NYC Open Data Plan: Mayor's Management Report (MMR) Indicators

NOTE: To review the latest plan, make sure to filter the "Report Year" column to the latest year.

This dataset includes a listing of each Mayor's Management Report (MMR) indicator, and either the dataset(s) used to generate them, why those datasets are not yet published, or why they cannot be published.

City Government Office of Technology and Innovation (OTI) Dataset wcrd-6u4m 9 fields
DOWNLOAD CSV
Dataset fields
Showing 50 real records
Department of Buildings (DOB)
Year: 2025 • Agency: Department of Buildings (DOB) • Mmr Indicator Id: 14983
Year
2025
Agency
Department of Buildings (DOB)
Mmr Indicator Id
14983
Mmr Indicator Name
Jobs filed – All applications (DOB NOW)
Mmr Indicator Description
The number of applications filed in DOB NOW, inclusive of new building, major renovation, minor renovation, full demolition, electrical, elevator, subdivision, letter of no objection, crane notification and prototype, and limited alteration.
Mmr Indicator Source
DOB NOW
Is The Source Of This
Partially
Nyc Open Data Url
https://data.cityofnewyork.us/Housing-Development/DOB-NOW-Build-Job-Application-Filings/w9ak-ipjd/about_data
Public Statement From Your
This indicator relies upon data from multiple modules and/or systems of record which must first be aggregated before reporting; not all of the constituent pieces are on the Open Data portal
Department of Buildings (DOB)
Year: 2025 • Agency: Department of Buildings (DOB) • Mmr Indicator Id: 14984
Year
2025
Agency
Department of Buildings (DOB)
Mmr Indicator Id
14984
Mmr Indicator Name
Jobs professionally certified
Mmr Indicator Description
The number of applications filed by registered architects and professional engineers who have certified that their submissions are in compliance with the NYC Building Code and applicable zoning regulations. These jobs do not undergo a regular plan examination but are subject to random audit as well as other DOB reviews.
Mmr Indicator Source
DOB NOW and BIS
Is The Source Of This
Partially
Nyc Open Data Url
https://data.cityofnewyork.us/Housing-Development/DOB-NOW-Build-Job-Application-Filings/w9ak-ipjd/about_data; https://data.cityofnewyork.us/Housing-Development/DOB-Job-Application-Filings/ic3t-wcy2/about_data
Public Statement From Your
This indicator relies upon calculations and logic external to the system of record which must be applied before reporting
Department of Buildings (DOB)
Year: 2025 • Agency: Department of Buildings (DOB) • Mmr Indicator Id: 14985
Year
2025
Agency
Department of Buildings (DOB)
Mmr Indicator Id
14985
Mmr Indicator Name
Jobs professionally certified that were audited (pre-approval)
Mmr Indicator Description
The number of professionally certified applications filed that were audited prior to approval.
Mmr Indicator Source
DOB NOW and BIS
Is The Source Of This
Partially
Nyc Open Data Url
https://data.cityofnewyork.us/Housing-Development/DOB-NOW-Build-Job-Application-Filings/w9ak-ipjd/about_data; https://data.cityofnewyork.us/Housing-Development/DOB-Job-Application-Filings/ic3t-wcy2/about_data
Public Statement From Your
This indicator relies upon calculations and logic external to the system of record which must be applied before reporting
Department of Buildings (DOB)
Year: 2025 • Agency: Department of Buildings (DOB) • Mmr Indicator Id: 14986
Year
2025
Agency
Department of Buildings (DOB)
Mmr Indicator Id
14986
Mmr Indicator Name
All inspections completed
Mmr Indicator Description
The number of inspections completed agency-wide.
Mmr Indicator Source
DOB NOW and BIS
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
This indicator relies upon calculations and logic external to the system of record which must be applied before reporting
Department of Buildings (DOB)
Year: 2025 • Agency: Department of Buildings (DOB) • Mmr Indicator Id: 14987
Year
2025
Agency
Department of Buildings (DOB)
Mmr Indicator Id
14987
Mmr Indicator Name
Enforcement inspections resulting in violations (%)
Mmr Indicator Description
The total number of enforcement inspections performed that resulted in the issuance of at least one violation divided by the total number of construction inspections performed.
