual_design_end%60%2C%0A%20%20%60actual_construction%60%2C%0A%20%20%60actual_construction_1%60%2C%0A%20%20%60actual_construction_start%60%2C%0A%20%20%60actual_construction_end%60%2C%0A%20%20%60borough%60%2C%0A%20%20%60community_board%60%2C%0A%20%20%60budget_line%60%2C%0A%20%20%60ten_year_plan_category%60%2C%0A%20%20%60agency_data_date%60%2C%0A%20%20%60fms_data_date%60%0AWHERE%0A%20%20caseless_one_of%28%60managing_agency%60%2C%20%22DDC%22%29%0A%20%20AND%20caseless_one_of%28%60reporting_period%60%2C%20%22202501%22%29%0AORDER%20BY%20%60current_phase%60%20ASC%20NULL%20LAST/page/filter
Department of Design and Construction (DDC)
Year: 2026 • Agency: Department of Design and Construction (DDC) • Mmr Indicator Id: 10118
Year
2026
Agency
Department of Design and Construction (DDC)
Mmr Indicator Id
10118
Mmr Indicator Name
Eligible projects with completed post-construction surveys (%)
Mmr Indicator Description
The number of eligible capital construction projects for which at least one completed customer survey was returned as a percent of the number of construction projects substantially completed during the last quarter of the prior fiscal year through the third quarter of the current fiscal year. Note: Infrastructure projects involving minimal work at multiple sites throughout the City are typically excluded from surveys.
Mmr Indicator Source
Policy Analysis/Client Survey database
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
DDC will be having internal conversations over the next year to determine if this data can be published and, if so, confirm the timeline and other publishing details.
Department of Design and Construction (DDC)
Year: 2026 • Agency: Department of Design and Construction (DDC) • Mmr Indicator Id: 11053
Year
2026
Agency
Department of Design and Construction (DDC)
Mmr Indicator Id
11053
Mmr Indicator Name
Construction-related fatalities
Mmr Indicator Description
On DDC-managed construction sites, the total number of fatalities resulting from a work-related event. This includes events occurring at a construction site or related to an event at a construction site.
Mmr Indicator Source
Accident/Incident database maintained by DDC Safety and Site Support
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
DDC will be having internal conversations over the next year to determine if this data can be published and, if so, confirm the timeline and other publishing details.
Department of Design and Construction (DDC)
Year: 2026 • Agency: Department of Design and Construction (DDC) • Mmr Indicator Id: 11054
Year
2026
Agency
Department of Design and Construction (DDC)
Mmr Indicator Id
11054
Mmr Indicator Name
Construction-related injuries
Mmr Indicator Description
On DDC-managed construction sites, the total number of persons injured (required medical attention beyond first aid or suffered a fatality) as a result of a work-related event. This includes events occurring at a construction site or related to an event at a construction site.
Mmr Indicator Source
Accident/Incident database maintained by DDC Safety and Site Support
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
DDC will be having internal conversations over the next year to determine if this data can be published and, if so, confirm the timeline and other publishing details.
Department of Design and Construction (DDC)
Year: 2026 • Agency: Department of Design and Construction (DDC) • Mmr Indicator Id: 11055
Year
2026
Agency
Department of Design and Construction (DDC)
Mmr Indicator Id
11055
Mmr Indicator Name
Construction-related accidents
Mmr Indicator Description
On DDC-managed construction sites, the total number of work-related events which resulted in a fatality or injury requiring medical attention beyond first aid. This includes events occurring at a construction site or related to an event at a construction site.
Mmr Indicator Source
Accident/Incident database maintained by DDC Safety and Site Support
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
DDC will be having internal conversations over the next year to determine if this data can be published and, if so, confirm the timeline and other publishing details.