Mmr Indicator Source
DOB NOW and BIS
Is The Source Of This
Partially
Nyc Open Data Url
https://data.cityofnewyork.us/Housing-Development/DOB-Violations/3h2n-5cm9/about_data
Public Statement From Your
This indicator relies upon calculations and logic external to the system of record which must be applied before reporting
Department of Buildings (DOB)
Year: 2025 • Agency: Department of Buildings (DOB) • Mmr Indicator Id: 15004
Year
2025
Agency
Department of Buildings (DOB)
Mmr Indicator Id
15004
Mmr Indicator Name
Jobs professionally certified that were audited (post-approval) (%)
Mmr Indicator Description
The percent of professionally certified jobs (building applications) that were audited by DOB staff after approval and/or permit issuance.
Mmr Indicator Source
DOB NOW and BIS
Is The Source Of This
Partially
Nyc Open Data Url
https://data.cityofnewyork.us/Housing-Development/DOB-NOW-Build-Job-Application-Filings/w9ak-ipjd/about_data; https://data.cityofnewyork.us/Housing-Development/DOB-Job-Application-Filings/ic3t-wcy2/about_data
Public Statement From Your
This indicator relies upon calculations and logic external to the system of record which must be applied before reporting
Department of Buildings (DOB)
Year: 2025 • Agency: Department of Buildings (DOB) • Mmr Indicator Id: 15011
Year
2025
Agency
Department of Buildings (DOB)
Mmr Indicator Id
15011
Mmr Indicator Name
Jobs filed – All applications (BIS)
Mmr Indicator Description
The number of applications filed in BIS, categorized by job scope: new building, major renovation (Alteration I), minor renovation (Alterations II and III), demolition, subdivision condominium, and subdivision improvement.
Mmr Indicator Source
BIS mainframe database
Is The Source Of This
Yes
Nyc Open Data Url
https://data.cityofnewyork.us/Housing-Development/DOB-Job-Application-Filings/ic3t-wcy2/about_data
Department of Buildings (DOB)
Year: 2025 • Agency: Department of Buildings (DOB) • Mmr Indicator Id: 15012
Year
2025
Agency
Department of Buildings (DOB)
Mmr Indicator Id
15012
Mmr Indicator Name
Work permits issued – Initial (BIS)
Mmr Indicator Description
The number of initial work permits issued through BIS.
Mmr Indicator Source
BIS mainframe database
Is The Source Of This
Yes
Nyc Open Data Url
https://data.cityofnewyork.us/Housing-Development/DOB-Permit-Issuance/ipu4-2q9a/about_data
Department of Buildings (DOB)
Year: 2025 • Agency: Department of Buildings (DOB) • Mmr Indicator Id: 15013
Year
2025
Agency
Department of Buildings (DOB)
Mmr Indicator Id
15013
Mmr Indicator Name
Work permits issued – Renewals (BIS)
Mmr Indicator Description
The number of renewal work permits issued through BIS.
Mmr Indicator Source
BIS mainframe database
Is The Source Of This
Yes
Nyc Open Data Url
https://data.cityofnewyork.us/Housing-Development/DOB-Permit-Issuance/ipu4-2q9a/about_data
Department of Buildings (DOB)
Year: 2025 • Agency: Department of Buildings (DOB) • Mmr Indicator Id: 15014
Year
2025
Agency
Department of Buildings (DOB)
Mmr Indicator Id
15014
Mmr Indicator Name
Percent meeting time to first action – Illegal Conversion of Residential Building/Space (40 days)
Mmr Indicator Description
The percent of service requests for which the agency met its planned time of action to provide the service.
Mmr Indicator Source
BIS mainframe maintained by DOB
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
This indicator relies upon calculations and logic external to the system of record which must be applied before reporting
Department of Buildings (DOB)
Year: 2025 • Agency: Department of Buildings (DOB) • Mmr Indicator Id: 15015
Year
2025
Agency
Department of Buildings (DOB)
Mmr Indicator Id
15015
Mmr Indicator Name
Percent meeting time to first action – Work Without Permit (40 days)
Mmr Indicator Description
The percent of service requests for which the agency met its planned time of action to provide the service.
Mmr Indicator Source
BIS mainframe maintained by DOB
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
This indicator relies upon calculations and logic external to the system of record which must be applied before reporting
Department of Buildings (DOB)
Year: 2025 • Agency: Department of Buildings (DOB) • Mmr Indicator Id: 15016
Year
2025
Agency
Department of Buildings (DOB)
Mmr Indicator Id
15016
Mmr Indicator Name
Percent meeting time to first action – Elevator – Defective/Not Working (40 days)
Mmr Indicator Description
The percent of service requests for which the agency met its planned time of action to provide the service.
Mmr Indicator Source
BIS mainframe maintained by DOB
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
This indicator relies upon calculations and logic external to the system of record which must be applied before reporting
Department of Buildings (DOB)
Year: 2025 • Agency: Department of Buildings (DOB) • Mmr Indicator Id: 15017
Year
2025
Agency
Department of Buildings (DOB)
Mmr Indicator Id
15017
Mmr Indicator Name
Percent meeting time to first action – Work Contrary/Beyond Approved Plans/Permits (40 days)
Mmr Indicator Description
The percent of service requests for which the agency met its planned time of action to provide the service.
Mmr Indicator Source
BIS mainframe maintained by DOB
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
This indicator relies upon calculations and logic external to the system of record which must be applied before reporting
Department of Buildings (DOB)
Year: 2025 • Agency: Department of Buildings (DOB) • Mmr Indicator Id: 15018
Year
2025
Agency
Department of Buildings (DOB)
Mmr Indicator Id
15018
Mmr Indicator Name
Percent meeting time to first action – Failure to Maintain (40 days)
Mmr Indicator Description
The percent of service requests for which the agency met its planned time of action to provide the service.
Mmr Indicator Source
BIS mainframe maintained by DOB
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Public Statement From Your
This indicator relies upon calculations and logic external to the system of record which must be applied before reporting
Department of Buildings (DOB)
Year: 2025 • Agency: Department of Buildings (DOB) • Mmr Indicator Id: 15030
Year
2025
Agency
Department of Buildings (DOB)
Mmr Indicator Id
15030
Mmr Indicator Name
Of eligible audited jobs (post-approval), the percent of audits that failed (%)
Mmr Indicator Description
The percent of professionally certified jobs (building applications) that were audited by DOB staff after approval and/or permit issuance and for which objections pertaining to substantive issues of zoning, life safety and/or accessibility resulted in the issuance of a revocation notice.
Mmr Indicator Source
BIS mainframe database maintained by DOB and DOB NOW
Is The Source Of This
Partially
Nyc Open Data Url
https://data.cityofnewyork.us/Housing-Development/DOB-NOW-Build-Job-Application-Filings/w9ak-ipjd/about_data; https://data.cityofnewyork.us/Housing-Development/DOB-Job-Application-Filings/ic3t-wcy2/about_data
Public Statement From Your
This indicator relies upon calculations and logic external to the system of record which must be applied before reporting
Department of Buildings (DOB)
Year: 2025 • Agency: Department of Buildings (DOB) • Mmr Indicator Id: 15089
Year
2025
Agency
Department of Buildings (DOB)
Mmr Indicator Id
15089
Mmr Indicator Name
Certificates of occupancy issued (permanent and initial temporary)
Mmr Indicator Description
The total number of initial temporary Certificates of Occupancy issued plus the number of final Certificates of Occupancy issued during the reporting period.