Department of Design and Construction (DDC)
Year: 2026 • Agency: Department of Design and Construction (DDC) • Mmr Indicator Id: 11088
Year
2026
Agency
Department of Design and Construction (DDC)
Mmr Indicator Id
11088
Mmr Indicator Name
Construction contracts completed within budget (%)
Mmr Indicator Description
The percentage of projects that completed construction where the resulting cost increase from change orders that were caused by DDC due to design error, design omission or field conditions does not exceed 10 percent of the adjusted total construction costs. (Note: for purposes of calculating this data, construction costs do not include costs associated with the change orders caused by DDC. Only stand-alone construction contracts are included.)
Mmr Indicator Source
DDC’s Project Management Information System
Is The Source Of This
This MMR Indicator was retired
Public Statement From Your
This information is not releasable pursuant to FOIL and would not be reported pursuant to the NYC Open Data Law. However, please note that the agency does report the total numbers.
Department of Design and Construction (DDC)
Year: 2026 • Agency: Department of Design and Construction (DDC) • Mmr Indicator Id: 12305
Year
2026
Agency
Department of Design and Construction (DDC)
Mmr Indicator Id
12305
Mmr Indicator Name
Front-End Planning phase completed
Mmr Indicator Description
The total number of projects, agency wide, that completed the Front End Planning (FEP) phase in the current reporting period.
Mmr Indicator Source
Front End Planning Unit
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
DDC will be having internal conversations over the next year to determine if this data can be published and, if so, confirm the timeline and other publishing details.
Department of Design and Construction (DDC)
Year: 2026 • Agency: Department of Design and Construction (DDC) • Mmr Indicator Id: 15607
Year
2026
Agency
Department of Design and Construction (DDC)
Mmr Indicator Id
15607
Mmr Indicator Name
Rain gardens installed
Mmr Indicator Description
Number of rain gardens completed. Rain gardens are planted areas in the sidewalk that are designed to collect and manage stormwater. DDC is responsible for the implementation of capital projects on behalf of client agencies, such as the Department of Environmental Protection.
Mmr Indicator Source
DDC Project Management Information System
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
DDC will be having internal conversations over the next year to determine if this data can be published and, if so, confirm the timeline and other publishing details.
Department of Design and Construction (DDC)
Year: 2026 • Agency: Department of Design and Construction (DDC) • Mmr Indicator Id: 15608
Year
2026
Agency
Department of Design and Construction (DDC)
Mmr Indicator Id
15608
Mmr Indicator Name
Infiltration basins installed
Mmr Indicator Description
Number of infiltration basins completed. Infiltration basins are designed to store rain water beneath a surface that closely mimics its surroundings, like grass or concrete. DDC is responsible for the implementation of capital projects on behalf of client agencies, such as the Department of Environmental Protection.
Mmr Indicator Source
DDC Project Management Information System
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
DDC will be having internal conversations over the next year to determine if this data can be published and, if so, confirm the timeline and other publishing details.
Department of Design and Construction (DDC)
Year: 2026 • Agency: Department of Design and Construction (DDC) • Mmr Indicator Id: 15609
Year
2026
Agency
Department of Design and Construction (DDC)
Mmr Indicator Id
15609
Mmr Indicator Name
Porous pavements installed (square feet)
Mmr Indicator Description
Total square feet of porous pavement installed. Porous pavement is special roadway paving that is designed to collect and manage stormwater that runs off the streets and sidewalks when it rains. DDC is responsible for the implementation of capital projects on behalf of client agencies, such as the Department of Environmental Protection.
Mmr Indicator Source
DDC Project Management Information System
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
DDC will be having internal conversations over the next year to determine if this data can be published and, if so, confirm the timeline and other publishing details.
Department of Design and Construction (DDC)
Year: 2026 • Agency: Department of Design and Construction (DDC) • Mmr Indicator Id: 15610
Year
2026
Agency
Department of Design and Construction (DDC)
Mmr Indicator Id
15610
Mmr Indicator Name
Pedestrian ramp corners installed
Mmr Indicator Description
Number of pedestrian ramp corners completed to achieve compliance with federal Americans with Disabilities Act (ADA) guidelines by making pedestrian ramps easier to identify. DDC is responsible for the implementation of capital projects on behalf of client agencies, such as the Department of Transportation.