Mmr Indicator Source
Certificate of Occupancy Document Database (CODD) and DOB NOW, maintained by DOB
Is The Source Of This
Yes
Nyc Open Data Url
https://data.cityofnewyork.us/Housing-Development/DOB-Certificate-Of-Occupancy/bs8b-p36w/about_data; https://data.cityofnewyork.us/Housing-Development/DOB-NOW-Certificate-of-Occupancy/pkdm-hqz6/about_data
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 3364
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
3364
Mmr Indicator Name
Neighborhood proposals and studies advanced
Mmr Indicator Description
The number of proposals to support affordable housing development, sustainability, and resiliency, or improve physical and social infrastructure of existing neighborhoods, in the form of written reports, certified applications for zoning map or text amendments, website postings, and/or public presentations of recommended actions.
Mmr Indicator Source
Planning Coordination and Borough Offices
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 5867
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
5867
Mmr Indicator Name
Letters responded to within 14 days (%)
Mmr Indicator Description
The percentage of letters answered in 14 calendar days or less. Responses should be substantive and adequately address the question/issue raised by the customer. A simple acknowledgement is not considered an adequate response. However, for more complex inquiries that require research and action on the part of the agency, an acknowledgement which includes a description of the next step (either on the agency’s behalf, or the customer’s), as well as an estimated time frame for completion, is considered acceptable and can be reported as part of the 14 day response. Agencies must internally track the additional time until a customer has a complete and full response.
Mmr Indicator Source
Records maintained by the Executive Office
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 5869
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
5869
Mmr Indicator Name
E-mails responded to within 14 days (%)
Mmr Indicator Description
The percentage of emails answered in 14 calendar days or less. Responses should be substantive and adequately address the question/issue raised by the customer. A simple acknowledgement is not considered an adequate response. However, for more complex inquiries that require research and action on the part of the agency, an acknowledgement which includes a description of the next step (either on the agency’s behalf, or the customer’s), as well as an estimated time frame for completion, is considered acceptable and can be reported as part of the 14 day response. Agencies must internally track the additional time until a customer has a complete and full response.
Mmr Indicator Source
Records maintained by the Executive Office
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 5876
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
5876
Mmr Indicator Name
Completed requests for interpretation
Mmr Indicator Description
The sum of all requests for interpretation using a language other than English fulfilled by the agency via telephone (including Language Line, call centers, offices/reception desks and 311 transfer calls) and via face-to-face interaction with bilingual employees or contracted interpreters.
Mmr Indicator Source
Records maintained by DCP’s Planning Coordination Division
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 10672
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
10672
Mmr Indicator Name
City projects (non-zoning) that entered public review
Mmr Indicator Description
The number of projects submitted by public agencies or the NYC Economic Development Corporation, including their associated environmental review, which were certified as complete and, for those actions subject to ULURP (Uniform Land Use Review Procedure), referred for public review. Projects include: individual sitings of City facilities, acquisition of property or office space by the City, housing approvals, business improvement districts, franchises, landmarks and concessions.
Mmr Indicator Source
Database maintained by DCP’s Planning Coordination Division
Is The Source Of This
Yes
Nyc Open Data Url
https://data.cityofnewyork.us/City-Government/Zoning-Application-Portal-ZAP-Project-Data/hgx4-8ukb/about_data
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 10673
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
10673
Mmr Indicator Name
City projects (non-zoning) that entered public review within 6 months (%)
Mmr Indicator Description
The percent of projects submitted by public agencies or the NYC Economic Development Corporation, including their associated environmental review, certified as complete and/or referred for public review within six months of project start, normally marked by submission of a Pre-Application Statement (PAS) to the Department.
Mmr Indicator Source
Database maintained by DCP’s Planning Coordination Division
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 10695
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
10695
Mmr Indicator Name
DCP initiated planning information and policy analysis initiatives presented to the public
Mmr Indicator Description
The number of projects informing the public of significant trends in land use, housing, zoning, demographics, and procedures and/or policies, in the form of written reports, individual datasets, website postings, and/or public presentations.
Mmr Indicator Source
Planning Coordination
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 11028
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
11028
Mmr Indicator Name
Simple zoning action projects that entered public review
Mmr Indicator Description
The number of simple zoning actions initiated by private and public applicants, including the number of simple zoning actions initiated by private and public applicants, including the Department of City Planning, that were certified as complete and, for those actions subject to ULURP (Uniform Land Use Review Procedure), referred for public review. Simple projects, which can include one or more land use applications and their associated environmental review, include: zoning map changes, amendments to the zoning resolution, zoning special permits, authorizations, and certifications. In general, they have no or limited environmental review (all Type II designations).
Mmr Indicator Source
Database maintained by DCP’s Planning Coordination Division
Is The Source Of This
Yes
Nyc Open Data Url
https://data.cityofnewyork.us/City-Government/Zoning-Application-Portal-ZAP-Project-Data/hgx4-8ukb/about_data
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 11029
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
11029
Mmr Indicator Name
Simple zoning action projects that entered public review within 12 months (%)
Mmr Indicator Description
The percent of simple public and private zoning actions certified as complete or referred for public review within 12 months of project start, normally marked by submission of a Pre-Application Statement (PAS) to the Department.
Mmr Indicator Source
Database maintained by DCP’s Planning Coordination Division
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 11032
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
11032
Mmr Indicator Name
Renewals and South Richmond action projects that entered public review
Mmr Indicator Description
The number of project renewals citywide and South Richmond School Seat/Subdivision certification project approvals located in the South Richmond Development Special District that are certified as complete and, for those actions subject to ULURP (Uniform Land Use Review Procedure), referred for public review. Typical applicants are individual home and business owners and private developers. Project renewals include special permits for use (i.e. residential, commercial, manufacturing) or bulk (which determines the maximum size and placement of a building on a zoning lot), subject to terms of expiration.
Mmr Indicator Source
Database maintained by DCP's Planning Coordination Division.
Is The Source Of This
Yes
Nyc Open Data Url
https://data.cityofnewyork.us/City-Government/Zoning-Application-Portal-ZAP-Project-Data/hgx4-8ukb/about_data
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 11033
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
11033
Mmr Indicator Name
Renewals and South Richmond action projects that entered public review within 6 months (%)
Mmr Indicator Description
The percent of project renewals citywide and South Richmond School Seat/Subdivision certification project approvals, including their associated environmental review, certified as complete or referred for public review within six months of project start, normally marked by submission of a Pre-Application Statement (PAS) for renewals or a filed land use application for South Richmond School Seat/Subdivision certifications to the Department.
Mmr Indicator Source
Database maintained by DCP's Planning Coordination Division
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 12309
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
12309
Mmr Indicator Name
Zoning actions with CEQR (EAS) that entered public review
Mmr Indicator Description
The number of zoning actions with CEQR (City Environmental Quality Review) requiring an EAS (Environmental Assessment Statement) initiated by private and public applicants, including DCP, that were certified as complete and, for those actions subject to ULURP (Uniform Land Use Review Procedure), referred for public review. Complex projects, which can include one or more land use applications and their associated environmental review, include: zoning map changes, amendments to the zoning resolution, zoning special permits, authorizations, and certifications. They require a more involved environmental review and interagency coordination (Type I or unlisted actions).
Mmr Indicator Source
Database maintained by DCP's Planning Coordination Team
Is The Source Of This
Yes
Nyc Open Data Url
https://data.cityofnewyork.us/City-Government/Zoning-Application-Portal-ZAP-Project-Data/hgx4-8ukb/about_data
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 12310
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
12310
Mmr Indicator Name
Zoning actions with CEQR (EAS) that entered public review within 15 months (%)
Mmr Indicator Description
The percent of public and private zoning actions with CEQR (City Environmental Quality Review) requiring an EAS (Environmental Assessment Statement) certified as complete and/or referred for public review within 15 months of project start, normally marked by submission of a Pre-Application Statement (PAS) to the Department.
Mmr Indicator Source
Database maintained by DCP's Planning Coordination Team
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 12311
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
12311
Mmr Indicator Name
Zoning actions with CEQR (EIS) that entered public review
Mmr Indicator Description
The number of zoning actions with CEQR (City Environmental Quality Review) requiring an EIS (Environmental Impact Statement) initiated by private and public applicants, including DCP, that were certified as complete and, for those actions subject to ULURP (Uniform Land Use Review Procedure), referred for public review. Complex projects, which can include one or more land use applications and their associated environmental review, include: zoning map changes, amendments to the zoning resolution, zoning special permits, authorizations, and certifications. They require a more involved environmental review and interagency coordination (Type I or unlisted actions).