Mmr Indicator Source
DDC Project Management Information System
Is The Source Of This
The underlying data is owned by another agency or entity.
Department of Design and Construction (DDC)
Year: 2026 • Agency: Department of Design and Construction (DDC) • Mmr Indicator Id: 15611
Year
2026
Agency
Department of Design and Construction (DDC)
Mmr Indicator Id
15611
Mmr Indicator Name
Coastal protection constructed (linear feet)
Mmr Indicator Description
Total linear feet of coastal protection constructed to prevent the effects of storm surge and sea level rise. DDC is responsible for the implementation of capital projects on behalf of client agencies, such as the Department of Environmental Protection.
Mmr Indicator Source
DDC Project Management Information System
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
DDC will be having internal conversations over the next year to determine if this data can be published and, if so, confirm the timeline and other publishing details.
Department of Design and Construction (DDC)
Year: 2026 • Agency: Department of Design and Construction (DDC) • Mmr Indicator Id: 15814
Year
2026
Agency
Department of Design and Construction (DDC)
Mmr Indicator Id
15814
Mmr Indicator Name
Sewers (new and replaced) (miles)
Mmr Indicator Description
Total length of sewer newly installed or replaced during the reporting period. DDC is responsible for the implementation of capital projects on behalf of client agencies, such as the Department of Environmental Protection.
Mmr Indicator Source
DDC’s Project Management Information System
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
DDC will be having internal conversations over the next year to determine if this data can be published and, if so, confirm the timeline and other publishing details.
Department of Design and Construction (DDC)
Year: 2026 • Agency: Department of Design and Construction (DDC) • Mmr Indicator Id: 15846
Year
2026
Agency
Department of Design and Construction (DDC)
Mmr Indicator Id
15846
Mmr Indicator Name
Construction cost variance (%)
Mmr Indicator Description
Construction cost variance refers to the percentage by which the estimate at completion exceeds the original construction contract amount. The reported indicator is the median value of the cost variances (%) for the construction contracts that are substantially completed during the last quarter of the prior fiscal year through the third quarter of the current fiscal year. E.g. the reported Fiscal 2025 value refers to contracts substantially completed in fourth quarter Fiscal 2024 (April-June 2024) through third quarter Fiscal 2025 (January-March 2025). Original construction contract value refers to the construction contractor award amount for the competitive sealed bid contracts. Estimate at completion refers to estimated construction cost at substantial completion, which includes the contract and all change orders. Substantial completion is the point at which nearly all the work required by the contract is complete and a list of outstanding tasks (referred to as a punch list) is developed and provided to the contractor. These items must be completed in order for a project to be considered fully complete. For Design-Build contracts, this includes both design and construction costs.
Mmr Indicator Source
Public Buildings, Infrastructure & Agency Chief Contracting Officer
Is The Source Of This
Partially
Nyc Open Data Url
https://data.cityofnewyork.us/City-Government/Capital-Projects-Dashboard-Citywide-Budget-and-Sch/fb86-vt7u/explore/query/SELECT%0A%20%20%60reporting_period%60%2C%0A%20%20%60managing_agency%60%2C%0A%20%20%60sponsor_agency%60%2C%0A%20%20%60pid%60%2C%0A%20%20%60fms_id%60%2C%0A%20%20%60total_budget%60%2C%0A%20%20%60spend_to_date%60%2C%0A%20%20%60spend_to_date_1%60%2C%0A%20%20%60fms_project_name%60%2C%0A%20%20%60agency_project_name%60%2C%0A%20%20%60agency_project_description%60%2C%0A%20%20%60current_phase%60%2C%0A%20%20%60current_phase_start%60%2C%0A%20%20%60forecast_current_phase_end%60%2C%0A%20%20%60forecast_completion%60%2C%0A%20%20%60actual_design_start%60%2C%0A%20%20%60actual_design_end%60%2C%0A%20%20%60actual_construction%60%2C%0A%20%20%60actual_construction_1%60%2C%0A%20%20%60actual_construction_start%60%2C%0A%20%20%60actual_construction_end%60%2C%0A%20%20%60borough%60%2C%0A%20%20%60community_board%60%2C%0A%20%20%60budget_line%60%2C%0A%20%20%60ten_year_plan_category%60%2C%0A%20%20%60agency_data_date%60%2C%0A%20%20%60fms_data_date%60%0AWHERE%0A%20%20caseless_one_of%28%60managing_agency%60%2C%20%22DDC%22%29%0A%20%20AND%20caseless_one_of%28%60reporting_period%60%2C%20%22202501%22%29%0AORDER%20BY%20%60current_phase%60%20ASC%20NULL%20LAST/page/filter