Mmr Indicator Source
Database maintained by DCP's Planning Coordination Team
Is The Source Of This
Yes
Nyc Open Data Url
https://data.cityofnewyork.us/City-Government/Zoning-Application-Portal-ZAP-Project-Data/hgx4-8ukb/about_data
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 12312
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
12312
Mmr Indicator Name
Zoning actions with CEQR (EIS) that entered public review within 22 months (%)
Mmr Indicator Description
The percent of public and private zoning actions with CEQR (City Environmental Quality Review) requiring an EIS (Environmental Impact Statement) certified as complete and/or referred for public review within 22 months of project start, normally marked by submission of a Pre-Application Statement (PAS) to the Department.
Mmr Indicator Source
Database maintained by DCP's Planning Coordination Team
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 15044
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
15044
Mmr Indicator Name
Citywide proposals and studies advanced
Mmr Indicator Description
The number of citywide proposals and studies updated publicly to promote an equitable, prosperous, sustainable city, anchored by affordable housing, economic opportunities, and other neighborhood investments, in the form of written reports, certified applications for zoning map or text amendments, website postings, and/or public presentations of recommended actions.
Mmr Indicator Source
Economic Development and Regional Planning, and Housing Divisions
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 15203
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
15203
Mmr Indicator Name
Zoning verification letter requests fulfilled
Mmr Indicator Description
The number of formal zoning verification letter requests fulfilled. A zoning verification letter is a formal document DCP can produce that confirms the property's zoning. It's usually requested by building or site owners for financial or legal reasons (i.e. for a bank or licensing agency).
Mmr Indicator Source
Fiscal and Zoning Divisions
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 15204
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
15204
Mmr Indicator Name
Zoning Help Desk requests fulfilled
Mmr Indicator Description
The number of land use questions and requests from New Yorkers that are handled by DCP staff at the agency's Zoning Help Desk. The Zoning Help Desk answers zoning-related questions from members of the public. These questions include what can be built on a site, how a property owner would go about changing their zoning, details on special districts, and similar inquiries.
Mmr Indicator Source
Zoning Division
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 15636
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
15636
Mmr Indicator Name
Homes projected through land use actions reviewed by the City Planning Commission
Mmr Indicator Description
The number of homes that could be built based on approved land use actions at the City Planning Commission. An approved land use action changes the existing rules and regulations for how land is zoned and used. Types of land uses include residential, commercial, industrial, and parks.
Mmr Indicator Source
Land Use Review and Planning Support Divisions - Zoning Application Portal
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 15637
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
15637
Mmr Indicator Name
Affordable homes projected through land use actions reviewed by the City Planning Commission
Mmr Indicator Description
The number of affordable homes that could be built based on approved land use actions at the City Planning Commission. A home is considered “affordable” if a family spends approximately one third or less of its income to live there. An approved land use action changes the existing rules and regulations for how land is zoned and used. Types of land uses include residential, commercial, industrial, and parks.
Mmr Indicator Source
Land Use Review and Planning Support Divisions - Zoning Application Portal
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 15638
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
15638
Mmr Indicator Name
Median days for simple zoning action projects to enter public review
Mmr Indicator Description
The median number of days that simple zoning actions spent under internal review and revision before starting the public review process. Before entering public review, simple zoning actions must be pre-certified and evaluated in internal review, which entails checking that all the documents associated with the land use application are accurate and complete.
Mmr Indicator Source
Land Use Review and Planning Support Divisions - Zoning Application Portal
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 15639
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
15639
Mmr Indicator Name
Time simple zoning action projects spent with DCP under internal review before entering public review (%)
Mmr Indicator Description
The percentage of time simple zoning actions spent under internal review at the Department of City Planning (DCP) before starting public review. During the internal review process, DCP must evaluate applications for accuracy and completeness. Any errors or missing information is then handled by the applicant requesting the proposed action. Therefore, this measures the amount of time a proposed action is spent being evaluated by DCP throughout the internal review process and does not take into account time spent outside of DCP with other actors that impact this process.
Mmr Indicator Source
Land Use Review and Planning Support Divisions - Zoning Application Portal
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 15640
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
15640
Mmr Indicator Name
Time simple zoning action projects spent with applicant before entering public review (%)
Mmr Indicator Description
The percentage of time simple zoning actions spent with the applicant before starting public review. During the internal review process, DCP must evaluate applications for accuracy and completeness. Any errors or missing information is then handled by the applicant requesting the proposed action. Therefore, this measures the amount of time a proposed action is spent with applicant throughout the internal review process as a comparison with how much time it spends under internal review at DCP.
Mmr Indicator Source
Land Use Review and Planning Support Divisions - Zoning Application Portal
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 15641
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
15641
Mmr Indicator Name
Median days for zoning actions with CEQR (EAS) to enter public review
Mmr Indicator Description
The median number of days that zoning actions with CEQR requiring an Environmental Assessment Statement spent under internal review and revision before starting the public review process. Before entering public review, zoning actions with CEQR requiring an EAS must be pre-certified and evaluated in internal review, which entails checking that all the documents associated with the land use application are accurate and complete.
Mmr Indicator Source
Land Use Review and Planning Support Divisions - Zoning Application Portal
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 15642
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
15642
Mmr Indicator Name
Time zoning actions with CEQR (EAS) spent with DCP under internal review before entering public review (%)
Mmr Indicator Description
The percentage of time zoning actions with CEQR requiring an Environmental Assessment Statement spent under internal review at the Department of City Planning (DCP) before starting public review. During the internal review process, DCP must evaluate applications for accuracy and completeness. Any errors or missing information is then handled by the applicant requesting the proposed action. Therefore, this measures the amount of time a proposed action is spent being evaluated by DCP throughout the internal review process and does not take into account time spent outside of DCP with other actors that impact this process.
Mmr Indicator Source
Land Use Review and Planning Support Divisions - Zoning Application Portal
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 15643
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
15643
Mmr Indicator Name
Time zoning actions with CEQR (EAS) spent with applicant before entering public review (%)
Mmr Indicator Description
The percentage of time zoning actions with CEQR requiring an Environmental Assessment Statement spent with the applicant before starting public review. During the internal review process, DCP must evaluate applications for accuracy and completeness. Any errors or missing information is then handled by the applicant requesting the proposed action. Therefore, this measures the amount of time a proposed action is spent with applicant throughout the internal review process as a comparison with how much time it spends under internal review at DCP.
Mmr Indicator Source
Land Use Review and Planning Support Divisions - Zoning Application Portal
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 15644
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
15644
Mmr Indicator Name
Median days for zoning actions with CEQR (EIS) to enter public review
Mmr Indicator Description
The median number of days that zoning actions with CEQR requiring an Environmental Impact Statement spent under internal review and revision before starting the public review process. Before entering public review, zoning actions with CEQR requiring an EIS must be pre-certified and evaluated in internal review, which entails checking that all the documents associated with the land use application are accurate and complete.
Mmr Indicator Source
Land Use Review and Planning Support Divisions - Zoning Application Portal
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 15645
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
15645
Mmr Indicator Name
Time zoning actions with CEQR (EIS) spent with DCP under internal review before entering public review (%)
Mmr Indicator Description
The percentage of time zoning actions with CEQR requiring an Environmental Impact Statement spent under internal review at the Department of City Planning (DCP) before starting public review. During the internal review process, DCP must evaluate applications for accuracy and completeness. Any errors or missing information is then handled by the applicant requesting the proposed action. Therefore, this measures the amount of time a proposed action is spent being evaluated by DCP throughout the internal review process and does not take into account time spent outside of DCP with other actors that impact this process.