Department of Education (DOE)
Year: 2026 • Agency: Department of Education (DOE) • Mmr Indicator Id: 3810
Year
2026
Agency
Department of Education (DOE)
Mmr Indicator Id
3810
Mmr Indicator Name
Student enrollment as of October 31 in grades 3-K to 12 (000)
Mmr Indicator Description
The number of students on the October 31st audited register, including charter school students, for a given school year. By February DOE completes an audit of schools to verify October 31st enrollment data.
Mmr Indicator Source
Automate the School System
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
The agency will be having internal conversations over the next year to determine if this data can be published and, if so, confirm the timeline and other publishing details.
Department of Education (DOE)
Year: 2026 • Agency: Department of Education (DOE) • Mmr Indicator Id: 3811
Year
2026
Agency
Department of Education (DOE)
Mmr Indicator Id
3811
Mmr Indicator Name
Average daily attendance (%)
Mmr Indicator Description
The percentage of students present as calculated by the number of students present divided by the number of students present and absent, not including charter school students, for each school day. Includes District 75.
Mmr Indicator Source
Automate the Schools Data System
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
The agency will be having internal conversations over the next year to determine if this data can be published and, if so, confirm the timeline and other publishing details.
Department of Education (DOE)
Year: 2026 • Agency: Department of Education (DOE) • Mmr Indicator Id: 3812
Year
2026
Agency
Department of Education (DOE)
Mmr Indicator Id
3812
Mmr Indicator Name
Elementary/middle school attendance (%)
Mmr Indicator Description
The percentage of students in grades PK-8 present as calculated by the number of students present divided by the number of students present and absent, not including charter school students, for each school day.
Mmr Indicator Source
Automate the Schools Data System
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
The agency will be having internal conversations over the next year to determine if this data can be published and, if so, confirm the timeline and other publishing details.
Department of Education (DOE)
Year: 2026 • Agency: Department of Education (DOE) • Mmr Indicator Id: 3813
Year
2026
Agency
Department of Education (DOE)
Mmr Indicator Id
3813
Mmr Indicator Name
High school attendance (%)
Mmr Indicator Description
The percentage of students in grades 9–12 present as calculated by the number of students present divided by the number of students present and absent, not including charter school students, for each school day.
Mmr Indicator Source
Automate the Schools Data System
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
The agency will be having internal conversations over the next year to determine if this data can be published and, if so, confirm the timeline and other publishing details.
Department of Education (DOE)
Year: 2026 • Agency: Department of Education (DOE) • Mmr Indicator Id: 3821
Year
2026
Agency
Department of Education (DOE)
Mmr Indicator Id
3821
Mmr Indicator Name
Students in grades 3 to 8 meeting or exceeding standards – English Language Arts (%)
Mmr Indicator Description
The percent of general and special education students who meet the learning standard in English Language Arts (ELA) for their grade by performing at Level 3 (Proficient) or higher. Scores are on a scale ranging from Level 1, below basic proficiency level, through Level 4, the advanced level.
Mmr Indicator Source
New York State Department of Education (NYSED); New York City Public Schools Office of Policy and Evaluation (OPE)
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
The agency will be having internal conversations over the next year to determine if this data can be published and, if so, confirm the timeline and other publishing details.