Mmr Indicator Source
Land Use Review and Planning Support Divisions - Zoning Application Portal
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 15646
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
15646
Mmr Indicator Name
Time zoning actions with CEQR (EIS) spent with applicant before entering public review (%)
Mmr Indicator Description
The percentage of time zoning actions with CEQR requiring an Environmental Impact Statement spent with the applicant before starting public review. During the internal review process, DCP must evaluate applications for accuracy and completeness. Any errors or missing information is then handled by the applicant requesting the proposed action. Therefore, this measures the amount of time a proposed action is spent with applicant throughout the internal review process as a comparison with how much time it spends under internal review at DCP.
Mmr Indicator Source
Land Use Review and Planning Support Divisions - Zoning Application Portal
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 15647
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
15647
Mmr Indicator Name
Median days for city projects (non-zoning) to enter public review
Mmr Indicator Description
The median number of days that non-zoning City projects spent under internal review and revision before starting the public review process. Before entering public review, non-zoning City projects must be pre-certified and evaluated in internal review, which entails checking that all the documents associated with the land use application are accurate and complete.
Mmr Indicator Source
Land Use Review and Planning Support Divisions - Zoning Application Portal
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 15648
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
15648
Mmr Indicator Name
Median days for renewals and South Richmond action projects to enter public review
Mmr Indicator Description
The median number of days that renewals and South Richmond actions under internal review and revision before starting the public review process. Before entering public review, renewals and South Richmond actions must be pre-certified and evaluated in internal review, which entails checking that all the documents associated with the land use application are accurate and complete.
Mmr Indicator Source
Land Use Review and Planning Support Divisions - Zoning Application Portal
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Department of City Planning (DCP)
Year: 2025 • Agency: Department of City Planning (DCP) • Mmr Indicator Id: 15649
Year
2025
Agency
Department of City Planning (DCP)
Mmr Indicator Id
15649
Mmr Indicator Name
Community Board engagement requests fulfilled
Mmr Indicator Description
The number of times that Department of City Planning staff answered questions, showed a presentation, provided training, or otherwise gave their assistance to a Community Board.
Mmr Indicator Source
Borough Offices
Is The Source Of This
This MMR indicator will require additional evaluation to determine if its underlying data is already published on Open Data, when that data can be published, or why that data cannot be published.
Department of Citywide Administrative Services (DCAS)
Year: 2025 • Agency: Department of Citywide Administrative Services (DCAS) • Mmr Indicator Id: 2181
Year
2025
Agency
Department of Citywide Administrative Services (DCAS)
Mmr Indicator Id
2181
Mmr Indicator Name
Trainings completed by City employees/participants in managerial and professional development
Mmr Indicator Description
The total number of City employee/participant completions of the various trainings in the managerial and professional development portfolio during the reporting period, excluding compliance training.
Mmr Indicator Source
DCAS Citywide Learning and Development
Is The Source Of This
No, the underlying data is exempt from publication as per NYC's Open Data Law.
Public Statement From Your
This data is not published on the Open Data because it contains employee-specific information, which is considered internal administrative data and is exempt from disclosure under the NYC Open Data Law (§ 23-501(g)).
Department of Citywide Administrative Services (DCAS)
Year: 2025 • Agency: Department of Citywide Administrative Services (DCAS) • Mmr Indicator Id: 2187
Year
2025
Agency
Department of Citywide Administrative Services (DCAS)
Mmr Indicator Id
2187
Mmr Indicator Name
In-house trade shop work orders completed within 30 days (%)
Mmr Indicator Description
The percentage of in-house work orders during the reporting period received by the DCAS Trade Shops finished within 30 days of the work being assigned. The trade shops include carpenters, plumbers, electricians, etc., and is independent of maintenance and mechanical work.
Mmr Indicator Source
DCAS Construction and Technical Services
Is The Source Of This
No, the underlying data is exempt from publication as per NYC's Open Data Law.
Public Statement From Your
Pursuant to § 23-501(g)(3) of the NYC Open Data Law, this data is exempt from publication as it pertains to internal service delivery and operational assessments specific to DCAS-managed facilities. The percentage is managed through an internal DCAS system and reflects conditions exclusive to DCAS tenants across the 55 facilities it owns and manages. As such, the data supports internal decision-making and is not applicable to external audiences.